Proposal Chapter 2&3
Proposal Chapter 2&3
Notes on accessibility: This template has been tested and is best accessible with JAWS 11.0 or higher.
For questions about using this template, please contact CMS IT Governance. To request changes to the
template, please submit an XLC Process Change Request (CR).
Table of Contents
1. Introduction .............................................................................................................. 1
1.1 Purpose ........................................................................................................... 1
1.2 Audience ......................................................................................................... 1
2. Overview ................................................................................................................... 1
3. Assumptions/Constraints/Risks ............................................................................. 1
3.1 Assumptions.................................................................................................... 1
3.2 Constraints ...................................................................................................... 1
3.3 Risks ............................................................................................................... 1
4. Staff Management Approach .................................................................................. 1
4.1 Methods & Tools ............................................................................................. 1
4.2 Staff Required ................................................................................................. 2
4.3 Staff Acquisition and Organization .................................................................. 3
5. Staff Development ................................................................................................... 4
5.1 Staff Orientation .............................................................................................. 4
5.2 Training Required ............................................................................................ 4
5.3 Training Schedule ........................................................................................... 5
Appendix A: Record of Changes .......................................................................... 6
Appendix B: Acronyms ......................................................................................... 7
Appendix C: Glossary ........................................................................................... 8
Appendix D: Referenced Documents ................................................................... 9
Appendix E: Approvals ....................................................................................... 10
Appendix F: Notes to the Author / Template Instructions ............................... 11
Appendix G: XLC Template Revision History .................................................... 12
Appendix H: Additional Appendices .................................................................. 13
List of Figures
No table of figures entries found.
List of Tables
Table 1: Staff Management Processes ........................................................................... 2
Table 2: Staff Requirements ............................................................................................ 2
Table 3: Project Staff and Organization........................................................................... 3
Table 4: Training Requirements ...................................................................................... 4
Table 5: Record of Changes ........................................................................................... 6
Table 6: Acronyms .......................................................................................................... 7
Table 7: Glossary ............................................................................................................ 8
Table 8: Referenced Documents ..................................................................................... 9
Table 9: XLC Template Revision History....................................................................... 12
1. Introduction
1.1 Purpose
This document describes the processes and procedures used to staff the Project. This plan
supplements the overall Project Management Plan (PMP) and covers the staffing requirements
for the project. The Staffing Management Plan (SMP) is intended to be a living document,
reviewed at least annually and updated as needed.
1.2 Audience
The intended audience for the SMP is all project stakeholders, including the project sponsor,
senior leadership and the project team.
2. Overview
Instructions: Provide a high-level overview of the project. Focus on the process and
deliverable aspects of the project, including contract type, major milestones, and
stakeholders.
3. Assumptions/Constraints/Risks
3.1 Assumptions
Instructions: Describe any assumptions or dependencies regarding the staff
management approach for the project. These may concern such issues as: staffing
profile of external and internal resources, SOW requirements, etc.
3.2 Constraints
Instructions: Describe any limitations or constraints that may have a significant impact
on the staff management approach or project delivery from a staffing perspective.
3.3 Risks
Instructions: Describe any risks associated with staff management of the project and
proposed mitigation strategies.
needs for adding and removing project personnel. Describe the approach to allocating
staff between each CMS lifecycle phase, and when and how staff will be transitioned on
and off the project team. Describe the methods, processes, tools and techniques that
will be used for staff management, and how they will integrate with other project
processes (e.g., schedule management, contract management, subcontractor
management, project monitoring and control, risk management, etc.). As appropriate,
refer to the Project Management Plan (PMP) and/or any applicable subordinate plans
that may exist (e.g., Schedule Management Plan, Subcontractor Management Plan,
Risk Management Plan, etc.). Ensure appropriate entry/exit procedures exist (e.g.,
return of equipment, removal of user access privileges, transfer of files and working
papers, etc).
Role/Responsibility – Enter the name of the role and briefly describe the
associated responsibility.
Skills Required – For each role, describe the skills required to perform role.
Number of Staff Required – For each role, enter the number of people required to
fulfill the role. This is the actual number of people required, not based on full
time equivalent, and includes both Federal and Contract staff.
Timeframe Needed – Enter the estimated start date for the role.
Duration Required – Indicate the length of time this role will be required for the
project.
Instructions: Complete the table above for each role identified in the section named
“Staff Required”
Role – Enter the name of the role identified in the section named “Staff
Required.”
Number of Staff Required –Enter the number of people required. This should be
the number identified in section named “Staff Required.”
Number of Federal Staff Received – Enter the number of Federal staff committed
to support the project. This captures the actual number of people resource
management has agreed to provide to support the project
a contracting vehicle.
5. Staff Development
5.1 Staff Orientation
Instructions: Describe any information, forms, processes, or procedures that new staff
must receive and/or complete prior to beginning work on the project (e.g., project travel
policy, Data Use Agreement, Application for Access to CMS Computer Systems, etc.).
Role/Staff Resource – Describe the role as defined in the PMP and identify the
expected staff resource(s) by name for each role.
Training Needed – For each staff resource, describe the training needed to close
any skill gap and bring the resource to the appropriate competency level.
Appendix B: Acronyms
Instructions: Provide a list of acronyms and associated literal translations used within
the document. List the acronyms in alphabetical order using a tabular format as
depicted below.
Table 6: Acronyms
Acronym Literal Translation
Appendix C: Glossary
Instructions: Provide clear and concise definitions for terms used in this document that
may be unfamiliar to readers of the document. Terms are to be listed in alphabetical
order.
Table 7: Glossary
Term Definition
Appendix E: Approvals
The undersigned acknowledge that they have reviewed the Staffing Management Plan
and agree with the information presented within this document. Changes to this Staffing
Management Plan will be coordinated with, and approved by, the undersigned, or their
designated representatives.
Instructions: List the individuals whose signatures are desired. Examples of such
individuals are Business Owner, Project Manager (if identified), and any appropriate
stakeholders. Add additional lines for signature as necessary.
Signature: Date:
Print Name:
Title:
Role:
Signature: Date:
Print Name:
Title:
Role:
Signature: Date:
Print Name:
Title:
Role:
Some text and tables are provided as boilerplate examples of wording and
formats that may be used or modified as appropriate.
3. Do not delete any headings. If the heading is not applicable to the investment,
enter “Not Applicable” under the heading.
5. Figure captions and descriptions are to be placed centered, below the figure.
All figures must have an associated tag providing appropriate alternative text
for Section 508 compliance.
6. Delete this “Notes to the Author / Template Instructions” page and all
instructions to the author before finalizing the initial draft of the document.