Procedure: Technical Bid Evaluation For Auger Boring

This document provides a procedure for evaluating auger boring bids for relocating a fuel oil pipeline in Bandung, West Java. It describes the project background, including details about the pipeline owner Pertamina and how it supplies fuel to West Java. The objective is to define material requirements for contractors to relocate a section of the 12-inch Cilacap-Bandung II pipeline that will be impacted by construction of a high-speed railway. Terminology and abbreviations used in the document are also defined.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
271 views6 pages

Procedure: Technical Bid Evaluation For Auger Boring

This document provides a procedure for evaluating auger boring bids for relocating a fuel oil pipeline in Bandung, West Java. It describes the project background, including details about the pipeline owner Pertamina and how it supplies fuel to West Java. The objective is to define material requirements for contractors to relocate a section of the 12-inch Cilacap-Bandung II pipeline that will be impacted by construction of a high-speed railway. Terminology and abbreviations used in the document are also defined.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 6

PROCEDURE PT.

WIJAYA KARYA (Persero) Tbk


DEPARTEMEN INDUSTRIAL PLANT
Document Number TECHNICAL BID Rev. : 0
EVALUATION FOR Page Number
PRPP-10-TBE-0001
AUGER BORING 1 dari 5

PROJECT END USER : PT. PERTAMINA (PERSERO)

PROJECT OWNER : PT. KERETA CEPAT INDONESIA CHINA

COMPANY : HIGH SPEED RAILWAY CONTRACTOR


CONSORTIUM PT. WIJAYA KARYA (Persero) Tbk
– DEPARTEMEN SIPIL UMUM 1

CONTRACTOR : PT. WIJAYA KARYA (Persero) Tbk –


DEPARTEMEN INDUSTRIAL PLANT

PROJECT : RELOCATION FUEL OIL PIPELINE PERTAMINA


DK 117-128 & DK 135-138

LOCATION : TOL PURBALEUNYI, BANDUNG, JAWA BARAT

CONTRACT NUMBER : TP.02.01/HSRCC.WIKA.P/96/X/2018

0 02/01/2018 PGS MN RA GPS


Made By Reviewed By Approved By
REV. DATE DESC
PT WIJAYA KARYA
PROCEDURE PT. WIJAYA KARYA (Persero) Tbk
DEPARTEMEN INDUSTRIAL PLANT
Document Number TECHNICAL BID Rev. : 0
EVALUATION FOR Page Number
PRPP-10-TBE-0001
AUGER BORING 2 dari 5

TABLE OF CONTENS
1.0 BACKGROUND
2.0 OBJECTIVE
3.0 TERMINOLOGY AND ABBREVIATIONS
3.1 Terminology
3.2 Abbreviations

1.0 BACKGROUND
PROCEDURE PT. WIJAYA KARYA (Persero) Tbk
DEPARTEMEN INDUSTRIAL PLANT
Document Number TECHNICAL BID Rev. : 0
EVALUATION FOR Page Number
PRPP-10-TBE-0001
AUGER BORING 3 dari 5

PT. Pertamina (Persero) is a Government Company that has an


authority from the Government to distribute fuel oil (Bahan Bakar
Minyak - BBM) to all corners of Indonesia. In the distribution of fuel,
there are several modes of transportation used such as through ships, pipelines and tank
truck. Especially in Java, the role of pipelines in the proces distribution of fuel is very vital.
For West Java, in the area Bandung and surrounding, fuel supply comes from 2 locations of
BBM Terminal (TBBM). Those are TBBM Ujung Berung and TBBM Padalarang. Both TBBM
get fuel supply from TBBM Lomanis located in Cilacap, Central Java which is pumped
through Cilacap-Bandung I (CB-I) and Cilacap-Bandung II (CB-II).
Development of Fast Train Railway (Jalur Kereta Cepat) to be undertaken by PT. Kereta
Cepat Indonesia China (PT. KCIC) from Jakarta to Bandung where based on the Lay Out
Plan Plan will be clashed to the Cilacap-Bandung II (CB-II) Pipe Line owned by PT.
Pertamina in Purbaleunyi Toll Road KM 127 + 560 to KM 138 + 440 Line A and KM 145 +
800 to KM 147 + 850 Line B.
PROCEDURE PT. WIJAYA KARYA (Persero) Tbk
DEPARTEMEN INDUSTRIAL PLANT
Document Number TECHNICAL BID Rev. : 0
EVALUATION FOR Page Number
PRPP-10-TBE-0001
AUGER BORING 4 dari 5

The pipeline CB-II is located as the following map :

Figure -1 – Pipeline CB-II Route Map


2.0 OBJECTIVE
This Material Take Off document aims to define the minimum requirements for the
CONTRACTOR to supply material for 12” Pipeline Relocation Cilacap Bandung – II Affected from
Development of Fast Train Railway of PT KCIC Project.

3.0 TERMINOLOGY AND ABBREVIATIONS


3.1 Terminology
COMPANY : PT. Kereta Cepat Indonesia China
PROCEDURE PT. WIJAYA KARYA (Persero) Tbk
DEPARTEMEN INDUSTRIAL PLANT
Document Number TECHNICAL BID Rev. : 0
EVALUATION FOR Page Number
PRPP-10-TBE-0001
AUGER BORING 5 dari 5

CONSULTANT : Consortium PT. Technip Indonesia – PT.


Technip Engineering Indonesia
PROJECT : Provision of Front End Engineering (FEED) for
Pipeline Relocation Cilacap Bandung – II Affected from Development of Fast Train Railway of PT
KCIC
CONTRACTOR : Party who provide services to perform part of the contractual scope of
work
Shall : Means absolute requirement to be followed strictly in order to conform
the philosophy
Should : Means recommendation, that alternative solutions having the same
functionality and quality are acceptable
May : Means course of action that is permissible within the limits of the
philosophy (permission)

3.2 Abbreviations
3LPE Three Layer Polyethylene
API American Petroleum Institute
ASME American Society of Mechanical Engineers
BBM Bahan Bakar Minyak
CB Jalur Pipa Cilacap-Bandung
FEED Front End Engineering Design
HDD Horizontal Directional Drilling
HFERW High-Frequency Electric Resistance Welding
KCIC PT. Kereta Cepat Indonesia China
MOP Maximum Operating Pressure
MTO Material Take Off
OD Outside Diameter
PSL Product Specification Level
PTTI Consortium PT. Technip Indonesia - PT. Technip Engineering Indonesia
SI Standard International Unit System
SNI Standar Nasional Indonesia
TBBM Terminal Bahan Bakar Minyak
PROCEDURE PT. WIJAYA KARYA (Persero) Tbk
DEPARTEMEN INDUSTRIAL PLANT
Document Number TECHNICAL BID Rev. : 0
EVALUATION FOR Page Number
PRPP-10-TBE-0001
AUGER BORING 6 dari 5