Project .... Software Requirements Specification
Project .... Software Requirements Specification
1.INTRODUCTION
1.1 PURPOSE
1.5 REFERENCES
http://www.scribd.com/doc/Multithreaded-Airport-Simulation.
http://www.en.wikipeadia.org/wiki/Air-Traffic-Control.
http://www.searidgetech.com/site/solution/apron-management.
2. OVERALL DESCRIPTION
2.1 PRODUCT PERSPECTIVE
Runway Used
Number and Type of Approaches
New Estimates of Arrival and Departure
New Flight Information
Gates monitors
Belt monitors
7
Stand Allocation
PILOT :
PASSENGER:
9
ADMINISTRATOR:
3. SYSTEM FEATURES
3 .1 AIR TRAFFIC CONTROL
If any changes had been made for Flight Scheduling, then this
new Software provides updated flight information and it is
displayed on Monitors located in the passengers on terminal
buildings, the internet and on phones.
or time.
REQ-5 Flight schedule will be displayed on a [Priority =
particular day, for past and future schedule Medium]
consult to airlines.
REQ-6 It consists of a series of video monitors, gate [Priority=High]
and baggage information displays. And an
automated interactive voice response system.
1. Takeoff :
Takeoff speed
Takeoff runway required
Takeoff climb required
Obstacle clearance requirement
2. Landing :
Landing speed
Landing runway required
Landing climb required
6. OTHER REQUIREMENTS
6.1.1 DESCRIPTION
Reservations
APPENDIX A : Glossary
investments
Sensitivity of benefits
Air traffic control
Merge
Diverge
22