esign Calculations For Alqibla Project ZONE ZONE

M1
PUMPSTATION INPUT DATA sewage system

sewage data
GL= 3.15 M HOUSES 888 NO
INLET PIPE= 0.8 M #CAP/HOUSE NOW 10 CAPITA
INV PIPE= 0 M Qav. /Cap 0.46 M3/DAY
NO. PIPE 1 NO year 25
n= 0.011 DESIGN PERIOD n= 0.011 YEARS
pipe length 22 m ∆POP% 0.03
min. slope = 0.0012 PF 0.9
storm data
SCREEN CHAMBER Atotal= HA
LENGTH= 2 m i= mm/hr
WIDTH= 2 m streat area = m2
BASE OFFSET UNDER INLET PIPE = 0.25 m green area= m2
DISTANCE BETWEEN WETWELL= 3 m buildings area= m2
BASE THIKNES= 0.3 m C=
WALL THIKNESS= 0.3 m
ROOF THIKNESS= 0.25 m
HEAL WIDTH= 0.8 m
WT= 2 m

NOTES:
esign Calculations For Alqibla Project ZONE ZONE
M1
PUMPSTATION HYDRAULIC CALCULATION
sewage system
DISCHARGE CALCULATIONS:
POPULATION:
p= ٬185٫93 capita @ 2043
Qavg= ٬76٫97 m3/day
Qpeak= ٬230٫92 m3/day
Qinft.= ٬23٫09 m3/day
0.8
Qtotal peak= ٬254٫01 m3/day

d/D= 0.7
INLET PIPE CALCULATION: f(x) = 3.6858974359x^5 - 9.6226689977x^4 + 9.4267191142x^3 - 3.7918851981x^2 + 0.8107837995x - 0.0005769231
Assume slope= 0.0012 m/m 0٫001 0.6
assumeDia= 0.8 m 0٫001
Cross Section Area= 0.5024 m 0.5
0٫001
Hydaulic Radius = 0.1256 m

Axis d/D
Vfull= ٬0٫01 m/sec 0٫001 0.4
Qfull= ٬0٫00 m3/sec 0٫001
d/D
Qparial=Qtotal peak= 0.3 Polynomial (d/D)
٬0٫00 m3/sec 0٫001
Qpartial/Qfull= 0٫001
0٫000 0.2
d/D= 0٫001
Vactu./Vfull= 3.5524567671 0٫000
0.1
Vactu.= ٬0٫03 m/sec 0٫000
Pipe INV at up= 0 m 0٫000 0
Pipe INV at down= -0.0264 m 0 0.2 0.4 0.6 0.8 1 1.2
0٫000
DEPTH OF WATER IN PIPE= 0.5115961339 m
Axis q/Q

NOTES: ELEVATION
* OF PIPE INV. IN MANHOLE
ELEVATION
** OF PIPE INV. IN WETWELL
esign Calculations For Alqibla Project ZONE ZONE
M1
PUMPSTATION HYDRAULIC CALCULATION
sewage system
DESIGN OF COARSE SCREEN
Qavg = 76٫97 m3/day
Quantity of Screenings = Qavg x 30 / 1000000
= 0٫0000 m3/day v/V
Provide storage for 7 days 0.8
Quantity of Screenings 7 x =Quantity of Screenings per day
= 0٫002 m3 0.7

Number of Storage Units = 1 f(x) = 8.5400170782x^5 - 20.8540633992x^4 + 18.4069175549x^3 - 6.6666012798x^2 + 1.1170400749x - 0.0033015862
0.6
Quantity per Unit = 0٫002 m3
Dimension of screen basket in front of inlet pipe 0.5
L = 0٫02 m
0.4
W = 0٫01 m
H = 0٫01 m 0.3
Volume = 0٫001 m3 0٫002 m3 MUST DAILY CLEENING
Dimension of screenings trough 0.2
L = 0٫02 m
0.1
W = 0٫01 m
D = 0٫01 m 0
0 0.2 0.4 0.6 0.8 1 1.2
Volume = 0٫001 m3 > 0٫002 m3 error
Screen Design
Bar Size Bs = 10 mm
Clear Opening Co = 25 mm

NOTES:
Efficiency Coefficient Ef = Clear Opening Vmax= 1 m/ses
Clear Opening + Bar size Vmin= 0.3 m/sec
Sewer Pumpstation Design Calculations For Alqibla Project ZONE ZONE
M1
PUMPSTATION HYDRAULIC CALCULATION
sewage system

= 0٫01
Clear area through each scree AQpeak= Qpeak /Vmax

A= 0٫000 M2
0
DEPTH OF WATERIN SCREEN= 0.25 M 0
WIDTH OF SCREEN= 0٫01 M v/V 0
Number of Openings= ٬22 OPEN
NO OF BAR= ٬21 BAR X 1 CM THIK
USE
L = 0٫02 m
W = 0٫01 m
H = 0٫01 m
Volume = 0٫001 m3

q/Q 0 ٬0٫00 ٬0٫00 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.1

v/V 0 ٬0٫00 ٬0٫00 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 1.05
NOTES: d/D 0 ٬0٫00 ٬0٫00 0.09 0.11 0.15 0.2 0.24 0.32 0.4 0.5 0.7
Sewer Pumpstation Design Calculations For Alqibla Project M1
PUMPSTATION HYDRAULIC CALCULATION

WEIGHT OF TANK

ROOF ELEV= 3.65 m


length of pipe= 22 m
Sump Elv.= -2.2764 m
WALL HIGH= 5.6764 m
Volume of walls= 13.62336 m
volume of base= 2.52 m
volume of roof= 0.6 m
weight of tank= 41.8584 T
SUBMERCY VOLUME= 24.31728 m3
up ward force = 238.309344 kn
= 23.8309344 T
EXTENSION VOLUME= 2.496 m3
weigh of extention= 6.24 T
DOWN WARD FORCE= 35.6184 T NO FLOATING
Sewer Pumpstation Design Calculations For Alqibla Project M1
PUMPSTATION HYDRAULIC CALCULATION
WETWELL INPUT DATA
Length of tank= 3 m
Width of tank= 3 m Fitting type Quantity K factor Total K factor
GL= 3.15 m 90º Elbow 4 0.5 2
dist.sump from INP= 2.25 m Tee 1 1.7 1.7
WALL THIKNESS= 0.3 m Reducer 0 0.7 0
BASE THIKNES= 0.3 m Gate Valve 1 0.2 0.2
ROOF THIKNESS= 0.25 m Check valve 1 2 2
pump high 1 m
pump width= 0.8 m TOTAL K= 5.9
MIN WATER high= 0٫001 m
PUMPING VELOCITY= 0.3 m3/SEC
force main pipe materials 140
force main pipe LENGTH= 1200 m
OUTLET STRUCTURE SUMP 2 M
# CHECK VALVE= 1 NO
#GATE VALVE= 1 NO
# BEND= 4 NO
#TEE = 1 NO
# PUMPS= 2 NO
HEAL WIDTH= 0.8 M
Sewer Pumpstation Design Calculations For Alqibla Project
PUMPSTATION HYDRAULIC CALCULATION

FIND DEPTH OF WELL

Top roof Level= 3.65 m A 5D 4


Sump Level= -2.2764 m a 2.5D 2
Depth = 5.9264 m B 0.75D 0.6
C 0.3D - 0.5D 0.32
D 0.8
FIND WEIGHT OF TANK Hmin S+C 0٫01
h 2.5D
volume of base= 3.888 m3 S 0٫1
volume of walls= 5.33376 m3 W  2D 1.6
tanke volume= 9.22176 m3 w 2D 1.6
weight of tank= 23.0544 ton X  5D 4
pressure under tank= 0٫001 ton/m2 Y  4D 3.2
FIND FORCE MAIN DIA. Z1  5D 4
SAY D= 0٫00 m
Z2  5D
4
AREA= ٬0٫00 M2  0 – 10 degrees

V= ٬0٫03 M/SEC
FIND TDH Qp = individual pump capacity, m3/s
HS= 0٫04 M Cu = unit conversion coefficient = 0.935
HM= 0٫00 M D = outside diameter of pump bell/volute, m
HF= 0٫24 M S = height from lowest pumping level to pump bell/volute, m
TDH= 0٫28 M

hf=(10.67�^1.85)/(�^1.85�^4.87)xL
Sewer Pumpstation Design Calculations For Alqibla Project
PUMPSTATION HYDRAULIC CALCULATION

SELECT PUMPS
#PUMPS= 2
Q MAX= 25٫401 m3/day
Q MAX= 0٫500 m3/HR
Q MAX= 0٫008 m3/MIN
Q MAX= 0٫000 M3/SEC
TDH= 0٫028 M

TOTAL Q= 0.1388888889 M3/SEC


Q STEP= 0.03 M3/SEC/STEP
QM3/SEC CALC TDH CAPRARI SULZER GRUNDFOS Q M3/HR
0.03 0٫005 18.7 15 20 108
0.06 0٫006 16 13 19 216
0.09 0٫007 13 12 17 324 8.5 KW
0.12 0٫009 10.5 9 12 432 18 A
0.15 0٫011 6.7 8 8 540
0.18 0٫014 3.5 7.5 4 648
0.21 0٫017 0 7 3 756
0.24 0٫021 0 6 1 864
Sewer Pumpstation Design Calculations For Alqibla Project
PUMPSTATION HYDRAULIC CALCULATION

TRY CAPRARI TRY SULZER


SYSTEM CURVE
2٫4

2٫1

1٫9

1٫6
TDH M

f(x) = - 21628.3202394302x^4 + 11819.5847362508x^3 - 2017.5715488214x^2 + 67.536976912x + 14.3839285714


1٫4

1٫1

0٫9

0٫6
0 0.05 0.1 0.15 0.2 0.25 0.3

Q M3/SEC

CALC TDH CAPRARI SULZER Polynomia l (SULZER) GRUNDFOS


Sewer Pumpstation Design Calculations For Alqibla Project
PUMPSTATION HYDRAULIC CALCULATION

CHECK PUMP

HEAD= 27.95362236 M
Q= 0.1388888889 M3/SEC
Q= 8.3333333333 M3/MIN
Q= 500 M3/HR
Q= 12000 M3/DAY
PUMP HIGH= 1 M
OPERATION CYCLE= 10
LWD= 1 M
DETENSTION TIME= 6 MIN
ACTIVE VOLUME= 12.5 M3 WLMIN
WELL CROSS AREA= 9 M3 0
ACTIVE DEPTH= 0٫0001 M -0.2
LWL= -1.2764 M -0.4
MAX WL= 0٫000 M -0.6 P WL
WATER IN PIPE LEVEL ٬0٫00 M -0.8
d/D LEVEL= 0.5736 M -1
PIPE CROWN LEVEL= 0.7736 M -1.2
HOUSE CONNECTION SUMP LEVEL= ٬0٫02 M -1.4
DEEPUST DEPTH OF NET WORK= ٬0٫03 M P WL PINV WLMAX WLMIN
0٫0 -0.0264 0.1124888889 -1.2764
Sewer Pumpstation Design Calculations For Alqibla Project
PUMPSTATION HYDRAULIC CALCULATION
STRUCTUR CALCULATION FOR HDPE
The vacuum
Loading Information pressure can be Load Class Pl, lb
Fill height above top of pipe H
significant when 4٫9 in 1.25 m Field Equipment 10٬000
the pipe has a
Water height above top of pipe peakHinw it. When
0 in 0 m H15 12٬000
the pipe is
Soil Density gs the
drained
120 lbs/ft3 0٫02 t/m3 H20 16٬000
Vehicle Load on pipe (NEH 636, 52-7) Pl pressure 10000
vacuum lbs 5 t
can cause the
Impact Factor (NEH 636, 52-8) pipe Ito
f collapse. 1 converter unte
Most pipe will
Pressure from the fill above the pipe Ps
withstand 5 psi3.417541557
of psi 2.4027695015 t/m2 from to factor
Hydrostatic pressure above the pipe vacuum.
PG If the 0 psi 0 t/m2
pipe is properly
in m 0٫0000
Vacuum pressure in the pipe (0 to 5 ps Pv at the
vented 0 psi 0 t/m2 lbs/ft3 t/m3 0.01601846
high point the
Wheel Load Felt by the pipe Pw can be1.348252735
vacuum psi 0.9479154816 t/m2 lbs t 0.0005
Total External Pressure on pipe expected
P to be4.765794292 psi 3.3506849831 t/m2 psi t/m2 0.7030695783
almost 0 psi.
Pipeline Information (Solid Wall HDPE) in2 m2 0.000645
Input nominal diameter of Pipe 1٫4 in 0.35 m lb/ft t/m 0.00147636
Input Standard Dimension Ratio SDR 17 KPA T/M2 0.101972
Input the Pipe Pressure Rating PR 2.4 psi 1.6873669879 t/m2 lbs T 0.0005
Pipe Modulus of Elasticity, short ter E 110000 psi 77337.653613 t/m2 FT M 0.3048
Pipe Modulus of Elasticity, long ter Elong 22000 psi 15467.530723 t/m2
Section Modulus, (Pipe Wall Moment Ipw 0.000110917 in4/in
Input Pipe Wall Thickness t 0.11 in 0.002794 m
Input Pipe Outside Diameter OD 13.99952756 in 0.355588 m
Pipe Inside Diameter ID 13.77952756 in 0.35 m
Mean Diameter Dm 13.88952756 in 0.352794 m
Actual Pipe Wall Area Aapw 0.11 in2/in 0.00007095 m2/m
Sewer Pumpstation Design Calculations For Alqibla Project
PUMPSTATION HYDRAULIC CALCULATION
Wall Crushing
Thrust in Pipe wall Tpw ٬4٫00 lb/ft ٬0٫01 t/m
Required Wall Area (long term) Apw ٬0٫00 in2/in ٬0٫00 m2/m Pipe wall will not crush
Actual Pipe Wall Area Aapw ٬0٫00 in2/in
Deflection (%DX/D<=7.5% for pipes other than spillway conduits)
Deflection Lag Factor (NEH 636, 52-11 DL ٬0٫01
Bedding Constant (NEH 636, 52-11 [0 K ٬0٫00
Modulus of soil reaction (see table o E' ٬4٫00
Deflection %DX/D ٬0٫01 % Deflection is within limits
Buckling
Buckling Factor of Safety (NEH 636, WheelFS load and ٬0٫03
Water Buoyancy factor (NEH 636, 52 vacuum Rw ٬0٫01
pressures do not
Coefficient of Elastic Support (NEH 6 applyB'to buckling ٬0٫01
Buckling Reduction Factor (NEH 636, sinceCthey are not ٬0٫01
permanent or
Wall Buckling Critical Pressure qa loads. ٬0٫01
constant psi ٬0٫01 t/m2 Buckling will occur!
Pressure Applied by Permanent Load Pp ٬0٫03 psi ٬0٫02 t/m2
Strain (eall<=5%)
Hoop Strain eh ٬0٫000000 in/in 0٫0000000 m/m
Vertical decrease in diameter DY ٬0٫0000 in 0٫0000000 M
Flexural Strain ef ٬0٫000000 in/in 0٫0000000 M/M
Combined Strain e ٬0٫00 % ٬0٫00 % Pipe Strain is not a problem
Sewer Pumpstation Design Calculations For Alqibla Project
PUMPSTATION HYDRAULIC CALCULATION

BEARING CAPACITY OF SHALLOW FOUNDATIONS


Terzaghi Methods
Input
Units of Measurement
SI SI or E

Foundation Information
Shape SQ SQ, CI, CO, or RE
B= 5.2 m
L= 5.2 m
D= 5.4264 m

Soil Information
c= 12.6 kPa
phi = 30 deg
gamma = 180 kN/m^3
Dw = 1.15 m

Factor of Safety
F= 3
Sewer Pumpstation Design Calculations For Alqibla Project
PUMPSTATION HYDRAULIC CALCULATION
Unit conversion 1000

Gamma w = 9.8
phi (radians) 0٫001

Terzaghi Computations
a theta = 0٫03
Nc = 0٫37
Nq = 0٫22
N gamma = 0٫20
gamma' = 170.2
coefficient #1 = 1.3
coefficient #3 = 0.4
sigma zD' = 9٫35
W sub f 0

Bearing Capacity
q ult = 287٫23 kPa 2928.9109575329 T/M2
qa= 95٫74 kPa 976.303652511 T/M2

Allowable Column Load


P= 258.88725105 kN 26.3992507639 TON
Sewer Pumpstation Design Calculations For Alqibla Project
PUMPSTATION HYDRAULIC CALCULATION
DOWN WARD FORCE=
volume of base= 8.112 M3
Volume of walls= 23.468544 M3
volume of roof= 3.267 M3
TOTAL VOLUME= 34.847544 M3
WEIGHT OF TANK= 87.11886 TON
WEIGHT OF FITTING = 5 TON
SURCHARGE WEIGH= 10 TON
TOTAL WEIGH= 102.11886 TON
BC 3.7765850592 TON/M2 NO COMP. PILE NEED
SUBMERCY VOLUME= 60.126996 M3
up ward force = 60.126996 TON NO BOYANCY CASE
Sewer Pumpstation Design Calculations For Alqibla Project
PUMPSTATION HYDRAULIC CALCULATION

SUMMARY SEWAGE

TRANSFORMER SEWER TYPE PUMPS SEWER TYPE


NUMBER NUMBER
MANIFUCTURE MANIFUCTURE
POWER DISCHARGE
HEAD
PRESSUR
GENERATOR SEWER TYPE POWER
NUMBER WHEIGHT
MANIFUCTURE CYCLE
POWER
CABLE SIZE MANIFOLD SEWER TYPE
LENGTH RISER DAIM.
WIDTH LENGTH
HIGH PRESSUR
MATERIAL
NUMBER

FORCEMAINE DSEWER TYPE


LENGTH
PRESSUR
MATERIAL
NUMBER

Sewer Pumpstation Design Calculations For Alqibla Project


PUMPSTATION HYDRAULIC CALCULATION
BEAM SPREADSHEET CALCULATIONS
© Copy Write John Andrew P.E. 15 Aug 2010

CASE-A CANTILEVER WITH LOAD AT ANY POINT


Beam Shear & Moment Diagrams
SAMPLE AISC STANDARD WIDE FLANGE BEAMS

BEAM CALCULATION
METHOD

Step-1 Type beam load and


properties data under "Input"
below.

Step-2 Excel will, "Calculate"


beam: shear, moment, and
deflection due to the
consentrated load "P" lbs and
the distributed load "w" lbs/ft.
BEAM CALCULATION
METHOD

Step-1 Type beam load and


properties data under "Input"
below.

Step-2 Excel will, "Calculate"


beam: shear, moment, and
deflection due to the
consentrated load "P" lbs and
the distributed load "w" lbs/ft.

Notes:
1. Distributed load w can
include the weight of the
beam pluss any additional
distributed load.

2. Do not delete load P when


calculating the moment due to
w and vise versa.

Sewer Pumpstation Design Calculations For Alqibla Project


PUMPSTATION HYDRAULIC CALCULATION
Effect of load P only INPUT
Load, P = 10000 lbs 5 ton feet 18 w Ix Sx
Load location in inches, a = 19 in 0.4826 m inches = feet * 12 lb/ft in^4 in^3
Beam span in feet, Lf = 20 ft 6.096 m = 216 W12x40 40 307 0٫52
Location in inches from free end, 120 in 3.048 m W12x72 72 597 0٫97
AISC Beam Section = W18x60 W12x120 120 1070 16٫3
Beam weight per foot, w = 60 lbs/ft 0.0885816 t/m
Beam section modulus about x-x, 108 in^3 0.0017698029 m3 W14x61 61 640 0٫92
Section 2nd moment of area about 984 in^4 0.0004095717 m4 W14x283 283 3840 45٫9
Modulus of elasticity, E = 29000000 lbs/in^2 42814.44 T/M2 W14x500 500 8210 83٫8
Allowable tension/compression str 22000 lbs/in^2 2243.384 t/m2
CALCULATE W16x50 50 659 0٫81
Beam span in inches, L = Lf * 12 W16x100 100 1500 17٫7
= 216 in 5.4864 m
Right support force, R = P W18x60 60 984 1٫08
= 15000 lbs 7.5 t W18x158 158 3060 31٫0
Max beam shear force, V = -R W18x283 283 564 6160
= -15000 lbs -7.5 t
b= (L - a) W24x62 62 1560 13٫2
= 136 in 3.4544 m W24x250 250 8490 64٫4
Moment at x if x > a, Mx1 = - P*(x - a) W24x450 450 17100 1170
= -600000 in-lbs -7.62 t.m
Max moment, Mm = -P*b
= -2040000 in-lbs -25.908 t-m
Sewer Pumpstation Design Calculations For Alqibla Project
PUMPSTATION HYDRAULIC CALCULATION

Beam Deflection due to P only CALCULATE continued


Max beam deflection at x = 0, yMP =
(P*b^2/(6*E*I))*(3*L - b)
= 0٫001 in 0٫1 CM
Beam deflection at x < a,
(P*b^2/(6*E*I))*(3*L
y= - 3*x - b)
= 0٫000 in x > a Not OK 0٫1 CM
Beam deflection at x = a, ya = P*b^3/(3*E*I)
= 0٫000 in 0٫1 CM
Beam deflection at x >(P*(L
a, y-=x)^2/(6*E*I))*(3*b - L + x)
= 0٫000 in x > a, OK 0٫01 CM
Max allowable deflection = L / 360
= 0٫001 in 0٫02 CM

End Slopes due to P only CALCULATE continued


Beam left end slope, θL =(P*L^2) / (2*E*I)
0٫0000 radians 0٫000 deg
Beam right end slope, θR = 0
CASE-B CANTILEVER WEIGHT LOAD w LB/FT

Sewer Pumpstation Design Calculations For Alqibla Project


PUMPSTATION HYDRAULIC CALCULATION
Effect of beam weight only CALCULATE continued
Total beam weight, W = w * Lf
= 1200 lbs
Right support force, RB = W converter unte
= 1200 lbs from to factor
Max beam shear force, V = RB in m 0٫0000
= 1200 lbs lbs/ft3 t/m3 0.01601846
Beam shear force at x, V = - (w/12)*x lbs t 0.0005
= -600 lbs psi t/m2 0.7030695783
Max beam moment, Mm =- (w/12) * L^2 / 2 in2 m2 0.000645
= -116640 in-lbs -17.775936 t/m lb/ft t/m 0.00147636
Moment at x, Mx2 =-((w/12)*x^2 / 2) KPA T/M2 0.101972
= -36000 in-lbs -5.4864 t/m lbs T 0.0005
Effect of beam weight only FT M 0.3048
End Slopes CALCULATE continued
Beam left end slope, θL((w/12)*L^3)
= / (6*E*I)
= 0.0002942977 radians 0٫000 deg
Beam right end slope, θR = 0
CASE-C CANTILEVER WEIGHT AND CONCENTRATED LOADS
SET x = L ABOVE FOR MAX MOMENT
Total moment at x if x > a, MxT = Mx1 + Mx2
-152640 in-lbs -23.262336 t/m x > a, OK
Moment stress at x, Fx = MxT / Sx
= 1413 lbs/in^2 993.6716706589 T/M2
Safety Factor at x, SFx = Fa / Fx
= 15.566037736 SFx > 2.00, OK

Sewer Pumpstation Design Calculations For Alqibla Project


PUMPSTATION HYDRAULIC CALCULATION

Effect of beam weight only CALCULATE continued


Beam deflection due to load((w/12)/(24*E*I))*((3*L^4
w at x, yX = - 4*L^3*x + x^4))
= 0٫00000000 in
Max beam deflection due to load w, yMW((w/12)*L^4)
= / (8*E*I)
= 0٫00000000 in
Max allowable deflection = L / 360
= 0٫001 in

Total Cantilever Deflection due to beam weight and load P.


Total beam deflection at x if x < a, yX = yA + yB
= 0٫000 in x > a, OK
Max beam deflection at free end, yMAX = yMW + yMB
= 0٫001 in
Max allowable deflection = Li / 360
= 0٫00000001 in
Principal of Superposition
Within the elastic limit the total deflection at a point in a beam is equal to
the sum of the deflections due to all of the apllied loading systems.

Sewer Pumpstation Design Calculations For Alqibla Project


PUMPSTATION HYDRAULIC CALCULATION

Sewer Pumpstation Design Calculations For Alqibla Project


PUMPSTATION HYDRAULIC CALCULATION
Sewer Pumpstation Design Calculations For Alqibla Project
PUMPSTATION HYDRAULIC CALCULATION
Sewer Pumpstation Design Calculations For Alqibla Project
PUMPSTATION HYDRAULIC CALCULATION

Sewer Pumpstation Design Calculations For Alqibla Project


PUMPSTATION HYDRAULIC CALCULATION
PUMP DISCHARGE TEST
WELL LENGTH= 4
WELL WIDTH= 3
WELL AREA= 12
DRAWDOWN TEST TI 10 MIN
DISTANCE TRAVEL= 0.27 M
SO V FOR ONE PUMP= 3.24 M3
Q= 19.44 M3/HR
THE BOLD NET WORK Q TEST
WELL LENGTH= 4
WELL WIDTH= 3
WELL AREA= 12
RISING TIME 10 MIN
DISTANCE TRAVEL= 0.08 M
V= 0.96 M3
Q= 5.76 M3/HR= 138.24
Q PEAK= Q* P.F= 414.72 M3/DAY
ADD INFILTERATION =10%QMAX=41.5 M3/DAY

TOTAL ALSAHAFIEEN AREA Q= 456.12 M3/DAY


= 19.005 M3/HR
AND MASFEN TOTAL SEWAGE MAX=28352 M3/DAY

TOTAL= 28808.12 M3/DAY= 1200.338 M3/HR


SO MUST ADD NEW PUMPS

USE 3 PUMP EACH PUM Q=600 WITH HEAD 7 M


FROM DATA SHEET OF PUMP POWER =75 KW
NO NEED NEW GENERATOR OR TRANSFORMER BECAUSE AVILBE ONE IS 165 KVA AS GENERATOR AND 250 KVA
ENERATOR AND 250 KVA FOR TRANSFORMER
R/D B/D
0٫0000 0٫0000
0٫000 0٫000
0٫0000 0٫0000
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫1
0٫0000 0٫001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫000 0٫001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫01
0٫0000 0٫001
0٫0000 0٫0001
0٫0000 0٫0001
0٫000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫000 0٫0001
0٫0000 0٫0001
0٫000 0٫0001
0٫0000 0٫001
0٫0000 0٫001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫000 0٫0001
0٫0000 0٫0001
0٫000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫00 1
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫01
0٫0000 0٫001
0٫00 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫0000 0٫0001
0٫00 0
h/D V/Vfull Q/Qfull
0٫000 0٫00 0٫000
0٫000 0٫00 0٫000
0٫000 0٫00 0٫000
0٫000 0٫00 0٫00
0٫000 0٫00 0٫000
0٫000 0٫00 0٫00
0٫000 0٫00 0٫00
0٫000 0٫1 0٫00
0٫000 0٫01 0٫00
0٫000 0٫01 0٫00
0٫000 0٫01 0٫00
0٫000 0٫01 0٫00
0٫0 0٫01 0٫00
0٫000 0٫01 0٫0
0٫000 0٫01 0٫00
0٫000 0٫01 0٫00
0٫000 0٫1 0٫00
0٫00 0٫01 0٫00
0٫000 0٫01 0٫00
0٫000 0٫01 0٫00
0٫000 0٫01 0٫00
0٫000 0٫01 0٫00
0٫00 0٫01 0٫00
0٫000 0٫01 0٫0
0٫000 0٫1 0٫00
0٫000 0٫01 0٫00
0٫000 0٫01 0٫00
0٫000 0٫01 0٫00
0٫000 0٫01 0٫00
0٫000 0٫01 0٫00
0٫000 0٫01 0٫00
0٫00 0٫01 0٫00
0٫000 0٫01 0٫00
0٫000 0٫01 0٫0
0٫000 0٫01 0٫00
0٫000 0٫01 0٫00
0٫000 0٫1 0٫00
0٫000 0٫01 0٫00
0٫000 0٫01 0٫00
0٫000 0٫01 0٫00
0٫00 0٫01 0٫00
0٫000 0٫01 0٫00
0٫000 0٫01 0٫00
0٫000 0٫01 0٫0
0٫000 0٫01 0٫00
0٫000 0٫01 0٫00
0٫000 0٫01 0٫00
0٫000 0٫01 0٫00
0٫00 0٫01 0٫00
0٫000 0٫01 0٫00
0٫000 0٫01 0٫00
0٫000 0٫01 0٫00
0٫000 1 0٫00
0٫1 1 0٫1
0٫001 1 0٫01
0٫001 0٫01 0٫01
0٫001 0٫01 0٫01
0٫001 0٫01 0٫01
0٫001 0٫01 0٫01 h/D
0٫001 0٫01 0٫01
0٫001
0٫001 0٫01 0٫01
0٫01 0٫01 0٫01
0٫001 0٫01 0٫01 0٫001
0٫001 0٫01 0٫1
0٫001 0٫01 0٫01
0٫001 0٫01 0٫01 0٫001
0٫001 0٫01 0٫01
0٫1 0٫01 0٫01
0٫001 0٫01 0٫01 0٫001
0٫001 0٫01 0٫1
0٫01 0٫01 0٫01
0٫001 0٫01 0٫01 0٫000

0٫01 0٫01 0٫01


0٫001 0٫01 0٫01
0٫000
0٫001 0٫01 0٫01
0٫001 0٫01 0٫1
0٫001 0٫01 0٫01
0٫000
0٫001 0٫01 0٫01 0٫000 0٫000 0٫000 0٫001 0٫001
0٫001 0٫01 0٫01
0٫001 0٫01 0٫01
0٫001 0٫01 0٫01
0٫001 0٫01 0٫1
0٫001 0٫01 0٫01
0٫001 0٫01 0٫01
0٫001 0٫01 0٫01
0٫001 0٫01 0٫01
0٫001 0٫01 0٫01
1 1 1
01 0٫001 0٫001 0٫001
D= 0.7
imension Recommended Value Value
A 5D
a 2.5D
B 0.75D
C 0.3D - 0.5D
D
Hmin S+C
h Greater of H or 2.5D

S See Equation 9-1

W  2D
w 2D
X  5D
Y  4D
Z1  5D
Z2  5D
 0 – 10 degrees
 0 – 10 degrees
 10 degrees max.
Qp = individual pump capacity, m3/s
Cu = unit conversion coefficient = 0.935
D = outside diameter of pump bell/volute, m
S = height from lowest pumping level to pump bell/volute, m
BEAM SPREADSHEET CALCULATIONS
© Copy Write John Andrew P.E. 15 Aug 2010

CASE-A CANTILEVER WITH LOAD AT ANY POINT


Beam Shear & Moment Diagrams

Nomanclature

a = load location from left end, in


b = load location from right end, in
E = modulus of elasticity, lbs/in2
Fa = allowable stress, lbs/in2
I = section second moment of area about the horizontal X-X axis, in4
L = beam span in inches
Lf = beam span in feet
M = beam or truss moment, in-lbs
P = concentrated load, lbs
R = support reaction force, lbs
SF = safety factor
Sx = beam section modulus about the horizontal axis, in3
V = beam shear force, lbs
w = beam weight per foot, lb/ft
x = location on beam, in
y = beam vertical deflection under load, in
θ = beam end slope, rad or deg

Ref: http://www.linsgroup.com/MECHANICAL_DESIGN/Beam/beam_formula.htm
SAMPLE AISC STANDARD WIDE FLANGE BEAMS
w Ix Sx
lb/ft in^4 in^3
BEAM CALCULATION METHOD
W12x40 40 307 0٫52
Step-1 Type beam load and properties W12x72 72 597 0٫97
data under "Input" below. W12x120 120 1070 16٫3

Step-2 Excel will, "Calculate" beam: W14x61 61 640 0٫92


shear, moment, and deflection due to W14x283 283 3840 45٫9
the consentrated load "P" lbs and the
W14x500 500 8210 83٫8
distributed load "w" lbs/ft.

Notes: W16x50 50 659 0٫81


1. Distributed load w can include the W16x100 100 1500 17٫7
weight of the beam pluss any
additional distributed load. W18x60 60 984 1٫08
W18x158 158 3060 31٫0
2. Do not delete load P when
W18x283 283 564 6160
calculating the moment due to w and
vise versa.
W24x62 62 1560 13٫2
W24x250 250 8490 64٫4
W24x450 450 17100 1170
Effect of load P only INPUT
Load, P = 15000 lbs feet 18
Load location in inches, a = 80 in inches = feet * 12
Beam span in feet, Lf = 18 ft = 216
Location in inches from free end, x = 120 in
AISC Beam Section = W18x60
Beam weight per foot, w = 60 lbs/ft
Beam section modulus about x-x, Sx = 108 in^3
Section 2nd moment of area about x-x, I = 984 in^4
Modulus of elasticity, E = 29000000 lbs/in^2
Allowable tension/compression stress, Fa = 22000 lbs/in^2
CALCULATE
Beam span in inches, L = Lf * 12
= 216 in
Right support force, R = P
= 15000 lbs
Max beam shear force, V = - R
= -15000 lbs
b = (L - a)
= 136 in
Moment at x if x > a, Mx1 = - P*(x - a)
= -600000 in-lbs
Max moment, Mm = - P * b
= -2040000 in-lbs

Beam Deflection due to P only CALCULATE continued


Max beam deflection at x = 0, yMP = (P*b^2/(6*E*I))*(3*L - b)
= 0٫001 in
Beam deflection at x < a, y = (P*b^2/(6*E*I))*(3*L - 3*x - b)
= 0٫000 in x > a Not OK
Beam deflection at x = a, ya = P*b^3/(3*E*I)
= 0٫000 in
Beam deflection at x > a, y = (P*(L - x)^2/(6*E*I))*(3*b - L + x)
= 0٫000 in x > a, OK
Max allowable deflection = L / 360
= 0٫001 in

End Slopes due to P only CALCULATE continued


Beam left end slope, θL = (P*L^2) / (2*E*I)
0٫0000 radians 0٫001 deg
Beam right end slope, θR = 0

CASE-B CANTILEVER WEIGHT LOAD w LB/FT


Beam Shear & Moment Diagrams

Effect of beam weight only CALCULATE continued


Total beam weight, W = w * Lf
= 1080 lbs
Right support force, RB = W
= 1080 lbs
Max beam shear force, V = RB
= 1080 lbs
Beam shear force at x, V = - (w/12)*x
= -600 lbs
Max beam moment, Mm = - (w/12) * L^2 / 2
= -116640 in-lbs
Moment at x, Mx2 = -((w/12)*x^2 / 2)
= -36000 in-lbs
Effect of beam weight only CALCULATE continued
Beam deflection due to load w at x, yX = ((w/12)/(24*E*I))*((3*L^4 - 4*L^3*x + x^4))
= 0٫000 in
Max beam deflection due to load w, yMW = ((w/12)*L^4) / (8*E*I)
= 0٫000 in
Max allowable deflection = L / 360
= 0٫001 in

Effect of beam weight only


End Slopes CALCULATE continued
Beam left end slope, θL = ((w/12)*L^3) / (6*E*I)
= 0.0002943 radians 0٫000 deg
Beam right end slope, θR = 0

CASE-C CANTILEVER WEIGHT AND CONCENTRATED LOADS


SET x = L ABOVE FOR MAX MOMENT
Total moment at x if x > a, MxT = Mx1 + Mx2
-636000 in-lbs x > a, OK
Moment stress at x, Fx = MxT / Sx
= 5889 lbs/in^2
Safety Factor at x, SFx = Fa / Fx
= 0٫04 SFx > 2.00, OK

Total Cantilever Deflection due to beam weight and load P.


Principal of Superposition
Within the elastic limit the total deflection at a point in a beam is equal to the sum of
the deflections due to all of the apllied loading systems.

Total beam deflection at x if x < a, yX = yA + yB


= 0٫000 in x > a, OK
Max beam deflection at free end, yMAX = yMW + yMB
= 0٫001 in
Max allowable deflection = Li / 360
= 0٫001 in

Total Beam Slope at x


Total beam end slope (at x = 0), θt = θA + θB
0٫00000 radians 0٫01 deg

EXAMPLE: CANTILEVER WITH CONCENTRATED LOAD


EMAMPLE:
Given the cantilever data below calculate the maximum moment and free end
deflection due to load P only. Do not include the weight of the beam.
EMAMPLE:
Given the cantilever data below calculate the maximum moment and free end
deflection due to load P only. Do not include the weight of the beam.

Load, P = 15000 lbs


Load location in inches, a = 0 in
Beam span in feet, Lf = 18 ft
Location in inches, x = 0 in
AISC Beam Section = W12x40
Beam weight per foot, w = 40 lbs/ft
Beam section modulus, Sx = 51.5 in^3
Section 2nd moment of area about x-x, I = 307 in^4
Modulus of elasticity, E = 29000000 lbs/in^2
Allowable tension/compression stress, Fa = 22000 lbs/in^2

The beam data in yellow above is copied and pasted into the "INPUT"
data cells below.

Note: Load location, x = a = 0 inches.

Effect of load P only INPUT


Load, P = 600 lbs feet 10
Load location in inches, a = 100 in inches = feet * 12
Beam span in feet, Lf = 18 ft = 120
Location in inches, x = 50 in
AISC Beam Section = W12x40
Beam weight per foot, w = 40 lbs/ft
Beam section modulus, Sx = 51.5 in^3
Section 2nd moment of area about x-x, I = 307 in^4
Modulus of elasticity, E = 29000000 lbs/in^2
Allowable tension/compression stress, Fa = 22000 lbs/in^2
CALCULATE
Beam span in inches, L = Lf * 12
= 216 in
Right support force, R = P
= 600 lbs
Max beam shear force, V = - R
= -600 lbs
b = (L - a)
= 116 in
Moment at x if x > a, Mx1 = - P*(x - a)
= 30000 in-lbs
Max moment, Mm = - P * b
= -69600 in-lbs

Beam Deflection CALCULATE continued


Max beam deflection at x = 0, yM = (P*b^2/(6*E*I))*(3*L - b)
= 0٫000 in
Beam deflection at x < a, y = (P*b^2/(6*E*I))*(3*L - 3*x - b)
= 0٫000 in x > a, OK
Beam deflection at x = a, ya = P*b^3/(3*E*I)
= 0٫000 in
Beam deflection at x > a, y = (P*(L - x)^2/(6*E*I))*(3*b - L + x)
= 0٫000 in x < a, Not OK
Max allowable deflection = L / 360
= 0٫001 in

CASE-C CANTILEVER FREE TO DEFLECT BUT NOT ROTATE


Beam Shear & Moment Diagrams
Effect of distributed load w only INPUT
AISC Beam Section = W12x72 feet 10
Beam weight per foot, w = 72 lbs/ft inches = feet * 12
Beam span in feet, L = 20 ft = 120
Location in inches, x = 100 in
Beam section modulus, Sx = 97.4 in^3
Section moment area about x-x, I = 579 in^4
Modulus of elasticity, E = 29000000 lbs/in^2
Allowable stress, Fa = 22000 lbs/in^2
CALCULATE
Beam span in inches, Li = L * 12
= 240 in
Right support force, R = V = w*L
= 1440 lbs
Max moment is at fixed end, MR = -(w/12)*L^2 / 3
= -115200 in-lbs
Moment at deflected end, ML = (w/12)*L^2 / 6
57600 in-lbs
Moment at x, Mx = (w/12)*(L^2 - 3*x^2) / 6
27600 in-lbs
Moment stress at x, Fx = MxT / Sx
= 283 lbs/in^2
Safety Factor at x, SFx = Fa / Fx
= 0٫78 SFx > 2.00, OK

Beam Deflection CALCULATE


Max deflection at x = 0, ym = (w/12)*L^4 / (24*E*I)
= 0٫000 in OK
Beam deflection at x, yx = (w/12)*(L^2 - x^2)^2 / (24*E*I)
= 0٫000 in
Max allowable deflection = Li / 360
= 0٫001 in
End Slopes
Beam left end slope, θL = 0

Beam right end slope, θR = 0


CASE-D CANTILEVER WITH END LOAD
Beam Shear & Moment Diagrams

Input the maximum moment, allowable stress and safety factor below and use the
AISC spreadsheet table to calculate the beam section modulus Sx that will support
the moment M at the allowable bending stress Fa.

Determine Steel Member Section Size based on estimated section modulus Sx


INPUT
Moment in beam, M = 190000 in-lbs
Allowable material stress, Fa = 22000 lbs/in^2
Design Safety Factor, SF = 0٫03
CALCULATE
Required beam section modulus, Sx = SF * M / Fa
= 0٫22 in^3

Open the AISC Structural Steel Sections spreadsheet or other table.

Select a beam section with a section modulus Sx equal to or a small amount


greater than the required Sx calculated above.

There may be more than one beam section with the required Sx or slightly
larger.

Select Beam Section Sx


INPUT
Select beam from tables = W14x61
Actual beam section modulus, Sx = 92.1 in^3

Determine Member Section Size based on estimated section modulus Sx


INPUT
Max moment in beam, M = 2552000 in-lbs
Allowable material stress, Fa = 22000 lbs/in^2
Safety Factor, SF = 2.5
CALCULATE
Minimum beam section modulus, Sx = SF * M / Fa
= 2٫90 in^3

Ref: http://www.linsgroup.com/MECHANICAL_DESIGN/Beam/beam_formula.htm
This is the end of this Worksheet
ZONE

M1
lforcemain
length
1300

CAST
LENGTH

WIDTH
0٫02
Q m3/day

155652
Vactive
0٫27

arrow

1
WELL DIMENSION
G.L of street

3.15

PIPE Dai m

1.2
MIN. DEPTH FROM
PIPE TO SUMP AVILBLE
(CASTED)
2.25

Active depth
0٫03
Q m3/hr

6485.5
WELL AREA m2
0٫09

#PUMP

3
MENSION
SERVIED AREA ha

76.3
LW depth 1
(VOTEX)
0.3

CAST WIDTH

CHDPE
1٫40
Q m3/min

1٫08
WELL LENGTH
0٫04

cycle operation

20
i mm/hr

17

LW depth2 (HEATING)

L
0.6

d/D
0٫01
Q m3/sec

1.8015277778
detention time min
0٫03

CASE WIDTH

0.7
C

0.5
POWER one pump
KW
60

B
1.6

force main area


0٫00
velosity m/sec

0٫5

forcemain dai.

0.7
INVE.inlet
pipe m W2
-0.7 0.7
Distance B
K
1.6 1
GL752VS1)
Static head
defined as t
vertical lift
the fluid th
the pump h
C J to
overcome. I
0.7 1.6 assumed to
a constant
head after t
station is pu
into operat
for a
WL GULLY WL STREET baseline of
system head
0٫02 0٫01
curve. It is
defined as
follows:
Static Head
Highest
elevation
opened to t
atmosphere
for a
baseline of
system head
curve. It is
defined as
follows:
Static Head
Highest
elevation
opened to t
atmosphere
minus the
system’s low
point**
*This will
typically be
pipe outlet.
**All pump
off elevatio
(Suggestion
WLWELL Use the
average
0٫01
elevation
between the
hs “lead
WL RIVER pump on” a
0٫04
“all pumps
off”. This w
@TIDE give the mi
pump no point of the
1.5 pump
operation
range.):
3

LWLwell
-0٫02
GL752VS1)
Static head is
defined as the
vertical lift of
the fluid that
the pump has
to
overcome. It is
assumed to be
a constant
head after the
Axis Title

station is put
into operation
for a
baseline of the
system head
curve. It is
defined as
follows:
Static Head =
Highest
elevation
opened to the
atmosphere*
for a
baseline of the
system head
curve. It is
defined as
follows:
Static Head =
Highest
elevation
opened to the
atmosphere*
minus the
system’s low
point**
*This will
typically be the
pipe outlet.
**All pumps
off elevation
(Suggestion:
Use the
average
elevation
between the
“lead hm m Hf m
pump on” and
0٫02 #REF!
“all pumps
off”. This will
give the mid
point of the
Qpump
pump m3/hr Qpm3/min
operation
range.):
21٫62
0٫36
mwl manhol roof ELV.
0٫00 3.65
1

WELL WD FLOOD
0٫04 OK

TDH m LENGTH
#REF! NOT APROFED

Q ump
WIDTH
m3/sec
0٫01 OK

sump ELV well high


-2.95 5.8
velosity
hammer
ZONE M1
WELL TSEWAGEEng.Tahir:
GROUNG LEVEL AT
PUMP STATION
Eng.Tahir:
INLET PIPE INV.
SITE DATA Eng.Tahir:
LEVEL SEWAGE DESIGN PARAMETERS SOIL INPUT
INLET PIPE
GL DIAMETER 3.15 M PF 3 GAMMA WATER 1 T/M3
UP IPL@ MANHOLE 0 M RF 0.9 GAMMA DRY SOIL 1900 T/M3
IPDIA Eng.Tahir: 0.8 M MIN SLOPE 0.0012 C COHESION 12 T/M2
# HOUSES GROUTH RATE 888 NO MAX d/D FOR DN<=250 0.5 ANGLE FRICTION 30 DEG
CAP./HOUSE NOW 10 NO MAX d/D PIPE> DN 250 0.75 SF 3
GR 0.03 MAX Qtotal/Qfull 0.8 Vehicle Load 5 T
DESIGN AGE 25 YEAR #PIPES 1
CONSUMPTION /CAP 0.46 M3/DAY n 0.011 FORCE MAIN INPUT DATA
WATER TABLE 2 M FC' 25 T/M2 #PIPE 1 NO
FY 500 T/M2 OD 0.35 M
Eng.Tahir: LENGTH FROM MANHOLE 22 M ID 0.3 M
DISCHARGE FOR
ONE PUMP HOUSE CONNECT SUMP L. 2.25 M PWALL THICK 0.025 M
PUMPS INPU LONGUST LINE LENGTH 2000 M LENGTH 1200 M
QP 500 M3/HR WETWELL DIM W 3 M OUT LET ST L 2 M
HIGH P 1 M WETWELL DIM LENGTH 3 M VELOCITY 3 M/SEC
WIDTH P 0.8 M DEPTH IP INV TO SUMP 2.25 M
LWD1 0.5 M 1ST JOINT HIGH 1.25 M SCREEN INPUT DATA
LWD2 1 M 2ND JOINT HIGH 3 M LENGTH 2 M
OUT P DIA M 3RD JOINT HIGH 2 M WIDTH 2 M
POWER KW DEPTH ROOF AND GRAGE 0.5 M D UNDER IPL 0.25 M
CYCLE 10 NO/HR WALL THIK 0.3 M WALL THIK 0.3 M
WEIGHT KG BASE HEAL LENGHT 0.8 M BASE THIK 0.3 M
B LENGTH 1.5 M BASE THICK 0.3 M HEAL LENGTH 0.8 M
RPN 1400 NO ROOF THICK 0.25 M CONCRETE GAMA 2.5 T/M3
NO. PUMP 2 CONCRETE FC' 25 T/M2
ROOF THICK 0.25 M
LENGTH PIPE MANHO 18 M
SUMMARY
POPULATION ELEVATIONS OF SCREEN TANK TDH FORCE MAIN
POP NOW= 88٫80 CAP. INV PIPE AT SCREE 0٫00 M #PUMPS= 0٫2 NO Crushing Pipe wall will not crush

POPat 25= 185٫93 CAP. SCRN SUMP L= 0٫00 M Q PROVIDE= 100٫0 M3/HR Deflection Deflection is within limits
Qav. at 25 76٫97 m3/day W depth AT SCREE 0٫01 M TDH= 2٫8 M Buckling Buckling will occur!
q inf.= 23٫09 m3/day Water L.= 0٫00 M CYCLE = 1٫0 Strain <=5% Pipe Strain is not a problem
Qpeak= 230٫92 m3/day SCRN ROOF L.= 0٫04 M VELOCITY= 0٫3 M/SEC
Qtotal flow 254٫01 m3/day GRAVEL L.= -0٫01 M WATER DEPTH = 0٫2 M
Qtotal flow 10٫58 m3/hr TANK VOLUME= 0٫17 M3 WELL VOLUM= 0٫9 M3
Qtotal flow 0٫18 m3/min
Qtotal flow 0٫00 m3/sec ELEVATIONS OF WETWELL TANK MWL WELL= 0٫1 M
INLET PIPE DESIGN INV PIPE AT WE 0٫00 M WELL HIGH= 0٫6 M
NUMBER 0٫01 WELL SUMP L= -0٫02 M HWL= 0٫0 M

Qpartial/ 0٫01 W depth AT WE 0٫02 M CONTROL


d/D= 0٫01 Water L.= 0٫00 M S%= 0.12 na Q ONEPUMP 500 M3/HR
Vactu= 0٫03 M/SEC WETWELL ROOF 0٫04 M DN= 250 mm PUMP NO= 2 NO
IN PIP W 0٫001 M GRAVEL L.= -0٫03 M CYCLE 10
TANK VOLUME= 0٫35 M3 FMD= 0.3 M
ZONE M1

FORCE MAINThe STRUCTURAL


vacuum
Eng.Tahir: STORM DESIGN PARAMETERS SOIL INPUT
pressure
INLET PIPE can be
PIPE COVER significant
DIAMETERwhen 1.25 M GAMMA WATER T/M3
the pipe has a
SDR peak in it. When 17 GAMMA DRY SOIL T/M3
the pipe is drained
Pipe PressuretheRating
vacuum 2.4 T/M2 MIN SLOPE 0.001 C COHESION T/M2
pressure can
Impact Factorcause(NEH 636,to
the pipe 1 MAX d/D FOR DN<=250 0.5 ANGLE FRICTION DEG
collapse. Most
Pressure from the
pipe willfill a 76.3 T/M2 MAX d/D PIPE> DN 250 0.75 SF 3
withstand 5 psi of
Hydrostatic pressure
vacuum. If theab 0.5 T/M2 MAX Qtotal/Qfull 0.8
pipe is properly
Vacuum pressurevented in the
at the pi 17
high T/M2 #PIPES 1
point the vacuum
Wheel Load Feltcan be expected 0.948 T/M2 n 0.011 FORCE MAIN INPUT DATA
to be almost 0 psi.
Total External Pressure 3.35 T/M2 FC' 25 T/M2 #PIPE 1 NO
Pipe Pressure Rating 1.789 T/M2 FY 500 T/M2 OD 315 M
Elasticity,SHORT TERM 77337.65 T/M2 LENGTH FROM MANHO 22 M ID 0.29 M
Elasticity, long term 15467.5 T/M2 HOUSE CONNECT SUMP 2.25 M PWALL THICK 25 M
P Inertia) LONGUST LINE LENGTH 2000 M LENGTH 1200 M
Outside Diameter M WETWELL DIM W 3M OUT LET ST L 2M
Inside Diameter M WETWELL DIM LENGTH 3M VELOCITY 3 M/SEC
Mean Diameter M DEPTH IP INV TO SUMP 2.25 M
Actual Pipe Wall Area M2 1ST JOINT HIGH 1.25 M SCREEN INPUT DATA
M 2ND JOINT HIGH 3M LENGTH 2M
OUT P DIA M 3RD JOINT HIGH 2M WIDTH 2M
POWER KW DEPTH ROOF AND GRA 0.5 M D UNDER IPL 0.25 M
CYCLE NO/HR WALL THIK 0.3 M WALL THIK 0.3 M
WEIGHT KG BASE HEAL LENGHT 0.8 M BASE THIK 0.3 M
B LENGTH M BASE THICK 0.3 M HEAL LENGTH 0.8 M
RPN NO ROOF THICK 0.25 M CONCRETE GAMA 2.5 T/M3
CONCRETE FC' 25 T/M2
ROOF THICK 0.25 M
LENGTH PIPE M 18 M

HWL=
HWL=

0.1124888889

d/D=
0٫01
0٫01
0٫01
0٫00
0٫00
0٫00
0٫00
0٫00
ZONE 0
WELL TSEWAGE
Eng.Tahir:
GROUNG
LEVEL AT
Eng.Tahir:
PUMP STATION
INLET PIPE
SITE DATA Eng.Tahir:
INV. LEVEL SEWAGE DESIGN PARAMETERS SOIL INPUT
INLET PIPE
GL DIAMETER 3.15 M PF 3 GAMMA WATER T/M3
UP IPL@ MANHOLE M RF 0.9 GAMMA DRY SOIL T/M3
IPDIA Eng.Tahir: M MIN SLOPE 0.001 C COHESION T/M2
# HOUSES GROUTH RATE NO MAX d/D FOR DN<=2 0.5 ANGLE FRICTION DEG
CAP./HOUSE NOW NO MAX d/D PIPE> DN 2 0.75 SF 3
GR % MAX Qtotal/Qfull 0.8
DESIGN AGE YEAR #PIPES 1
n 0.011 FORCE MAIN INPUT DATA
FC' 25 T/M2 #PIPE 1 NO
FY 500 T/M2 OD 315 M
Eng.Tahir: LENGTH FROM MANH 22 M ID 0.29 M
DISCHARGE
FOR ONE PUMP HOUSE CONNECT SUM 2.25 M PWALL THICK 25 M
PUMPS INPU LONGUST LINE LENGT 2000 M LENGTH 1200 M
QP M3/HR WETWELL DIM W 3 M OUT LET ST L 2 M
HIGH P M WETWELL DIM LENGT 3 M VELOCITY 3 M/SEC
WIDTH P M DEPTH IP INV TO SU 2.25 M
LWL1 M 1ST JOINT HIGH 1.25 M SCREEN INPUT DATA
LWL2 M 2ND JOINT HIGH 3 M LENGTH 2 M
OUT P DIA M 3RD JOINT HIGH 2 M WIDTH 2 M
POWER KW DEPTH ROOF AND GR 0.5 M D UNDER IPL 0.25 M
CYCLE NO/HR WALL THIK 0.3 M WALL THIK 0.3 M
WEIGHT KG BASE HEAL LENGHT 0.8 M BASE THIK 0.3 M
B LENGTH M BASE THICK 0.3 M HEAL LENGTH 0.8 M
RPN NO ROOF THICK 0.25 M CONCRETE GAMA 2.5 T/M3
CONCRETE FC' 25 T/M2
ROOF THICK 0.25 M
LENGTH PIPE MANHOLE 18 M
ZONE 0
WELL TSTORM
Eng.Tahir:
GROUNG
LEVEL AT
Eng.Tahir:
PUMP STATION
INLET PIPE
SITE DATA Eng.Tahir:
INV. LEVEL SEWAGE DESIGN PARAMETERS SOIL INPUT
INLET PIPE
GL DIAMETER 3.15 M PF 3 GAMMA WATER T/M3
UP IPL@ MANHOLE M RF 0.9 GAMMA DRY SOIL T/M3
IPDIA Eng.Tahir: M MIN SLOPE 0.001 C COHESION T/M2
GROUTH RATE
AREA HA MAX d/D FOR DN 0.5 ANGLE FRICTION DEG
C NO MAX d/D PIPE> D 0.75 SF 3
i mm/HR MAX Qtotal/Qfull 0.8
DESIGN AGE YEAR #PIPES 1
n 0.011 FORCE MAIN INPUT DATA
FC' 25 T/M2 #PIPE 1 NO
FY 500 T/M2 OD 315 M
Eng.Tahir: LENGTH FROM M 22 M ID 0.29 M
DISCHARGE
FOR ONE PUMP HOUSE CONNECT 2.25 M PWALL THICK 25 M
PUMPS INPU LONGUST LINE L 2000 M LENGTH 1200 M
QP M3/HR WETWELL DIM W 3M OUT LET ST L 2M
HIGH P M WETWELL DIM LE 3M VELOCITY 3 M/SEC
WIDTH P M DEPTH IP INV TO 2.25 M
LWL1 M 1ST JOINT HIGH 1.25 M SCREEN INPUT DATA
LWL2 M 2ND JOINT HIGH 3M LENGTH 2M
OUT P DIA M 3RD JOINT HIGH 2M WIDTH 2M
POWER KW DEPTH ROOF AND 0.5 M D UNDER IPL 0.25 M
CYCLE NO/HR WALL THIK 0.3 M WALL THIK 0.3 M
WEIGHT KG BASE HEAL LENGH 0.8 M BASE THIK 0.3 M
B LENGTH M BASE THICK 0.3 M HEAL LENGTH 0.8 M
RPN NO ROOF THICK 0.25 M CONCRETE GAMA 2.5 T/M3
CONCRETE FC' 25 T/M2
ROOF THICK 0.25 M
LENGTH PIPE M 18 M
ZONE 0 ZONE 0
WELL TSEWAGE
Eng.Tahir:
GROUNG
WELL TSTORM
Eng.Tahir:
GROUNG
LEVEL AT LEVEL AT
Eng.Tahir:
PUMP STATION Eng.Tahir:
PUMP STATION
INLET PIPE INLET PIPE
SITE DATA Eng.Tahir:
INV. LEVEL SEWAGE DESIGN PARAMETERS SOIL INPUT SITE DATA Eng.Tahir:
INV. LEVEL
INLET PIPE INLET PIPE
GL DIAMETER 3.15 M PF 3 GAMMA WATER T/M3 GL DIAMETER 3.15 M
UP IPL@ MANHOLE M RF 0.9 GAMMA DRY SOIL T/M3 UP IPL@ MANHOLE M
IPDIA Eng.Tahir: M MIN SLOPE 0.001 C COHESION T/M2 IPDIA Eng.Tahir: M
# HOUSES GROUTH RATE NO MAX d/D FOR DN 0.5 ANGLE FRICTION DEG AREA GROUTH RATE
HA
CAP./HOUSE NOW NO MAX d/D PIPE> D 0.75 SF 3 C NO
GR % MAX Qtotal/Qfull 0.8 i mm/HR
DESIGN AGE YEAR #PIPES 1 DESIGN AGE YEAR
n 0.011 FORCE MAIN INPUT DATA
FC' 25 T/M2 #PIPE 1 NO
FY 500 T/M2 OD 315 M
Eng.Tahir: LENGTH FROM M 22 M ID 0.29 M Eng.Tahir:
DISCHARGE DISCHARGE
FOR ONE PUMP HOUSE CONNECT 2.25 M PWALL THICK 25 M FOR ONE PUMP

PUMPS INPU LONGUST LINE L 2000 M LENGTH 1200 M PUMPS INPU


QP M3/HR WETWELL DIM W 3 M OUT LET ST L 2 M QP M3/HR
HIGH P M WETWELL DIM LE 3 M VELOCITY 3 M/SEC HIGH P M
WIDTH P M DEPTH IP INV TO 2.25 M WIDTH P M
LWL1 M 1ST JOINT HIGH 1.25 M SCREEN INPUT DATA LWL1 M
LWL2 M 2ND JOINT HIGH 3 M LENGTH 2 M LWL2 M
OUT P DIA M 3RD JOINT HIGH 2 M WIDTH 2 M OUT P DIA M
POWER KW DEPTH ROOF AND 0.5 M D UNDER IPL 0.25 M POWER KW
CYCLE NO/HR WALL THIK 0.3 M WALL THIK 0.3 M CYCLE NO/HR
WEIGHT KG BASE HEAL LENGH 0.8 M BASE THIK 0.3 M WEIGHT KG
B LENGTH M BASE THICK 0.3 M HEAL LENGTH 0.8 M B LENGTH M
RPN NO ROOF THICK 0.25 M CONCRETE GAMA 2.5 T/M3 RPN NO
CONCRETE FC' 25 T/M2
ROOF THICK 0.25 M
LENGTH PIPE M 18 M
SEWAGE DESIGN PARAMETERS SOIL INPUT
PF 3 GAMMA WATER T/M3
RF 0.9 GAMMA DRY SOIL T/M3
MIN SLOPE 0.001 C COHESION T/M2
MAX d/D FOR DN 0.5 ANGLE FRICTION DEG
MAX d/D PIPE> D 0.75 SF 3
MAX Qtotal/Qfull 0.8
#PIPES 1
n 0.011 FORCE MAIN INPUT DATA
FC' 25 T/M2 #PIPE 1 NO
FY 500 T/M2 OD 315 M
LENGTH FROM M 22 M ID 0.29 M
HOUSE CONNECT 2.25 M PWALL THICK 25 M
LONGUST LINE L 2000 M LENGTH 1200 M
WETWELL DIM W 3M OUT LET ST L 2M
WETWELL DIM LE 3M VELOCITY 3 M/SEC
DEPTH IP INV TO 2.25 M
1ST JOINT HIGH 1.25 M SCREEN INPUT DATA
2ND JOINT HIGH 3M LENGTH 2M
3RD JOINT HIGH 2M WIDTH 2M
DEPTH ROOF AND 0.5 M D UNDER IPL 0.25 M
WALL THIK 0.3 M WALL THIK 0.3 M
BASE HEAL LENGH 0.8 M BASE THIK 0.3 M
BASE THICK 0.3 M HEAL LENGTH 0.8 M
ROOF THICK 0.25 M CONCRETE GAMA 2.5 T/M3
CONCRETE FC' 25 T/M2
ROOF THICK 0.25 M
LENGTH PIPE M 18 M
ZONE 0 ZONE 0
WELL TSEWAGE
Eng.Tahir:
GROUNG
WELL TSTORM
Eng.Tahir:
GROUNG
LEVEL AT LEVEL AT
Eng.Tahir:
PUMP STATION Eng.Tahir:
PUMP STATION
INLET PIPE INLET PIPE
SITE DATA Eng.Tahir:
INV. LEVEL SEWAGE DESIGN PARAMETERS SOIL INPUT SITE DATA Eng.Tahir:
INV. LEVEL
INLET PIPE INLET PIPE
GL DIAMETER 3.15 M PF 3 GAMMA WATER T/M3 GL DIAMETER 3.15 M
UP IPL@ MANHOLE M RF 0.9 GAMMA DRY SOIL T/M3 UP IPL@ MANHOLE M
IPDIA Eng.Tahir: M MIN SLOPE 0.001 C COHESION T/M2 IPDIA Eng.Tahir: M
# HOUSES GROUTH RATE NO MAX d/D FOR DN 0.5 ANGLE FRICTION DEG AREA GROUTH RATE
HA
CAP./HOUSE NOW NO MAX d/D PIPE> D 0.75 SF 3 C NO
GR % MAX Qtotal/Qfull 0.8 i mm/HR
DESIGN AGE YEAR #PIPES 1 DESIGN AGE YEAR
n 0.011 FORCE MAIN INPUT DATA
FC' 25 T/M2 #PIPE 1 NO
FY 500 T/M2 OD 315 M
Eng.Tahir: LENGTH FROM M 22 M ID 0.29 M Eng.Tahir:
DISCHARGE DISCHARGE
FOR ONE PUMP HOUSE CONNECT 2.25 M PWALL THICK 25 M FOR ONE PUMP

PUMPS INPU LONGUST LINE L 2000 M LENGTH 1200 M PUMPS INPU


QP M3/HR WETWELL DIM W 3 M OUT LET ST L 2 M QP M3/HR
HIGH P M WETWELL DIM LE 3 M VELOCITY 3 M/SEC HIGH P M
WIDTH P M DEPTH IP INV TO 2.25 M WIDTH P M
LWL1 M 1ST JOINT HIGH 1.25 M SCREEN INPUT DATA LWL1 M
LWL2 M 2ND JOINT HIGH 3 M LENGTH 2 M LWL2 M
OUT P DIA M 3RD JOINT HIGH 2 M WIDTH 2 M OUT P DIA M
POWER KW DEPTH ROOF AND 0.5 M D UNDER IPL 0.25 M POWER KW
CYCLE NO/HR WALL THIK 0.3 M WALL THIK 0.3 M CYCLE NO/HR
WEIGHT KG BASE HEAL LENGH 0.8 M BASE THIK 0.3 M WEIGHT KG
B LENGTH M BASE THICK 0.3 M HEAL LENGTH 0.8 M B LENGTH M
RPN NO ROOF THICK 0.25 M CONCRETE GAMA 2.5 T/M3 RPN NO
CONCRETE FC' 25 T/M2
ROOF THICK 0.25 M
LENGTH PIPE M 18 M
SEWAGE DESIGN PARAMETERS SOIL INPUT
PF 3 GAMMA WATER T/M3
RF 0.9 GAMMA DRY SOIL T/M3
MIN SLOPE 0.001 C COHESION T/M2
MAX d/D FOR DN 0.5 ANGLE FRICTION DEG
MAX d/D PIPE> D 0.75 SF 3
MAX Qtotal/Qfull 0.8
#PIPES 1
n 0.011 FORCE MAIN INPUT DATA
FC' 25 T/M2 #PIPE 1 NO
FY 500 T/M2 OD 315 M
LENGTH FROM M 22 M ID 0.29 M
HOUSE CONNECT 2.25 M PWALL THICK 25 M
LONGUST LINE L 2000 M LENGTH 1200 M
WETWELL DIM W 3M OUT LET ST L 2M
WETWELL DIM LE 3M VELOCITY 3 M/SEC
DEPTH IP INV TO 2.25 M
1ST JOINT HIGH 1.25 M SCREEN INPUT DATA
2ND JOINT HIGH 3M LENGTH 2M
3RD JOINT HIGH 2M WIDTH 2M
DEPTH ROOF AND 0.5 M D UNDER IPL 0.25 M
WALL THIK 0.3 M WALL THIK 0.3 M
BASE HEAL LENGH 0.8 M BASE THIK 0.3 M
BASE THICK 0.3 M HEAL LENGTH 0.8 M
ROOF THICK 0.25 M CONCRETE GAMA 2.5 T/M3
CONCRETE FC' 25 T/M2
ROOF THICK 0.25 M
LENGTH PIPE M 18 M