This document provides design data and calculations for the foundation of an LPG storage tank. It determines loads on the foundation from the empty, operating and test weights of the tank, as well as wind, seismic and thermal loads. It then sizes the steel bearing plate, anchor bolts, wall pier and footing to resist the calculated loads based on allowable stress design criteria. The wall pier is designed for shear and flexure, with reinforcement sized to resist the maximum moment from seismic and gravity loads on the tank foundation.

Uploaded by

GooddayBybs
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
161 views18 pages

SAS Foundation

This document provides design data and calculations for the foundation of an LPG storage tank. It determines loads on the foundation from the empty, operating and test weights of the tank, as well as wind, seismic and thermal loads. It then sizes the steel bearing plate, anchor bolts, wall pier and footing to resist the calculated loads based on allowable stress design criteria. The wall pier is designed for shear and flexure, with reinforcement sized to resist the maximum moment from seismic and gravity loads on the tank foundation.

Uploaded by

GooddayBybs
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 18

LPG Storage tank foundation

DESIGN DATA
Tank Data:
Empty weight = 2,571 kgs
Operating weight = 6,791 kgs (80%Volumn)
Test weight = 11,520 kgs
thickness,t = 12.0 mm
Basic daimeter = 1.7 m.
Length of vessel, Lv 17.2 m.
Height from Center of Vessel to Top of Wall Pier, Cb = 1.07 m.
Length of between saddles, Ls = 2.2 m.
Maximum design temperature = 50 oC or 122 oF
Vessel Material = carbon steel
Bolts:
Bolt spacing:
Saddle:
long by 2.72 m.
wide by 0.55 m.
Design Criteria:
Concrete: f'c = 210 ksc
Reinforceing: fy = 2500 ksc
Soil unit weight: g= 8000 ksm
Wind loads:ASCE 7-05
Earthquake loads:ASCE7-05
DETERMINE LOADS
Empty,Operarting,and Test Loads
เผผผื่อนนนน้ำหนนัก piping support 10 %
Total empty load, De = 2,828.10 kgs.
Total operating load, Do = 7,470.10 kgs.
Total test load, Dt = 12,672.00 kgs.
Tranverse Moment from Pipe Eccentricity
Eccentricity = 1.30 ft
Empty transverse moment per pier, MTe = 167.12 kg-m
Operating transverse moment per pier, MTo = 441.42 kg-m
Test transverse moment per pier, MTt = 748.80 kg-m
Wind Loads:
Vessel wind is applied st the center of the vessel
Cf_round = 0.7 Gf = 0.85
Cf_flat= 1.8 qz = 20.89 psf

qz_long = qz.Gf.Cf_flat = 31.95 psf or 156.02 kg/m2


qz_tran = qz.Gf.Cf_round = 12.43 psf or 60.67 kg/m3
Determine Effective Diameters
OD = ID+(2(t)) = 1.712 m. Or 5.62 ft
ODeff = 1.5xOD = 2.74 m.
Transverse Wind Loads
Atr =Odeff(Lv) = 47.03 m2
Wtran = Atr.qz_tran = 2,853.25 kgs.
Longitudinal Wind Loads
Al = (ODeff).(Cb + ODeff/2) = 6.68 m2
Wlong = Al.qz_long = 1,042.59 kgs.
Vertical Couple Force, Compression/Tension Load:
Wlong_FC = Wlong.Cb/Ls = 507.08 kgs.

SEISMIC LOADS
Site Location
ต.ททน้ำชน้ำช้ ง อ.สวทน้ำงววีระวงศศ์ จ.ออุบลรน้ำชธน้ำนวี
คทน้ำควน้ำมเรท งตอบสนองเชสิงสเปกตรนัมทวีผื่คน้ำบสนันน Ss = 0.08 g
คทน้ำควน้ำมเรท งตอบสนองเชสิงสเปกตรนัมทวีผื่คน้ำบสนันน S1 = 0.083 g
ชนันนดสินประเภท D
สนัมประสสิ ทธสิธ ชนันนดสิน Fa = 1.6 Fv = 2.4
SDS =(2/3)FaSs = 0.0853
SD1 =(2/3)FVS1 = 0.1328
Fundamental period, T = 0.021153141 sec.
Importance Factor, I = 1.25
Sa = 0.057335 g
R= 2.9
สนัมประสสิ ทธสิธ ผลตอบสนองแรงแผทนดสินไหว, Cs = Sa/(R/I) = 0.02471336 g
Vessel Load:
Empty: Ee =0.30.SDS.I.De = 90.50 kg.
Operating: Eo =0.30.SDS.I.Do = 239.04 kg.
Wall Pier Seismic Loads
weight of wall pier above footing, Wtpierb = (1/2).(Hf-Hm)Lpier.Wpier.gconc
3,000.00 kgs.
Lateral force of wall pier, Ewallpier = Cs.Wtpier= 74.14 kg
Thermal Force:
m= 0.6
Operating load, Po = 3,735.05 kgs. per pier
Ff = m(Po) = 2,241.03 kgs. per pier
Assume pier size is long by 2.5 m.
wide by 0.5 m.
high by 2 m.
Moment of inertia, I = 2,604,166.67 cm4
Modulus of elasticity,Ec = 218,819.79 ksc
Thermal expansion coefficient for carbon steel at 122 F
Thermal growth between e saddles, D = Ce.Ls(Temp-70) = 0.07436 cm
Fd =3DEI/2H3 = 7,945.04 kgs. OK.
Tf := min(Ff, Fd) = 10,304.91 kgs.

DESIGN ELEMENTS
Size Steel Bearing Plate
Steel bearing plate dimension:
Width = 50 cm.
Length = 250 cm.
Check bearing stress (test load case) :
P= 6,336.00 kg per pier
Allowable bearing stress. Fp = 0.35f'c(A2/A1)^0.5 < 0.70 f'c
Assume pier section length
area of pier, A2 = 12500 cm2
area of steel bearing plate, A1 = 12,500 cm2
Fp = 0.35f'c= 73.5 ksc
หนทวยแรงตช้น้ำนทวีผื่เกสิดขขนน,fp =P/(NB) = 0.51 kg/cm2 < Fp OK
Fb ของแผทนเหลล็ก =0.75Fy = 1800 kg/cm2
0.95b = 237.5 cm
0.95d 47.5 cm
m=N-0.95d/2 = 1.25 cm.
n=B-0.95bf/2 = 6.25 cm.
t =(3fpn2/Fb)^0.5 = 0.181659021 cm. or 4 mm.
ใชช้แผทนเหลล็กเททน้ำกบนั ควน้ำมหนน้ำ 6 mm.

ALLOWABLE STRESS LOAD COMBINATION


Vertical Loads Horizontal Load
1. Operating V1 =Do_fix 3,735.05 kg H1 = 10,304.91 kg
2.Oper+Wind+Live V2 =Do_fix 3,735.05 kg H2tran = 2,853.25 kg
H2long = 1,042.59 kg
3.Oper+Seismic V3=(1.2+0.14SDS).Do_fix H3=0.7(Eo+Ewallpier)
+Live V3= 4,526.68 kg H2tran = 219.23 kg
H2long = 219.23 kg
4.Empty+Seismic V4=(0.9-0.14SDS).De_fix H4tran = 219.23 kg
V4 = 1,103.71 kg H4long = 219.23 kg
5.Test V5 = 6,336.00 kg
6.Test+Wind V6 = 6,336.00 kg H6 = 0.25Wtran = 713.31
H6 = 0.25Wlong = 260.65

ANCHOR BOLT DESIGN


Shear Force = 10,304.91 kg
Assume Bolt A325 หนทวยแรงเฉผอนทวีผื่ยอมใหช้ = 1470 kg/cm2
Try bolt Dia. 32 mm
Pv = 11,816.45 kg
No. Bolt = 0.87 ตนัว ใชช้ 2 ตนัว
m = 3.23(f'c^0.5)/(2D)= 7.31 kg/cm2 ใชช้ไมทเกสิน 11
Ft =0.60Fy= 1440 kg/cm2
ควน้ำมยน้ำว, L = DFt/4m = 157.51 cm
Anchor Embedment = 12D= 38.40 cm. ใชช้ 40 cm.

WALL PIER DESIGN


concrete covering 5 cm.
Diamer of tie 9 mm.
Diamer of main reinforcement bar 16 mm. A = 2.01 cm2
Effective depth 44.6 cm.
Shear Design
Vmax.= 10,304.91 kg
Shear Capacity Vc = 0.29fc'^0.5(b.d) = 46,857.87 kg > Vmax OK.

Flexural Design
Maximum moment in the wall pier,Mmax =Vmax.(Hf-Hm) = 20,609.82 kg-m
fc' = 210 ksc
fc = 78.750 ksc ใชช้ 79
fy = 3000 ksc
fs = 1500
Es = 2040000
Ec =15,100·fc'^0.5 = 218,819.79 ksc
n = Es/Ec = 9
k= 0.322
j= 0.893
R= 11.34 ksc

Mc =Rbd =
2
5,639,571.22 kg-m. > Mmax OK.
As 1
= Mmax/fs.jd= 34.51 cm 2
each face
Try 20 DB 16 mm As = 40.19 cm2
Approximate spacing, S =( Lpier-2Cc-db)/(No. ofbar-1) = 12.55 cm

FOOTING DESIGN
Assume thickness of footing,Hm = 0.3 m.
COMB.1 Operating
P1max = 3,735.05 kg
H1 = 10,304.91 kg
Moment at bottom of footing
Mtotal =H1.Hpier= 20,609.82 kg-m
COMB.4 Empty+Seismic
P4max = 1,103.71 kg
H4 = 219.23 kg
Moment at bottom of footing
Mtotal =H4.Hpier= 438.46 kg-m
v= 40 m/s
q = 0.5*ρ*v2= 1 kPa = 20.8854342331

ODeff := if(OD < 3ft , 2×OD, if(OD < 4.5ft , 1.8×OD, if(OD <6.5ft , 1.7×OD, if(OD< 8.5ft , 1.6×OD, 1.5×OD))))

หน้ำคทน้ำ Fa,Fv
Ss คทน้ำนอช้ ย Ss คทน้ำทวีผื่ตอช้ งกน้ำร Ssคทน้ำมน้ำก
0.75 0.08 1
Fa 1.2 1.468 1.1
คนน้ำนวณกน้ำรเคลผผื่อนตนัวของถนัง
y= (Wol3)/(3EIm) Wo = 7,470.10 kgs
l= 100 cm.
E= 218,819.79 ksc
I= 2,604,166.67 cm4
y= 0.0043696816 cm
T =0.32(y^0.5)
Hpier = Hf-Hm = 2 m. ระยะจน้ำกดช้น้ำนบน wall ถขง ดช้น้ำนบนของ footimng

a. No slide plate (steel support on concrete) 0.60


b. Steel slide plate 0.40
c. Low-friction slide plate assemblies 0.05 to 0.20

122 F
0.000078 in/ft/F
7.217847769 Ls(ft)

D= 0.0293 inches = 0.07436 cm

upper element width = (saddle wid


lower width = upper element widt
)^0.5 < 0.70 f'c
width
kg
kg
D< 8.5ft , 1.6×OD, 1.5×OD))))
upper element width = (saddle width)+1 inch = 0.575 m.
lower width = upper element width -2D-1 inch = 0.40128
Ammonia (NH3) Storage tank foundation
DESIGN DATA
Vessel Data:
Empty weight = 98 kips
Operating weight = 335 kips
Test weight = 394 kips
Basic daimeter = 12 ft
Length of between saddles, L = 22 ft
Maximum design temperature = 500 F
Vessel Material = carbon steel
Bolts:
Bolt spacing:
Saddle:
Design Criteria:
Concrete: f'c = 4000 psi
Reinforceing: fy = 60000 psi
Soil unit weight: g= 100 pci
Allowable net soil bearing:Sbnet = 3.8 ksf
Wnd loads:ASCE 7-05
Earthquake loads:ASCE7-05
DETERMINE LOADS
Empty,Operarting,and Test Loads
เผผผื่อนนนน้ำหนนัก piping support 10 %
Total empty load, De = 107.8 kips
Total operating load, Do = 368.5 kips
Total test load, Dt = 433.4 kips
Tranverse Moment from Pipe Eccentricity
Eccentricity = 7.5 ft
Empty transverse moment per pier, MTe = 36.75 ft-k
Operating transverse moment per pier, MTo = 125.625 ft-k
Test transverse moment per pier, MTt = 147.75 ft-k
Wind Loads:
Vessel wind is applied st the center of the vessel

Transverse wind: Hw = 13.44 kips


Longitudinal wind: Hw = 2.85 kips

Thermal Force:
m= 0.1
Operating load, Po = 184.25 kips per pier
Ff = m(Po) = 18.425 kips per pier
Assume pier is long by 12 ft 2 inches
wide by 0 ft 14 inches
high by 0 ft 81 inches
Moment of inertia, I = 33,385.33 inches4
Modulus of elasticity,Ec = 3,605.00 ksi
Thermal expansion coefficient for carbon steel at 500 F e = 0.0362
Thermal growth between e saddles, D = ε L = 0.7964 inches
T =3DEI/2H3 = 270.54 kips OK.
DESIGN ELEMENTS
Size Steel Bearing Plate
Steel bearing plate dimension:
Width = 2.5
Length = (saddle length)+2.5 cm. =
Check bearing stress (test load case) :
P= 216.7 kips per pier
Allowable bearing stress. Fp = 0.35f'c(A2/A1)^0.5 < 0.70 f'c
Assume pier section length width
area of pier, A2 = 0
area of steelbearing plate, A1 = 0
Fp =
a. No slide plate (steel support on concrete) 0.60
b. Steel slide plate 0.40
c. Low-friction slide plate assemblies 0.05 to 0.20

upper element width = (saddle width)+1 inch =


lower width = upper element width -2D-1 inch =
คทน้ำจน้ำกตรน้ำง
0.42 inches/100ft
แปลงเปล็ น
0.035 cm./m.