Bill of Materials and Labor Quotation: Description Qty Unit Unit Price Amount Remarks
Bill of Materials and Labor Quotation: Description Qty Unit Unit Price Amount Remarks
Bill of Materials and Labor Quotation: Description Qty Unit Unit Price Amount Remarks
Painting
Epoxy Primer w/ Catalyst 80 gal 780.00 62,400.00
Epoxy Reducer 80 gal 507.00 40,560.00
Traffic Paint Yellow 50 gal 1,560.00 78,000.00
Traffic Paint Black 50 gal 1,560.00 78,000.00
Painting Accessories 1 lot 65,000.00 65,000.00
Paint Brush and roller, Sanding paper, Steel Brush,etc -
Cutting Tools 1 lot 520,000.00 520,000.00
Acytelene, Cutting Disc, etc - -
Sub Total PHP 4,623,060.00
Others
Lifting Equipments 1 lot 400,000.00 400,000.00
Drilling and Coring Equipments 1 lot 300,000.00 300,000.00
Temporary Supports and scaffo 1 lot 250,000.00 250,000.00
Mobilization and Demobilization 1 lot 200,000.00 200,000.00
Sub Total PHP 1,150,000.00
Page 1 of 10
BREDCO Port, Bacolod City
Noted By:
Page 2 of 10
BREDCO Port, Bacolod City
Description Qty Unit Unit Price Amount Weight kgs price/ sqm area Remarks
Materials and Accessories
Steel Works
MS Plate 20mmx4'x8' 30 shts 32,500.00 975,000.00
GI Pipe 4"x6m S80 (Hot-dip) 40 pcs 14,300.00 572,000.00
S/S Anchor Bolts w/ Nuts 25mm 370 sets 1,950.00 721,500.00
Steel Shafting 2"x6m 8 pcs 6,500.00 52,000.00
Welding Rod 8018 1000 kls 390.00 390,000.00
Welding Rod 6013 200 kls 117.00 23,400.00
- -
Grouting and Anchoring - -
Concrete Epoxy Injectable 250 packs 3,900.00 975,000.00
Non-Shrink Cementitious Grout 60 bags 1,170.00 70,200.00
Painting
Epoxy Primer w/ Catalyst 80 gal 780.00 62,400.00
Epoxy Reducer 80 gal 507.00 40,560.00
Traffic Paint Yellow 50 gal 1,560.00 78,000.00
Traffic Paint Black 50 gal 1,560.00 78,000.00
Painting Accessories 1 lot 65,000.00 65,000.00
Paint Brush and roller, Sanding paper, Steel Brush,etc - -
Cutting Tools 1 lot 520,000.00 520,000.00
Acytelene, Cutting Disc, etc - -
- -
Page 3 of 10
BREDCO Port, Bacolod City
Description Qty Unit Unit Price Amount Weight kgs price/ sqm area Remarks
W14 x 34 x 6 m 5 pcs 12,698.07 63,490.36 1,520.73
W14 x 30 x 6 m 42 pcs 11,204.18 470,575.64 11,271.27
W12 x 26 x 12 m 8 pcs 19,420.58 155,364.65 3,721.31
W12 x 22 x 6 m 3 pcs 8,216.40 24,649.20 590.40 kls
W6 x 15 x 6 m 23 pcs 5,602.09 128,848.09 3,086.18 30,029.89 kls
1,253,747.95
Angle Bars -
L50x50x5x6m 495 pcs 942.00 466,290.00 11,657.25
L50x50x6x6m 110 pcs 1,130.40 124,344.00 3,108.60
L63x63x5x6m 155 pcs 1,531.13 237,324.65 5,519.18
L63x63x6x6m 10 pcs 1,814.67 18,146.69 422.02
L75x75x5x6m 65 pcs 1,822.77 118,480.05 2,755.35 23,462.39 kls
964,585.39
C Purlins -
Cpurlins 2x7x1.8mmx6m 420 pcs 861.00 361,620.00 8,820.00
Cpurlins2x4x1.8mmx6m 130 pcs 697.00 90,610.00 2,210.00 11,030.00
452,230.00
MSPlates
PL(400x300x25) 18 pcs 891.60 16,048.85 423.90
PL(350x250x25) 11 pcs 650.13 7,151.40 188.89
PL(150x150x10) 5 pcs 66.87 334.35 8.83
PL(4'x8'x8mm) 4 pcs 7,077.66 28,310.65 747.77 1,369.39 kls
51,845.26
Accessories
M25 x 6 Shafting 12 pcs 1,240.50 14,886.00 277.44
M20 x 6 Shafting 5 pcs 664.00 3,320.00 110.98 388.42
25mm plain washer 80 pcs 15.00 1,200.00
25mm nut 225 pcs 30.00 6,750.00
25mm lock washer 80 pcs 8.00 640.00
20mm plain washer 50 pcs 15.00 750.00
20mm nut 140 pcs 30.00 4,200.00
20mm lock washer 50 pcs 8.00 400.00
32,146.00
Sagrods/Cross Braces
DSB 12x6 G40 170 pcs 202.69 34,456.95 905.57
DSB 20x9 G40 120 pcs 844.53 101,343.98 2,663.44 3,569.01 kls
Turn Buckle 25mm 135 pcs 160.00 21,600.00
157,400.93 69,849.11 kls
#DIV/0!
Hi-Rib Roofing 2,324.00 lm 320.00 743,680.00 12.91
Skylight (IMAC 2mmx0.8mxLm) 702.80 lm 400.00 281,120.00
Roof Insulation (Blanket Bare) 55.00 rolls 2,100.00 115,500.00
Roof Insulation (Aluminum FOil) 30.00 rolls 4,900.00 147,000.00
GI Wire #12 220.00 kls 60.00 13,200.00
Teksscrew 2" 20,000.00 pcs 0.60 12,000.00
Welding Rod 1/8 6011 1,000.00 kg 90.00 90,000.00
Welding Rod 1/8 6013 1,500.00 kg 90.00 135,000.00
Epoxy Primer 400.00 gal 570.00 228,000.00
Reducer 250.00 gal 380.00 95,000.00
Moisture Barrier 210.00 kls 185.00 38,850.00
Sub Total PHP 4,811,305.53 #DIV/0!
Earthworks (Mobilization, Clearing and Layout, Excavation)
Backfill 1000 cu.m 250.00 250,000.00
Backhoe Operation hrs 2,000.00 -
Page 4 of 10
BREDCO Port, Bacolod City
Description Qty Unit Unit Price Amount Weight kgs price/ sqm area Remarks
Soil Poisoning 8 gal 4,000.00 32,000.00
Sub Total PHP 250,000.00 #DIV/0!
Total Materials PHP 12,411,365.53 #DIV/0!
Others
Labor for EGA Construction @2160 per sqm 3,106,080.00
Page 5 of 10
Roofing and Trusses and Steelworks
Description Qty Unit Unit Price Amount
Columns and Girders
W14x43x12 11 pcs 34,618.91 380,808.00 8,462.40 769.3091 43 12 39.36
W14x34x6 1 pcs 13,686.55 13,686.55 304.15 304.1455 34 6 19.68
W14x34x12 1 pcs 27,373.09 27,373.09 608.29 608.2909 34 12 39.36
W12x26x12 8 pcs 20,932.36 167,458.91 3,721.31 465.1636 26 12 39.36
W6x15x6 23 pcs 6,038.18 138,878.18 3,086.18 16,182.33 134.1818 15 6 19.68
728,204.73
Trusses
W14x43x6 2 pcs 17,309.45 34,618.91 769.31 384.6545 43 6 19.68
W14x30x6 42 pcs 12,076.36 507,207.27 11,271.27 268.3636 30 6 19.68
W14x34x6 4 pcs 13,686.55 54,746.18 1,216.58 304.1455 34 6 19.68
W14x22x6 3 pcs 8,856.00 26,568.00 590.40 196.8 22 6 19.68
L50x50x5x6m 495 pcs 942.00 466,290.00 11,657.25
L50x50x6x6m 110 pcs 1,130.40 124,344.00 3,108.60
L63x63x5x6m 155 pcs 1,424.30 220,767.12 5,519.18 6
L63x63x6x6m 10 pcs 1,730.27 17,302.66 422.02 6
L75x75x5x6m 65 pcs 1,695.60 110,214.00 2,755.35 6
Cpurlins 2x7x1.8mmx6m 420 pcs 750.00 315,000.00 8,820.00
Cpurlins2x4x1.8mmx6m 130 pcs 550.00 71,500.00 2,210.00 48,339.96
1,948,558.14
MSPlates
PL(400x300x25) 8 pcs 942.00 7,536.00 188.40
PL(350x250x25) 4 pcs 686.88 2,747.50 68.69
PL(150x150x10) 5 pcs 70.65 353.25 8.83
PL(4'x8'x8mm) 4 pcs 7,477.72 29,910.89 747.77 1,013.69 kls
40,547.64
Accessories
M25 x 6 Shafting 12 pcs 1,240.50 14,886.00 277.44
M20 x 6 Shafting 5 pcs 664.00 3,320.00 110.98 388.42 kls
25mm plain washer 80 pcs 15.00 1,200.00
25mm nut 225 pcs 30.00 6,750.00
25mm lock washer 80 pcs 8.00 640.00
20mm plain washer 50 pcs 15.00 750.00
20mm nut 140 pcs 30.00 4,200.00
20mm lock washer 50 pcs 8.00 400.00
32,146.00
Sagrods/Cross Braces
DSB 12x6 170 pcs 186.44 31,694.96 905.57
DSB 20x9 120 pcs 776.84 93,220.48 2,663.44 3,569.01 kls
Turn Buckle 25mm 135 pcs 160.00 21,600.00
146,515.44
Prepared by:
Jacylou A. Cepedoza
Civil Engineer
Lic. No.: 0134760, 11/10/20
PTR: 7148773, Bacolod City
Others
Labor for EGA Construction @2160 per sqm 3,106,080.00
Page 8 of 10
Rebars Cutting List
120
otal lengths