Safety Inspection Report: KLL (I)

The inspection report summarizes a safety inspection conducted at the Riviera at Puri construction site in Jakarta on December 18, 2018. The inspection was led by the WSH Safety Unit and found three issues: workers installing roof tiles lacked fall protection like railings and harnesses, scaffolding structures were unsafe without railings and incomplete platforms, and temporary railings were missing around voids and staircases. Corrective actions and photos were documented.

Uploaded by

Ega Nugraha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
138 views1 page

Safety Inspection Report: KLL (I)

The inspection report summarizes a safety inspection conducted at the Riviera at Puri construction site in Jakarta on December 18, 2018. The inspection was led by the WSH Safety Unit and found three issues: workers installing roof tiles lacked fall protection like railings and harnesses, scaffolding structures were unsafe without railings and incomplete platforms, and temporary railings were missing around voids and staircases. Corrective actions and photos were documented.

Uploaded by

Ega Nugraha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Safety Inspection Report

Date of
Project Site: The Riviera at Puri, Jakarta 18 Desember 2018
Inspection:

KLL (I):
Type of Inspected
WSH Safety Unit Visit Andry (WSH) – KLL
Inspection: by:
Lukman (Safety SPV)
Assessment Ega (SO) – PT. KCBM
C
Rating:

S/N Location of Description of Positive Photo of


Finding Finding Finding
1 N.A. N.A.

Corrective
Location Description of Photo of Corrective Closure
S/N Photo of Finding Action Taken /
of Finding Finding Action Taken Date
Action by
1 Work Site Pekerjaan
pemasangan
genteng tanpa
railing proteksi dan
body harnes.

[1]

2 Work Site Struktur


Scaffolding tampak
tidak aman.
-Tidak ada railing.
-Platform kerja
tidak terisi penuh.

[7]

3 Work Site Tidak ada railing


temporary pada
area void dan
tangga.

[1]