CIVIL

CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH SURAU SATU


TINGKAT, SEBUAH SEKOLAH RENDAH AGAMA (24 KELAS), TIGA
TINGKAT DAN SEBUAH KANTIN DI ATAS LOT 514, PRESINT 18,
PUTRAJAYA.

WATER RETICULATION PROPOSAL

FOR

SYARIKAT BEKALAN AIR SELANGOR

FEBRUARI 2015

Prepared by:

RMS & ASSOCIATES CONSULT.


NO 88A, JALAN BADMINTON 13/29,
SEKSYEN 13, 40100,
SHAH ALAM, SELANGOR D.E.
TEL: 03-55117494 FAX: 03-55117496

0
CIVIL

CADANGAN MEMBINA DAN MENYIAPKAN SEBUAH SURAU SATU


TINGKAT, SEBUAH SEKOLAH RENDAH AGAMA (24 KELAS), TIGA
TINGKAT DAN SEBUAH KANTIN DI ATAS LOT 514, PRESINT 18,
PUTRAJAYA.

1.0 BRIEF DESCRIPTION ON THE SCOPE OF WORKS

Jabatan Agama Islam Wilayah Persekutuan had planned to


develop upgrading works at Presint 18 Putrajaya.

The area of the land is granually flat. We proposed the


Platform Level based on the land surveyor data and site
investigation data. All final decision based on the data
required before get the actual platform and piling size. Minor
site clearing is required for the development area.

1.1 EXTERNAL WATER SUPPLY

Water supply for the Wilayah Persekutuan Putrajaya is under


the jurisdiction of SYABAS Holding Sdn Bhd or (SYABAS). Based
on the design and conforming to the Authority’s requirements
and design procedures, the following conceptual design is
established. The development shall obtain its water supply
from the existing pipeline with the size to be confirmed with
SYABAS.

Based on the Water pressure test result only will be able to


further analysis the water supply system for the development.
The water pressure to be requested from SYABAS during
application for water. However based on the preliminary
analysis for water demand, 150mm dia. of Concrete Lined Mild
Steel (CLMS) and 150mm dia. of HDPE Pipe to be proposed
from the tapping point.

A length of 150mm dia. of Ductile Iron (DI) will be constructed


and 3 nos of Hydrant to be installed.

1
CIVIL

The water supply demand for the development is in the region


of 23,100 Gallons per 1 day storage.
The estimated water demand derivations are as shown in
Table 1 below: -

Table 1.0 Estimated Water Demand

Ite Type of Area Factor Unit Total


m Building m2 Demand
(g/d)
1. Surau - 13/person 500 person 6500

2. Gerai - 396.25/stal 1 unit 396.25


l
3. School - 13.2/stude 1200 student 15840
nt
4. Rumah - 330/unit 1 unit 330
Bilal
~23,100
TOTAL (Gal/day).

Total Water Demand = 23,100 gallon/day

The potable water shall be supplied via water reticulation


pipeline from the elevated water tank. Then from the elevated
water tank, the water supply by gravity to each roof top water
tank of the highest level of the respecting unit.

One third of the total water demand will be stored at suction


tank to make sure there is sufficient pressure to transport
water on the rooftop. The size of suction tank used is 4.43 mm
diameter with 3.07 m height.

Internal water storage will be provided for Domestic Water,


which shall be stored inside the internal water tank proposed
to be located in the rooftop of all building.

2
CIVIL

As such, the internal storage is categorized under internal


plumbing and shall be submitted under M& E services.

2.0 Water Supply

The following Guidelines will be adopted throughout.


a. MWA Design Guidelines
b. SPAN Design Guidelines
c. Water Supply Enactment
d. British Standard 534
e. JKR Standards
The water supply system characteristics shall be designed to
meet the following criteria: -

o Maximum flow velocity “V” shall be not exceeding 0.6


m/sec.

o Peak flow factor for water reticulation shall be 2.5, while its
fire analysis shall be average flow plus fire flow of hydrant
with one (1) draw-off point operating at 1140 lpm.

o Hazen-Williams equation using Hardy Cross analysis is used


for hydraulic calculation and simplified as follows: -

o HL = 10.7Q1.852
 C1.852D4.87
Where,

HL = head loss due to pipe friction, meter/km


Q = Design flow, m3/sec
C = pipe coefficient, 100
D = internal diameter of pipe, meter

3
CIVIL

o minimum pipe gradient shall not be less than 1:500

o Minimum cover to crown of pipe shall be 1.0m and


maximum cover shall be 2.0m. Where these conditions
cannot be met, the pipes shall be surrounded with
minimum thickness of 150mm mass concrete.

o All pipes lay adjacent to or under the roadway shall have a


minimum cover of 1.2m to the crown of pipe.

o Pipe materials shall be mild steel PN16 to BS534 or Ductile


Iron.

o Fire hydrants of double pillar type shall be located


approximately 90m intervals within the reticulation system.
Its location and type shall be as approved by BOMBA

o All valve chambers shall be brick chambers, except for Fire


Hydrant valve chambers.

o Isolating valve shall be located within the system at


suitable locations for maintenance purpose.

o Minimum residual pressure above highest supply level shall


not be less than 7.5m of head of water.

o Thrust blocks for bends and tees shall be designed to


sustain 1.5 x working pressure with excess of 1.5 safety
factors.

o Air valves shall be installed at highest points, points that


constitute changes of direction and slope. For position of

4
CIVIL

long descending/ascending pipeline, the spacing shall be <


100m.

o Scour valve shall be installed at lowest point in pipeline. Its


size shall be one third of pipeline diameter.

o Minimum riser for culvert crossing shall be 300mm.

o Minimum hydraulic gradient in pipeline shall not fall below


than 5.0 m to the crown of the pipeline to avoid air pocket
and column separation.

5
CIVIL

Table 2 : Estimation of water consumption

Residential Daily Water Usage


(g/d)
Low cost house and low cost flat 220 / unit
Medium low cost flat and medium cost 330 / unit
house 330/ unit
Single and double storey terrace house 330 / unit
Single and double storey bungalow 440/ unit
Apartment/condominium 440/ unit
(Additional 450 litres per room if more
than 4 bedrooms).
Commercial
Single storey shops 440/ unit
Multiple storey shop house 330/ unit
Office 1,000 /100m2
Petrol station – a) with car washing bay 10,000/ unit
b) without car 10,000/ unit
washing bay 450 /stall
market – a) dry stall 1,500 /stall
b) wet stall 1,500 /stall
hawker centre 1,500 /room
hotel 220/ unit
shopping complex According to daily water
industrial lots usage
light industrial workshop 1,500 /unit
terrace factory 5,000 /unit
Public and Social
Hospital 1,500 /bed
Mosque/ surau 10 /person
Community hall 25,000 /unit
Club house 50,000 /unit
Balai raya 440 /unit
Day school 10/student
Boarding school 55/student
Institution 25,000 /ha
Kindergarten 30 /child