CALCULATION NOTE

Project N° - Unit Doc. type Code Serial N° Rev. index

NG-018 D3-NGD PRO 024

Revision 0 1 2 3 Page

REVISION
Date 03/02/12
CN - heat tracing calcualtion Made by PCN
2/2
Checked by MSS
Approved by MSS
1

2 0. Aim of the calculation note


3

4 The aim of this calculation note is to estimated the electrical requirement for heat tracing at the discharge of gas lift scrubber
5

6 1. System description
7

8 Gas lift scrubber recovers condensated liquids and slug from gas lift pipeline.
9 Liquid in the gas lift scrubber are sent to production manifold by pressure difference (gas lift scrubber is at 85 barg and production manifold is at 22 barg).
10 The liquid are sent to production manifold with an on/off control. When liquid level in gas lift scrubber reach the LCH1 (level control high #1), on/off valve opens.
11 When liquid are flashed accross the control valve the temperature decreases below the hydrate formation point. To avoid plugging of the line, heat tracing is installed to keep
12 temperature above the hydrate point.
13

14 Note that, durring pigging operation, large amount of liquid (slug) are expect (inlet flow of gas lift scrubber 100% liquid).
15 During this operation, the normal control valve will not be sufficient to transfer all the liquid to production manifold.
16 A by-pass control valve is install to allow emptying of the gas lift scrubber during pigging operation.
17 This automatic control valve will be open when liquid level in gas lift scrubber reachs LCH2 (LCH2>LCH1)
18 For pigging operation, methanol injection (with portable methanol injection skid) will be use to avoid hydrate formation. Electrical heat tracing is not design for this case.
19

20 2. Basis of design
21

22 The design case for electrical heat tracing sizing is the case where the liquid flowrate at the gas lift pipeline outlet is the highest.
23 This case occurs with highest gas lift flowrate, lowest arrival temperature and highest gas lift molecuar weigth.
24 This case is describe in heat and material balance (NG-018-D3-NGD-408100) as case 5
25

26 Year Production Profile Description Wellhead flowing Wellhead flowing Gas lift arrival
27 pressure (bara) temperature (oC) temperature
(°C)
28 Case 1 2015 Maximum Liquid 30 40 26
29 Case 2 2015 Maximum Liquid 30 65 26
30 Case 3 2017 Maximum Oil + Water +Gas 30 40 26
31 Case 4 2017 Maximum Oil + Water +Gas 30 65 26
32 Case 5 2034 Max gas lift – High Molecular 30 40 19
33 Case 6 2034 Max gas liftweight
– Low molecular 30 65 26
34 Case 7 2040 weight
Turndown 30 40 26
35 Case 8 2040 Turndown 30 65 26
36

37

38 Following basis are given in Process design basis (NG-018-D5-NGD-408001):


39

40 Gas lift scrubber operating pressure 85 barg


41 Gas lift scrubber minimum operating temperature 19°C
42 Production manifold operating pressure 22 barg
43
44 3. Calculation
45
46 Hydrate formation temperature:
47

48 Hydrate formation temperature is calculated with HYSYS utility "Hydrate Formation utility"
49 At 22 barg, with the gas lift scrubber outlet composition, hydrate will form at -0.5°C.
50 Electrical heat tracing is design to maintain temperature 5°C above the hydrate formation temperature, ie 4.5°C.
51

Fluid propeties:

Fluid propeties are summurized bellow


pressure : 22 barg
temperature : -10.3°C (without heat tracing)

pressure : 85 barg heat tracing is thus design to heat the fluid from
52 temperature : 19°C -10.3°C to 4.5°C.
53
Flowrate : 2747 kg/hr

54

55

56

57

58