MORTH BT, CC, Causeway, Bridge
MORTH BT, CC, Causeway, Bridge
MORTH BT, CC, Causeway, Bridge
199 2.a.I Cutting and removing Palmyrah trees including stacking of girth 30 to 100 cm. Each 19.00
200 ii - do - 100 to 200 cm. Each 33.00
201 2.b.I Uprooting and removing Palmyrah stumps including stacking of girth 30 to 100 cm. Each 23.50
237 8.a Sand or loose soils wet sand not under water, silt in canals,channels and drains SS 20- 1 cum 19.00
A.
238 b - do - 20-B 1 cum 20.00
239 9.a Loamy and Clayey soils like black cotton soils, red earth and ordinary gravel SS 20-A. 1 cum 31.50
269 iii -do- from 7 th extra lift and above 1 cum 3.20
FOR HARD DISINTEGRATED ROCK (ITEM 16 & 17 ABOVE )
270 21.b. I Extra for every additional 1 metres Lift or part there of over the initial lift for first 3 extra 1 cum 2.10
lifts
271 ii Extra for every additional 1 mtrs. lift or part there of from 4 th extra lift to 6 th extra lift 1 cum 3.10
272 21.b.iii -do- from 7 th extra lift and above 1 cum 4.60
FOR FISSURED AND FRACTURED, HARD ROCK AND BOULDERS ETC.,(ITEM 18
TO 19 a ABOVE ).
273 21.c.I Extra for every additional lift of 1 metre or part there of over the initial lift for the first 3 1 cum 4.10
extra lifts
274 ii Extra for every additional lift of 1metre or part there of over from 4th extra lift to 6 th 1 cum 5.10
extra lift
275 iii -do- from 7 th extra lift and above 1 cum 6.60
276 Note: The lift charges mentioned in SS item Nos 21a,21 b, and 21c under (D) Earth
work are applicable to delifts also.
277 22.a Add to relevant SS 20-A rates for new tank bunds, closing breaches, road formation and 1 cum 2.10
embankments for extra watering and consolidation by stone roller upto 1 tonne.
279 c Add to relevant SS 20-A rates for new tank bunds,closing breaches, road formation and 1 cum 20.50
embankments for extra watering and consolidation of proctor's density with 8 to 10
tonne power roller including watering and conveyance of water for initial lead of 1/2
kilometer.
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
280 Note: The element of Hire charges is Rs 51.76 per 10 cum corresponding to the hire 1 cum
charges of 8 to 10 Tonne power roller fixed at Rs. 2200/- per day of 8 hours. The rate
shall be increased when the element of hire charges increases for item No. 22 c
above,if the roller is lent to the contractor at a rate of Rs 275/- per hour(i.e., Rs 2200/-
per day of 8 hours may be effected).
281 22.d Extra for every additional 1/2 km lead for water over the initial lead of 1/2 Km for 1 cum 2.20
consolidation of banks .
282 23.a Benching old embankment slopes 0.45 x 0.45 metres. 1 RM 1.30
283 23.b Puddle wall work 1 cum 33.50
284 24 Turfing slopes including watering for 3 months with initial lead for conveyance of water 1 Sq.m 13.50
and grass for 1 hectometre.
285 25 Refilling with the excavated sand complying with the standard specifications for filling 1 cum 10.50
foundations
286 26.a Refilling with the excavated soils ( other than sand) complying with the standard 1 cum 7.10
specifications for filling foundations.
287 b Trimming of slopes of embankments and depositing the soils on the top of the bank. 1 cum 50% of earth work excav
of similar classification
290 Note:
291 1. Add for vibrating concrete 1 cum 32.00
292 2. Add for machine mixing of concrete. 1 cum 31.50
293 3.Add where the power is available for operating the mixer, the rate is, 1 cum 21.00
294 aI White washing and colour banding for guard and guide stones including cost of each 4.10
materials
295 bI Screening sand and gravel 1 cum 4.10
296 b2 Screening chips and metal 1 cum 8.70
297 c1 Removing and refixing Hectometre or Demarcation stones each 5.10
CENTERING CHARGES
298 L1 Centering charges for culvert slabs and other structures of 3 mts. span and above 1 cum 699.00
299 L2 Centering charges for bed blocks and culvert slabs and other structures of less than 3 1 cum 572.00
mts. span.
CENTERING CHARGES FOR MINOR AND MAJOR BRIDGE WORKS
300 L3 For mass concrete piers, abutments and steining well curbes, well caps etc., 1 cum 507.00
301 L4 For RCC piers, abutments, wing wall, steining, well curbs, well caps etc., 1 cum 634.00
302 NOTE:- The rates under L3 and L 4 are applicable to Roads and Buildings and Irrigation structures up
to 2 metres width
n Laying and fixing RCC Hume pipes in position including lifting, aligning etc., complete
with (fixing ) collars for the following diametres of pipes but excluding cost of materials
( NP2 Class )
HARD METAL
327 5 (a) 40 mm thick ness 10 sqm 100.00
328 (b) 50 mm thick ness 10 sqm 114.00
329 (c ) 75 mm thick ness 10 sqm 127.00
330 (d ) 100 mm thick ness 10 sqm 134.00
331 (e) 150 mm thick excluding hire charges 10 sqm 240.00
Spreading gravel watering with an initial lead of 2 hectometres and power roller
( 8 to 10 T ) rolling excluding hire charges of power roller and barricading etc.,
( for a compact thickness of )
353 Hot applied thermoplastic compound(For MORTH data,for works of state & national high Per Litre 150.00
ways only)
354 Reflectionising glass beads of 2 mm thick(For MORTH data,for works of state & national Per Kg 50.00
high ways only)
355 Road marking paint confirming to IS 164(For MORTH data,for works of state & national Per Kg 125.00
high ways only)
BAILING OUT WATER CHARGES FOR CD & CM WORKS (WHEREVER REQUIRED)
356 I 14 For earth work excavation for foundations below low water level 1 cum 85.00
357 I 15 For cement concrete for foundation below low water level 1cum 85.00
358 n Labour charges for laying filters with coarse aggregate. 1 cum 34.00
359 o Labour charges for laying filter with sand. 1 cum 16.00
BUILDING ITEMS
SS RATE
FOR 2005-
S. No Details Unit 06
1 2 3 4.00
IV . RATES OF MATERIALS
(A) BRICKS & TILE PRODUCTS
1 Bricks second class or ground moulded (Non-Modular or traditional size) 23 x 11 x 7 cm 1000 Nos 1350.00
2 - do- modular size 19 x 9 x 9 cm 1000 Nos 1404.00
3 Bricks country (Non-modular tradditional size) 22 x 11 x 5 cm 1000 Nos 972.00
Flyash lime solid blocks with compressive strength of 100 kg/sq.cm
4 290 x 225 x 140 mm Each 8.30
5 290 x 200 x 140 mm Each 7.10
6 290 x 122 x 140 mm Each 4.80
7 290 x 100 x 140 mm Each 4.00
8 225 x 100 x 60 mm Each 1.70
9 145 x 225 x 140 mm Each 4.80
10 145 x 200 x 140 mm Each 3.60
Flyash lime solid blocks with compressive strength of 50 kg/sq.cm
11 290 x 225 x 140 mm Each 7.10
12 290 x 200 x 140 mm Each 5.90
13 290 x 122 x 140 mm Each 3.60
14 290 x 100 x 140 mm Each 3.00
15 225 x 100 x 60 mm Each 1.30
16 145 x 225 x 140 mm Each 3.60
17 145 x 200 x 140 mm Each 3.20
18 Cynder 1 Cum 248.40
Supply of ‘AEROCON’ HQ building Blocks & ‘COMFORTILE-Thermal Roof Tile’
(‘Ex-factory price) including all taxes.
A. AEROCON – HQ BUILDING BLOCKS
19 600 x 200 x 75 mm Each 24.80
20 600 x 200 x 100 mm Each 33.50
21 600 x 200 x 125 mm Each 40.00
22 600 x 200 x 150 mm Each 46.40
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
23 600 x 200 x 200 mm Each 62.60
24 600 x 200 x 230 mm Each 72.40
B. COMFORTILE -Thermal Roof Tile
25 300 x 200 x 50 mm Each 9.70
Supply & fixing of AEROCON PANELS
26
Supply & fixing of 50mm thick Aerocon sandwich Panels having Tongue and Groove
joint for partitions and walls using G.I. Flooring & Ceiling channels, hardware, Labour,
transportation, wastages, etc.,as a complete item of work excluding finishings, fittings &
fixtures. Sqm. 918.00
27
Supply & fixing of 75mm thick Aerocon sandwich Panels having Tongue & groove joint
for partitions And walls using G.I. Flooring & Ceiling channels, hardware, Labour,
transportation, wastages, etc.,As a complete item of work Excluding finishings, fittings &
fixtures Sqm. 1026.00
AEROCON PANELS
28 50mm thick x 600mm standard width x 2400mm, 2700mm & 3000mm lengths Sqm. 648.00
29 75mm thick x 600mm standard width x 2400mm, 2700mm & 3000mm lengths Sqm. 864.00
CUDDAPAH/SHAHABAD STONES
30 Cuddapah/Shahabad slab 40 mm thick and size not less than 0.457 M x 0.457 M 1 Sqm 90.70
31 Cuddapah/Shahabad slab 50 mm thick and size not less than 0.457 M x 0.457 M 1 Sqm 101.50
Shahabad Stone slab of Tandur 25.4 mm thick
32 White 10 Sqm 680.40
33 Blue 10 Sqm 734.40
Shahabad Stone slab of Tandur 50.8 mm thick
34 White 10 Sqm 777.60
35 Blue 10 Sqm 885.60
Polished Shabad stone slab 25.4mm thick (0.457 x 0.457M)
36 White 10 Sqm 1323.00
37 Blue 10 Sqm 1674.00
38 Polished black cuddapah slabs 25.4 mm thick (0.457x 0.457M) 10 Sqm 1247.40
39 Polished Bethamcherla white stone 25.4 mm thick (0.254M x0.254M) 10 Sqm 3267.00
40 Polished Bethamcherla colored stone 25.4 mm thick (0.254M x0.254M) 10 Sqm 3483.00
41 High Polished Granite 18 to 20 mm thick up to 8'-00 (2.43 M) other than black 1Sqm 1587.60
42 High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) other than black 1Sqm 1458.00
43 High Polished Granite 18 to 20 mm thick up to 8'-00 (2.43 M) black 1Sqm 1360.80
44 High Polished Granite 16 to 18 mm thick up to 8'-00 (2.43 M) black 1Sqm 1231.20
Rounding the edges of cuddapah Slabs and Shahabad stone slabs & Marble slabs
45 including polishing the same. 1 Rm 27.00
46 Rounding the edges of Granite slabs including polishing the same. 1 Rm 81.00
47 Flat nosing to Cuddapah slabs and Shahabad stone slabs 40mm thick 1 Rm 3.90
48 Flat nosing to Cuddapah slabs and Shahabad stone slabs 50mm thick 1 Rm 4.50
49 Flat nosing to Cuddapah slabs and Shahabad stone slabs 60mm thick 1 Rm 5.70
50 Flat nosing to Cuddapah slabs and Shahabad stone slabs 75mm thick 1 Rm 6.50
FLOORING SLABS/ TILES
Dongari Adanga marble slab polished 18 mm to 20 mm (average ) thick (size 0.457 M x
51 0.457 M)/ (0.6M x 0.6M) 1 sqm 486.00
Dongari Adanga marble slab polished 16 mm to 20 mm (average ) thick (size 0.457 M x
52 0.457 M)/ (0.6M x 0.6M) 1 sqm 432.00
Dongari Adanga marble slab polished 18 mm to 20 mm (average ) thick 0.305 M x
53 0.305 M 1 sqm 405.00
Dongari Adanga marble slab polished 16 mm to 20 mm (average ) thick 0.305 M x
54 0.305 M 1 sqm 351.00
Dongari Adanga marble slab polished 18 mm to 20 mm (average ) thick ( 0.610 M width
55 of any length). 1 sqm 648.00
Dongari Adanga marble slab polished 16 mm to 20 mm (average ) thick ( 0.610 M width
56 of any length) 1 sqm 594.00
57 Marble Tiles polished 8 mm thick 1 sqm 280.80
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
58 Cutting marble slabs upt o 50 mm thick by mechanical device. 1 RM 5.40
59 Granite stone tiles 8 mm thick ( mirror polished of all shades) 1 sqm 604.80
60 Ceramic tiles 7.3mm thick 1st quality of all shades ( as per manufacture specification) 1 sqm 324.00
Chequrred Terrazo tiles of 22 mm thick ( Medium shade) 0.254 M x 0.406
61 M 1 sqm 189.00
Chequrred Terrazo tiles of 22 mm thick (Dark shade) 0.254 M x
62 0.406 M 1 sqm 172.80
63 Chequrred Terrazo tiles of 30 mm thick ( Light shade) 0.305 M x 0.305 M 1 sqm 172.80
Chequrred Terrazo tiles of 30 mm thick (Dark shade) 0.305 M x
64 0.305 M 1 sqm 183.60
Chequrred Terrazo tiles of 30 mm thick ( medium shade) 0.305 M x
65 0.305 M 1 sqm 162.00
66 Decorated white background glazed tiles 200 mm x 152 mm 1 sqm 397.40
67 Decorated coloured background glazed tiles 200 mm x 300 mm 1 sqm 443.90
68 Fantasy Glazed Tiles size 200mm x152 mm 1 sqm 420.10
69 White glazed Tiles of any size Ist quality 1 sqm 243.00
70 Glazed coloured Tiles of any size Ist Quality 1 sqm 287.30
71 Precast Terrazo Tiles 20 mm thick ( Medium shade) 1 sqm 205.20
72 Precast Terazo Tiles 20 mm thick (dark shade) 1 Sqm 199.80
73 Supply & Fixing precast Terrazo Tiles Marbleite in white & colour vains 20 mm thcik 1 Sqm 216.00
74 a) Fixing charges only 1 Sqm 17.80
75 b) Polishing charges only 1 Sqm 23.80
76 c) Wax polishing charges only. 1 Sqm 14.60
77 Supply & Fixing precast Terrazo Tiles Marbleite in white tiles 20 mm thick 1 Sqm 167.40
78 a) Fixing charges only 1 Sqm 17.80
79 b) Polishing charges only 1 Sqm 23.80
80 c) Wax polishing charges only. 1 Sqm 14.60
81 Supply & fixing Terrazo tiles 20 mm thick grey tiles 1 Sqm 97.20
82 a) Fixing charges only 1 Sqm 17.80
83 b) Polishing charges only 1 Sqm 23.80
84 c) Wax polishing charges only. 1 Sqm 14.60
Supply & fixing of Crazy Marble flooring
85 Marble powder 1 Kg 2.10
86 Marble chips 1 Sqm 351.00
87 Mosaic chips 1 Sqm 1984.00
88 Grinding, Polishing, electricity charges 1 Sqm 69.70
89 Vitrified polished floor tiles 800x 800x10 mm thickness premium type 1st quality 1 Sqm 1220.40
90 Vitrified polished floor tiles 600x 600x 8mm thickness premium colour 1st quality. 1 Sqm 864.00
91 Vitrified polished floor tiles 600x 600x 8mm thickness normal colour 1st quality. 1 Sqm 756.00
92 Vitrified polished floor tiles 400x 400x 7mm thickness normal colour 1st quality. 1 Sqm 702.00
Providing Bisazza glass Tiles Group 1 series or equivalent quality 20 x 20x4 mm thick to
93 be aplied on sponge finish using laucratic 290 thin set polymer based adhesive. 1 Sqm 1395.40
139 Labour charges for petty Iron work for truss straps etc., wrought & plut up (lahour only) 1 Kg 6.50
labour for fabrication of reinforcement including bending and placing at site in position
140 including cost of binding wire 1 Kg 4.30
Galvanized Steel Barbed wire
141 I.O.A. 12 Gauge 1 Kg 23.80
142 I.O.A. 14 Gauge 1 Kg 22.70
Supply & fixing of Rolling shutter made of 80 x 1.25 mm machine rolled laths (rate
143 includes top cover bearings, and locking arrangements etc. ) 1 Sqm 1296.00
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
Supplying & fixing collapsable steel shutters with verticle, double channel of 20 x10x2
mm of 100 mm center Bracers with flat iron 40x40x6 mm with 38 mm dia steel plully
144 with all fixtures and furniture as per special spn. 1105 1 Sqm 1080.00
(D) DOOR FITTINGS
1) TOWR BOLTS AS PER IS 204
BRASS
145 100 mm Long Each 42.10
146 150 mm Long Each 62.60
147 200 mm Long Each 84.20
148 250 mm Long Each 104.80
149 300 mm Long Each 128.50
ALLUMINIUM
150 75 MM Long Each 29.20
151 100 mm Long Each 34.60
152 150 mm Long Each 42.10
153 200 mm Long Each 52.90
154 250 mm Long Each 62.60
155 300 mm Long Each 73.40
MILD STEEL (POWDER COATED)
156 100 mm Long Each 10.80
157 150 mm Long Each 16.20
158 200 mm Long Each 22.70
159 250 mm Long Each 31.30
160 300 mm Long Each 38.90
2) BUTT HINGES AS PER IS : 205
BRASS
161 75 MM Long Each 18.40
162 100 mm Long Each 58.30
163 125 mm Long Each 70.20
164 150 mm Long Each 92.90
ALLUMINIUM
165 75 MM Long Each 41.00
166 100 mm Long Each 49.70
167 125 mm Long Each 58.30
168 150 mm Long Each 58.30
MILD STEEL (POWDER COATED)
169 75 mm Long Each 5.40
170 100 mm Long Each 9.70
171 125 mm Long Each 14.00
172 150 mm Long Each 19.40
3) DOOR HANDLES AS PER IS:208
ALLUMINIUM
173 75 mm Long Each 27.00
174 100 mm Long Each 31.30
175 125 mm Long Each 46.40
176 150 mm Long Each 51.80
MILD STEEL (POWDER COATED)
177 125 mm Long Each 14.00
178 150 mm Long Each 20.50
ALDROPS AS PER IS:2681
BRASS
179 300 mm long Each 379.10
ALLUMINIUM
180 200 mm long Each 122.00
181 250 mm long Each 145.80
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
182 300 mm long Each 157.70
MILD STEEL (POWDER COATED)
183 200 mm long Each 48.60
184 250 mm long Each 63.70
185 300 mm long Each 75.60
5)FLAT LATCHES
BRASS
186 Door Stopers Each 75.60
187 Windows Stay Each 86.40
ALLUMINIUM
188 200 mm long Each 58.30
189 250 mm long Each 67.00
190 300 mm long Each 70.20
MILD STEEL (POWDER COATED)
191 250 mm long Each 23.80
192 300 mm long Each 30.20
193 Door Stopers Each 20.50
194 Supply & fixing droppery rods (25.4 mm) 1" x 21 G Powder coated with PVC rings Rft 16.20
195 Supply & fixing droppery bracket - brass powder coated pair 189.00
196 Brass Aldrop heavy duty 350 mm Each 729.00
197 Brass Aldrop heavy duty 450 mm Each 1037.90
198 Alluminium Aldrop 350 mm ISI marked IS 204 Each 198.70
199 Alluminium Aldrop 450 mm ISI marked IS 204 Each 251.60
200 Delux window stay alluminium Each 54.00
201 Heavy duty alluminium Door stopper Each 22.70
202 Brass fancy handles 150 mm Each 128.50
203 Brass fancy handles 200 mm Each 175.00
204 Brass fancy handles 250 mm Each 315.40
205 Brass fancy handles 300 mm Each 402.80
206 Brass fancy handles 450 mm Each 629.60
207 Door closer automatic hyper brand IS 3564 Each 527.00
208 Double action brass plate floor spring Hyper brand IS 6315 Each 727.90
209 Floor spring Ist Quality for Aluminium door Each 1283.00
210 Heavy duty mortice lock 6/7 levers with PC or CP handles complete set Each 326.20
211 Heavy duty mortice lock 6/7 levers with brass heavy handles Each 1137.20
212 Brass latch heavy 300 mm Each 238.70
213 Brass latch heavy 350 mm Each 274.30
214 Brass latch heavy 450 mm Each 361.80
215 Friction stay hinges for windows Each 48.60
216 Keyless lockset for toilet with CP or PC handles (complete set) Each 140.40
217 Keyless lock set for toilet with brass handles Each 373.70
(E) MISCELLANEOUS ITEMS
218 Alluminium sheet 24 Gauge 1 Sqm 180.40
Alluminium strips
219 Alluminium Strip 40 mm wide and 2 mm thick 1 Kg. 125.30
220 Alluminium plain strip edging 38x12x3 mm Metre 40.00
221 Alluminium plain strip edging 57x12x3 mm Metre 57.20
222 Alluminium strips 10 mm 1 Kg. 113.40
223 Alluminium Strips 25 mm 1 Kg. 113.40
224 Alluminium Stips 38 mm wide and 1.6 mm thick. 1 Kg. 113.40
225 7.5mm thick Alluminium Grill (as approved by the department) 3.58 Kg/Sq.m. 1 Sqm 664.20
226 Supply & fixing MS/CI grills of any design 1 Kg. 32.40
227 Mastic pad 2'0 " x 4'0" (0.60M x 1.2M) of 1" (25.4 mm ) thick 1 Sqm 530.30
228 Mastic pad 2'0 " x 4'0" (0.60M x 1.2M) of 1/2" (12.7 mm ) thick 1 Sqm 303.50
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
229 Expanded metal Jally 3/4" (19.05 mm ) size 1 Sqm 82.10
230 GI (M.S) fly proof wire mesth 16 x 20 guage 1 Sqm 111.20
231 SS fly proof mesh 1 Sqm 270.00
232 Chain link mesh 8 guage 2" x2" (50.8 mm x 50.8 mm) 1 Sqm 128.50
233 Chain link mesh 8 guage 3" x 3" (76.2 mm x 76.2 mm) 1 Sqm 87.50
234 Chain link mesh 8 guage 4"x4" (101.6 mm x 101.6 mm) 1 Sqm 74.50
235 Rabbit wire mesh (chicken mesh) 1 Sqm 8.60
Providing Tarfelting roof repairs duly applying one coat of appropriate grade of bitumen
in hot condition @ 1.2 Kg/1Sqm of roof area, fixing tarfelt (Manufactures to IS
1322/1972 specification), applying second coat of appropriate grade of hot bitumen at
1.20 Kg/1Sqm of roof area and spreading course aggregate (sand ) at 0.063 cum per 1
236 Sqm of roof area finished item including all taxes. 1 Sqm 113.40
ROOFSHIELD-1500 OR EQUIVALENT (1.50 mm thickness, 2.25Kg per Sq.Mt and 20
X1 Mtr. roll with a center core of 90 micron thickness HMHDPE film) Water Proofing
Membrane.A) apply one coat of Butiminous Emulsion, first coat of bituminous grade
85/25, fix "ROOFSHIELD-1500 OR EQUIVALENT" water proofing membrane, apply
second coat of Bitumen grade 90/15 after sealing all the joints and abutments with a
Gas torch and apply one coat of BITUMINOUS ALUMINIUM PAINT for heat resistance
for finished item including all taxes
237 1 Sqm. 175.00
Supply, laying & fixing of 60mm thick cement Mosaic reflective concrete pavers from
"Super decorative floorings" make of grade M-40 and above including labour charges,
loading & unloading, laying to desired lines and levels complete. However cement,
238 sand, water, electricity etc shall be provided by you free of cost at site. 1 Sqm. 581.00
Supply, laying & fixing of 30mm thick cement Mosaic reflective concrete pavers from
"Super decorative floorings" make of grade M-40 and above including labour charges,
loading & unloading, laying to desired lines and levels complete. However cement,
239 sand, water, electricity etc shall be provided by you free of cost at site. 1 Sqm. 522.70
WATER PROOFING & CONSTRUCTION CHEMICALS AND EPOXIES
Any company make As per I.SI. Standards, First Quality Rate (exfactory )
including all taxes
A) Concrete Admixtures and Plasticisers
Conflow SNP1 or Equivalent
240 Pack size 1 litre 1 litre 38.60
Conflow SNP20 or Equivalent
241 Pack size 1 litre 1 litre 48.60
Conflow SNPA or Equivalent
242 Pack size 1 litre 1 litre 63.40
B) Super Plasticisers
Conflow SNS I OR EQUIVALENT.
243 Pack size 1 Ltr Ltr 48.60
Conflow SNS 2 OR EQUIVALENT.
244 Pack size 1 Ltr Ltr 48.60
Accelerating Plasticisers
Conflow SNA OR EQUIVALENT.
245 Pack size 1 Ltr Ltr 60.50
Retarding Plasticisers
Conflow SNR OR EQUIVALENT.
246 Pack size 1 Ltr Ltr 38.60
Air Entraining Agents
Conflow SNE OR EQUIVALENT.
247 Pack size 1 Ltr Ltr 38.60
Retarding super Plasticisers
Conflow SNS3 SPL OR EQUIVALENT
248 Pack size 1 Ltr Ltr 48.60
Conflow SNS3 OR EQUIVALENT
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
249 Pack size 1 Ltr Ltr 63.40
Mortar Plasticisers
Morflow SN1 OR EQUIVALENT
250 Pack size 1 Ltr Ltr 18.40
Integral Water Proofing compounds
Conflow SNW1 OR EQUIVALENT
251 Pack size 1 Ltr Ltr 56.00
Conflow SNW2 OR EQUIVALENT
252 Pack size 25 Kg Kg 8.30
253 Pack size 750 Gms Pack 10.20
Block Admixtures
Conflow SNB OR EQUIVALENT
254 Pack size 1 Ltr Ltr 19.30
Sprayed Concrete Accelerators
Shotset SN1 OR EQUIVALENT
255 pack size 250 Kg. Kg 19.30
B) Concrete surface Treatments curing compounds
CURAID SN1 OR EQUIVALENT
256 Pack size 1 Ltr Ltr 48.60
CURAID SN2 OR EQUIVALENT
257 Pack size 1 Ltr Ltr 50.50
Formwork & Mould Treatment
Shutterol SNU OR EQUIVALENT
258 Pack size 1 Ltr Ltr 48.70
Cleaning Agents
Uniklen SN1 OR EQUIVALENT
259 Pack size 1 Ltr Ltr 20.20
Uniklen SN2 OR EQUIVALENT
260 Pack size 1 Ltr Ltr 45.00
Uniklen SN3 OR EQUIVALENT
261 Pack size 1 Ltr Ltr 107.50
C)Free flow - Non shrink Grounts
Pre – Packed Cementitious Grouts
Expacrete SN 50 OR EQUIVALENT
262 Pack size 25 Kg Kg 8.30
Expacrete SN 70 OR EQUIVALENT
263 Pack size 25 Kg Kg 10.20
Expacrete SN 90 OR EQUIVALENT
264 Pack size 25 Kg Kg 15.70
Expacem SN 2 OR EQUIVALENT
265 Pack size 250 gm pack 23.80
Epoxy Resin Grouts
Expacrete SNE 1 OR EQUIVALENT
266 Pack size 1 Kg Kg 510.30
Expacrete SNE 3 OR EQUIVALENT
267 Pack size 15 Kg pack 1944.00
Polyster Resin Grouts
Anchrset SN1 OR EQUIVALENT
268 Pack size 1 Kg pack 121.50
Anchrset SN2 OR EQUIVALENT
269 Pack size 10 Kg pack 1142.10
D) Industrial Flooring systems
Floor Hardeners
Flortop SNC OR EQUIVALENT
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
270 pack size 25 Kg Kg 19.30
Floor top SNS OR EQUIVALENT
271 Pack size 25 Kg. Kg 11.90
Expoxy Floor coating & protective coatings
Procoat SNF or Equivalent
272 Pack size 1 Kg Pack 403.40
Procoat SNS or Equivalent
273 Pack size 1 Kg Pack 335.30
Essenputty SNE or Equivalent
274 pack size 1 Kg Pack 204.10
Procoat SNZ or Equivalent
275 Pack size 1 Ltr Pack 486.00
Procoat SNL or Equivalent
276 Pack size 2.5 Kg. Pack 704.70
Epoxy Self Levelling (Flooring system)
Flortop SNSL or Equivalent
277 Pack size 14 Kg Pack 2818.80
Flortop SNSL (SPL) or Equivalent
278 Pack size 14 Kg Pack 2148.10
Heavy Duty Epoxy Base (Flooring system)
Flortop SNM or Equivalent
279 Pack size 16 Kg Pack 1142.10
Flortop SNFM or Equivalent
280 Pack size 16 Kg Pack 874.80
Epoxy resin primer
Florcoat SNP or Equivalent
281 Pack size 1 Kg Pack 486.00
Procoat SNC or Equivalent
282 pack size 3 Kg Pack 806.80
Procoat SNP or Equivalent
283 pack size 1 Kg Pack 470.90
Procoat SNP2 or Equivalent
284 pack size 3 Kg Pack 845.60
E) Repair Products
Repcrete SNC or Equivalent
285 Pack size 25 Kg Kg 11.90
Repcrete SNE1 or Equivalent
286 Pack size 16 kg Pack 1341.40
Repcrete SNW Primer or Equivalent
287 Pack size 1 Kg Pack 670.70
Repcrete SNW Mortor or Equivalent
288 Pack size 1 Kg Pack 189.50
Uniplug SN or Equivalent
289 pack size 5 Kg Kg 25.70
F) Water Proffing Systems
Aquacoat SNF or Equivalent
290 Pack size 15+5 Kg Pack 1477.40
Water Repellants
Aquarepel SN1 or Equivalent
291 Pack size 1 Ltr Ltr 45.90
G) Adhesive Tile Adhesives
Tilegrip SNU or Equivalent
292 Pack size 15 Kg Kg 15.70
Bonding Adhesives
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
Conbond SNA or Equivalent
293 Pack size 1 Ltr Ltr 204.10
Conbond SNE or Equivalent
294 Pack size 1 Kg Pack 558.90
Note: Literature for usage / application of above construction /water proofing materials,
epoxies etc, will be obtained from manufacturers.
BITUMINOUS HOT SEALING COMPOUND
295 Grade 'A' I.S.I excluding 16 % Tax 1 Kg 17.30
296 Bitumen solution primer of aproved quality excluding 16 % tax 1 Kg 28.10
297 Tar Felt Type - 2 Grade - 1 1 sqm 50.80
GLASS
298 Plain Glass 4 mm thick 1 sqm 189.00
299 Plain Glass 5 mm thick 1 sqm 259.20
300 Tinted Glass 4 mm thick 1 sqm 356.40
301 Tinted Glass 5 mm thick 1 sqm 475.20
302 Pin headed Glass 4 mm thick 1 sqm 172.80
303 Ground Glass 4 mm thick 1 sqm 248.40
304 Ground Glass 5 mm thick 1 sqm 324.00
JALI (CEMENT CONCRETE)
305 25 mm thick 1 sqm 91.80
306 40 mm thick 1 sqm 118.80
307 50 mm thick 1 sqm 162.00
BRUSHES
308 Wire Brush Each 21.60
309 Soft Brush Each 97.20
DISTEMPERS
310 Dry Powder Distemper 1 Kg 21.60
311 Oil Bound Washable Distemper 1 Kg 54.00
POLISH
312 French Spirit Polish 1 Ltr 97.20
313 Wax Polish (Ready made) 1 Kg 194.40
314 Putty for steel work 1 Kg 14.00
315 Putty for wood work 1 Kg 30.20
316 Malamine Polish including cost & labour charges 1Sqm 297.00
PAINTS (CONFORMING TO I.S.I)
317 Alluminium paint Ist Grade 1 Ltr 194.40
318 Anti Corrosive bitumen paint (Black ) grade1 1 Ltr 297.00
319 Red Oxide Primer Paint Grade -1 1 Ltr 70.20
320 Red Oxide Primer Paint Grade – II 1 Ltr 54.00
321 Synthetic Enamel paints in all shades Grade - I 1 Ltr 135.00
322 Synthetic Enamel paints in all shades Grade - II 1 Ltr 97.20
323 Plastic Emulsion Paint Grade – I 1 Ltr 216.00
324 Water proof Cement paint of Superior Quality 1 Kg 29.20
325 White Lead 1 Kg 56.20
326 Marble Powder 1 Kg 14.00
327 Cement primer Grade –I 1 Kg 70.20
328 Cement primer Grade –II 1 Kg 54.00
329 Impervios Water Proofing compound 1 Kg 18.40
330 Fevicol/Wood adhesive compound 1 Kg 118.80
331 Wood Primer 1 Ltr 97.20
332 Oil bound Distemper Primer. 1 Ltr 54.00
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
Supplying and finishing (Altek or equivalent brand) to interior faces of new walls and
ceiling of approved colour as per manufacturers specification including cost and
conveyance of materials to site and labour charges such as preparing the wall, applying
333 primary coat etc, complete for finished item of work. 1 Sqm 70.20
334 Altek paint 25 Kg 313.20
335 Trump 1 Ltr 129.60
336 Snowcem or equivalent quality 25 Kg 864.00
337 Surya Cem or equivalent quality 25 Kg 162.00
338 a).Unitek Fine Grade or equivalent brand 25kg 259.20
b).Supply and finishing of Unitek fine Grade or
equivalent brand t with superfine grade to interior
faces of new walls and ceiling of approved colour as
per manufacturers specification including cost and
conveyance of materials to site and labour charges
such as preparing the wall, applying the primary
coat etc., complete for finished item of work 1 sqm 99.40
339 Unitek Superfine Grade or equivalent brand 25kg 280.80
Supply and finishing of Unitek Superfine Grade or equivalent brand to interior faces of
new walls and ceiling of approved colour as per manufacturers specification including
cost and conveyance of materials to site and labour charges such as preparing the wall,
340 applying the primary coat etc., complete for finished item of work 1sqm. 70.20
341 Unitek Granito Grade or equivalent brand 1kg 1296.00
342 Unitek Granito Grade or equivalent brand 5kg 6318.00
343 Unitek Granito Grade or equivalent brand 20kg 25110.00
Supply and finishing of Unitek Granito Grade or equivalent brand to interior faces of new
walls and ceiling of approved colour as per manufacturers specification including cost
and conveyance of materials to site and labour charges such as preparing the wall,
344 applying the primary coat etc., complete for finished item of work 1sqm. 1274.40
a).Unitek Superfine (Water resistant )Grade or
equivalent brand 25kg 810.00
b).Supply and finishing of Unitek Superfine(Water
resistant)Grade or equivalent brand to interior and
exterior faces of new walls and ceiling of approved
colour as per manufacturers specifications
including cost and conveyance of materials to site
and labour charges such as preparing the
wall,applying the primary coat etc.,complete for
345 finished item of work. 1 sqm. 135.00
346 Unitek Orient Grade or equivalent brand 25kg 1058.40
Supply and finishing of Unitek Orient Grade or equivalent brand to interior and exterior
faces of new walls and ceiling of approved colour as per manufacturers specification
including cost and conveyance of materials to site and labour charges such as
347 preparing the wall, applying the primary coat etc., complete for finished item of work 1sqm. 194.40
348 Unitek Antico Grade or equivalent brand 25kg 1123.20
Supply and finishing of Unitek Antico Grade or equivalent brand to interior and exterior
faces of new walls and ceiling of approved colour as per manufacturers specification
including cost and conveyance of materials to site and labour charges such as
349 preparing the wall, applying the primary coat etc., complete for finished item of work 1Sqm. 178.20
Supply & Application of Two Coats of Alltek Super Fine, One Coat of Alltek Water Based
350 Cement Primer & Two Coats of Alltek Flora (Plastic Emulsion Paint) 1 Sqm. 97.00
Supply & Application of Two Coats of Alltek Super Fine, One Coat of Alltek Water Based
351 Cement Primer & Two Coats of Delight (Acrylic Washable Distemper) 1 Sqm. 81.00
Supply & Application One Coat of Alltek Water Based Cement Primer & Two Coats of
352 Alltek Harmony (Acrylic Emulsion Paint Extr. Grade). 1 Sqm. 86.00
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
Supply & Application of One Coat of Alltek Water Based Cement Primer & Two Coats of
353 Alltek Alltimate (100% Pure Acrylic Emulsion Paint) 1 Sqm. 118.00
ANTI TERMITE TREATMENT TO OLD & EXISTING BUILDINGS
Providing post construction anti termite treatment to drilling 1/2 inch dia., holes in 12mm
depth at the edges of wall floor junction every foot apart and pouring anti termite
chemical (Chloriphriphos 20% E.C / Lindine - 20 % E.C. ) with a hand operator pressure
pump until refusal or to a maximum of one litre per hole. Holes will sealed with cement
motor after treatment and providing spraying and injenction termiticides fro treating and
applying doors, windows, frames, removing , crusting treating with preventive chemicals
( the plinth area of the building each floor shall be taken for purpose of payment)
354 finished item including all costs, conveyances and all taxes. 1 Sqm. 118.00
Providing pre construction anti termite treatment for new buildings:Providing, applying
and Injecting for pre construction anti termite treatment to wall tenches bottom
excavation, foundations, vertical walls, top surface of plinth filling wall and floor
junctions, joints, conduits and external perimeter of the building (Chloriphriphos 20%
E.C / Lindine - 20 % E.C. ) with a hand operator pressure pump at applicable areas as
per site condition in various stages as per IS: 6313, the plinth area of the building each
floor shall be taken for purpose of payment and finished item including all costs,
355 conveyances and all taxes. 1 Sqm. 133.00
Vinycide, Matt finish plastic emulsion Artilin Anti Insect paint OR EQUIVALENT for
interior walls and ceilings, which will be applied on cement plastered surface, brick, old
356 matt finish paints adhering to the substrate, wood etc., washable finished item . 1 Sqm. 226.00
Kremasoie INS, Semi gloss finish Artilin Anti Insect paint OR EQUIVALENT for interior
and exterior surfaces, which will be applied on cement plastered surface, brick, old matt
finish paints adhering to the substrate, wood, wood products, plasttic products, tiles,
357 glass texttile covering etc., washable finished item . 1 Sqm. 262.00
Kremacryl, Matt finish Artilin Anti Insect paint OR EQUIVALENT for interior and exterior,
which will be applied on cement plastered surface, brick, old matt finish paints adhering
358 to the substrate, wood etc., washable finished item . 1 Sqm. 287.00
Vernis 107, Semi gloss finish transparent Artilin Anti Insect Varnish OR EQUIVALENT
for wood work, works against wood borers and termites also for interiors only, which will
359 be applied on wooden surfaces, steel surfaces and tiles, washable finished item . 1 Sqm. 262.00
Kermasoie Fongicide, Semi gloss finish Artilin Anti Fungus paint OR EQUIVALENT for
inreriors and exteriors which will be applied on cement plastered surface, brick, old
Matt finish paints adhering to the substrate,wood and wood products, plaster products,
360 tiles and glass texttile covering etc., washable finished item . 1 Sqm. 237.00
Kermasoie INS& Fong, Semi gloss finish acrylic Artilin Anti Insect and Anti Fungus paint
OR EQUIVALENT for inreriors and exteriors which will be applied on cement plastered
surface, brick, old Matt finish paints adhering to the substrate,wood and wood products,
361 plaster products, tiles and glass texttile covering etc., washable finished item . 1 Sqm. 292.00
Bactesoie, Semi gloss finish Artilin bactericidal and fungicidal paint OR EQUIVALENT
for inreriors only which will be applied on cement plastered surface, brick, old Matt
finish paints adhering to the substrate,wood and wood products, plaster products, tiles
362 and glass texttile covering etc., washable finished item . 1 Sqm. 320.00
Prelaminated particle Board
(One side choice colour and other side balancing white lamination)
A EXTERIOR (GRADE-I)
363 9 mm thick 1 Sqm 567.00
364 12 mm thick 1 Sqm 626.40
365 18 mm thick 1 Sqm 756.00
366 25 mm thick 1 Sqm 816.50
B. REGULAR (GRADE -II)
367 9 mm thick 1 Sqm 489.20
368 12 mm thick 1 Sqm 542.20
369 18 mm thick 1 Sqm 614.50
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
370 25 mm thick 1 Sqm 722.50
Prelaminated particle Board
(Both sides choice colour of same shade)
C. EXTERIOR (GRADE –I)
371 9 mm thick 1 Sqm 659.90
372 12 mm thick 1 Sqm 723.60
373 18 mm thick 1 Sqm 877.00
374 25 mm thick 1 Sqm 950.40
D. REGULAR (GRADE - II)
375 9 mm thick 1 Sqm 565.90
376 12 mm thick 1 Sqm 618.80
377 18 mm thick 1 Sqm 705.20
378 25 mm thick 1 Sqm 803.50
Particle Board (Exterior Grade ) (Bhutan or Equivalent)
A. Plain Particle Board
379 8 mm thick 1 Sqm 208.40
380 12 mm thick 1 Sqm 232.20
381 18 mm thick 1 Sqm 303.50
382 21.4 mm thick 1 Sqm 356.40
383 25 mm thick 1 Sqm 403.90
384 35 mm thick 1 Sqm 659.90
Melamine Faced prelaminated
B. Particle Board (Single Deco)
385 8 mm thick 1 Sqm 432.00
386 12 mm thick 1 Sqm 489.20
387 18 mm thick 1 Sqm 567.00
388 25 mm thick 1 Sqm 642.60
389 35 mm thick 1 Sqm 1069.20
Melamine Faced prelaminated
C. Particle Board (Twin Deco)
390 8 mm thick 1 Sqm 496.80
391 12 mm thick 1 Sqm 567.00
392 18 mm thick 1 Sqm 656.60
393 25 mm thick 1 Sqm 726.80
394 35 mm thick 1 Sqm 1366.20
Particle Board (Interior Grade)(Bhutan or Equivalent)
A. Plain Particle Board
395 6 mm thick 1 Sqm 166.30
396 8 mm thick 1 Sqm 178.20
397 10 mm thick 1 Sqm 196.60
398 12 mm thick 1 Sqm 208.40
399 18 mm thick 1 Sqm 256.00
400 21.4 mm thick 1 Sqm 303.50
401 25 mm thick 1 Sqm 320.80
402 35 mm thick 1 Sqm 558.40
Melamine Faced Prelaminated
B. Particle Board (Singel Deco)
403 8 mm thick 1 Sqm 380.20
404 10 mm thick 1 Sqm 402.80
405 12 mm thick 1 Sqm 425.50
406 18 mm thick 1 Sqm 489.20
407 25 mm thick 1 Sqm 553.00
Melamine Faced prelaminated
C. Particle Board (Twin Deco)
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
408 8 mm thick 1 Sqm 434.20
409 10 mm thick 1 Sqm 475.20
410 12 mm thick 1 Sqm 492.50
411 18 mm thick 1 Sqm 563.80
412 25 mm thick 1 Sqm 619.90
NATURAL COLOUR INSULATING BOARD
413 12 mm thick 1 Sqm 160.90
414 18 mm thick 1 Sqm 237.60
415 25 mm thick 1 Sqm 302.40
WHITE FACE INSULATING BOARD
416 12 mm thick 1 Sqm 196.60
417 18 mm thick 1 Sqm 279.70
418 25 mm thick 1 Sqm 249.50
419 Extra for venered particle Board with commercial venerrring on both sides. 1 Sqm 95.00
420 Venering on both sides with one side teak venered and other side commercial venered 1 Sqm 202.00
421 Teak venering on both sides 1Sqm 315.40
422 Particle Board 12 mm thick (Three Layer) 1 Sqm 249.50
PANELS
Plain particle Board (PPB) (Interioir Grade)
423 9 mm thick 1 Sqm 205.20
424 12 mm thick 1Sqm 227.90
425 15 mm thick 1 Sqm 258.10
426 18 mm thick 1Sqm 285.10
427 21.4 mm thick 1 Sqm 324.00
428 25 mm thick 1Sqm 343.40
Plain particle Board (PPB) (Exterior Grade)
429 9 mm thick 1 Sqm 273.20
430 12 mm thick 1Sqm 295.90
431 15 mm thick 1 Sqm 353.20
432 18 mm thick 1Sqm 385.60
433 21.4 mm thick 1 Sqm 446.00
434 25 mm thick 1Sqm 482.80
Prelaminated particle Board (OSL) (Interior Grade)
435 9 mm thick 1 Sqm 419.00
436 12 mm thick 1Sqm 451.40
437 15 mm thick 1 Sqm 497.90
438 18 mm thick 1Sqm 529.20
439 21.4 mm thick 1 Sqm 568.10
440 25 mm thick 1Sqm 594.00
Prelaminated particle Board (OSL) (Exterior Grade)
441 9 mm thick 1 Sqm 470.90
442 12 mm thick 1Sqm 529.20
443 15 mm thick 1 Sqm 565.90
444 18 mm thick 1Sqm 600.50
445 21.4 mm thick 1 Sqm 661.00
446 25 mm thick 1Sqm 698.80
Prelaminated particle Board (BSL) (Interior Grade )
447 9 mm thick 1 Sqm 475.20
448 12 mm thick 1Sqm 516.20
449 15 mm thick 1 Sqm 548.60
450 18 mm thick 1Sqm 587.50
451 21.4 mm thick 1 Sqm 661.00
452 25 mm thick 1Sqm 737.60
Prelaminated particle Board (BSL) (Exterior Grade)
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
453 9 mm thick 1 Sqm 527.00
454 12 mm thick 1Sqm 590.80
455 15 mm thick 1 Sqm 643.70
456 18 mm thick 1Sqm 709.60
457 21.4 mm thick 1 Sqm 740.90
458 25 mm thick 1Sqm 771.10
LAMINATED SHEETS (EQUIVALENT TO DECOLAM)
Glossy Finish
459 1.00 mm thick 1 Sqm 256.00
460 1.50 mm thick 1Sqm 368.30
461 1.80 mm thick 1Sqm 403.90
Mat Finish
462 1.00 mm thick 1 Sqm 273.20
463 1.50 mm thick 1 Sqm 380.20
464 1.80 mm thick 1Sqm 410.40
MEDIUM FIBRE BOARD INTERIOR GRADE (EQUIVALENT TO NUWUD)
465 6 mm thick 1 Sqm 261.40
466 8 mm thick 1Sqm 297.00
467 12 mm thick 1 Sqm 398.50
468 15 mm thick 1Sqm 505.40
469 18 mm thick 1 Sqm 564.80
470 25 mm thick 1Sqm 802.40
471 30 mm thick 1 Sqm 968.80
472 35 mm thick 1Sqm 1057.30
MEDIUM FIBRE BOARD EXTRIOR GRADE (EQUIVALENT TO NUWUD)
473 6 MM Thick 1 Sqm. 357.50
474 8 MM Thick 1 Sqm. 415.80
475 12 MM Thick 1 Sqm. 549.70
476 15 MM Thick 1 Sqm. 691.20
477 18 MM Thick 1 Sqm. 773.30
478 25 MM Thick 1 Sqm. 1031.80
479 30 MM Thick 1 Sqm. 1284.70
480 35 MM Thick 1 Sqm. 1517.40
GLOSSY FINISH
481 1 mm thick 1 Sqm. 230.00
MATT FINISH
482 1 mm thick 1 Sqm. 245.00
PARTICLE BOARD CEILINGS
483 Gypsum Board 0.595 M x 0.595 M 12.5 mm thick of IS 2095 -1992` 1 Sqm 190.10
False ceiling with 12.5 mm Gypsum Board IS 2095 -1982 using Gyp steel section
484 including installation and complete finish excluding painting. 1 Sqm 577.80
Supply & fixing GVP board 0.595 x 0.595M 12.5mm thick tile using fine line grid
485 system including installation and complete finished excluding painting 1 Sqm 640.40
Gypboard wall lining :
Supply & fixing of Gypboard wall lining using 9.5/12.5 mm thick Gyp - board (cnforming
to IS 2095-1982), fixing to Gypsteel GI channels of perimeter channel (20mm x30mm
x27mm x0.55mm thick) and ceiling channels of (51.5 mm x 26mm
x26mmx10.5mmx0.55mm thick) and fixing and finishing using joint compound and
486 paper tapecomplete finish as per specification without painting. 1 Sqm 591.80
Gypboard plain false ceiling:
Supply and fixing of Gypboard plain false ceiling using 12.5 mm thick Gypboard
conforming to IS 2095 -1982, fixing to Gypsteel GI channels frame work using perimeter
channel (20mm x30mmx27mmx0.55mm) Intermediate channels (45mm
x15mmx15mmx0.9mm) and ceiling channels (51.5 mm x26mm x10.5mm x 0.55 mm
thick) jointing and finishing using joint compound and paper tape complete finish as per
487 specification without painting 1 Sqm 651.20
Gypboard (fine line) Grid suspended ceiling
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
Supply &fixing 75mm thick metal stud partition using 12.5 mm thick Gypboard
conforming to IS 2095-1982 screw fixed to either side to 48 mm studs of 0.55 mm thick
with the 50 mm floor and ceiling channel 0.55 mm and the joints duly finished with joint
490 compound, paper tape and two coats Dry wall top coat as per specification. 1 Sqm 972.00
Providing false ceiling with 15 mm thick Arm strong mineral fiber Board fine finished of
size 600x 600mm fixed over Aluminum frame using "T" Angles 38.1x25.4 mm (1 1/2"
x1") size heavy duty weight suspended from roof using 6mm dia MS Rod hooking over
roof replacement and outer attached to the "J" Bolts fixed to the"T" angles including
Cost &conveyance of all materials and labour charges such as cutting , fixing of
491 standing of frame work exposing roof making complete for finished item of work 1 Sqm 702.00
Providing wooden paneling 12 mm thick Novapan one side laminated sheet fixed on
wooden frame of BT wood size 50.8 mm x 25.4 mm (2"x1") at distance of 609.6mm (2'-
0") intervals of both ways providing 3/4" x 1/2" (19.05 mm x 12.7 mm ) size BT wood
ornamental cover beeding and necessary screws, fevical glue complete for finished item
492 of work. 1 Sqm 1312.20
501 Plywood 3 ply with teak ply on one face and commercial ply on another face 4mm thick 1 Sqm 374.80
502 Plywood 5 ply with commercial ply on both faces 6 mm thick 1 Sqm 332.60
503 Plywood 5 ply with commercial ply on both faces 8 mm thick 1 Sqm 339.10
504 Plywood 5 ply with Teak ply on both faces 9 mm thick 1 Sqm 814.30
505 Plywood 5 ply with teak ply on one face and comercial ply on another face 6 mm thick 1 Sqm 487.10
506 Plywood 5 ply with teak ply on one face and comercial ply on another face 9 mm thick 1 Sqm 624.20
507 Plywood 9 ply with commercial ply on both faces 12 mm thick. 1 Sqm 386.60
508 Plywood 9 ply with commercial ply on both faces 15 mm thick. 1 Sqm 558.40
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
509 Plywood 9 ply with commercial ply on both faces 19 mm thick. 1 Sqm 641.50
510 Plywood 9 ply with teak ply on both faces 12 mm thick 1 Sqm 950.40
Plywood 9 ply with teak ply on one face and commerical ply on another face 13 mm
511 thick 1 Sqm 796.00
Flush Door Shutters ( Kutty or Equivalent ) Conforming to IS 2201
(Providing Solid core Flush Doors veneer facing).
Both Sides Teak
512 40/38 mm thick 1 Sqm 1303.00
513 35mm thick 1 sqm 1272.20
514 30 mm thick 1 sqm 1213.90
One Side teak wood and other side commercial
515 40/38 mm thick 1 sqm 1172.90
516 35 mm thick 1 sqm 1123.70
517 30 mm thick 1 sqm 1075.70
One Side teak wood and other side Kutty Coat
518 40/38 mm thick 1 sqm 1386.70
519 35 mm thick 1 sqm 1332.50
520 30 mm thick 1 sqm 1279.30
Both Side Commercial
521 40/38 mm thick 1 sqm 995.80
522 35 mm thick 1 sqm 948.20
523 30 mm thick 1 sqm 899.10
Both Sides Kutty Coat
524 40/38 mm thick 1 sqm 1236.60
525 35 mm thick 1 sqm 1183.70
526 30 mm thick 1 sqm 1129.70
Providing Internal Lipping by Teak Wood Single Leaf
527 All edges 30 mm thick & below 1 sqm 317.50
528 35 mm thick 1 sqm 359.60
529 38/40 mm thick 1 sqm 395.30
Providing Internal Lipping by Teak Wood Double Leaf
530 All edges 30 mm thick & below 1 sqm 485.50
531 35 mm thick 1 sqm 509.50
532 38/40 mm thick 1 sqm 671.20
Providing External Lipping by Teak Wood Single Leaf
533 All edges 30 mm thick & below 1 sqm 221.40
534 35 mm thick 1 sqm 245.70
535 38/40 mm thick 1 sqm 245.70
536 Bottom edges only 1 sqm 23.80
Providing External Lipping by Teak Wood Double Leaf
537 All edges 30 mm thick & below 1 sqm 263.50
538 35 mm thick 1 sqm 293.80
539 38/40 mm thick 1 sqm 293.80
540 Bottom edges only 1 sqm 23.80
Providing External Lipping by Hard Wood Single Leaf
541 All edges 30 mm thick & below 1 sqm 83.90
542 35 mm thick 1 sqm 95.90
543 38/40 mm thick 1 sqm 95.90
544 Bottom edges only 1 sqm 19.20
Providing External Lipping by Hard Wood Double Leaf
545 All edges 30 mm thick & below 1 sqm 108.00
546 35 mm thick 1 sqm 119.90
547 38/40 mm thick 1 sqm 119.90
548 Bottom edges only 1 sqm 19.20
Designers Doors by Teak wood
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
549 Torina 1 sqm 401.50
550 Penta Torina 1 sqm 467.60
551 Arch Torina 1 sqm 401.50
Designers Doors by Hard Wood
552 Torina 1 sqm 179.80
553 Penta Torina 1 sqm 239.80
554 Arch Torina 1 sqm 179.80
555 Tanjore Art 1 sqm 677.20
Kutty’s New International Eleganza range Panel Doors OR EQUIVALENT with
imported phenolic moulded fiber board panels
Kutty’s Vishala Heavy Duty
556 975 x 2035 x 30 mm thick 1 sqm 1775.50
557 920 x 2065 x 30 mm thick 1 sqm 1775.50
558 830 x 2065 x 30 mm thick 1 sqm 1775.50
559 680 x 2065 x 30 mm thick 1 sqm 1775.50
560 975 x 2035 x 35 mm thick 1 sqm 1831.70
561 920 x 2065 x 35 mm thick 1 sqm 1831.70
562 830 x 2065 x 35 mm thick 1 sqm 1831.70
563 680 x 2065 x 35 mm thick 1 sqm 1831.70
564 975 x 2035 x 38 mm thick 1 sqm 1882.40
565 920 x 2065 x 38 mm thick 1 sqm 1882.40
566 830 x 2065 x 38 mm thick 1 sqm 1882.40
567 680 x 2065 x 38 mm thick 1 sqm 1882.40
Kutty’s Vishala Light Duty
568 975 x 2035 x 30 mm thick 1 sqm 1704.20
569 920 x 2065 x 30 mm thick 1 sqm 1704.20
570 830 x 2065 x 30 mm thick 1 sqm 1704.20
571 680 x 2065 x 30 mm thick 1 sqm 1704.20
572 975 x 2035 x 35 mm thick 1 sqm 1745.80
573 920 x 2065 x 35 mm thick 1 sqm 1745.80
574 830 x 2065 x 35 mm thick 1 sqm 1745.80
575 680 x 2065 x 35 mm thick 1 sqm 1745.80
576 975 x 2035 x 38 mm thick 1 sqm 1786.30
577 920 x 2065 x 38 mm thick 1 sqm 1786.30
578 830 x 2065 x 38 mm thick 1 sqm 1786.30
579 680 x 2065 x 38 mm thick 1 sqm 1786.30
Kutty’s Heera Heavy Duty
580 920 x 2035 x 30 mm thick 1 sqm 1775.50
581 815 x 2035 x 30 mm thick 1 sqm 1775.50
582 660 x 2035 x 30 mm thick 1 sqm 1775.50
583 920 x 2035 x 35 mm thick 1 sqm 1831.70
584 815 x 2035 x 35 mm thick 1 sqm 1831.70
585 660 x 2035 x 35 mm thick 1 sqm 1831.70
586 920 x 2035 x 38 mm thick 1 sqm 1882.40
587 815 x 2035 x 38 mm thick 1 sqm 1882.40
588 660 x 2035 x 38 mm thick 1 sqm 1882.40
Kutty’s Heera Light Duty
589 920 x 2035 x 30 mm thick 1 sqm 1704.20
590 815 x 2035 x 30 mm thick 1 sqm 1704.20
591 660 x 2035 x 30 mm thick 1 sqm 1704.20
592 920 x 2035 x 35 mm thick 1 sqm 1745.80
593 815 x 2035 x 35 mm thick 1 sqm 1745.80
594 660 x 2035 x 35 mm thick 1 sqm 1745.80
595 920 x 2035 x 38 mm thick 1 sqm 1786.30
596 815 x 2035 x 38 mm thick 1 sqm 1786.30
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
597 660 x 2035 x 38 mm thick 1 sqm 1786.30
Kutty’s Fantasy Heavy Duty
598 815 x 2065 x 30 mm thick 1 sqm 1797.10
599 660 x 2065 x 30 mm thick 1 sqm 1797.10
600 815 x 2065 x 35 mm thick 1 sqm 1831.70
601 660 x 2065 x 35 mm thick 1 sqm 1831.70
602 815 x 2065 x 38 mm thick 1 sqm 1882.40
603 660 x 2065 x 38 mm thick 1 sqm 1882.40
Kutty Fantasy Light duty
604 815 x 2065 x 30 mm thick 1 sqm 1704.20
605 660 x 2065 x 30 mm thick 1 sqm 1704.20
606 815 x 2065 x 35 mm thick 1 sqm 1745.30
607 660 x 2065 x 35 mm thick 1 sqm 1745.30
608 815 x 2065 x 38 mm thick 1 sqm 1786.30
609 660 x 2065 x 38 mm thick 1 sqm 1786.30
Kutty’s Eleganza Heavy Duty
610 815 x 2065 x 30 mm thick 1 sqm 1797.10
611 660 x 2065 x 30 mm thick 1 sqm 1797.10
612 815 x 2065 x 35 mm thick 1 sqm 1831.70
613 660 x 2065 x 35 mm thick 1 sqm 1831.70
614 815 x 2065 x 38 mm thick 1 sqm 1882.40
615 660 x 2065 x 38 mm thick 1 sqm 1882.40
Kutty’s Eleganza Light Duty
616 815 x 2065 x 30 mm thick 1 sqm 1704.20
617 660 x 2065 x 30 mm thick 1 sqm 1704.20
618 815 x 2065 x 35 mm thick 1 sqm 1745.30
619 660 x 2065 x 35 mm thick 1 sqm 1745.30
620 815 x 2065 x 38 mm thick 1 sqm 1786.30
621 660 x 2065 x 38 mm thick 1 sqm 1786.30
Kutty’s Heleganza Golden Oak Heavy Duty
622 850 x 2035 x 30 mm thick 1 sqm 1797.10
623 850 x 2035 x 35 mm thick 1 sqm 1831.70
624 850 x 2035 x 38 mm thick 1 sqm 1882.40
Kutty’s Heleganza Golden Oak Light Duty
625 850 x 2035 x 30 mm thick 1 sqm 1704.20
626 850 x 2035 x 35 mm thick 1 sqm 1745.30
627 850 x 2035 x 38 mm thick 1 sqm 1786.30
Providing external Lipping with teak wood.
628 30/32 mm thick 1 sqm 221.40
629 35/38 mm thick 1 sqm 245.70
Providing external Lipping with Hard wood.
630 30/32 mm thick 1 sqm 95.60
631 35/38 mm thick 1 sqm 119.90
632 Ployurethene coating for extra water resistance for bath / toilet doors for each side. 1 sqm 89.60
DOOR FRAMES
ACCUCEL OR EQUIVALENT BATHROOM DOOR CHAUKHAT FRAME: Single
633 Rebate size 60mmx 30mm
The Door Chaukhat Frame (Single Rebate) shall be made of solid PVC foam profile with
homogenous fine cellular structure having smooth outer integral skin having 60mm
width and 30mm thickness and shall be fixed to wall as per instructions of engineer in
charge using 100 x 8 sheet metal CSK screws. Door frame should be waterproof,
termite proof, elegant and should have excellent screw holding strength to fix hinges
and hold doors properly for a long life for finished item of work including all taxes. 1 Rm 245.00
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
ACCUCEL OR EQUIVALENT PANEL DOOR SHUTTER: 750mm(W) x2100mm(L)
634 x28mm (T)
The door shutter shall be made of solid PVC foam profile with homogenous fine cellular
structure having smooth outer integral skin having 71mm width and 28mm thick as
vertical and horizontal stiles, joints are made using solvent adhesive and GI ‘C’ sections
(39mm x 19mm x 19mm x 0.6mm thick) or MS pipe (40mm x 20mm) stiffener frame
insert and telescopic polymeric ‘L’ corners. The panel shall be filled with 3mm thick
high-pressure compact laminate as per manufacturer’s guidelines. Cover molding shall
be provided for covering fixing screws and elegant look. Panel Door shutter should be
waterproof, termite proof, elegant and should have excellent screw holding strength to
fix hinges and hold doors properly for a long life. Normal hardware and fitting shall be
fixed for finished item of work including all taxes. 1 sqm 2350.00
ACCUCEL OR EQUIVALENT OPENABLE WINDOW SHUTTER WITH DOUBLE
635 REBATE CHAUKHAT FRAME (1600mm x 1600mm)
The Window Chaukhat Frame (Double Rebate) shall be made of solid PVC foam profile
with homogenous fine cellular structure having smooth outer integral skin having
100mm width and 30mm thickness. Made of two sections joined together with solvent
adhesive and GI ‘C’ section (25mm x 19mm x 0.6mm thick) stiffener insert. Press fit
type ‘Tee’ section 25mm width and 19mm thick is fixed in the frame after fixing it to wall
as per instructions of engineer in charge using 100x8 sheet metal CSK screws. The
Open able Window shutter should made of solid PVC foam profile with homogenous
fine cellular structure having smooth outer integral skin having 71mm width x 28mm
thick as vertical and horizontal stiles. Joints are made using solvent adhesive and GI ‘C’
sections (39mm x 19mm x 19mm x 0.6mm thick) stiffener frame insert and telescopic
polymeric ‘L’ corners. The 4mm thick glass panel shall be fixed using PVC foam profile
beading (12mm x 10mm) for finished item of work including all taxes. 1 Sqm. 4600.00
636 RAJSHRI OR EQUIVALENT SOLID DOOR FRAME
Providing and fixing factory made polyvinyl chloride (PVC) Door Frame of the size 50 x
47mm with a wall thickness of 5mm, made out of extruded 5mm rigid PVC foam sheet,
mitre cut at two corners and joined with 2nos. of 150mm long brackets of 15x15mm
M.S. square tube. The two vertical door profiles are to be reinforced with 19x19mm M.S.
Square tube of 19 gauge. The door frame shall be fixed to the wall using 65/100mm
long M.S. Screws through the frame by using PVC fasteners. A minimum of 4nos. of
screws to be provided for each vertical member & minimum 2nos. for horizontal
member etc. complete as per manufacturers specification and direction of Engineer-in-
Charge for finished item of work including all taxes. 1 Rm 253.00
637 RAJSHRI OR EQUIVALENT SOLID PANEL DOOR SHUTTER
Providing and fixing 30mm thick Solid panel PVC door shutter consisting of frame made
out of M.S. tubes of 19 gauge thickness and size of 19mm x 19mm for stiles, & 15mm x
15mm for top & bottom rails. M.S. frame shall have a coat of steel primers of approved
make and manufacture. M.S. frame shall be covered with 5mm thick heat moulded PVC
‘C’ channel of size 30 x 50mm forming stiles, and 5mm thick, 75mm wide PVC sheets
for top rail, lock rail & bottom rail on either side, and 10mm (5mm x 2) thick, 20mm wide
cross PVC sheet as gap insert for top rail & bottom rail. Panelling of 5mm thick PVC
sheet to be fitted in the M.S. frame welded / sealed to the stiles & rails with 30mm wide
x 5mm thick PVC sheet beading on either side, and joined together with solvent cement
adhesive etc. An additional 5mm thick PVC strip of 20mm width is to be stuck on the
interior side of the ‘C’ Channel using PVC solvent adhesive. complete as per direction of
Engineer-in-charge, manufacturer’s specification & drawing for finished item of work
including all taxes. 1 Sqm. 1743.00
DOOR FRAMES
MS. Hallow door frames manufactured by cold roll formed process steel sheet 1.25mm
638 thick bright CRCA confirming to IS 4351 - 1976 with Hinges tower Bolts etc. 1 Rm 167.40
Flush door shutters, solid bond wood block board type with teak ply on both
faces.
639 25 mm thick 1 sqm 902.90
640 30 mm thick 1 sqm 933.10
641 35 mm thick 1 sqm 1004.40
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
Flush door shutters, solid bond wood block board type with commercial ply on
both faces.
642 25 mm thick 1 sqm 459.00
643 30 mm thick 1 sqm 517.30
644 35 mm thick 1 sqm 567.00
645 40 mm thick 1 sqm 675.00
Flush door shutters, solid bond wood block board type with teak venner on one
face and commericla ply on another face (liping)
646 20 mm thick 1 sqm 605.90
647 25 mm thick 1 sqm 675.00
648 30 mm thick 1 sqm 756.00
649 35 mm thick 1 sqm 810.00
650 40 mm thick 1 sqm 864.00
Plain cement bonded particle boards conforming to IS 14276 truly exterior grade
(Bison panel or equivalent)
651 6 mm thick 1 sqm 150.10
652 8 mm thick 1 sqm 184.70
653 10 mm thick 1 sqm 217.10
654 12 mm thick 1 sqm 251.60
655 16 mm thick 1 sqm 335.90
656 20 mm thick 1 sqm 402.80
657 25 mm thick 1 sqm 487.10
658 30 mm thick 1 sqm 569.20
659 40 mm thick 1 sqm 737.60
Prelaminated cement particle board truly exterior board one side laminated (Bison
Lam or equivalent)
660 6 mm thick 1 sqm 400.70
661 8 mm thick 1 sqm 423.40
662 10 mm thick 1 sqm 446.00
663 12 mm thick 1 sqm 468.70
664 16 mm thick 1 sqm 521.60
Prelaminated cement particle board truly exterior board both side laminated
(Bison Lam or equivalent)
665 6 mm thick 1 sqm 446.00
666 8 mm thick 1 sqm 468.70
667 10 mm thick 1 sqm 491.40
668 12 mm thick 1 sqm 514.10
669 16 mm thick 1 sqm 567.00
ECO-BOARD MULTI PURPOSE CEMENT BOARDS (HIGH PRESSURED STEAM
CURED)
670 4 mm thick 1 Sqm. 103.00
671 6 mm thick 1 Sqm. 156.00
672 8 mm thick 1 Sqm. 203.00
673 10 mm thick 1 Sqm. 227.00
674 12 mm thick 1 Sqm. 260.00
675 14 mm thick 1 Sqm. 300.00
676 16 mm thick 1 Sqm. 345.00
677 18 mm thick 1 Sqm. 390.00
678 20 mm thick 1 Sqm. 430.00
ECO-BOARD CLASSIC
679 4 mm thick 1 Sqm. 175.00
680 6 mm thick 1 Sqm. 260.00
ECO-BOARD PEARL
681 4 mm of size 595mm X 595mm 1 Sqm. 216.00
MULTIPURPOSE CEMENT BOARDS FALSE CEILING WITH EXPOSED METAL E-
GRID IS 14862 : 2000
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
682 Using 6 mm thick E-board 1 Sqm 600.00
683 Using 8 mm thick E-board 1 Sqm 660.00
684 Using 4 mm thick E-board classic* 1 Sqm 620.00
685 Using 6 mm thick E-board Classic* 1 Sqm 724.00
686 Using 4 mm thick E-board Pearl 1 Sqm 672.00
WALL PANELLING
Supply and fixing of E-board wall paneling (water, fire and Termite proof) with
frame work made of GI stud profile of size 48 x 40 10 x 0.6 mm thick placed at
every 610 mm C/C intervals fixed vertically in between floor and roof `U’ track of
size 50 x 30 x 0.6 mm thick duly fixed with self expansion screws and with 8 mm
thick E-board / 6 mm thick E-board classic cladded around with self tapping self
embedding screws fixed at every 300 mm (centres) leaving a 3 mm gap between
two panels of width 2’-0”. The Gap will be covered with a decorative
beading.Surface will be given a smooth finish over a coat of primer.
687 With 8 mm E-board 1 Sqm. 797.00
688 With 6 mm E-board Classic 1 Sqm. 860.00
DOUBLE SKIN PARTITION
Supply and fixing double skin E-board partition with Frame work made of GI stud profile
of size 48 x 40 x 10 x 0.6 mm thick placed at every 610 mm C/C intervals and 915 mm
horizontal intervals duly fixed with self expansion screws, the E-board of 8 mm thick
cladded around with self tapping self embedding screws fixed at every 300 mm
(centres) leaving 3 mm gap between two panels of witdth 2’-0” (610 mm). The gap will
be covered with decorative molding surface will be given a smooth finish over cement
primer. The rate is inclusive of cost and conveyance of all materials and labour charges
689 etc. complete. 1 Sqm. 1226.00
DOOR
Supply and fixing of E-board door shutter with alround style “U” lipping size 15 x 18 x 15
mm made from 0.8 mm thick powder coated cold rolled steel profiles with 16 mm thick
E-board with necessary screws fixed at 1’-0” interval 250 mm long aldrops 2 Nos. M.S.
nickel coated 250 mm long 1 No. M.S. Tower bolts including cost and conveyance of all
materials at site and applying 1 coat of primar, 2 coats of luppum and 2 coats of
690 synthetic enamel paint as per approved design for finished item of work. 1 Sqm. 1050.00
DOOR WITH CRCA FRAME
Providing and fixing frame made from 1.2 mm powder coated cold rolled steel profiles of
overall section size of 60 mm x 45 mm with 21 mm rivet for shutter with necessary
stiffners hinges and screws. E-board shutter with alround `U’ lipping of size 15 X 18 X
15 mm made from 0.8 mm thick CRCA powder coated steel profile with 16 mm thick E-
board with necessary screws fixed at every 1’-0” interval 250 mm long aldrops 2 Nos.
MS Nickel coated 250 mm long 1 No. MS tower bolt including cost and conveyance.
One coat of primer, 2 coats of luppum and 2 coats of synthetic enamel paint as per
691 approved colour, labour charges etc. 1 Sqm. 1600.00
Cup Boards Shutters using Cement Bonded Particle Board (Bison Panel or
Equivalent )
Supply and fixing of cup board shutters and frames using 16mm thick Cement Bonded
Particle Board (Bison Panel or Equivalent) duly painted both sides with one coat of
primer and two coats of synthetic / enamel paint of approved shade and brand including
fixing of hardware like M.S. powder coated Piano hinges of size 18mm x 18mm, brass
ball catches, Aluminum tower bolts and handles , Godrej locks, Fevicol, screws and
nails including cost and conveyance of all materials, labour charges, all incidental and
operational charges etc., complete for finished item of work at site as per the directions
692 of Engineer in Charge. 1 sqm 1269.00
False Ceiling using Cement Bonded Particle Board (Bison Panel or Equivalent )
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
Supply and fixing of false ceiling with galvanized and pre painted steel T section of size
24mm x 38mm x 0.4mm for main T duty pre punched to accept cross T section of size
24mm x 30mm x 0.4mm duly punched at both ends for insertion into main T. The grid
size will be 610mm x 610mm. The frame work (grid) is suspended to the roof by using
G.I flat of 0.60mm or 14-gauge G.I wire with necessary fixers to the roof and frame
work. 8mm thick Cement Bonded Particle Board lay on the grid. The cost inclusive of
necessary hardware, labour, one coat of primer (Both side) and two coats of smooth
693 finish on visible side. 1Sqm 626.40
WALL PANELING WITH CEMENT BONDED PARTICLE BOARD (BISON PANEL OR
EQUIVALENT)
Supply and fixing bison panel wall paneling (water proof) with frame work made of GI
stud section of size 48mm x 35mm x 0.55mm thick placed at every 610 mm C/C
intervals vertically and at 1200mm internals horizontally fixed to the wall by means of
self expansion screws and caps. 10 mm thick cement bonded particle board (Bison
panel or Equivalent) is to be fixed to frame by means of self taping screws placed at
every 300 mm intervals leaving 3mm gap between two panels. The cost inclusive of one
coat of Altek primer and two coats of Altek smooth finish and cost & conveyance of all
694 materials, labour charges etc. complete as per the direction of Engineer in charge. 1 Sqm 1004.40
DOUBLE SKIN PARTITION WITH CEMENT BONDED PARTICLE BOARD (BISON
PANEL OR EQUIVALENT)
Supply and fixing double skin partition made out of G.I. track section of size 50mmx
35mm x 0.55 mm for fixing to the roof and floor and stud section of size 48mm x 35mmx
0.55mm placed in track section vertically at 610mm intervalsand at 1200mm intervals
horizontally fixed to the wall by means of self expansion screws and caps to the wall
and roof. 10mm thick Cement bonded particle board (BISON PANEL OR EQUIVALENT)
is to be fixed both sides of frame work by using self taping screws fixed at every 300mm
intervals to the frame work leaving 3 mm gap between two panels. The cost inclusive
with one coat of Altek primer and two coats of Altek smooth finish and cost and
conveyance of all materials to site, labour charges etc., complete as per the direction of
695 Engineer in charge. 1 Sqm 1609.20
DOUBLE SHUTTER WITH CEMENT BONDED PARTICLE BOARD (BISON PANEL
OR EQUIVALENT)
Supply and fixing cement bonded particle board shutter with alround "U" section of size
12mmx18mm x12mm made from 0.6 mm thick galvanized, color quoted cold rolled
steel profiles 16 mm thick panel with necessary screws fixed at every 304.8 mm
intervals. The cost inclusive of MS Nickel coated Aldrops of size 255 mm long 2 Nos.,
200 mm long tower boalts 1 No., 125 mm handles 2 Nos.m 300 mm long "T" hing cost
and conveyance of all materials at site and applying 1 coat primer, 1 coat of luppum and
696 2 coats of synthetic enamel paint as per approved design for finished itme of work. 1 Sqm 1188.00
Doors Frames (Colour Coated Steel Sections) & Shutter using Cement Bonded
Particle Board (Bison Panel or Equivalent)
Providing and fixing of door frame made from cold roll formed sections made of
galvanized (Base steel as per IS277 with zinc of 120 Gms/sq.mtr) colour coated steel
sections with total coated thickness of 1mm, primer coated with epoxy primer coat of 5-7
microns thick, finish paint with polyester paint of 12-16 microns. The Section for door
frame is to be filled with polyurethane (P.U) form of 40kg/m3. Overall size of frame
section should be of 50mm x 50mm. With necessary corner brackets, stiffeners,
hinges,and screws. Cement Bonded particle board shutter (Bison Panel or Equivalent)
“Single Leaf” with all round styles “U” section of size 12m x 18m x 12mm made from 0.6
mm thick galvanized, colour coated cold rolled steel profiles with 16mm thick Cement
Bonded particle Board (Bison Panel or Equivalent) with necessary screws fixed at every
1’-0” (304.8mm) intervals. The cost inclusive of MS nickel coated Aldorp of size 250mm
long 2nos. 200mm long tower bolt 1no., 125mm handles 2nos., cost and conveyance of
all materials at site and applying one coat primer , one coat of luppum and two coats of
697 synthetic enamel paint as per approved design for finished item of work 1 Sqm 1890.00
Box Type Cup Board using Cement Bonded Particle Board (Bison Panel or
Equivalent) & Shutter using Pre-Laminated Cement Bonded Particle Board (Bison
Lam or Equivalent)
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
Supply and fixing of box type cup board using 20mm thick Cement Bonded Particle
Board (Bison Panel or Equivalent) for making frame of size 100mm x 35mm using two
sandwiched 16mm boards, one plain board and one Pre-Laminated cement bonded
particle board with plain 35mm wood lipping. The Shutters are made of 16m thick Pre-
Laminated Cement Bonded Particle Board (Bison Lam or Equivalent) of approved
shade inclusive of hardware like M.S. powder coated Piano hinges of size ¾” x ¾” ,
Aluminum powder coated handles of size 4” (101.6mm), Aluminum tower bolt 4”
(101.6mm) Godrej locks, screws, wood lipping and Fevicol etc., complete finish item of
698 work. 1 Sqm 2700.00
Door Shutter with Cement Bonded Particle Board (Bison Lam or Equivalent)
Supply and fixing of door shutter made out of PVC Hollow extruded section having
dimensions of 47mm x 26mm with wall thickness of 1.5mm with necessary tapering to
house Bison Lam thickness of 12mm. All the four corners are jointed with PVC ‘L’
brackets of size 4’’ x 8’’ (101.6 x 203.2mm) and the PVC lipping is filled with well-
seasoned country wood to hold hinges. The hardware consists of 250mm long aldrop –
2 Nos.250mm Handle- 1 No. (all are of Aluminum). The cost is inclusive of all
699 incidental, labour transportation charges. 1 Sqm 1239.00
Double Skin Partition with Pre Laminated Cement Bonded Particle Board (Bison
Lam or Equivalent)
Supply and fixing double skin partition made out of G.I track section of size 50 mm x
35mm x 0.55mm for fixing to the roof and floor and stud section of size 48mm x 35mm x
0.55mm placed in track section vertically at 610mm intervals and at 1200mm internals
horizontally. The frame is fixed by means of self expansion screws and caps to the wall /
roof. 12mm thick Pre Laminated Cement bonded particle board (Bison Lam or
equivalent) is to be fixed both sides of the frame work by using 2mm thick electro plated
CR flat section leaving 3mm gap between two panels. The cost inclusive of cost and
conveyance of all materials to sites, other materials incidentals and labour charges as
700 per the direction of Engineer in charges. 1 Sqm 1639.00
Wall Paneling with Pre Laminated Cement Bonded Particle Board (Bison Lam or
equivalent)
Supply and fixing of wall paneling with frame work made of G.I stud section of size
48mm x 35mm x 0.55mm thick placed at every 610mm intervals vertically and at
1200mm internals horizontally fixed to the wall by means of self expansion screws and
caps. 12mm thick pre laminated Cement bonded particle board (Bison Lam or
equivalent) is to be fixed to frame by means of self-taping screws placed at every
300mm intervals leaving 3mm gap between two panels. The cost inclusive of
Conveyance of materials, Labour charges etc., complete as per the direction of
701 Engineer in charge. 1 Sqm 1320.00
Aluminum Partition with Pre Laminated Cement Bonded Particle Board (Bison
Lam or Equivalent)
Supply and fixing in position aluminum glazed partitions using 5.50 mm thick plain glass
to full height using with pre laminated cement bonded particle board (Bison Lam or
equivalent) of 10mm thick to a height of 0.91 metre at bottom panel and remaining
height with glass and aluminum sections anodized to 12 to 15 microns and of sections
of size 37mm x 62mm and 1.5mm thickness with one metre centre to centre duly fixed
with clip beading on both sides including fixing the frame to pillars by M.S. flats, bolts
and nuts including cost and conveyance of all materials etc., complete as directed
702 during execution. 1 Sqm 2028.10
SINTEX OR EQUIVALENT DOOR (SINGLE PANEL)
Supply and fixing Sintex or equivalent doors are made out of PVC section and panels.
The overall dimension of the same is 33mm X 47mm with usual process variation and
having a wall thickness of 1.5mm with a variation of ± 0.3mm. The infill is seamless
hallow multi chambered PVC single panel having an effective dimension of 762mm X
20mm having a wall thickness of 1mm ± 0.3mm including all taxes complete, for finished
703 item of work. Sqm. 1755.00
Supply and fixing PVC door frames made from extruded sections in overall dimensions
of 40 X 48mm having a wall thickness of 1.5mm with usual process variation of ±
704 0.3mm, including all taxes complete, for finished item of work. Sqm. 164.20
SINTEX OR EQUIVALENT OPENABLE WINDOW
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
Supply and fixing of Sintex window shall be made out of extruded PVC section. The
outer frame having overall dimensions of 40 X 48mm with a wall thickness of 1.5mm
with usual process variation of ± 0.3mm. The shutter frame having with overall
dimensions of 26 X 47mm with wall thickness of 1.2mm ± 0.3mm provided with 5mm
glazing. The centre mullion having over all dimensions of 25 X 32.5mm ±0.3mm,
705 including all taxes complete, for finished item of work. Sqm. 2615.80
SINTEX OR EQUIVALENT SLIDING 2 TRACK WINDOWS
Supply and fixing of two track or three track sliding window the outer frame shall be 58 X
45mm with a wall thickness of 1.2mm ± 0.3mm. The sliding shutter frame is made of
PVC section 57 X 32mm with overall dimensions of 1.5mm ± 0.3mm provided with 5mm
glazing. Roller bearings and arrestor type handle cum lock shall be provided, including
706 all taxes complete, for finished item of work. Sqm. 2268.00
SINTEX OR EQUIVALENT FALSE CEILING
Supply and fixing of PVC false ceiling on MS/GI made skeleton framework. The frame
shall be 24 X 48mm MS tube section fixed along with the wall. The entire frame work
shall be concealed with PVC section having overall dimensions of 6 X 250mm with a
wall thickness of 1mm ± 0.3mm with tongue and groove system, provided with
necessary arrangements for electrical connections, including all taxes complete, for
707 finished item of work. Sqm. 1161.00
SINTEX OR EQUIVALENT WALL PANELLING
Supply and fixing of wall panelling on the framework of wooded rippers of 24 X 24mm of
required size. The entire framework shall be panelled with PVC section having overall
dimensions of 6 X 250mm with a wall thickness of 1mm ± 0.3mm. The panels are
joined with tongue and groove system. Necessary cutouts for electrical connections to
708 be provided at required places, including all taxes complete, for finished item of work. Sqm. 1107.00
SINTEX OR EQUIVALENT PVC CABINETS
Supply and fixing of PVC cupboards for kitchen and bedrooms shall be made out of
multi chambered PVC sections having overall dimensions of 20 X 762mm with a wall
thickness of 1.2mm ± 0.3mm. The cabinets shall be made as per the requirements of
the room with groove system. The PVC section surface shall be plain and laminated
709 finish to have good look, including all taxes complete, for finished item of work. Sqm. 3202.20
SINTEX OR EQUIVALENT SMC SIGN BOARDS
Supply of hot pressed compression moulded SMC sign plates for making road signs ass
per the approved dimensions of National Highway Authority Of India, including all taxes
complete, for finished item of work.
710 Circular sign plate Dia 400mm. Each. 464.40
711 Circular sign plate Dia 600mm. Each. 1220.40
712 Circular sing plate Dia 870mm Each. 2445.10
713 Triangular sign plate 600mm. Each. 626.40
714 Triangular sign plate 900mm. Each. 1414.80
715 Square sign plate 600mm. Each. 1134.00
716 Square sign plate 1000mm. Each. 4212.00
SINTEX OR EQUIVALENT PVC PARTITION
Supply and fixing of PVC Double Skin Partition. The entire framework shall be carried
out by mild steel section having overall dimensions of 24 X 48mm with a wall thickness
of 1.2mm. The entire framework shall be concealed with PVC section having overal
dimensions of 6 X 250mm with a wall thickness of 1mm ± 0.3mm both sides. Glass
provision/Door provision can be provided along the partition wherever required.
Partitions can be made full or half as per requirement, including all taxes complete, for
717 finished item of work. Sqm. 2035.80
SINTEX OR EQUIVALENT WATER STORATGE TANKS
Supply of Sintex or equivalent Polyethylene water storage tank double layer confirming
718 to ISI 12701/96 mark with lid including all taxes. Ltr. 5.94
PVC DOOR SHUTTER (Nandi or Equivalent)
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
Supply and fixing of door shutters made of rigid PVC extruded hollow section(Nandi or
equivalent) of 20mm X 200 mm with the wall thickness of 1.0mm +/- 0.1mm equally
divided into 4 no's with tongue and groove locking arrangements.The shutter frame is
made of 58 X 24 mm with the wall thickness of 1.5mm +/- 0.15mm section metri-cut and
joined at 4 cornors with 125mm X 225mm plastic brackets.The shutter shall be
horizontally reinforced with 2 no's of 8mm PVC rods. Teak wood battons shall be
reinforced inside the door shutter during the fabrication of the door shutter at those
719 points wherever the hardware is fixed on to the door shutter. Sqmt. 1074.60
Supply and fixing of door shutters made of rigid PVC extruded hollow section(Nandi or
equivalent) of 20mm X 200 mm with the wall thickness of 1.0mm +/- 0.1mm equally
divided into 4 no's with tongue and groove locking arrangements.The shutter frame is
made of 30mm X 79mm with the wall thickness of 1.5mm +/-0.15mm section metri-cut
and joined at 4 cornors with 125mm X 225mm plastic brackets.The shutter shall be
horizontally reinforced with 2 no's of 8mm PVC rods.Teak wood battons shall be
reinforced inside the door shutter during the fabrication of the door shutter at those
720 points wherever the hardware is fixed onto the door shutter. Sqmt. 1295.00
PVC DOOR FRAME (Nandi or Equivalent)
Supply and fixing of door frame made of hollow extruded PVC section(Nandi or
equivalent) having dimensions of 40 X 57mm with the wall thickness of 2mm +/- 0.2mm
duly reinforced with seasoned wood plank at the hinges side. The door frame top 2
721 cornors shall be metri-cut/weilded. 1 RM 155.00
Supply and fixing of door frame made of hollow extruded PVC section(Nandi or
equivalent) having dimensions of 40 X 46 mm with the wall thickness of 2mm +/- 0.2mm
duly reinforced with seasoned wood plank at the hinges side. The door frame top 2
722 cornors shall be metri cut/weilded 1 RM 135.00
PRE- PAINTED STEEL, WINDOWS, VENTILATORS & DOOR FRAMES.
Supply and fixing of windows & top Hung and fixed louvered ventilators made of
pre - painted steel (base steel as per IS 513 of -0.6 mm thick 'D" quality,
galvanized as per IS 277 with zinc of 120 GSM) primer coated with epoxy primer of
5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and
back coated with 5-7 microsn thick alkyd backer. Section for outer frame should
be 46 x 52 mm section for shutter should be 46 x 46 mm section for mullion
should be 46 x 70 mm, and section for beading should be 18 x 25 mm and section
for louvered ventilation should be 33 x57mm Box section. The windows should be
panelled with 5mm thick plain float glass & 4 mm pinhead glass for ventilators
with Ethy propylene Diamine monomer Gasket(EPDM). The sections are to be cut
to length mitre joined with corner brocket centre mullions are to be fixed using
mullilon cap. Handle made of high grade aluminium powder coated and nylon
receiver. Gaskets made of Ethyl propylene Diamine monomer(EPDM). Corner
brackets made of
CRCA with Zinc Phasphating. Mullion caps made of glass linked nylon. The above
frames should be fixed to the concrete /masonry wall by means of self expanidng
screws. including 10 mm square guard bars with 6" pitch and all taxes, complete
for finished item of work.
Windows
Single shutter 2'0 x 4'0 (609.6 x 1219.2 mm ) Outer frame section size of 46 x 52 mm
723 shutter frame section size of 46 x 46 mm 1 sqm 2929.00
Double shutter 3'-0" x 4'-0" (914.4mm x 1219.2 mm) outer frame sectionsize of 46 x
724 52 mm shuter frame section size of 46 x 46 mm 1 Sqm 2929.00
Double shutter 3'-0" x 4'-0" (914.4mm x 1219.2 mm) outer frame sectionsize of 46 x 52
725 mm shutter frame section size of 46 x 46 mm Mullion section size of 46 x 70 mm 1 Sqm 3103.90
Double shutter 4'-0" x 4 '-0" (1219.2x12.19.2mm) outer frame section size of 46 x 52
726 mm shutter frame section size of 46 x 46 mm 1 Sqm 2929.00
Centre fixed both side openable shutter 5'-0" x 4'-0" (1524x1219.2mm) outer frame
section size of 46 x 52 mm shutter frame section size of 46 x 46 mm Mullion section
729 size of 46 x 70 mm fixed beading section size of 18 x 25 mm 1 Sqm 2767.00
Centre fixed both side openable shutter 6'-0" x 4'-0" (1828.8x1219.2mm) outer frame
section size of 46 x 52 mm shutter frame section size of 46 x 46 mm Mullion section
730 size of 46 x 70 mm fixed beading section size of 18 x 25 mm 1 Sqm 2767.00
Centre fixed both side openable shutter 6'-0" x 4'-6" (1828.8x1371.6mm) outer frame
section size of 46 x 52 mm shutter frame section size of 46 x 46 mm Mullion section
731 size of 46 x 70 mm fixed beading section size of 18 x 25 mm 1 Sqm 2767.00
Ventilators :
Top Hung 2 '-0" x 2'-0" (609.6x609.6mm) outer frame section size of 46mm x 52 mm
732 shutter frame section size of 46mm x 46 mm 1 Sqm 3208.70
Top Hung 4 '-0" x 2'-0" (1219.2x609.6mm) outer frame section size of 46 x 52 m shutter
733 frame section size of 46 x 46 mm Mullion section size of 46 x 70 mm 1 Sqm 3208.70
Top Hung 4 '-0" x 3'-0" (1219.2x914.4mm) outer frame section size of 46 x 52m m
734 shutter frame section size of 46 x 46 mm Mullion section size of 46 x 70 mm 1 Sqm 3208.70
Fixed louvers 2'-0" x 2'-0" (609.6x609.6mm)(Box section) outer frame section size of 33
735 x 57 mm 1 Sqm 2196.70
Fixed louvers 4'-0" x 2'-0" (1219.2x609.6mm)(Box section) outer frame section size of
736 33 x 57 mm Mulliion section size of 33 x 57 1 Sqm 2196.70
Fixed louvers 4'-0" x 3'-0"(1219.2x914.4mm)(Box section) outer frame section size of 33
737 x 57 mm Mulliion section size of 33 x 57 1 Sqm 2196.70
NCL or Equivalent ECO 3000 SERIES WINDOWS (SUITABLE FOR RESIDENTIAL
BUILDINGS WITH GRILL PROVISION)
Providing and Fixing of windows made of pre-painted steel (Base steel as per IS
513 of 0.6mm thick galvanized as per IS 277 with Zinc of 150 GSM). Primer coated
with epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-
16 microns thick and back coated with 5-7 microns thick alkyd backer. Section
for outer frame should be of 48x50mm, center mullion should be of 48x50mm,
section for shutter should be of 47x20mm and Fixed glass beading section should
be of 12x12mm. Outer frame and mullions to have rebate for Glazed shutter and a
20mm provision for Guard bars/Grills. The sections are to be cut to length metre
joined with corner bracket. Centre mullion is to be fixed with mullion cap.
Seccolor Handle, 8” stay made of Aluminium, 2 nos. of Stainless Steel heavy duty
Pivot hinges shall be provided per shutter. The windows should be paneled with
5mm thick plain float glass. Rubber Gaskets are provided all around the glass.
The above frames should be fixed to the concrete/masonry wall by means of
self expanding screws, Including 10mm Square guard bars with 6” (152.4mm)
pitch and all Taxes, etc., complete for finished item of work.
Single shutter Window 2’0”x4’0” (609.6mm x 1219.2mm). Outer frame section size of
738 48x50mm shutter frame section size of 47x20mm. 1 Sqm 2696.80
Double shutter Window with vertical mullion 3’0” x 4’0” ( 914.4mm x 1219.2mm) outer
frame section size of 48x50mm shutter frame section size of 47x20mm. Mullion section
739 size of 48x50mm. 1 Sqm 2871.70
Double shutter Window with vertical member4’0” x 4’0” (1219.2mm x 1219.2mm) outer
frame section size of 48x50mm shutter frame section size of 47x20mm and mullion
740 section should be of 48x50mm. 1 Sqm 2871.70
Centre fixed both side openable shutter window 5’0”x4’0” (1524mm x1219.2mm). Outer
frame section size of 48x50mm. Shutter frame section size of 47x20mm. Mullion
741 section size of 48x50mm. Fixed beading section size of 12x12mm. 1 Sqm 2533.70
Centre fixed both side openable shutter window 6’0”x4’0” (1828.8mm x1219.2mm).
Outer frame section size of 48x50mm. Shutter frame section size of 47x20mm. Mullion
742 section size of 48x50mm. Fixed beading section size of 12x12mm. 1 Sqm 2533.70
NCL or Equivalent ECO 4000 SERIES WINDOWS (SUITABLE FOR RESIDENTIAL
BUILDINGS WITH GRILL & FLYMESH PROVISION)
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
Providing & Fixing of windows made of pre-painted steel (Base Steel as per IS 513
of 0.6mm thick galvanized as per IS 277 with zinc of 150 GSM). Primer coated with
epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16
microns thick and back coated with 5-7 microns thick alkyd backer. Section for
outer frame should be of 72x50mm, center mullion should be of 72x50mm,
Section for fixed glass beading section should be of 12x12mm and section for
shutters should be of 47x20mm. Outer frame & mullion sections to have rebate
for glazed shutters, flymesh and a 20mm provision for guard bars/grills. Flymesh
shutter section should be of 20x40mm. The sections are to be cut to length metre
joined with corner bracket. Centre mullions are to be fixed with mullion cap.
Telescopic Stay, ‘D’ type handle, 2 nos’ of 3” Tower Bolt made of Aluminium. 2
Nos of heavy duty stainless steel pivot hinges shall be provided per Shutter. The
windows should be paneled with 5mm thick plain float glass and S.S. Mesh for
flymesh shutter(304 grade). Rubber Gaskets are provided all around the glass.
The above frames should be fixed to the concrete/masonry wall by means of self
expanding screws. Including 10mm Square guard bars with 6” (152.4mm) pitch
and all Taxes, complete for finished item of work
Single shutter Window 2’0”x4’0” (609.6mm x 1219.2mm). Outer frame section size of
743 72x50mm shutter frame section size of 47x20mm. 1 Sqm 3580.20
Double shutter Window with vertical mullion 3’0” x 4’0” ( 914.4mm x 1219.2mm) outer
frame section size of 72x50mm shutter frame section size of 47x20mm. Mullion section
744 size of 72x50mm. 1 Sqm 3755.20
Double shutter Window with vertical member4’0” x 4’0” (1219.2mm x 1219.2mm) outer
frame section size of 72x50mm shutter frame section size of 47x20mm and mullion
745 section should be of 72x50mm. 1 Sqm 3755.20
Centre fixed both side openable shutter window 5’0”x4’0” (1524mm x1219.2mm). Outer
frame section size of 72x50mm. Shutter frame section size of 47x20mm. Mullion
746 section size of 72x50mm. Fixed beading section size of 12x12mm. 1 Sqm 3418.20
Centre fixed both side openable shutter window 6’0”x4’0” (1828.8mm x1219.2mm).
Outer frame section size of 72x50mm. Shutter frame section size of 47x20mm. Mullion
747 section size of 72x50mm. Fixed beading section size of 12x12mm. 1 Sqm 3418.20
Flymesh Shutters
Supply & fixing of Flymesh shtters of size 20 x 40 mm fly proof mesh with std.
Spn (S.S.) flymesh inclding cost and conveyance of all materials, all taxes and
labour charges etc. complete for finished item of work.
748 Single shutter 2'-0" x 4'-0" (609.6x1219.2mm) shutter section size 20 x 40 mm 1 Sqm 673.90
749 Double shutter 3'-0" x 4'-0" (914.4x1219.2mm) shutter section size 20 x 40 mm 1 Sqm 673.90
750 Double shutter 4'-0" x 4'-0" (1219.2x1219.2mm) shutter section size 20 x 40 mm 1 Sqm 673.90
Supply & fixing of Flymesh shutters of size 20 x 40 mm fly proof mesh with
Netlon flymesh inclding cost and conveyance of all materials, all taxes and labour
charges etc. complete for finished item of work.
751 Single shutter 2'-0" x 4'-0" (609.6x1219.2mm) shutter section size 20 x 40 mm 1 Sqm 581.00
752 Double shutter 3'-0" x 4'-0" (914.4x1219.2mm) shutter section size 20 x 40 mm 1 Sqm 581.00
753 Double shutter 4'-0" x 4'-0" (1219.2x1219.2mm) shutter section size 20 x 40 mm 1 Sqm 581.00
Door frames
Supply & fixing of Door frames made of all formed sections of 1.25mm thick
CRCA section, size should be 50x60mm with 32mm rebate. The corner of the
frame should be welded. The frame should be painted with one coat of primer and
finished painted with pure polyester paint. The frame should be provided with
approved quality butt hinges of 3 Nos. including all taxes complete for finished
item of work.
754 Single shutter 3'-0" x 7'-0" (914.4x2133.6mm) outer frame section size of 50 x 60 mm 1RM 146.90
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
755 Double shutter 5'-0" x 7'-0" (1524x2133.6mm) outer frame section size of 50 x 60 mm 1 RM 146.90
Supplying & fixing of Door frame made of roll formed section of 1.25 mm thick CRCA
section, size should be 50 x 60 mm with 32 mm rebate. The corner of the frame should
be welded. The frame should be painted with one coat of primer and finished painted
with pure plolyester paint. The frame should be provided with approved quality butt
hinges of 3 Nos. including all taxes complete for finished item of work.
756 Single shutter 3'-0" x 7'-0" (914.4x2133.6mm) outer frame section size of 50 x 75 mm 1 RM 167.40
757 Single shutter 5'-0" x 7'-0" (1524x2133.6mm) outer frame section size of 50 x 75 mm 1 RM 167.40
Providing and fixing IS:3564 marked Aluminium Die cast body tubular type universal
hydraulic door closer, Hardwyn make (Classic Queen) with necessary accessories and
758 screws etc complete Each 453.60
Providing and fixing IS:3564 marked Aluminium Extruded Section body tubular type
universal hydraulic door closer with double speed adjustment, Hardwyn make (Mytel)
759 with necessary accessories and screws etc complete Each 604.80
Providing and fixing IS:3564 marked Aluminium Extruded Section body tubular type
universal hydraulic door closer with double speed adjustment, Hardwyn make (Eddy)
760 with necessary accessories and screws etc complete Each 712.80
Providing and fixing IS:3564 marked Aluminium Extruded Section body tubular type
universal hydraulic door closer with double speed adjustment, Hardwyn make (Gazel)
761 with necessary accessories and screws etc complete Each 745.20
Providing and fixing double action hydraulic floor spring of approved brand manufacture
IS : 6315 marked, Hardwyn make (U-32) for doors including cost of cutting floors as
required, embedding in floors and S.S cover plates with Aluminum Pivot and single
piece M.S. Sheet outer box with slide plate etc. complete (Weight Capacity upto 130
762 Kgs) Each 1803.60
Providing and fixing double action hydraulic floor spring of approved brand manufacture
IS : 6315 marked, Hardwyn make (U-32) for doors including cost of cutting floors as
required, embedding in floors and Brass cover plates with Aluminum Pivot and single
piece M.S. Sheet outer box with slide plate etc. complete (Weight Capacity upto 130
763 Kgs) Each 1911.60
Providing and fixing double action hydraulic floor spring of approved brand manufacture
Hardwyn make (U-88) for doors including cost of cutting floors as required,
embedding in floors and S.S cover plates with Aluminum Pivot and single piece M.S.
764 Sheet outer box with slide plate etc. complete (Weight Capacity upto 80 Kgs) Each 1350.00
Providing and fixing double action hydraulic floor spring of approved brand
manufacture Hardwyn make (U-88) for doors including cost of
cutting floors as required, embedding in floors and Brass cover plates with Aluminum
Pivot and single piece M.S. Sheet outer box with slide plate etc. complete (Weight
765 Capacity upto 80 Kgs) Each 1458.00
Curtain Glazing
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
Supply and fixing of curtain Glazing made of pre painted steel (base steel as per
IS 513 of 0.6 mm thick D quality, galvanized as per IS 277 with Zinc of 120 GSM)
Primer coated with epoxy primer of 5-7 microns thick, finish painted with a
polyester paint of 12- 16 microns thick and back coated with 5-7 microns thick
alkyad backer. Section for outer frame should be 46 x 52 mm , section for mullion
should be 46 x 70 mm and section for beading should be 18 x 25 mm. The Glazing
should be panelled with 5 mm thick plain float Glass with Ethyl Propylene
diameine Monomer (EPDM) Gaskets. The sections are to be cut to length, mitre
joined with corner bracket. Cnetre mullions are to be fixed suing mullion cap.
Handle made of high grade alluminium powder coated and nylon receiver.
Gaskets made of Ethyl propylence Diamine Monomer (EPDM) Corner brackets
made of CRCA with zinc phosphating. Mullion caps made of Glass filled nylon.
The above frames should be fixed to the concrete / masonry wall be means of self
expanding screws. Including all taxes & complete for finished item of work.
Fixed Glazing 2'-0" x 2'-0" (609.6x609.6mm) grid outer frames section size of 46 x 52
766 mm 1 Sqm 2708.60
Mullion section size of 46 x 70mm
Beading section size of 18 x 25 mm
767 Fixed Glazing 2'-0" x 3'-0" (609.6x914.4mm) grid outer frame section size of 46 x 52 mm 1 sqm 2708.60
Mulllion section size of 46 x 70 mm
Beading section size of 18 x 25 mm
768 Fixed Glazing 3'-0" x 3'-0" (914.4x914.4mm) grid outer frame section size of 46 x 52 mm 1 sqm 2313.40
Mulllion section size of 46 x 70 mm
Beading section size of 18 x 25 mm
Fixed Glazing 3'-0" x 4'-0" (914.4x1219.2mm) grid outer frame section size of 46 x 52
769 mm 1 sqm 2313.40
Mulllion section size of 46 x 70 mm
Beading section size of 18 x 25 mm
ALLUMINIUM DOORS AND WINDOWS
Supplying alluminium Door frames with rectangular box hollw section (including
770 annodisation cost) 1 Kg 190.10
Supplying alluminium annodised openable sliding window, Ventgilator (including
771 annodisation cost) 1 Kg 190.10
772 A.C sheet Corrugated 6 mm thick 1 sqm 102.60
773 A.C sheet plain 4 m thick 1 sqm 95.00
774 A.C sheet plain 6 m thick 1 sqm 97.20
775 Sun Control film to the glazed windows partition including labour charges. 1 sqm 259.20
776 Alluminium Venetian blinds horizontal 25.4 mm wide with all accessories. 1 sqm 629.60
777 Alluminium Venetian blinds Verticle 100 mm wide with all accessories. 1 sqm 1069.20
778 S & F of marblex flooring with 2.0 mm thick in rolls. 1 sqm 351.00
779 S&F Vinyl Flooring with tiles 1.5 mm thick in rolls 1 sqm 351.00
RATES OF WORKS
A. DISMANTLING
Dismantling clearing away and carefully stacking materials useful for reuse.
780 Brick or stone masonry in clay upto 3 M height 1 Cum 54.00
781 Brick or stone masonry in clay over 3 M height 1 Cum 64.80
782 Brick or stone masonry in lime motar or brick masonry in cement mortar upto 3 M height 1 Cum 91.80
783 Brick in lime mortar wall up to 3 M height 1 Cum 54.00
784 Brick or stone masonry in lime motar or brick masonry in cement mortar over 3 M height 1 Cum 91.80
785 Brick in lime mortar wall up to 3 M height 1 Cum 54.00
786 Stone masonry in cement mortar upto 3 M height 1 Cum 129.60
787 Stone masonry in cement mortar over 3 M height 1 Cum 156.60
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
788 Terracing work in roofs or floors 10 Sqm 64.80
789 Flat stones in roof or floors incluidng lifting 10 Sqm 54.00
790 pan tiled or mangalore tiled roof without roof timbers. 10 Sqm 48.60
791 Flat and pan tiles or Mangalore tiles over flat tiles without roof timbers 10 Sqm 54.00
792 Old thatched roofing including tying materials into small bundles for reuse. 10 Sqm 16.20
793 Wrought and framed timber in roofs or floors 1 Cum 81.00
794 Doors and windows including removal of frame, hinges and fastening. 1 sqm 27.00
795 Old lime mortor plaster 10 Sqm 16.20
796 Old cement mortar plaster 10 Sqm 19.40
797 Dry rough stone revetment for aprons and stacking within 40 M lead 1 Cum 25.90
798 Revetment for aprons and stacking grouted within 40 lead 1 Cum 19.40
799 Lime concrete 1 Cum 86.40
800 Surki or cement concrete 1 Cum 135.00
801 Cuddapah slabs or shahabad stone slabs fooring on sand bed 10 Sqm 27.00
802 reinforced cement conrete 1 Cum 793.80
803 Through scraping of old pllastered surface 10 Sqm 16.20
Washing of platered surface with soap, soda and water (or with soda lime cumbly and
804 water) 10 Sqm 5.40
clean removal of lime plaster from walls and raking out joints 20mm deep or from
805 terraced roof and raking out joints 100 mm deep 10 Sqm 17.30
806 Clean removal of cement pllater from walls and raking out joint 200 mm deep 10 Sqm 18.40
Bailing out water for earth work excavation /concrete for foundatin below water level.
(For building items only)
a) other than sandy soil
807 0.0 M to 1.0 M 1 cum 69.10
808 1.0 M to 2.0 M 1 cum 82.10
809 2.0 M to 3.0 M 1 cum 96.10
b) Sandy soil
810 0.0 M to 1.0 M 1 cum 110.20
811 1.0 M to 2.0 M 1 cum 170.60
812 2.0 M to 3.0 M 1 cum 206.30
(E) CONCRETE
a) Supply and placing of the ready (design ) standard mix concrete M 20 grade from
standard suppliers approved by the Department including cost and conveyance,
813 pumping upto 5 floors and curing etc complete for finished item of work 1 Cum 2484.00
814 For each additional floor for M20 grade concrete 1 Cum 32.40
a) Supply and placing of the ready (design ) standard mix concrete M 25 grade from
standard suppliers approved by the Department including cost and conveyance,
815 pumping upto 5 floors and curing etc complete for finished item of work 1 Cum 2548.80
816 For each additional floor for M25 grade concrete 1 Cum 32.40
(F) labour charges for wrought and put up incluidng fixing in position frames,
shutters for doors, windows, ventilators etc.
817 Fully panelled doors external or internal 1 Sqm 356.40
818 Glazed and panelled doors 1 Sqm 343.40
819 Framed and planked doors 1 Sqm 335.90
820 Ledged, braced and planked doors 1 Sqm 288.40
821 Windows glazed 1 Sqm 343.40
822 Windows panelled 1 Sqm 452.50
823 Windows ledged, braced and planked 1 Sqm 288.40
824 Windows framed and planked 1 Sqm 274.30
825 Ventilators glazed, fixed with double frame with wire netting. 1 Sqm 343.40
826 Swing ventilators glazed 1 Sqm 370.40
827 Weldmesh doors and windows 1 Sqm 288.40
828 G.I or .AC sheet door & windows 1 Sqm 144.70
(G) MISCELLANEOUS ITEMS
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
829 Preparing gabions with jungle wood Each 2.60
830 Planting plants Each 1.90
831 Pruning plants Each 1.90
832 Maintaining avenues including fencing, weeding, milching, watering etc per plant. Each 4.50
833 - do - When scattered in hot weather with extra conveyance from March to June Each 5.20
834 Hoisting or lowering of slab 1 cum 72.40
835 Dressing faces of granite stone (double line dressing) 1 Sqm 119.90
836 Dressing faces of other than granite stone(double line dressing) 1 Sqm 74.50
Expansion Joint fillers
SUPPLY OF HIGH PERFORMANCE EXPANSION
JOINT FILLER BOARD. CONFIRMING TO M.O.S.T
(FOR ROADS&BUILDINGS)
"SILFLEX" CAPCELL HD-100
837 A. 18MM THICK 1 Sqm 540.00
838 B. 20MM THICK 1 Sqm 604.80
839 C. 25MM THICK 1 Sqm 756.00
SUPPLY OF EXPANSION JOINT FILLER BOARD
FOR BUILDINGS, COLUMNS, BEAMS AND
SLABS
"ARMOUR BOARD" SILFILL
840 A. 20MM THICK 1 Sqm 216.00
841 B. 25MM THICK 1 Sqm 270.00
842 C. 50MM THICK 1 Sqm 540.00
SUPPLY OF BACK UP TO COLD APPLIED
SEALANT IN CONSTRUCTION AND
LONGITUDINAL JOINT
"BACK UP ROAD" SILSEAL
843 A. 10MM OD 1 RM 8.60
844 B. 12MM OD 1 RM 10.40
845 C. 15MM OD 1 RM 13.00
846 D. 20MM OD 1 RM 17.30
847 E. 25MM OD 1 RM 21.60
(H) SCAFFOLDING
848 For superstructure in first floor over the rate of foundation and basement 1 cum 31.30
849 For second floor over the rate of first floor superstructure 1 cum 37.80
850 For third floor over the rate of IInd floor superstructure 1 cum 50.80
851 For each additional floor over third floor 1 cum 22.70
Scaffolding for plastering of walls and ceiling or painting of roof timber or walls,
where height is more than 3 M
852 1st and 2nd floor 10 Sqm 34.60
853 2nd and 3rd floor 10 Sqm 69.10
854 3rd and 4th floor 10 Sqm 103.70
855 Extra for every additional floor over 4th floor 10 Sqm 24.80
Centering charges
centering charges for all RCC roof slabs upto 150 mm depth and upto 3.66 M of floor
856 height 10 Sqm 788.40
Centering charges for all RCC roof slabs upto 150 mm depth & more than 3.66 M of
floor height. Add for each additional metre height or part there of over the rate as in item
857 above. 10 Sqm 216.00
centering charges for all RCC roof slabs above 150 mm upto 300 mm depth and upto
858 3.66 M of floor height 10 Sqm 1170.70
Centering charges for all RCC roof slabs above 150 mm and upto 300depth & more
than 3.66 M of floor height. Add for each additional metre height or part there of over the
859 rate as in item above. 10 Sqm 319.70
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
Centering charges for all R.C.C roof slabs projection upto 1.2 M only, at higher
level without having such slab projections at lower levels.
860 At 2nd floor level 10 Sqm 722.50
861 At 3rd floor level 10 Sqm 754.90
862 At 4th floor level 10 Sqm 788.40
Centering charges for all RCC waffle slabs incluidng ribs etc,(plain area) upto 3.66 M of
863 floor height 10 Sqm 1203.10
Centering charges for all RCC waffle slabs including ribs etc. (plain area) & more than
3.66 M of floor height. Add for each additional metre height or part there of over the rate
864 as in item above. 10 Sqm 328.30
865 Centering charges for all R.C.C helical stair cases. 10 Sqm 1284.10
866 Centering charges for RCM facia/ railing 50 to 75 mm thickness 1 Sqm 45.40
867 Centering charges for sunshade 0.6 M width 1 RM 34.00
868 Centering charges for sunshade 0.8 M width 1 RM 42.10
869 Centering charges for sunshade 1.00 M width 1 RM 47.50
870 Centering charges for T beams upto 3.66 M of floor height 1 cum 878.00
Centering charges for T beams more than 3.66 M of floor height . Add for each
871 additional metre height or part there of over the rate as in item above 1 cum 239.80
872 Centering charges for Rectangular beam, L beams, upto 3.66 M of floor height 1 cum 744.10
Centering charges for Rectangular beams & L beams more than 3.66 M of floor height .
873 Add for each additional metre height or part there of over the rate as in item above 1 cum 203.00
874 Centering charges for columns, pedastals 1 cum 744.10
875 Centering charges for Templates, bed blocks and footings 1 cum 468.70
876 Centering charges for arches upto 1.5 M span 1 cum 1013.00
877 Centering charges for arches above 1.5 M span 1 cum 1081.10
878 Centering charges for lintels and plinth beams ( less than 3.0 span) 1 cum 605.90
879 Centering charges for slabs above 300 mm depth 1 cum 703.10
880 Labour charges for 50 to 75 mm thick RCM Paradah walls 1 sqm 64.80
Labour charges for fixing A.C sheets including cost of J.Bots bitumen washers etc. with
881 or without ridges. 10 sqm 371.50
(j) LIFT CHARGES
For RCC items
882 Between 1 st and 2 nd floor 1 cum 40.00
883 Between 2nd and 3rd floor 1 cum 98.30
884 Between 3rd and 4th floor 1 cum 183.60
885 Between 4th and 5th floor 1 cum 288.40
886 Between 5th and 6 th floor 1 cum 314.30
887 between 6ht and 7 th floor 1 cum 393.10
888 Between 7th and 8 th floor 1 cum 457.90
889 Between 8th and 9 th floor 1 cum 510.80
890 Between 9th and 10th floor 1 cum 589.70
LIFT CHARGES FOR BRICK MASONRY & STONE MASONRY
891 Between 1 st and 2 nd floor 1 cum 32.90
892 Between 2nd and 3rd floor 1 cum 46.40
893 Between 3rd and 4th floor 1 cum 59.40
894 Add extra for every additional floor above 4th floor 1 cum 19.40
Lift charges for impervious coat upto 26 mm thick plastering with impermo compound
or shahabad stone flooring:
895 Between 1 st and 2nd floor 10 Sqm 16.20
896 Between 2nd and 3rd floor 10 Sqm 29.50
897 Between 3rd and 4th floor 10 Sqm 43.20
898 Add extra for every additional floor above 4th floor 10 Sqm 15.10
Lift charges for plastering
899 Between 1 st and 2 nd floor 10 Sqm 8.00
900 Between 2nd and 3rd floor 10 Sqm 14.00
901 Between 3rd and 4th floor 10 Sqm 20.50
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
902 Add extra for every additional floor above 4th floor 10 Sqm 9.10
Note:- SSR rates for Building Items are purely for guidance for the
officers for preparation of estimates vide para 113 of APPWD
code. Authority who prepares the estimate is however
responsible for proper rates as envisaged in para 45 of APPWD
code.
S S RATE
FOR
S.No Description of item Unit 2005-06
1 2 3
Supplying, laying, jointing and testing 101.6 mm SWG pipes of ISI make
conforming to ISI 651 &4127 with airtight cement joints in CM 1.5 : 1 prop.
incluidng excavation of trenches and socket pits in any soil (except rock
requiring blasting) upto 1524 mm(5'0") depth and refilling with watering and
1 tamping. 1 RM 135.20
Supplying, laying, jointing and testing 101.6 mm SWG pipes of ISI make
conforming to ISI 651 &4127 with airtight cement joints in CM 1:5:1 prop.
incluidng excavation of trenches and socket pits in any soil (except rock
requiring blasting) upto 914.4 mm (3'0") depth and refilling with watering and
2 tamping. 1 RM 105.60
3 a) Supplying & fixing SWG bends 101.6 mm Each 33.00
4 b) - do - labour charges only Each 12.10
Supplying & fixing 152.4 mm x 101.6 mm SWG gully traps of ISI make
conforming to ISI 651 &4127 with C.I Grating & Constg. Brick masonrary in
CM 1 :6 prop. Intermediae chamber and fitted with 304.8 mm x 288.6mm
5 (12"x9")C.I Frame and hinged cover Each 254.10
6 Supply of SWG pipe of ISI make conforming to ISI 651 4" dia (101.6mm) 1 RM 46.00
7 Supply of SWG pipe of ISI make conforming to ISI 651 6" dia (152.4mm) 1 RM 62.20
8 Supply of SWG pipe of ISI make conforming to ISI 651 8" dia (203.2mm) 1 RM 156.80
9 Supply of SWG pipe of ISI make conforming to ISI 651 10" dia (254mm) 1 RM 229.90
12 Extra for provision of medium weight 40 Kg in place of light weight cover. Each 357.50
Constructing 914.4 mm x 457.2 mm (3'0"x1'6") brick in CM 1:6 prop.
Masonry Inspection chamber upto 914.4 mm (3'0") and fitted with light weight
13 914.4 mm x 457.2 mm (3'0"x1'6") C.I frame and cover of 40 Kg. Each 1870.00
Constructing 457.2 mm x 457.2 mm (1'6"x1'6") brick in CM 1:6 prop. Masonry.
Inspection chamber upto 914.4 mm (3'0") and fitted with light weight 457.2 mm
14 x 457.2 mm (1'6"x1'6") C.I frame and cover of 20 Kg. Each 1127.50
15 a) Supplying & fixing 101.6 mm C.I Plug Bend Each 165.00
16 b) - do - labour charges only Each 33.00
17 a) Supplying & fixing 152.4mm dia CI plug bend Ist quality Each 377.00
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
18 b) - do - labour charges only Each 43.70
19 a) Supplying & fixing 101.6mm dia CI Plain bend Ist quality Each 154.00
20 b) - do - labour charges only Each 33.00
21 a)Making drainage connection in the existing inspection including all repairs Each 66.00
22 b) - do - labour charges only Each 38.50
a)Supplying , laying, jointing and testing 152.4 mm SWG pipes of ISI make
conforming to ISI 651 &4127 with airtight cement joints in CM 1.5 : 1 prop.
incluidng excavation of trenches and socket pits in any soil (except rock
requiring blasting) upto 151.2 cm depth and refilling with watering and
23 tamping. 1 RM 176.00
24 b) - do - labour charges only 1 RM 38.50
a)Supplying , laying, jointing and testing 152.4 mm CC bed 1:2:4 Prop: using
19.05 mm gauge graded granite metal chips and cradling 152.4 mm SWG
27 pipe line all round to have 76.2 mm thick cover over the sockets. 1 RM 77.00
28 b) - do - labour charges only 1 RM 27.50
Supplying & Laying 101.6 mm SWG channels with cement mortor joints with
29 suitable brick masonry for fixing the channels in position 1 RM 46.10
30 b) - do - labour charges only 1 RM 19.00
a) Supplying & Laying 152.4 mm SWG channels with cement mortor joints with
31 suitable brick masonry for fixing the channels in position 1 RM 86.10
32 b) - do - labour charges only 1 RM 26.60
a) Supplying & fixing 101.6 mm C.I Soil pipes with cement caulked joints and
33 painted black 1 RM 258.50
34 b) - do - labour charges only 1 RM 74.80
a) Supplying and fixing 152.4 mm (6") CI soil pipe Ist quality with cement
35 caulked joints and painted black ( single socket) 1 RM 467.50
36 b) - do - labour charges only 1 RM 74.80
a) Supplying and fixing 76.2 mm (3") CI soil pipe Ist quality with cement
37 caulked joints and painted black ( single socket) 1 RM 154.00
38 b) - do - labour charges only 1 RM 74.30
a) Supplying and fixing 152.4 mm(6") CI soil pipe Ist quality with cement
39 caulked joints and painted black ( Double socket) 1 RM 495.00
40 b) - do - labour charges only 1 RM 74.30
a) Supplying and fixing 76.2 mm(3") CI soil pipe 1st quality with cement
41 caulked joints and painted black ( Double socket) 1 RM 176.00
42 b) - do - labour charges only 1 RM 74.30
43 a) Supplying & fixing 101.6 mm (4") CI soil single junction with plug Each 220.00
44 b) - do - labour charges only Each 22.00
45 a) Supplying & fixig 152.4 mm (6") CI soil singel junctin with plain Each 377.00
46 b) - do - labour charges only Each 43.70
a) Supplying & fixing 152.4 x 152.4 mm (6"x6") CI single junction plug /door Ist
47 quality Each 434.50
48 b) - do - labour charges only Each 26.20
49 a) S& F 101.6 mm (4") CI soil double junction with plug Each 237.60
50 b) - do - labour charges only Each 33.00
51 a) S & F 101.6 x 76.2 mmm CI soil offsets (calcutta make) Each 148.50
52 b) - do - labour charges only Each 16.50
53 a) Supplying & fixing 152.4 x 152.4 mm CI single offset Ist quality Each 290.20
54 b) - do - labour charges only Each 26.20
55 a) Supplying & fixing 203.2 x 76.2 mm CI soil offsets Ist quality Each 246.20
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
56 b) - do - labour charges only Each 26.20
57 a) Supplying & fixing 101.6 mm x 152.4 mm C.I soil offsets (Calcutta make) Each 176.00
58 b) - do - labour charges only Each 19.80
59 a) Supplying & fixing 88.9 mm A.C cowls Each 38.50
60 b) - do - labour charges only Each 6.60
61 a) Supplying & fixing A.C Cowl 63.5 mm dia Each 27.50
62 b) - do - labour charges only Each 5.50
a) supplying & fixing 101.6 mm x 63.5 mm CI inverted double junction
63 (Calcutta/Nagpur make) Each 330.00
64 b) - do - labour charges only Each 28.60
65 a) S & F 76.2 mm CI Naharytrap (Calcutta/Nagpur make) Each 170.50
66 b) - do - labour charges only Each 26.40
67 Removing and refixing W.C s Each 133.10
68 Removing and refixing wash hand basins of any size with fittings complete Each 104.50
69 a) S & F 76.2 x 101.6 mm teak wood block complete Each 14.30
70 b) - do - labour charges only Each 4.40
71 a) S& F 76.2 mm C.I plug bends (Calcutta/Nagpur make) Each 110.00
72 b) - do - labour charges only Each 13.20
73 a) S & F 76.2 mm CI plain beds (Calcutta/Nagpur make) Each 96.80
74 b) - do - labour charges only Each 11.00
75 a) S&F 76.2 mm C.I single junction with Plug ( Calcutta / Nagapur make) Each 148.50
76 b) - do - labour charges only Each 18.70
77 a) S&F 76.2 mm C.I double junction with Plug ( Calcutta / Nagapur make) Each 209.00
78 b) - do - labour charges only Each 22.00
79 a) Supplying & fixing 76.2 mm x 76.2 mm CI offsets (Calcutta/Nagpur make) Each 115.50
80 b) - do - labour charges only Each 3.30
81 a) Supplying & fixing 76.2 mm x 152.4 mm CI offsets (Calcutta/Nagpur make) Each 126.50
82 b) - do - labour charges only Each 16.50
83 Supply & fixing 101.6 mm dia CI floor traps Ist quality Each 205.70
84 a)Boxing of Nahany traps in RCC floors Each 88.00
85 b) - do - labour charges only Each 44.00
86 Boxing of W.C Trap in R.C.C floor in Ist floor Labour charges only Each 176.00
87 Cutting holes in C.C; basement & repairs Labour charges only Each 49.50
88 Cuttinng holes in stone masonry & basement and repairs Labour charges only Each 33.00
89 Cutting holes in Brick masonry & repairs Labour charges only Each 22.00
90 Cutting holes in RCC slab floor & repairs Labour charges only Each 33.00
91 a) S & F 584.2 mm long Indian pattern white glazed W.C and trap Each 506.00
92 b) - do - labour charges only Each 121.00
a) S& F 584.2 mm long Orissa pan of parry Neycer/H.S.W make with 'P' & 'S'
93 trap Each 849.20
94 b) - do - labour charges only Each 151.80
95 a) S & F porcelanin foot rest for I.W.C.(Rectangular pair) Pair 121.00
96 b) - do - labour charges only Pair 27.50
a) S &F low down porcelain flushing tank Hindustan Sanitary wae/ parry/
97 Neycer with internal components Each 1210.00
98 b) - do - labour charges only Each 220.00
a)S & F European type Hindustan / Neycer or parry W.C best Indian make
99 white glazed (P trap) Each 605.00
100 b) - do - labour charges only Each 110.00
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
a) S & F European type Hindustan / Neycer or parry W.C best Indian make
101 white glazed with 'S' trap Each 715.00
102 b) - do - labour charges only Each 110.00
a) S& F best Indian make plastic seat and lid for European water closets &
103 Buffers as per IS 2548-1963 Each 242.00
104 b) - do - labour charges only Each 33.00
130 S & F CP long body bib cock fancy type delux 300 grames dia 12.7 mm Each 171.60
131 S & F 12.7mm dia high neck piller cock Ist quality Indian make 400 grams Each 274.60
132 a) S & F 12.7 mm .M.P couplings Each 19.80
133 b) - do - labour charges only Each 5.50
134 a) S & F 19.05 mm M.P couplings Each 22.00
135 b) - do - labour charges only Each 5.50
136 a) S& F MP coupling 25.4 mm dia Each 52.80
137 a) S & F PVC Rubber adopter for LLC and bend Each 11.00
138 b) - do - labour charges only Each 3.30
139 a) S& F 31.75 mm Brass union nuts Each 19.80
140 b) - do - labour charges only Each 3.30
141 a) S& F 38.1 mm Brass union nuts Each 20.90
142 b) - do - labour charges only Each 4.40
143 S& F GI union 12.7 mm Ist Quality Each 21.10
144 S& F GI union 19.05 mm Ist Quality Each 26.40
145 S& F GI union 25.4 mm Ist Quality Each 39.60
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
146 S& F GI union 31.75 mm Ist Quality Each 49.50
147 S& F GI union 38.1 mm Ist Quality Each 59.40
148 S& F GI union 50.8 mm Ist Quality Each 72.60
149 S& F GI connector 25.4 mm dia Each 44.00
150 S& F 12.7 m GI 'T' A class Ist quality Each 27.50
151 S& F 31.75 mm dia GI bend Ist quality Each 39.60
152 S & F 31.75 mm dia GI 'T' 1st Quality Each 38.70
153 a) Supplying & Fixing solder joints upto 50.8 mm dia Each 34.10
154 b) - do - labour charges only Each 11.00
155 a) Supplying & Fixing solution joints upto 50.8 dia Ist quality. Each 6.80
156 b) - do - labour charges only Each 1.30
183 Chiselling the stone masonry wall and repairs as directed by the department. 1 Rm 77.00
184 Chiselling the brick masonry wall and repairs as directed by the department. 1 Rm 16.50
a) S & F NP telephonic shower spray set & valve mixer with rest and all fittings
185 complete (ARK/ESSCO make) Each 825.00
186 b) - do - labour charges only Each 198.00
187 a) S & F NP shower spray fancy with NP Flexible pipe Each 275.00
188 b) - do - labour charges only Each 66.00
189 a) S & F NP cover for nahany trap Each 17.60
190 b) - do - labour charges only Each 8.80
191 a) Painting the flushing tank with white enamel paint Each 60.50
192 b) - do - labour charges only Each 30.80
193 S & F internal fittings for flush tank Each 330.00
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
194 Repairing and over hauling flushing tank Each 44.00
195 a) Supplying & Fixing NP chain rubber and plugh for baisn Each 22.00
196 b) - do - labour charges only Each 3.30
a) S & F 609.6 x 457.2 x 254 mm Indian make white glazed sink on cantilever
197 brackets with 2 NP couplings, plug and chain complete Each 2035.00
198 b) - do - labour charges only Each 165.00
a) S & F 762.00 x 457.2 x 228.6 mm Indian make white glazed sink on
199 cantilever brackets with 2 NP couplings, plug and chain complete Each 2420.00
200 b) - do - labour charges only Each 165.00
a) S & F 609.6 x 457.2 x 254 mm RCC terrazo finished sink (or constructed
at site with 50.8mm thick) brass plug and chain incluidng CI cantilever
201 brackets Each 330.00
202 b) - do - labour charges only Each 110.00
a) S & F 25.4 mm dia & 609.6 mm long aluminium anodized towel rod with
203 brackets and aluminium screws Each 82.50
204 b) - do - labour charges only Each 22.00
a) S & F 19.04 mm dia & 609.6 mm long aluminium anodized towel rod with
205 brackets and aluminium screws Each 71.50
206 b) - do - labour charges only Each 33.00
a) S & F 609.6 mm long 127 mm wide plate glass shelf with superior quality
207 aluminium railing complete with aluminium screws Each 104.50
208 b) - do - labour charges only Each 27.50
209 a) S & F 609.6 mm long 127 mm wide plate glass shelf only Each 33.00
210 b) - do - labour charges only Each 5.50
211 a) S & F NP soap dish heavy type with NP SCREWS Each 132.00
212 b) - do - labour charges only Each 6.10
213 a) S &F NP holder brackets with screws Each 27.50
214 b) - do - labour charges only Each 6.60
215 a) S & F liquid soap container NP metalic with NP brackets and screws. Each 121.00
216 b) - do - labour charges only Each 11.00
217 a) Constructing R.C.C over head tank with partition complete 1 Lt 3.90
218 b) - do - labour charges only 1 Lt 0.90
219 a) Constructing R.C.C over head tank with out partition complete 1 Lt 3.30
220 b) - do - labour charges only 1 Lt 0.80
221 a) S & F 25.4 mm copper ball cock ith PVC ball Indian make ISI mark Each 209.00
222 b) - do - labour charges only Each 22.00
223 a) S & F 19.05 mm copper ball cock ith PVC ball Indian make ISI mark Each 170.50
224 b) - do - labour charges only Each 22.00
225 a)S & F 12.7 mm copper ball cock ith PVC ball Indian make ISI mark Each 110.00
226 b) - do - labour charges only Each 22.00
227 a) S & F 25.4 mm GM peet valve Indian make heavy type Each 231.00
228 b) - do - labour charges only Each 22.00
229 a) S & F 19.05 mm GM peet valve Indian make heavy type Each 178.20
230 b) - do - labour charges only Each 22.00
231 a) S & F 12.7 mm GM peet valve Indian make heavy type Each 137.50
232 b) - do - labour charges only Each 22.00
233 a) S & F 31.75 mm GM peet valve Indian make heavy type Ist quality Each 346.50
234 a) S & F 38.1 mm GM peet valve Indian make heavy type Ist quality Each 545.60
235 b) - do - labour charges only Each 33.00
236 a)S & F 50.8 mm dia GM peet valve Ist quality Each 704.00
237 b) - do - labour charges only Each 44.00
238 a)S & F 63.5 mm dia GM peet valve Ist quality Each 1328.80
239 b) - do - labour charges only Each 55.00
240 a)S & F 76.2 mm dia GM peet valve Ist quality Each 1948.10
241 b) - do - labour charges only Each 66.00
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
a) S& F 12.7 mm GI pipe 'A' class ISI mark with GI fittings including the cost of
242 pipe & its fittings & labour charges complete 1 RM 71.50
243 b) - do - labour charges only 1 RM 19.80
a) S& F 19.05 mm GI pipe 'A' class ISI mark with GI fittings including the cost
244 of pipe & its fittings & labour charges complete 1 RM 77.00
245 b) - do - labour charges only 1 RM 19.80
a) S& F 25.4 mm GI pipe 'A' class ISI mark with GI fittings including the cost of
246 pipe & its fittings & labour charges complete 1 RM 121.00
247 b) - do - labour charges only 1 RM 19.80
a) S& F 38.1 mm GI pipe 'A' class ISI mark with GI fittings including the cost of
248 pipe & its fittings & labour charges complete 1 RM 165.00
249 b) - do - labour charges only 1 RM 22.00
a) S& F 50.8 mm GI pipe 'A' class ISI mark with GI fittings including the cost of
250 pipe & its fittings & labour charges complete 1 RM 203.50
251 b) - do - labour charges only 1 RM 33.00
a) S& F 12.7 mm GI pipe 'B' class ISI mark with GI fittings including the cost of
252 pipe & its fittings & labour charges complete 1 RM 88.00
253 b) - do - labour charges only 1 RM 19.80
a) S& F 19.05 mm GI pipe 'B' class ISI mark with GI fittings including the cost
254 of pipe & its fittings & labour charges complete 1 RM 93.50
255 b) - do - labour charges only 1 RM 19.80
a) S& F 25.4 mm GI pipe 'B' class ISI mark with GI fittings including the cost of
256 pipe & its fittings & labour charges complete 1 RM 137.50
257 b) - do - labour charges only 1 RM 19.80
a) S& F 38.1 mm GI pipe 'B' class ISI mark with GI fittings including the cost of
258 pipe & its fittings & labour charges complete 1 RM 192.50
259 b) - do - labour charges only 1 RM 22.00
a) S& F 50.8 mm GI pipe 'B' class ISI mark with GI fittings including the cost of
260 pipe & its fittings & labour charges complete 1 RM 247.50
261 b) - do - labour charges only 1 RM 33.00
a) S& F 31.75 mm GI pipe 'B' class ISI mark with GI fittings including the cost
262 & conveyance of all labour charges complete 1 RM 154.00
S & F 63.5 mm dia GI pipe 'B' class with GI fittings such as elbows tees
couplings, nipples, plugs including excavation for trenches and refilling the
trenches complete except for GI bends union and GI connectors with checknut
263 and socket Tata or Zenith make. 1 RM 257.40
264 a)S & F 12.7 mm holder bat clamps Each 6.60
265 b) - do - labour charges only Each 3.30
266 a)S & F 19.05 mm holder bat clamps Each 11.00
267 b) - do - labour charges only Each 3.30
268 a)S & F 25.4 mm holder bat clamps Each 13.20
269 b) - do - labour charges only Each 3.30
270 a)S & F 38.1 mm holder bat clamps Each 16.50
271 b) - do - labour charges only Each 4.40
a) Constructing Brick masonry chamber over the gully trap or peet valve and
272 fitted with 304.8 x 228.6 m size CI frame and hinged cover. Each 198.00
273 b) - do - labour charges only Each 49.50
a)Constructing Brick mlasonry supprt for G.I pipe with C.M 304.8 x 228.6
274 x228.6 mm size including plastering and finishing etc. complete. Each 33.00
275 b) - do - labour charges only Each 11.00
276 a) S & F 12.7 x 152.0 mm NP shower rose heavy Each 82.50
277 b) - do - labour charges only Each 9.90
278 a) S & F 12.7 x 137.0 mm NP shower rose heavy Each 82.50
279 b) - do - labour charges only Each 11.00
280 a) S & F 12.7 x 101.6 mm NP shower rose heavy Each 71.50
281 b) - do - labour charges only Each 11.00
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
282 a) S & F 12.7 x 88.9 CP fancy shower Each 132.00
283 b) - do - labour charges only Each 11.00
a) Supplying & fixing 12.7 mm GI drain pipe with plug for tanks (Mudvalve)
284 including making a hole Each 22.00
285 b) - do - labour charges only Each 11.00
a) Supplying & fixing 19.05 mm GI drain pipe with plug for tanks (Mud valve)
286 including making a hole Each 33.00
287 b) - do - labour charges only Each 11.00
a) Supplying & fixing 25.4 mm GI drain pipe with plug for tanks (Mud valve)
288 including making a hole Each 38.50
289 b) - do - labour charges only Each 13.20
a) Taking branch water connection from the existing 25.4 mm GI pipe
290 including cutting threading, etc, complete with fitting, Each 77.00
291 b) - do - labour charges only Each 22.00
a) Taking branch water connection from the existing 19.05 mm GI pipe
292 including cutting threading, etc, complete with fitting, Each 44.00
293 b) - do - labour charges only Each 19.80
a) Taking branch water connection from the existing 12.7 mm GI pipe
294 including cutting threading, etc, complete with fitting, Each 33.00
295 b) - do - labour charges only Each 16.50
296 Supplying & fixing leather washers for 12.7 mm bib tap and stop cock Each 1.10
297 Supplying & fixing leather washers for 19.05 mm bib tap and stop cock Each 2.20
298 Supplying & Fixing 12.7 mm fibre washers Each 2.20
299 Supplying & Fixing 19.05 mm fibre washers Each 2.80
300 a) Supplying & fixing 304.8 x 228.6 mm CI frame & cover over gully taps Each 66.00
301 b) - do - labour charges only Each 17.60
302 a) Supplying & fixing CI Nahany trap grating Each 11.00
303 b) - do - labour charges only Each 5.50
304 a) Supplying & fixing CI gully trap grating Each 27.50
305 b) - do - labour charges only Each 5.50
306 a) Supplying & fixing valves for brass ball cocks 25.4 mm dia Each 11.00
307 b) - do - labour charges only Each 4.40
308 a) Supplying & fixing 12.7 m valve for bib tap or stop cocks Each 10.10
309 b) - do - labour charges only Each 2.80
310 a) Supplying & fixing 19.05 m valve for bib tap or stop cocks Each 16.50
311 b) - do - labour charges only Each 3.30
312 Removing 12.7 mm GI pipe and refixing the same Rm 28.60
313 Removing 19.05 mm GI pipe and refixing the same Rm 33.00
314 Removing 25.4 mm GI pipe and refixing the same Rm 48.40
315 Removing 38.1 mm GI pipe and refixing the same Rm 60.50
316 Removing 50.8 mm GI pipe and refixing the same Rm 71.50
317 Cleaning the W.C with acid and Vim powder Each 16.50
318 Cleaning the Urinal with acid and Vim power Each 16.50
319 Cleaning the wash basin with acid and Vim power Each 16.50
320 Cleaning the E.W.C with acid and Vim power Each 16.50
a) Supplying & fixing 914.4 x 457.2 mm CI man hole frame and cover (light
321 weight) Each 462.00
322 b) - do - labour charges only Each 44.00
323 a)Supplying & fixingg CI steps for septic tank. Each 27.50
324 b) - do - labour charges only Each 5.50
a) Supplying & fixing 50.8 cm dia man hole frame & cover for 914.4 mm dia
325 chamebr (Light weight) Each 357.50
326 b) - do - labour charges only Each 33.00
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
a) Supplying & fixing 50.8 cm dia man hole frame & cover for 914.4 mm dia
327 chamebr (Medium weight) Each 660.00
328 b) - do - labour charges only Each 71.50
329 a) Supplying & fixing 101.6 x 101.6 mm SWG Tee Each 49.50
330 b) - do - labour charges only Each 12.10
331 a) S & F SWG pipe 101.6 mm of Ist Class with cement joints 1 RM 50.60
332 b) - do - labour charges only 1 RM 5.50
333 a) Supplying & Fixing SWG pipe 152.4 mm of Ist Class with cement joints 1 RM 66.00
334 b) - do - labour charges only 1 RM 11.00
Constg. 50.8 mm thick RCM baffle wall with 2.267 Kg steel & rabbit wire mesh
335 in CM 1:3 with fine rendering in neat cement 1 Sqm 115.50
336 a) Constg. 50.8 mm RCC partition wall 1 Sqm 132.00
337 b) - do - labour charges only 1 Sqm 22.00
338 a) S & F double layer of bamboo matting tarred on both sides. 10 Sqm 330.00
339 b) - do - labour charges only 10 Sqm 55.00
340 Removing of 101.6 m or 76.2 mm CI pipe 1 RM 16.50
341 a) Supplying & fixing 76.2 mm W.I clamps Each 8.80
342 b) - do - labour charges only Each 3.30
Extra depth of inspection chamber of 914.4 mm diameter excluding rock
343 cutting. 1 Rm 660.00
Extra depth of inspection chamber of 914.4 x 457.2mm diameter excluding
344 rock cutting. 1 Rm 660.00
345 a) Supplying & fixing NP coat hook Each 22.00
346 b) - do - labour charges only Each 5.50
Supplying & fixing small precast RCC water tanks including cover over the
347 roof of building 1 Lit 3.30
348 Labour charges for lay8ing glazed tiles 1 Sqm 55.00
388 Supplying & fixing oval shape basin white(520x410mm) parry or equalivalent Each 1298.00
Supply & fixing RCC cover 22" dia with nominal reinforcement 3 " thick and
389 hooks for lifting Each 440.00
390 Supply & fixing cp spl. Grating with frame and cover of Ist quality Each 31.40
391 Supply & fixing towel rod (CP) of 24" long and 3/4 " dia Each 204.60
392 Supply & fixing of LLC handle set Ist quality Each 44.00
Supply & fixing 4" dia CP thimble pipe
393 a) 150 mm long Each 220.00
394 b) 220 mm long Each 330.00
395 c) 300 mm long Each 440.00
396 Supply & fixing CP long bend Each 178.80
397 Supply & fixing CP short bend Each 89.10
Supply & fixing of PVC low level system parryware, slimline with internal
components & short bend.
398 a) 10 Ltrs capacity white Each 605.00
399 b) 10 ltrs capacity colour Each 671.00
400 c) 8 lts capacity tuffmate white & colour Each 407.00
401 Supplying & fixng bib cock with flange C.P jaquar make queen series. Each 752.00
Supply & fixing bib cock cum health faucet with 1 m long flexible tube
and wall hook of jaquar make queen series
402 a ) Chrome plated Each 2139.80
403 b) Ivory gold Each 3684.50
Supply & fixing pillar cock jaquar make Queen series
404 a ) Chrome plated Each 783.20
405 b) Ivory gold Each 1371.70
Supply & fixing Angular stop cokc with wall flange jaquar make Queen
series
406 a ) Chrome plated Each 723.30
407 b) Ivory gold Each 1338.70
Supply & fixing Waste coupling jaquar make
408 a ) Chrome plated Each 134.60
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
409 b) Ivory gold Each 147.60
Supply & fixng of Bottle trap jaquar make
410 a ) Chrome plated Each 504.90
411 b) Ivory gold Each 1027.40
Supply & Fixing copper pipe 450 mm long with nuts & washers Jaquar
make
412 a ) Chrome plated Each 153.20
413 b) Ivory gold Each 271.70
Supply and fixing wall mirror with provision for ove head shower and 115
mm long bend pipe with wall flange jaquar make queen series
414 a ) Chrome plated Each 2476.10
415 b) Ivory gold Each 4596.40
Supply & fixing overhead shower rose with revolving joint and 150 mm
long swivel shower arm Jaquar make qureen sseries.
416 a) Chrome plated Each 969.10
417 b) Ivory Gold Each 1712.60
Supply and Fixing Wall Mixer with Telephonic shower arrangement with crutch
418 and flexible pipe Jaquar series Ivory gold colour for bath tub. Each 4522.30
Suply & fixing Bath tub overflow set complete with over flow cap, 450 mm Ball
chain with rubber plug & union bend with brass nut jaquar make, Ivory gold
419 colour. Each 775.00
Supply & fixing sink cock with regular swinging spout with wall flange
420 chromeplated Jaquar make Queen series Each 1084.50
Supply & fixing soap dish jaquar make queen series:
421 a) Chrome plated Each 624.50
422 b) Ivory Gold Each 996.30
Supply & fixng of toilet paper holder Jaquar make Queen series.
423 a) Chrome plated Each 507.40
424 b) Ivory Gold Each 803.40
Supply & Fixing of Towel ring Jaquar make Queen series
425 a) Chrome plated Each 523.20
426 b) Ivory Gold Each 803.40
Supply & Fixing of towel coat hok Jaquar make Queen series
427 a) Chrome plated Each 355.60
428 b) Ivory Gold Each 563.80
429 Supply & Fixing of Towel rod 24 " Jaquar make Queen series Ivory gold colour Each 2740.10
Supply & Fixing of Tumbler holder Jaquar make Queen series, Ivory gtold
430 colour Each 877.50
431 Supply & fixing of Glass shelf 22" Jaquar make Queen series, Ivory gold colour Each 1680.90
"CZAR" OR EQUIVALENT BATH ROOM FITTINGS ACCESSORIES PRICES
INCLUSION OF ALL THE TAXES
432 Polo 3 flow hand shower-ts1000 Each 950.00
433 Polo 3 flow overhead shower - ts 1001 Each 779.00
434 Polo 4 flow hand shower - ts 1002 Each 1425.00
435 Rain head shower 6"-ts 1003 Each 665.00
436 Rain head shower 9"- ts 1004 Each 1425.00
437 Rio hand 4 flow shower -ts 1005 Each 903.00
438 Rio 4 flow overhead shower -ts 1006 Each 713.00
439 Viva 4 flow hand shower -ts 1007 Each 1378.00
440 Viva 4 flow overhead shower –ts1008 Each 1045.00
441 Sliding tel shower rail -ts 1009 Each 665.00
442 Flexi shower rail -ts 1010 Each 950.00
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
443 Tel shower jet/w/1.5 mtr pipe & wall hook -s 2302 -cp Each 570.00
444 Tel shower jet/w/1.5 mtr pipe & wall hook -s 2302 -col/cp Each 760.00
445 Tel shower jet/w/1.5 mtr pipe & wall hook -s 2302 -col/gold Each 894.00
446 Tel shower jet/w/1.5 mtr pipe & wall hook -s 2302 -spl/gold Each 994.00
447 Tel shower jet/w/1.5 mtr pipe & wall hook -s 2302 -gold Each 1169.00
448 Health faucet -s 2307 -cp Each 676.00
449 Health faucet -s 2307 -col/cp Each 901.00
450 Health faucet -s 2307 -col/gold Each 1061.00
451 Health faucet -s 2307 -spl/gold Each 1179.00
452 Health faucet -s 2307 -gold Each 1387.00
453 Bottle trap h/ casted 40/32mm -s 2061-cp Each 575.00
454 Bottle trap h/ casted 40/32mm -s 2061-col/cp Each 765.00
455 Bottle trap h/ casted 40/32mm -s 2061-col/gold Each 902.00
456 Bottle trap h/ casted 40/32mm -s 2061-spl/gold Each 1001.00
457 Bottle trap h/ casted 40/32mm -s 2061-gold Each 1179.00
458 Bottle trap exclu 40/32mm -s 2602 cp Each 405.00
459 Waste coupling heavy - s2603 cp 32mm Each 138.00
460 Waste coupling heavy - s2604cp 40mm Each 157.00
461 Waste coupling heavy - s2603 col/cp 32mm Each 183.00
462 Waste coupling heavy - s2604 col/cp 40mm Each 209.00
463 Waste coupling heavy - s2603 spl/gold 32mm Each 240.00
464 Waste coupling heavy - s2604 spl/gold 40mm Each 274.00
465 Waste coupling heavy - s2603 gold 32mm Each 282.00
466 Waste coupling heavy - s2604 gold 40mm Each 321.00
467 Waste coupling 150 mm long - s2605 cp 40mm Each 217.00
468 Waste coupling 150 mm long - s2605 col/cp 40mm Each 289.00
469 Waste coupling 150 mm long - s2605 spl/gold 40mm Each 377.00
470 Waste coupling 150 mm long - s2605 gold 40mm Each 445.00
471 Bath tub over flow set-s2606 -cp Each 426.00
472 Bath tub over flow set-s2606 -col/cp Each 567.00
473 Bath tub over flow set-s2606 -col/gold Each 668.00
474 Bath tub over flow set-s2606 -spl/gold Each 742.00
475 Bath tub over flow set-s2606 -gold 873.00
476 Concealed flush valve 32mm -sy 163 cp Each 1615.00
477 Concealed flush valve 32mm -sy 163 col/cp Each 2154.00
478 Concealed flush valve 32mm -sy 163 col/gold Each 2534.00
479 Concealed flush valve 32mm -sy 163 spl/gold Each 2815.00
480 Concealed flush valve 32mm -sy 163 gold Each 3312.00
481 Urinal flush valve 15mm -sy 2404 cp Each 1055.00
482 Urinal flush valve 15mm -sy 2404 col/cp Each 1406.00
483 Urinal flush valve 15mm -sy 2404 col/gold Each 1654.00
484 Urinal flush valve 15mm -sy 2404 spl/gold Each 1837.00
485 Urinal flush valve 15mm -sy 2404 gold Each 2162.00
486 Single line flush valve 32 mm w/elbow bend & flange - sy 2405 cp Each 1587.00
487 Single line flush valve 32 mm w/elbow bend & flange - sy 2405 col/cp Each 2116.00
488 Single line flush valve 32 mm w/elbow bend & flange - sy 2405 col/gold Each 2489.00
489 Single line flush valve 32 mm w/elbow bend & flange - sy 2405 spl/gold Each 2765.00
490 Single line flush valve 32 mm w/elbow bend & flange - sy 2405 gold Each 3253.00
491 Single line flush valve 32 mm w/o elbow bend - sy 2406 cp Each 1397.00
492 Single line flush valve 32 mm w/elbow bend & flange - sy 2406 col/cp Each 1862.00
493 Single line flush valve 32 mm w/elbow bend & flange - sy 2406 col/gold Each 2191.00
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
494 Single line flush valve 32 mm w/elbow bend & flange - sy 2406 spl/gold Each 2434.00
495 Single line flush valve 32 mm w/elbow bend & flange - sy 2406 gold Each 2863.00
496 Flush cock half turn -25mm -s2407 cp Each 713.00
497 Flush cock half turn -25mm -s2407 col/cp Each 950.00
498 Flush cock half turn -25mm -s2407 col/gold Each 1117.00
499 Flush cock half turn -25mm -s2407 spl/gold Each 1242.00
500 Flush cock half turn -25mm -s2407 gold Each 1461.00
501 Flush cock lever type -25mm -s2408 cp Each 806.00
502 Flush cock lever type -25mm -s2408 col/cp Each 1076.00
503 Flush cock lever type -25mm -s2408 col/gold Each 1266.00
504 Flush cock lever type -25mm -s2408 spl/gold Each 1407.00
505 Flush cock lever type -25mm -s2408 gold Each 1656.00
506 Push cock 25mm -s2409 cp Each 722.00
507 Push cock 25mm -s2409 col/cp Each 962.00
508 Push cock 25mm -s2409 col/gold Each 1132.00
509 Push cock 25mm -s2409 spl/gold Each 1258.00
510 Push cock 25mm -s2409 gold Each 1480.00
511 Urinal push cook 15 mm - s 2410 cp Each 229.00
512 Urinal push cook 15 mm - s 2410 col/cp Each 305.00
513 Urinal push cook 15 mm - s 2410 col/gold Each 359.00
514 Urinal push cook 15 mm - s 2410 spl/goldcp Each 399.00
515 Urinal push cook 15 mm - s 2410 gold Each 469.00
516 Pillar cock deluxe s 2000 15mm Each 309.00
517 Pillar cock regular s 2001 15mm Each 371.00
518 Bib cock with flange s 2002 15mm Each 301.00
519 Bib cock long nose with flange s 2003 15mm Each 407.00
520 Bib cock long body straight with flange s 2004 15mm Each 356.00
521 Concealed stop cock sheet flange s 2007 15mm Each 372.00
522 Concealed sheet sliding s 2010 15mm Each 405.00
523 Concealed sheet sliding s 2006 20mm Each 466.00
524 Concealed casted sliding wall flange s 2009 15mm Each 483.00
525 Concealed casted sliding wall flange s 2013 20mm Each 676.00
526 Concealed casted s 2008 15mm Each 475.00
527 Concealed casted s 2012 20mm Each 638.00
528 Angle cock with wall flange s 2014 15mm Each 290.00
529 Angle cock with long thread with flange s 2015 15mm Each 314.00
530 Angle cock with 18" connection with flange s 2016 15mm Each 368.00
531 Swan neck (left/right) s 2018 15mm Each 608.00
532 Sink cock with casted swivel spout with flange s 2019 15mm Each 590.00
533 Bath cock with wall flange s 2020 15mm Each 618.00
534 Two way bib cock with flange s 2021 15mm Each 475.00
535 Two way angle cock with flange s 2022 15mm Each 475.00
536 Sink cock table mounted with casted swivel spout s 2023 15mm Each 594.00
537 Sink cock pipe spout "goose" s 2024 15mm Each 594.00
538 Central hole basin mixer s 2101 15mm Each 1235.00
539 Close hole basin mixer s 2102 15mm Each 1235.00
540 Three hole basin mixer without pop up waste system s 2103 15mm Each 1435.00
541 Three hole basin with pop up waste system s 8-2103 a 15mm Each 1710.00
542 Wall mixer with arrangement for telephonic shower s 2105 a 15mm Each 1406.00
543 Wall mixer non telephonic shower arragement s 2106 15mm Each 1159.00
544 Wall mixer with bend for over head shower s 2105 15mm Each 1454.00
545 Wall mixer with tip ton for telephonic shower arrangement s 2104 15mm Each 1425.00
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
546 Wall mixer 3 in 1 for both telephonic shower & overlead shower s 2107 15mm Each 1710.00
547 Sink mixer with casted swivel spout s 2109 15mm Each 1088.00
548 Sink mixer table mounted with casted swivel spout s 2111 15mm Each 1197.00
549 Sink mixer pipe spout "goose" s 2112 15mm Each 1259.00
550 Four hole bidet mixer with pop up waste system (bottom spray) s 2110 15 mm Each 1910.00
551 One hole bidet mixer with pop up waste system s 2108 15 mm Each 1663.00
552 Spout plain with flange s 2201 15mm Each 485.00
553 Spout plain with flange s 2202 20mm Each 525.00
554 Spout with flange 9" long s 2203 15mm Each 609.00
555 Tip ton spout with flange s 2205 15mm Each 796.00
556 Shower arm with wall range s 2306 15mm Each 243.00
557 Sona shower s 2305 15mm Each 335.00
558 Tushar shower s 2304 15mm Each 330.00
559 Flush valve without elbow bend s 2401 32mm Each 1563.00
560 Flush valve with elbow blend & wall falnge s 2402 32 mm Each 1781.00
561 Two way bvertor with flange s 2501 15 mm Each 875.00
562 Four way owertor with nrv s 2503 15mm Each 1363.00
563 Four way fflvertor with nrv extended for duct provision s 2504 15mm Each 1811.00
564 Concealed casted sliding extended for duct s 2505 15mm Each 829.00
565 Piller cock sy 101 cp Each 380.00
566 Piller cock sy 101 col/cp Each 506.00
567 Piller cock sy 101 col/gold Each 596.00
568 Piller cock sy 101 spl/gold Each 662.00
569 Piller cock sy 101 gold Each 779.00
570 Bib cock with flange sy 102 cp Each 366.00
571 Bib cock with flange sy 102 col/cp Each 501.00
572 Bib cock with flange sy 102 col/gold Each 589.00
573 Bib cock with flange sy 102 spl/gold Each 654.00
574 Bib cock with flange sy 102 gold Each 770.00
575 Bib cock long nose with flange sy 103 cp Each 475.00
576 Bib cock long nose with flange sy 103 col/cp Each 634.00
577 Bib cock long nose with flange sy 103 col/gold Each 745.00
578 Bib cock long nose with flange sy 103 spl/gold Each 827.00
579 Bib cock long nose with flange sy 103 gold Each 974.00
580 Stop cock male/female sy 105 cp Each 342.00
581 Stop cock male/female sy 105 col/cp Each 456.00
582 Stop cock male/female sy 105 col/gold Each 537.00
583 Stop cock male/female sy 105 spl/gold Each 596.00
584 Stop cock male/female sy 105 gold Each 701.00
585 Concealed casted 15 mm with adjustable w/f sy 106 cp Each 534.00
586 Concealed casted 15 mm with adjustable w/f sy 106 col/cp Each 712.00
587 Concealed casted 15 mm with adjustable w/f sy 106 col/gold Each 837.00
588 Concealed casted 15 mm with adjustable w/f sy 106 spl/gold Each 930.00
589 Concealed casted 15 mm with adjustable w/f sy 106 gold Each 1094.00
590 Concealed casted 20mm with adjustable w/f sy 107 cp Each 724.00
591 Concealed casted 20mm with adjustable w/f sy 107 col/cp Each 965.00
592 Concealed casted 20mm with adjustable w/f sy 107 col/gold Each 1135.00
593 Concealed casted 20mm with adjustable w/f sy 107 spl/gold Each 1262.00
594 Concealed casted 20mm with adjustable w/f sy 107 gold Each 1484.00
595 Concealed casted heavy 20mm with adjustable w/f sy 107a cp Each 770.00
596 Concealed casted heavy 20mm with adjustable w/f sy 107a col/cp Each 1027.00
597 Concealed casted heavy 20mm with adjustable w/f sy 107a col/gold Each 1208.00
598 Concealed casted heavy 20mm with adjustable w/f sy 107a spl/gold Each 1342.00
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
599 Concealed casted heavy 20mm with adjustable w/f sy 107a gold Each 1580.00
600 Angle cock with wall flange sy 100 cp Each 342.00
601 Angle cock with wall flange sy 100 col/cp Each 456.00
602 Angle cock with wall flange sy 100 col/gold Each 537.00
603 Angle cock with wall flange sy 100 spl/gold Each 596.00
604 Angle cock with wall flange sy 100 gold Each 701.00
605 Angle cock with 18" connection & flange sy 100a cp Each 491.00
606 Angle cock with 18" connection & flange sy 100a col/cp Each 656.00
607 Angle cock with 18" connection & flange sy 100a col/gold Each 771.00
608 Angle cock with 18" connection & flange sy 100a spl/gold Each 857.00
609 Angle cock with 18" connection & flange sy 100a gold Each 1008.00
610 Two way angle cock with flange sy 100b cp Each 665.00
611 Two way angle cock with flange sy 100b col/cp Each 886.00
612 Two way angle cock with flange sy 100b col/gold Each 1043.00
613 Two way angle cock with flange sy 100b spl/gold Each 1159.00
614 Two way angle cock with flange sy 100b gold Each 1363.00
Swan neck (left/right) sy 111 cp Each 694.00
615 Swan neck (left/right) sy 111 col/cp Each 924.00
616 Swan neck (left/right) sy 111 col/gold Each 1088.00
617 Swan neck (left/right) sy 111 spl/gold Each 1208.00
618 Swan neck (left/right) sy 111 gold Each 1422.00
619 Sink cock with casted swivel spout sy 112 cp Each 656.00
620 Sink cock with casted swivel spout sy 112 col/cp Each 874.00
621 Sink cock with casted swivel spout sy 112 col/gold Each 1028.00
622 Sink cock with casted swivel spout sy 112 spl/gold Each 1142.00
623 Sink cock with casted swivel spout sy 112 gold Each 1344.00
624 Bib cock surgical with flange sy 114 cp Each 702.00
625 Bib cock surgical with flange sy 114 col/cp Each 936.00
626 Bib cock surgical with flange sy 114 col/gold Each 1101.00
627 Bib cock surgical with flange sy 114 spl/gold Each 1224.00
628 Bib cock surgical with flange sy 114 gold Each 1440.00
629 Pillar cock surgical sy 115 cp Each 653.00
630 Pillar cock surgical sy 115 col/cp Each 870.00
631 Pillar cock surgical sy 115 col/gold Each 1024.00
632 Pillar cock surgical sy 115 spl/gold Each 1137.00
633 Pillar cock surgical sy 115 gold Each 1339.00
634 Two way bib cock with flange sy 116 cp Each 665.00
635 Two way bib cock with flange sy 116 col/cp Each 886.00
636 Two way bib cock with flange sy 116 col/gold Each 1043.00
637 Two way bib cock with flange sy 116 spl/gold Each 1159.00
638 Two way bib cock with flange sy 116 gold Each 1363.00
639 Bib cock tip ton with wall flange sy 116a cp Each 665.00
640 Bib cock tip ton with wall flange sy 116a col/cp Each 886.00
641 Bib cock tip ton with wall flange sy 116a spl/gold Each 1043.00
642 Bib cock tip ton with wall flange sy 116a spl/gold Each 1159.00
643 Bib cock tip ton with wall flange sy 116a gold Each 1363.00
644 Swan neck with casted swivel spout sy 118 cp Each 732.00
645 Swan neck with casted swivel spout sy 118 col/cp Each 976.00
646 Swan neck with casted swivel spout sy 118 col/gold Each 1148.00
647 Swan neck with casted swivel spout sy 118 spl/gold Each 1275.00
648 Swan neck with casted swivel spout sy 118 gold Each 1500.00
649 Sink cock table top with casted swivel spout sy 119 cp Each 689.00
650 Sink cock table top with casted swivel spout sy 119 col/cp Each 919.00
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
651 Sink cock table top with casted swivel spout sy 119 col/gold Each 1080.00
652 Sink cock table top with casted swivel spout sy 119 spl/gold Each 1200.00
653 Sink cock table top with casted swivel spout sy 119 gold Each 1413.00
654 Cental hole basin mixer sy 121 cp Each 1335.00
655 Cental hole basin mixer sy 121 col/cp Each 1779.00
656 Cental hole basin mixer sy 121 col/gold Each 2094.00
657 Cental hole basin mixer sy 121 spl/gold Each 2327.00
658 Cental hole basin mixer sy 121 gold Each 2737.00
659 3 tap hole basin mixer w/o pop up waste system sy 122 cp Each 1525.00
660 3 tap hole basin mixer w/o pop up waste system sy 122 col/cp Each 2033.00
661 3 tap hole basin mixer w/o pop up waste system sy 122 col/gold Each 2392.00
662 3 tap hole basin mixer w/o pop up waste system sy 122 spl/gold Each 2657.00
663 3 tap hole basin mixer w/o pop up waste system sy 122 gold Each 3126.00
664 3 top hole with pop up waste system sy 134 cp Each 1899.00
665 3 top hole with pop up waste system sy 134 col/cp Each 2518.00
666 3 top hole with pop up waste system sy 134 col/gold Each 2962.00
667 3 top hole with pop up waste system sy 134 spl/gold Each 3292.00
668 3 top hole with pop up waste system sy 134 gold Each 3872.00
669 Wall mixer with bend for over head shower sy 123 cp Each 1699.00
670 Wall mixer with bend for over head shower sy 123 col/cp Each 2265.00
671 Wall mixer with bend for over head shower sy 123 col/gold Each 2665.00
672 Wall mixer with bend for over head shower sy 123 spl/gold Each 2960.00
673 Wall mixer with bend for over head shower sy 123 gold Each 3483.00
674 Wall mixer with arrangement for telephonic shower sy 124 cp Each 1618.00
675 Wall mixer with arrangement for telephonic shower sy 124 col/cp Each 2157.00
676 Wall mixer with arrangement for telephonic shower sy 124 col/gold Each 2537.00
677 Wall mixer with arrangement for telephonic shower sy 124 spl/gold Each 2820.00
678 Wall mixer with arrangement for telephonic shower sy 124 gold Each 3317.00
679 Wall mixer tip ton for telephonic shower arrangement sy 125 cp Each 1618.00
680 Wall mixer tip ton for telephonic shower arrangement sy 125 col/cp Each 2157.00
681 Wall mixer tip ton for telephonic shower arrangement sy 125 col/gold Each 2537.00
682 Wall mixer tip ton for telephonic shower arrangement sy 125 spl/gold Each 2820.00
683 Wall mixer tip ton for telephonic shower arrangement sy 125 gold Each 3317.00
684 Wall mixer non telephonic shower system sy 126 cp Each 1224.00
685 Wall mixer non telephonic shower system sy 126 col/cp Each 1631.00
686 Wall mixer non telephonic shower system sy 126 col/gold Each 1919.00
687 Wall mixer non telephonic shower system sy 126 spl/gold Each 2133.00
688 Wall mixer non telephonic shower system sy 126 gold Each 2509.00
689 Wall mixer 2 in i for both telephonic shower & o/s sy 127 cp Each 2110.00
690 Wall mixer 2 in i for both telephonic shower & o/s sy 127 col/cp Each 2813.00
691 Wall mixer 2 in i for both telephonic shower & o/s sy 127 col/gold Each 3310.00
692 Wall mixer 2 in i for both telephonic shower & o/s sy 127 spl/gold Each 3677.00
693 Wall mixer 2 in i for both telephonic shower & o/s sy 127 gold Each 4326.00
694 Sink mixer with casted swivel spout sy 126 cp Each 1224.00
695 Sink mixer with casted swivel spout sy 126 col/cp Each 1631.00
696 Sink mixer with casted swivel spout sy 126 col/gold Each 1919.00
697 Sink mixer with casted swivel spout sy 126 spl/gold Each 2133.00
698 Sink mixer with casted swivel spout sy 126 gold Each 2509.00
699 Four hole bidet mixer with pop up waste system (bottom spray) sy 130 cp Each 2119.00
700 Four hole bidet mixer with pop up waste system (bottom spray) sy 130 col/cp Each 2826.00
701 Four hole bidet mixer with pop up waste system (bottom spray) sy 130 col/gold Each 3325.00
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
702 Four hole bidet mixer with pop up waste system (bottom spray) sy 130 spl/gold Each 3694.00
703 Four hole bidet mixer with pop up waste system (bottom spray) sy 130 gold Each 4346.00
704 One hole bidet mixer with pop up waste system sy131 cp Each 1816.00
705 One hole bidet mixer with pop up waste system sy131 col/cp Each 2422.00
706 One hole bidet mixer with pop up waste system sy131 col/gold Each 2849.00
707 One hole bidet mixer with pop up waste system sy131 spl/gold Each 3165.00
708 One hole bidet mixer with pop up waste system sy131 gold Each 3725.00
709 Single hole sink mixer table top with waste system sy 132 cp Each 1321.00
710 Single hole sink mixer table top with waste system sy 132 col/cp Each 1760.00
711 Single hole sink mixer table top with waste system sy 132 col/gold Each 2071.00
712 Single hole sink mixer table top with waste system sy 132 spl/gold Each 2301.00
713 Single hole sink mixer table top with waste system sy 132 gold Each 2708.00
Bath tub mixer table mounted with telephone shower arrangement (exposed
714 adjustable legs) sy 133 cp Each 1777.00
Bath tub mixer table mounted with telephone shower arrangement (exposed
715 adjustable legs) sy 133 col/cp Each 2370.00
Bath tub mixer table mounted with telephone shower arrangement (exposed
716 adjustable legs) sy 133 col/gold Each 2788.00
Bath tub mixer table mounted with telephone shower arrangement (exposed
717 adjustable legs) sy 133 spl/gold Each 3098.00
Bath tub mixer table mounted with telephone shower arrangement (exposed
718 adjustable legs) sy 133 gold Each 3645.00
719 Spout up ton with flange sy 141 cp Each 948.00
720 Spout up ton with flange sy 141 col/cp Each 1264.00
721 Spout up ton with flange sy 141 col/gold Each 1487.00
722 Spout up ton with flange sy 141 spl/gold Each 1652.00
723 Spout up ton with flange sy 141 gold Each 1944.00
724 Spout plain with flange sy 142 cp Each 632.00
725 Spout plain with flange sy 142 col/cp Each 843.00
726 Spout plain with flange sy 142 col/gold Each 991.00
727 Spout plain with flange sy 142 spl/gold Each 1101.00
728 Spout plain with flange sy 142 gold Each 1296.00
729 Telephonic shower fitted with 1.5 metre pvc tube & swivel hook sy 152 cp Each 673.00
730 Telephonic shower fitted with 1.5 metre pvc tube & swivel hook sy 152 col/cp Each 896.00
Telephonic shower fitted with 1.5 metre pvc tube & swivel hook sy 152
731 col/gold Each 1055.00
Telephonic shower fitted with 1.5 metre pvc tube & swivel hook sy 152
732 spl/gold Each 1171.00
733 Telephonic shower fitted with 1.5 metre pvc tube & swivel hook sy 152 gold Each 1378.00
734 Bell shower sy 155 cp Each 352.00
735 Bell shower sy 155 col/cp Each 469.00
736 Bell shower sy 155 col/gold Each 552.00
737 Bell shower sy 155 spl/gold Each 614.00
738 Bell shower sy 155 gold Each 722.00
739 Shower arm with flange cp Each 287.00
740 Shower arm with flange col/cp Each 383.00
741 Shower arm with flange col/gold Each 450.00
742 Shower arm with flange spl/gold Each 501.00
743 Shower arm with flange gold Each 589.00
744 Flush valve with elbow bend 32mm &wall range sy 161 cp Each 1933.00
745 Flush valve with elbow bend 32mm &wall range sy 161 col/cp Each 2577.00
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
746 Flush valve with elbow bend 32mm &wall range sy 161 col/gold Each 3032.00
747 Flush valve with elbow bend 32mm &wall range sy 161 spl/gold Each 3369.00
748 Flush valve with elbow bend 32mm &wall range sy 161 gold Each 3963.00
749 Flush valve with out elbow bend 32mm sy 162 cp Each 1673.00
750 Flush valve with out elbow bend 32mm sy 162 col/cp Each 2231.00
751 Flush valve with out elbow bend 32mm sy 162 col/gold Each 2624.00
752 Flush valve with out elbow bend 32mm sy 162 spl/gold Each 2916.00
753 Flush valve with out elbow bend 32mm sy 162 gold Each 3430.00
754 Flush cock half turn 25mm cp Each 950.00
755 Flush cock half turn 25mm col/cp Each 1266.00
756 Flush cock half turn 25mm col/gold Each 1491.00
757 Flush cock half turn 25mm spl/gold Each 1656.00
758 Flush cock half turn 25mm gold Each 1948.00
759 Two way divertor with flange sy 172 cp Each 888.00
760 Two way divertor with flange sy 172 col/cp Each 1184.00
761 Two way divertor with flange sy 172 col/gold Each 1393.00
762 Two way divertor with flange sy 172 spl/gold Each 1548.00
763 Two way divertor with flange sy 172 gold Each 1821.00
764 Four way divertor with nrv sy 173 cp Each 1440.00
765 Four way divertor with nrv sy 173 col/cp Each 1921.00
766 Four way divertor with nrv sy 173 col/gold Each 2259.00
767 Four way divertor with nrv sy 173 spl/gold Each 2510.00
768 Four way divertor with nrv sy 173 gold Each 2954.00
Single lever basin mixer without pop up waste system with 455mm copper
769 connections & nuts sy 181 cp Each 2594.00
Single lever basin mixer without pop up waste system with 455mm copper
770 connections & nuts sy 181 col/cp Each 3458.00
Single lever basin mixer without pop up waste system with 455mm copper
771 connections & nuts sy 181 col/gold Each 4068.00
Single lever basin mixer without pop up waste system with 455mm copper
772 connections & nuts sy 181 spl/gold Each 4520.00
Single lever basin mixer without pop up waste system with 455mm copper
773 connections & nuts sy 181 gold Each 5318.00
Single lever basin mixer with pop up waste system with 455mm copper
774 connections & nuts sy 185 cp Each 2898.00
Single lever basin mixer with pop up waste system with 455mm copper
775 connections & nuts sy 185 col/cp Each 3864.00
Single lever basin mixer with pop up waste system with 455mm copper
776 connections & nuts sy 185 col/gold Each 4545.00
Single lever basin mixer with pop up waste system with 455mm copper
777 connections & nuts sy 185 spl/gold Each 5049.00
Single lever basin mixer with pop up waste system with 455mm copper
778 connections & nuts sy 185 gold Each 5941.00
779 Single lever concealed divertor for bath & over head shower system sy 182 cp Each 2898.00
Single lever concealed divertor for bath & over head shower system sy 182
780 col/cp Each 3864.00
Single lever concealed divertor for bath & over head shower system sy 182
781 col/gold Each 4545.00
Single lever concealed divertor for bath & over head shower system sy 182
782 spl/gold Each 5049.00
Single lever concealed divertor for bath & over head shower system sy 182
783 gold Each 5941.00
784 Single lever wall mixer with telephonic shower arrangement sy 183 cp Each 3705.00
785 Single lever wall mixer with telephonic shower arrangement sy 183 col/cp Each 4940.00
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
786 Single lever wall mixer with telephonic shower arrangement sy 183 col/gold Each 5812.00
787 Single lever wall mixer with telephonic shower arrangement sy 183 spl/gold Each 6457.00
788 Single lever wall mixer with telephonic shower arrangement sy 183 gold Each 7597.00
789 Single lever sink mixer with casted swivel spout sy 184 cp Each 3409.00
790 Single lever sink mixer with casted swivel spout sy 184 col/cp Each 4545.00
791 Single lever sink mixer with casted swivel spout sy 184 col/gold Each 5347.00
792 Single lever sink mixer with casted swivel spout sy 184 spl/gold Each 5940.00
793 Single lever sink mixer with casted swivel spout sy 184 gold Each 6989.00
794 Single lever bidet mixer with pop up waste system sy 186 cp Each 3408.00
795 Single lever bidet mixer with pop up waste system sy 186 col/cp Each 4544.00
796 Single lever bidet mixer with pop up waste system sy 186 col/gold Each 5346.00
797 Single lever bidet mixer with pop up waste system sy 186 spl/gold Each 5938.00
798 Single lever bidet mixer with pop up waste system sy 186 gold Each 6987.00
799 Single lever concealed divertor extended (quotable) sy 187 cp Each 3548.00
800 Single lever concealed divertor extended (quotable) sy 187 col/cp Each 4731.00
801 Single lever concealed divertor extended (quotable) sy 187 col/gold Each 5566.00
802 Single lever concealed divertor extended (quotable) sy 187 spl/gold Each 6184.00
803 Single lever concealed divertor extended (quotable) sy 187 gold Each 7276.00
804 Sur single lever basin mixer with 455 mm copper connection & nuts sy 188 cp Each 3148.00
Sur single lever basin mixer with 455 mm copper connection & nuts sy 188
805 col/cp Each 4198.00
Sur single lever basin mixer with 455 mm copper connection & nuts sy 188
806 col/gold Each 4938.00
Sur single lever basin mixer with 455 mm copper connection & nuts sy 188
807 spl/gold Each 5486.00
Sur single lever basin mixer with 455 mm copper connection & nuts sy 188
808 gold Each 6455.00
809 Towel rail sy 191 cp Each 575.00
810 Towel rail sy 191 col/cp Each 766.00
811 Towel rail sy 191 col/gold Each 902.00
812 Towel rail sy 191 spl/gold Each 1001.00
813 Towel rail sy 191 gold Each 1178.00
814 Towel ring sy 192 cp Each 350.00
815 Towel ring sy 192 col/cp Each 466.00
816 Towel ring sy 192 col/gold Each 549.00
817 Towel ring sy 192 spl/gold Each 610.00
818 Towel ring sy 192 gold Each 717.00
819 Soap dish sy 193 cp Each 413.00
820 Soap dish sy 193 col/cp Each 551.00
821 Soap dish sy 193 col/gold Each 649.00
822 Soap dish sy 193 spl/gold Each 721.00
823 Soap dish sy 193 gold Each 848.00
824 Tooth brush holder sy 194 cp Each 382.00
825 Tooth brush holder sy 194 col/cp Each 509.00
826 Tooth brush holder sy 194 col/gold Each 599.00
827 Tooth brush holder sy 194 spl/gold Each 666.00
828 Tooth brush holder sy 194 gold Each 784.00
829 Toilet paper holder sy 194 cp Each 432.00
830 Toilet paper holder sy 194 col/cp Each 577.00
831 Toilet paper holder sy 194 col/gold Each 678.00
832 Toilet paper holder sy 194 spl/gold Each 753.00
833 Toilet paper holder sy 194 gold Each 886.00
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
834 Robe hook sy 195 cp Each 255.00
835 Robe hook sy 195 col/cp Each 339.00
836 Robe hook sy 195 col/gold Each 399.00
837 Robe hook sy 195 spl/gold Each 444.00
838 Robe hook sy 195 gold Each 523.00
839 Bath set complete sy 196 cp Each 2399.00
840 Bath set complete sy 196 col/cp Each 3199.00
841 Bath set complete sy 196 col/gold Each 3763.00
842 Bath set complete sy 196 spl/gold Each 4180.00
843 Bath set complete sy 196 gold Each 4919.00
844 Towel rack 18 " sy 197 cp Each 1012.00
845 Towel rack 18 " sy 197 col/cp Each 1348.00
846 Towel rack 18 " sy 197 col/gold Each 1587.00
847 Towel rack 18 " sy 197 spl/gold Each 1762.00
848 Towel rack 18 " sy 197 gold Each 2074.00
849 Towel rack 24 " sy 197a cp Each 1207.00
850 Towel rack 24 " sy 197a col/cp Each 1609.00
851 Towel rack 24 " sy 197a col/gold Each 1893.00
852 Towel rack 24 " sy 197a spl/gold Each 2103.00
853 Towel rack 24 " sy 197a gold Each 2475.00
854 Counted mounted soap dish sy 199 cp Each 805.00
855 Counted mounted soap dish sy 199 col/cp Each 1073.00
856 Counted mounted soap dish sy 199 col/gold Each 1263.00
857 Counted mounted soap dish sy 199 spl/gold Each 1402.00
858 Counted mounted soap dish sy 199 gold Each 1650.00
859 Toilet paper with brass cover sy 201 cp Each 751.00
860 Toilet paper with brass cover sy 201 col/cp Each 1001.00
861 Toilet paper with brass cover sy 201 col/gold Each 1178.00
862 Toilet paper with brass cover sy 201 spl/gold Each 1309.00
863 Toilet paper with brass cover sy 201 gold Each 1540.00
864 Grab 8 ar 9" sy 200 cp Each 644.00
865 Grab 8 ar 9" sy 200 col/cp Each 858.00
866 Grab 8 ar 9" sy 200 col/gold Each 1010.00
867 Grab 8 ar 9" sy 200 spl/gold Each 1122.00
868 Grab 8 ar 9" sy 200 gold Each 1320.00
PRINCE/SUDHAKAR PVC/SWR PIPES & FITTINGS (OR EQUIVALENT)
Prince/ Sudhakar make or equivalent quality PVC /SWR pipes & fittings (
asper ISI standards) 4kg/cm2
869 75 mm dia 3 M Single Socket pipe Each 158.70
870 90 mm dia 3 M single socket pipe Each 252.30
871 110 mm dia 3 M Single socket pipe Each 301.70
872 75 mm dia 3 M Double socket pipe Each 179.50
873 90 mm dia 3 M Double socket pipe Each 286.30
874 110 mm dia 3 M Double socket pipe Each 349.40
875 75 mm dia 1828.8 mm (6'-0") Single Socket pipe Each 111.20
876 90 mm dia 1828.8 mm (6'-0") Single Socket pipe Each 173.00
877 110 mm dia 1828.8 mm (6'-0") Single Socket pipe Each 213.80
878 75 mm dia 1828.8 mm (6'-0") Double Socket pipe Each 118.70
879 90 mm dia 1828.8 mm (6'-0") Double Socket pipe Each 182.40
880 110 mm dia 1828.8 mm (6'-0") Double Socket pipe Each 222.40
881 75 mm dia 1219. mm (4'-0") Double Socket pipe Each 82.20
882 90 mm dia 1219. mm (4'-0") Double Socket pipe Each 125.50
883 110 mm dia 1219. mm (4'-0") Double Socket pipe Each 151.60
884 75 mm dia 914.4mm (3'-0") Double Socket pipe Each 69.10
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
885 90 mm dia 914.4mm (3'-0") Double Socket pipe Each 102.00
886 110 mm dia 914.4mm (3'-0") Double Socket pipe Each 130.70
887 75 mm dia 609.6mm (2'-0") Double Socket pipe Each 41.00
888 90 mm dia 609.6mm (2'-0") Double Socket pipe Each 70.10
889 110 mm dia 609.6mm (2'-0") Double Socket pipe Each 87.20
890 160 MM dia 3 M Double socket pipe Each 717.20
Prince/ Sudhakar make or equivalent quality PVC /SWR pipes & fittings
( asper ISI standards) 6kg/cm2
891 75 mm dia 3 M Single Socket pipe Each 269.30
892 90 mm dia 3 M single socket pipe Each 433.00
893 110 mm dia 3 M Single socket pipe Each 515.40
894 75 mm dia 3 M Double socket pipe Each 293.90
895 90 mm dia 3 M Double socket pipe Each 466.60
896 110 mm dia 3 M Double socket pipe Each 569.10
897 75 mm dia 1828.8 mm (6'-0") Single Socket pipe Each 176.30
898 90 mm dia 1828.8 mm (6'-0") Single Socket pipe Each 274.70
899 110 mm dia 1828.8 mm (6'-0") Single Socket pipe Each 326.50
900 75 mm dia 1828.8 mm (6'-0") Double Socket pipe Each 188.10
901 90 mm dia 1828.8 mm (6'-0") Double Socket pipe Each 285.70
902 110 mm dia 1828.8 mm (6'-0") Double Socket pipe Each 352.90
903 75 mm dia 1219. mm (4'-0") Double Socket pipe Each 127.60
904 90 mm dia 1219. mm (4'-0") Double Socket pipe Each 197.70
905 110 mm dia 1219. mm (4'-0") Double Socket pipe Each 240.60
906 75 mm dia 914.4mm (3'-0") Double Socket pipe Each 109.80
907 90 mm dia 914.4mm (3'-0") Double Socket pipe Each 160.80
908 110 mm dia 914.4mm (3'-0") Double Socket pipe Each 194.90
909 75 mm dia 609.6mm (2'-0") Double Socket pipe Each 70.80
910 90 mm dia 609.6mm (2'-0") Double Socket pipe Each 110.60
911 110 mm dia 609.6mm (2'-0") Double Socket pipe Each 140.50
912 160 mm dia 3 M Double socket pipe Each 1173.00
Prince/ Sudhakar make or equivalent quality U.V resistant UPVC) SWR
pipe fittings (as per ISI standards )
Plain Bend 87.5 Degrees.
913 75 mm dia Each 30.50
914 90 mm dia Each 44.00
915 110 mm dia Each 51.30
Door Bend 87.5 Degrees.
916 75 mm dia Each 41.60
917 90 mm dia Each 58.90
918 110 mm dia Each 65.80
45 Degree Bend
919 75 mm dia Each 23.70
920 90 mm dia Each 34.10
921 110 mm dia Each 43.90
Cleaning Pipe
922 75 mm dia Each 41.50
923 90 mm dia Each 60.50
924 110 mm dia Each 73.50
Single Tee
925 75 mm dia Each 36.90
926 90 mm dia Each 55.20
927 110 mm dia Each 67.00
Single Tee (With Door)
928 75 mm dia Each 44.30
929 90 mm dia Each 66.80
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
930 110 mm dia Each 80.70
Doube Tee
931 75 mm dia Each 78.00
932 90 mm dia Each 113.50
933 110 mm dia Each 160.80
Doube Tee (With Door)
934 75 mm dia Each 123.80
935 90 mm dia Each 177.30
936 110 mm dia Each 183.50
Single ' Y'
937 75 mm dia Each 45.70
938 90 mm dia Each 73.70
939 110 mm dia Each 84.90
Single ' Y' (With Door)
940 75 mm dia Each 58.30
941 90 mm dia Each 91.50
942 110 mm dia Each 106.90
Double ' Y'
943 75 mm dia Each 63.70
944 90 mm dia Each 98.50
945 110 mm dia Each 111.80
Double ' Y' (With Door )
946 75 mm dia Each 82.10
947 90 mm dia Each 127.90
948 110 mm dia Each 143.80
Coupler
949 75 mm dia Each 22.40
950 90 mm dia Each 31.70
951 110 mm dia Each 35.60
Reducer
952 90 x 75 mm dia Each 37.20
953 110 x 75 mm dia Each 35.80
954 90 x 110 mm dia Each 49.50
Vent Cowl
955 63 mm dia Each 6.10
956 75 mm dia Each 8.00
957 90 mm dia Each 10.30
958 110 mm dia Each 11.30
Pipe Clip
959 40 mm dia Each 7.20
960 50 mm dia Each 7.90
961 63 mm dia Each 7.90
962 75 mm dia Each 9.00
963 90 mm dia Each 10.00
964 110 mm Each 11.10
965 160 mm dia Each 22.20
P Trap
966 P' Trap ( Small without Airvent ) 110 mm Each 117.70
967 P' Trap ( Small with Airvent ) 110 mm Each 129.30
968 P' Trap (Big with Airvent ) 110 mm Each 148.10
969 P' Trap ( Big without Airvent ) 110 mm Each 136.20
970 Floor Trap (Bell Mouth ) 110 mm Each 140.10
971 Bell Mouth Trap 7 " ( 177.8 mm) Each 205.90
972 4" (101.6 mm ) Nahani Trap ( Without Jali with inlet) Each 70.40
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
973 3" (76.2 mm ) Nahani Trap ( without Jali without inlet) Each 54.20
974 4" (101.6 mm ) Nahani Trap ( without inlet with out Jali) Each 66.60
975 Mini Trap Each 33.20
976 3" (76.2 mm ) nahani Trap with Jali Each 63.90
977 4" (101.6 mm ) multi floor trap with jali Each 89.70
978 4" (101.6) multi floor trap with out jali Each 70.10
979 Round Jali Each 15.00
980 Square tile & jali Each 23.90
981 Pipe connector ( with LIP ring) Each 93.70
982 Pipe connector ( with out LIP ring) Each 72.80
Floor Traps
983 4" (101.6 mm ) Floor Trap Each 85.80
984 5" (127.mm ) floor Trap Each 91.20
Door cap 0.00
985 75 mm dia Each 35.40
986 90 mm dia Each 39.30
987 110 mm dia Each 45.10
Socket Plug
988 75 mm dia Each 32.90
989 90 mm dia Each 38.00
990 110 mm dia Each 39.30
Rubber Ring for socket
991 75 mm dia Each 4.80
992 90 mm dia Each 6.10
993 110 mm dia Each 7.20
Door Socket
994 75 mm dia Each 5.70
995 90 mm dia Each 7.20
996 110 mm dia Each 7.90
997 LIP ring 110 mm Each 42.90
Rubber Lubricant
998 100 Grams Each 18.40
999 250 Grams Each 40.40
1000 500 Grams Each 73.50
1001 1000 Grams Each 136.00
1002 P' Trap with lip Ring Each 185.90
Solvent Cement
1003 50 ml Each 9.40
1004 100 ml Each 16.10
1005 250 ml Each 37.40
1006 500 ml Each 71.80
1007 1000 ml Each 140.10
Internal Reducer.
1008 110mm x 90 mm Each 55.80
1009 160 mm x 110 mm Each 139.40
CENTIFUGAL CAST IRON PIPES & FITTNGS AS PER IS : 3989 - 1984
Note : Sales Tax and Excise duties extra
CI (spun) soils Waste & Ventilating pipe (3 M)
1010 75 mm dia Each 693.00
1011 100 mm dia Each 924.00
1012 150 mm dia Each 1694.00
CI (spun) soils Waste & Ventilating pipe (3 M) Double socket
1013 75 mm dia Each 770.00
1014 100 mm dia Each 1039.50
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
9 feet (2743.2 mm ) pipes
1015 75 mm dia Each 624.80
1016 100 mm dia Each 832.70
8 feet (2438.4) mm ) pipes
1017 75 mm dia Each 557.70
1018 100 mm dia Each 742.50
6 feet (1828.8 mm ) pipes
1018 75 mm dia Each 454.30
1019 100 mm dia Each 592.90
6 feet (1828.8 mm ) pipes Double socket
1020 75 mm dia Each 477.40
1021 100 mm dia Each 592.90
Cut pipes (pieces) 1 foot (304.8 mm)
1022 75 mm dia Each 107.80
1023 100 mm dia Each 115.50
Cut pipes (pieces) 1'.6" (457.2 mm )
1024 75 mm dia Each 146.30
1025 100 mm dia Each 169.40
1026 150 mm dia Each 322.30
Cut pipes (pieces ) 2 feet (609.6 mm)
1027 75 mm dia Each 200.20
1028 100 mm dia Each 223.30
1029 150 mm dia Each 401.50
Cut pipes (pieces ) 3 feet (914.4 mm)
1030 75 mm dia Each 254.10
1031 100 mm dia Each 308.00
Cut pipes (pieces ) 4 feet (1219.2 mm)
1032 75 mm dia Each 284.90
1033 100 mm dia Each 400.40
Plain Bend
1034 75 mm dia Each 91.30
1035 100 mm dia Each 119.90
1036 150 mm dia Each 261.80
Door Bend
1037 75 mm dia Each 106.70
1038 100 mm dia Each 138.60
1039 150 mm dia Each 289.30
Plain Bend 45 Degrees.
1040 75 mm dia Each 92.40
1041 100 mm dia Each 107.80
1042 150 mm dia Each 231.00
Door Bend 45 Degrees.
1043 75 mm dia Each 104.50
1044 100 mm dia Each 123.20
1045 150 mm dia Each 243.10
1046 Horn Bend Plain 101.6 x 50.8 mm (4" x 2") 100 mm dia Each 210.10
1047 Horn Bend door 101.6 x 50.8 mm (4" x 2") 100 mm dia Each 243.10
Heel Rest Bend
1048 75 mm dia Each 107.80
1049 100 mm dia Each 138.60
1050 150 mm dia Each 289.30
Single Branch Plain "T"
1051 75 mm dia Each 136.40
1052 100 mm dia Each 181.50
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
1053 150 mm dia Each 377.30
Single Branch Door "T"
1054 75 mm dia Each 154.00
1055 100 mm dia Each 204.60
1056 150 mm dia Each 408.10
Single Branch plain "Y"
1057 75 mm dia Each 154.00
1058 100 mm dia Each 207.90
1059 150 mm dia Each 466.40
Single Branch Door "Y"
1060 75 mm dia Each 169.40
1061 100 mm dia Each 231.00
1062 150 mm dia Each 492.80
Double Branch Plain "T"
1063 75 mm dia Each 181.50
1064 100 mm dia Each 246.40
Double Branch Door "T"
1065 75 mm dia Each 204.60
1066 100 mm dia Each 254.10
Double Branch Plain " Y"
1067 75 mm dia Each 204.60
1068 100 mm dia Each 273.90
Double Branch Door " Y"
1069 75 mm dia Each 215.60
1070 100 mm dia Each 297.00
Shoe bend
1071 75 mm dia Each 89.10
1072 100 mm dia Each 107.80
1073 150 mm dia Each 231.00
Collar
1074 75 mm dia Each 89.10
1075 100 mm dia Each 107.80
1076 150 mm dia Each 212.30
Cowel
1077 75 mm dia Each 73.70
1078 100 mm dia Each 85.80
1079 150 mm dia Each 192.50
Offset 3" (76.2 mm ) projection
1080 75 mm dia Each 104.50
1081 100 mm dia Each 137.50
1082 150 mm dia Each 278.30
Offset 6" (152.4mm ) projection
1083 75 mm dia Each 116.60
1084 100 mm dia Each 152.90
1085 150 mm dia Each 315.70
Long Door Bend
1086 75 mm dia Each 261.80
1087 100 mm dia Each 281.60
Hand Hole pipe ( Inspection pipe)
1088 75 mm dia Each 150.70
1089 100 mm dia Each 204.60
1090 150 mm dia Each 267.30
P Traps
1091 75 mm dia Each 161.70
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
1092 100 mm dia Each 223.30
1093 4" x 3" (101.6 mm x 76.2mm ) P. Traps 100 mm dia Each 231.00
1094 4" x 3" (101.6 mm x 76.2mm ) Vent Traps 100 mm dia Each 231.00
1095 4" x 3" (101.6 mm x 76.2mm ) Reducer 75 mm dia Each 154.00
1096 6" x 4" (152.4 mm x101.6 mm ) Reducer 75 mm dia Each 192.50
1097 3" x 2" ( 76.2 mm x 50.8 mm ) plain T 75 mm dia Each 158.40
1098 3" x 2" ( 76.2 mm x 50.8 mm ) Door T 75 mm dia Each 184.80
1099 3" x 2" ( 76.2 mm x 50.8 mm ) Plain Y 75 mm dia Each 184.80
1100 3" x 2" ( 76.2 mm x 50.8 mm ) Door Y 75 mm dia Each 184.80
1101 4" x 3" (101.6 mm x 76.2mm ) Plain T 75 mm dia Each 184.80
1102 4" x 3" (101.6 mm x 76.2mm ) Door T 75 mm dia Each 207.90
1103 4" x 3" (101.6 mm x 76.2mm ) Plain Y 75 mm dia Each 207.90
1104 4" x 3" (101.6 mm x 76.2mm ) Door Y 75 mm dia Each 231.00
1105 6" x 4" (152.4 mm x101.6 mm ) Plain T 75 mm dia Each 346.50
1106 6" x 4" (152.4 mm x101.6 mm ) Door T 75 mm dia Each 385.00
1107 6" x 4" (152.4 mm x101.6 mm ) Plain Y 75 mm dia Each 400.40
1108 6" x 4" (152.4 mm x101.6 mm ) Door Y 75 mm dia Each 431.20
Special Types of Long Fittings
Plain " T" 27 " (685.8 mm )
1109 75 mm dia Each 454.30
1110 100 mm dia Each 639.10
Door "T" 27" (685.8 mm )
1111 75 mm dia Each 508.20
1112 100mm dia Each 700.70
Plain " Y" 27" (685.8 mm)
1113 75 mm dia Each 508.20
1114 100mm dia Each 700.70
Door " Y" 27" (685.8 mm)
1115 75 mm dia Each 566.50
1116 100mm dia Each 770.00
Excavation of pipe line trenches for drainage and water supply in rock
requiring blasting with initial lead and lift including cost of blasting materials
where the depth is 1.5 times more than the width, in places where there is no
3. a. habitation.
Excavation of pipe line trenches for drainage and water supply in rock
requiring blasting with initial lead and lift including cost of blasting materials
where the depth is less than 1.5 times the width, in places where there is no
b. habitation.
Cutting rock for pipe line trenches by hammers, nuckles and chisels including
c. stacking where the depth is 1.5 times or more than the width.
Cutting rock for pipe line trenches by hammers, nuckles and chisels including
d. stacking where the depth is less than 1.5 times the width.
AS PER
Cutting rock for works other than pipe lines trenches by hammers, nuckles and COMMON
e. chisels including stacking. SSR
25% extra
over relevant
f. For contol blasting at restricted places SSR item
NOTE :- Rock should be measured in solids. In case it
is not possible, stacks should be made in
which case 40% for voids to be deducted from
the stack measurements.
Loading or unloading materials such as C.I. Pipes, PVC Pipes, AC
Pressure Pipes, DI Pipes, SW Pipes, PVC Pipes, A.C/Specials less than
4 300 mm dia upto 4 m in length including stacking.
a. C.I. Pipes/D.I. Pipes and fittings Per Tonne 55.60
b. A.C. Pipes & Specials Per Tonne 46.40
c. Stoneware pipes & Specials Per Tonne 46.60
d. P.V.C. Pipes and fittings Per Tonne 45.80
Loading or unloading materials such as C.I. Pipes, DI pipes, SW pipes,
AC pressure pipes & fittings/ specials from 300 mm to 600 mm dia upto 4
5 m in length including stacking.
a. C.I. Pipes/D.I. Pipes and fittings Per Tonne 69.60
b. A.C. Pipes & Specials Per Tonne 63.10
c. Stoneware pipes & Specials Per Tonne 63.50
Lowering the C.I. Pipes, D.I. Pipes and fittings with S/S ends carefully
into the trenches and laying them true to alignment and gradient
including all sundries, but excluding conveyance from source of supply
8. a. as per BIS No.3114/85.
DIAMETER OF PIPE : (S/S Pipes) in mm :
80 Per Metre 12.50
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
100 Per Metre 12.50
125 Per Metre 12.50
150 Per Metre 12.50
180 Per Metre 14.40
200 Per Metre 16.10
225 Per Metre 17.10
250 Per Metre 18.20
300 Per Metre 23.40
350 Per Metre 42.20
380 Per Metre 42.70
400 Per Metre 44.60
450 Per Metre 52.00
500 Per Metre 56.10
530 Per Metre 63.80
560 Per Metre 69.90
600 Per Metre 74.60
650 Per Metre 77.20
680 Per Metre 82.00
700 Per Metre 90.80
750 Per Metre 104.80
800 Per Metre 121.50
900 Per Metre 145.70
1000 Per Metre 176.00
1100 Per Metre 209.10
1200 Per Metre 245.30
Lowering the C.I. Pipes, D.I. Pipes and fittings with flanged ends carefully
into the trenches and laying them true to alignment and gradient
including all sundries, but excluding conveyance from source of supply
8. b. as per BIS No.3114/85.
DIAMETER OF PIPE : (D/F Pipes) in mm :
80 Per Metre 15.20
100 Per Metre 15.20
125 Per Metre 15.20
150 Per Metre 15.90
180 Per Metre 16.30
200 Per Metre 17.80
225 Per Metre 19.00
250 Per Metre 20.30
300 Per Metre 25.90
350 Per Metre 46.40
380 Per Metre 47.80
400 Per Metre 51.30
450 Per Metre 57.00
500 Per Metre 59.60
530 Per Metre 66.60
560 Per Metre 71.60
600 Per Metre 78.00
650 Per Metre 80.00
680 Per Metre 86.50
700 Per Metre 99.70
750 Per Metre 112.70
800 Per Metre 138.20
900 Per Metre 167.00
1000 Per Metre 197.80
1100 Per Metre 232.10
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
1200 Per Metre 270.50
Jointing the C.I. / DI Pipes & fittings with S/S ends excluding cost of
jointing materials such as lead or lead wool and hemp yarn but including
sundries such as cost of fuel for melting lead, filling with water, with a
water lead upto 500 m and testing to required pressure etc, complete as
9. a. BIS No.3114/85
DIAMETER OF PIPE : (S/S Pipes) in mm :
80 Each Joint 40.50
100 Each Joint 43.40
125 Each Joint 62.50
150 Each Joint 65.20
180 Each Joint 75.70
200 Each Joint 85.30
225 Each Joint 96.30
250 Each Joint 106.30
300 Each Joint 124.80
350 Each Joint 136.60
380 Each Joint 156.60
400 Each Joint 177.70
450 Each Joint 197.50
500 Each Joint 209.60
530 Each Joint 227.60
560 Each Joint 245.90
600 Each Joint 282.20
650 Each Joint 301.50
680 Each Joint 306.50
700 Each Joint 314.30
750 Each Joint 342.70
800 Each Joint 366.90
900 Each Joint 426.40
1000 Each Joint 483.50
1100 Each Joint 545.30
1200 Each Joint 600.20
Jointing the C.I. Pipes, D.I. Pipes & fittings with Rubber Gasket,
excluding the cost of the gasket but including all sundries filling with
water with a water lead upto 500 m and testing to required pressure etc.,
9. b. complete as per BIS No.3114/85.
DIAMETER OF PIPE : in mm :
80 Each Joint 37.50
100 Each Joint 40.20
125 Each Joint 58.20
150 Each Joint 60.70
180 Each Joint 70.10
200 Each Joint 80.60
225 Each Joint 91.20
250 Each Joint 99.00
300 Each Joint 118.00
350 Each Joint 127.30
380 Each Joint 146.00
400 Each Joint 167.40
450 Each Joint 186.10
500 Each Joint 197.40
530 Each Joint 214.30
560 Each Joint 231.60
600 Each Joint 268.50
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
650 Each Joint 287.00
680 Each Joint 291.70
700 Each Joint 299.10
750 Each Joint 326.10
800 Each Joint 349.30
900 Each Joint 405.80
1000 Each Joint 460.30
1100 Each Joint 509.20
1200 Each Joint 557.40
Jointing the C.I. Pipes, fittings and valves with flanged ends excluding
cost of jointing materials such as bolts, nuts, rubber insertion, white lead
and including filling with water with a water lead upto 500 m and testing
10 to required pressure etc., comp as per BIS No.3114/85.
DIAMETER OF PIPE : in mm :
80 Each Joint 47.70
100 Each Joint 50.90
125 Each Joint 73.40
150 Each Joint 76.50
180 Each Joint 89.20
200 Each Joint 100.90
225 Each Joint 114.90
250 Each Joint 124.70
300 Each Joint 149.30
350 Each Joint 163.40
380 Each Joint 186.90
400 Each Joint 210.30
450 Each Joint 235.80
500 Each Joint 247.80
530 Each Joint 273.20
560 Each Joint 293.10
600 Each Joint 345.70
650 Each Joint 371.50
680 Each Joint 375.90
700 Each Joint 386.40
750 Each Joint 421.40
800 Each Joint 451.80
900 Each Joint 524.30
1000 Each Joint 629.60
1100 Each Joint 670.40
1200 Each Joint 739.00
Lowering the RCC plain ended pipes carefully into the trench laying them
true to alignment and gradient, jointing RCC pipes with cement joints
including curing, the cost of jointing materials i.e., Cement Mortar (1:1.5),
11a hemp yarn etc., and testing including filling Per Metre 7.30
Lowering the RCC S/S pipes carefully into the trenches, laying them true
to the alignment and gradient, jointing with rubber rings and testing
including filling with water with a water lead upto 500 metres excluding
11b cost of rubber rings as per BIS No.783/ Per Metre 4.80
Lowering and laying in ready made trenches true to alignment and gradient,
jointing and testing of stoneware pipes excluding cost of jointing materials
15 such as cement mortar and hemp yarn as per BIS No. 4127/83.
DIA of Pipes in mm .
100 Per Metre 18.90
150 Per Metre 23.80
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
200 Per Metre 26.50
225 Per Metre 27.80
250 Per Metre 31.70
300 Per Metre 36.40
400 Per Metre 40.60
450 Per Metre 54.50
Lowering, laying, jointing & testing to Hydraulic Field test pressure including
cost of water with minimum water lead of 500 M (Labour charges only) for
16 PVC pipes excluding the cost of jointing materials.
DIA of Pipes in mm .
63 Per Metre 6.70
75 Per Metre 7.10
90 Per Metre 7.20
110 Per Metre 7.70
125 Per Metre 8.10
140 Per Metre 8.30
160 Per Metre 8.50
180 Per Metre 8.90
200 Per Metre 9.50
225 Per Metre 10.00
250 Per Metre 10.40
280 Per Metre 10.90
315 Per Metre 11.50
NOTE:- For item 9 to 16 the element of testing charges
is to be considered as 20% of the combined rate
for laying, jointing and testing. This 20% shall be
released only after satisfactory testing of the
pipe line to the required pressure.
Labour charges for lowering and keeping in position of C.I. Sluice valves,
17 reflux valves and scour valves. Dia of Valve in mm.
80 Each 19.20
100 Each 25.30
125 Each 33.20
150 Each 39.20
200 Each 72.70
250 Each 98.20
300 Each 148.80
350 Each 255.90
400 Each 313.90
450 Each 411.00
Labour charges for fixing Air Valves including boring the mains,
threading the bore and fixing nipple etc., complete. Dia of Air valve in
18 a. mm.
25 Each 52.70
40 Each 60.40
50 Each 63.80
65 Each 68.00
80 Each 74.70
100 Each 87.70
125 Each 135.90
150 Each 148.60
Labour charges for fixing Kinetic Air Valves with isolating Sluice valves,
Double Air valves/ Air Cushion valve excluding cost of jointing materials
such as bolts, nuts and rubber insertions etc., complete. Dia of Air Valve
18 b. in mm .
25 Each 52.40
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
40 Each 60.10
50 Each 63.40
65 Each 67.70
80 Each 74.40
100 Each 87.30
125 Each 135.30
150 Each 147.90
Labour charges for fixing fire hydrants excluding cost of jointing
19 materials.
65 mm Each 59.80
80 mm Each 74.50
Uprooting C.I./ DI Pipes by melting the lead, loosening the joints,
scraping the pipes, hoisting and keeping within a lead of 10 m but
20 excluding earth work excavation and refilling. Dia of Pipes in mm.
80 Per Metre
100 Per Metre
125 Per Metre
150 Per Metre
180 Per Metre
200 Per Metre
225 Per Metre
250 Per Metre
300 Per Metre
350 Per Metre
400 Per Metre
450 Per Metre
500 Per Metre Observed
600 Per Metre data only
Uprooting of RCC pipes including breaking the collars, loosening the
joint, scraping the pipes, hoisting and keeping within a lead of 10 m but observed data
21 excluding earthwork excavation and refilling. Per Metre only
22 Removing GI/PVC/HDPE pipes and specials/ fittings and clearing.
Dia of Pipes in mm
50 50% of data
of laying &
40 Per Metre jointing of GI/
30 Per Metre PVC/ HDPE
25 Per Metre pipes and
fittings of
20 Per Metre relevant PH
15 Per Metre item.
23 Cutting C.I./ DI Pipes without water in mains.Dia of pipes in mm.
80 Each cut 28.80
100 Each cut 28.80
125 Each cut 28.80
150 Each cut 28.80
180 Each cut 32.90
200 Each cut 32.90
225 Each cut 32.90
250 Each cut 47.30
300 Each cut 47.30
350 Each cut 65.90
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
380 Each cut 72.30
400 Each cut 75.40
450 Each cut 93.70
500 Each cut 112.70
530 Each cut 122.50
560 Each cut 132.30
600 Each cut 150.00
680 Each cut 169.20
24 Cutting A.C. Pipes without water in mains.Dia of pipes in mm.
80 Each cut 12.30
100 Each cut 12.30
125 Each cut 12.30
150 Each cut 12.30
200 Each cut 12.90
250 Each cut 20.90
300 Each cut 20.90
350 Each cut 26.20
400 Each cut 29.00
450 Each cut 35.60
500 Each cut 39.60
600 Each cut 44.30
Drilling and tapping CI/ DI Main and fixing brass screw down ferrule and
25 plug.
Each
10 mm to 20mm Tapping 57.40
Each
25 mm to 40mm Tapping 68.50
Cutting road surface including stacking of excavated materials for pipe
26 line trench work.
a) Cutting open B.T. road surface (as well as asphalt concrete upto 75 mm
thick) including water bound macadam 10 Sqm 186.80
b) Cutting open
c) Cutting open water
C.C. road surface
bound macadam road including soiling 1 Cum 354.80
1 Cum 60.80
27 Bailing out water.(For PH item)
a) Bailing out water from the pipe line trenches with oil engine driven
pumpsets, including hire charges, fuel charges and wages for Driver and
Helper. HP/Hour 13.00
b) Bailing out water from the pipe line trenches with Electric Driven pumpset
including hire charges, current charges and wages for Driver and Helper.
HP/Hour 10.20
NOTE:- The rate is payable on the total H.P. hours
ignoring fractions less than 0.5 HP hour and
rounding off 0.5 HP hour or more to the next
higher integer.
28 Shoring and strutting of trenches for water and sewer main.
10 Sqm of
Shoring
a) Single Staging from (0 to 2.5 Mts.) area 543.80
10 Sqm of
Shoring
b) Double staging from (2.5 m to 4.5 Mts.) area 735.30
Barricading, hoarding, lighting and watching etc., for water supply and
29 sewerage works for trenches. 10 RM 29.40
Laying and jointing glazed stoneware pipes including loose jointing with
cement fillets and all other incidental charges for infiltration gallery,
inclusive of bailing out water by pumping to keep the trench reasonably
31 dry to facilitate the work excluding cost of stoneware pipes
a) 200 mm to 400 mm Per Metre 218.10
Laying and jointing perforated RCC pipes inclusive of bailing out water and
jointing with cement fillets and all other incidental charges for infiltration gallery
inclusive of bailing out water by pumping to keep the trench reasonably dry to
32 facilitate the work excluding.
a) 200 mm to 600 mm Per Metre 225.10
One Sqm of
Centering
area 826.20
2) Slabs for thickness above (300 mm)
1651.70
3) Side walls curved surfaces.
624.50
4) Side wall straight surfaces.
555.50
5) Dome.
676.50
6) Roof Slab.
416.60
7) Column footing.
455.40
8) Column braces and beams
278.60
9) Circular braces, ring beams & circular column. 305.20
Note:- For RCC ELSR of staging above 15 m
observed data may be worked out for the extra
staging taking into consideration, the quantum
of concrete to be lifted, extra scaffolding
involved etc., and may be adopted in the
working estimate after getting approval from
the competent authority
b) For Ground level works :-
1) Slabs 1 Sqm
As per
2) Beams & Lintels 1 Sqm Common
3) Sun shades 1 Sqm SSR
4) RCC vertical walls of plane surface upto 3 m height
such as ground level tanks clarifiers and sludge
1 Sqm 302.30
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
digesters etc. 1 Sqm 302.30
5) RCC vertical walls of circular faces upto 3 m
height. 1 Sqm 385.70
NOTE: Scaffolding for every extra height of 1 m or
part thereof but not less than 0.5 m - 10 Sqm. 10 Sqm
34 Lift or delift of materials :
a) Lifting of cement concrete for RCC elevated
reservoir. For every 3 m height or part thereof over
the initial lift of 5 m 1 Cum 53.90
b) Delifting the materials such as stones, concrete
etc., for concrete below ground level for
construction of masonry ground level reservoirs,
inspection wells, test wells and sump wells etc., for
every 2 m depth or part thereof beyond the initial
depth of 4 meters from ground level. 1 Cum 16.40
Labour charges for fixing ventilating shafts complete with all accessories.
35 Each 222.20
Labour charges for fixing water closets including fixing of foot rests (for all
36 sizes). Each
Labour charges for fixing of flushing cistern including fixing of flush pipes, lead
37 pipe, jointing etc., complete Each
Labour charges for fixing wash hand basin including fixing of inlet and waste
38 pipe
Fixingconnections etc., and
urinal with inlet complete
waste pipe connections etc., complete. Each
39 Each
Relevant
Refilling the trench for pipe line with excavated earth including watering and Common
40 tamping etc., complete 10 Cum SSR item
25% extra
Extra allowance for isolated scattered works viz., valve pits, public fountains, over the cost
41 a meter pits and manholes etc., complete. Each of chamber.
Repairs to the existing mains, interconnections, replacement of valves/specials 100% extra
etc., including the cutting ,jointing, bailing out of water, drying, earth work over the cost
41 b execavation etc., complete. of work
Removal of wet silt and sludge from sullage drains with aid of baskets and
42 vessels. 10 Cum 554.10
As per
separate
Conveyance of C.I./ DI Pipes, C.I. Special excluding loading, unloading and sheet
43 stacking. enclosed
44 Conveyance of RCC pipes including loading, unloading and stacking. Deleted
As per local
competitive
45 Conveyance of Stoneware pipes inlcuding loading unloading and stacking. quotations
As per local
Conveyance of A.C. pressure pipes and accessories including loading, competitive
46 unloading and stacking. quotations
Conveyance of PVC pipes and accessories including loading, unloading and
47 stacking. Deleted
Well sinking in sandy and other loose soils under water either by manual
labour, divers, or dredgers, weighting the top of staining to assist
sinking etc., including dewatering and other incidental charges such as
hire charges for mechanical equipment etc,complete up to 4 m internal
48 dia.
Upto 2 m below GL/m Per metre 9220.60
From 2 to 4 m below GL/m Per metre 10098.10
From 4 to 6 m below GL/m Per metre 11414.80
From 6 to 8 m below GL/m Per metre 12871.10
From 8 to 10 m below GL/m Per metre 14227.90
Note:-Below 10 m for every metre depth or part
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
thereof add Rs.250/- per m. For higher dia,
observed data is to be prepared and got
approved.
Sinking in Hard strata other than rock but in soils like limestone, gravel, clay
under water including, pumping dewatering, hire charges for mechanical
49 equipment etc., complete. Deleted
As per
Common
50 Open well excavation in various soils. SSR
51 Rates for OHSRs/ELSRs including fixtures with a staging of 15 m.
a Capacity in 500 Kilo litres Per litre 4.75
b Capacity in 1000 Kilo litres Per litre 4.54
c Capacity in 1500 Kilo litres Per litre 4.28
d Capacity in 2000 Kilo litres Per litre 4.10
e Capacity in 2500 Kilo litres Per litre 3.89
NOTE: -1) The above rates are applicable for
Elevated Level Services Reservoirs /
OHSRs with RAFT FOUNDATION and a
rate of Rs.2,700/- per tonne for cement
and Rs.28,000/- per tonne for steel.
2) For every m height of staging above 15 m
or less than 15 m the rate shall be
increased/reduced by Rs.0.02 paise per
litre.
3) For every Rs.100/- increase/decrease in
price of cement per tonn increase/
decrease the rate by 0.7%
4) for every Rs.1000/- increase/decrease in
price of steel per tonne, increase/decrease
the rate by 2%
5) Rate inclusion of three coats of epoxy paint
to inner surface of the reservoir including
roof dome.
6) For intermediate ranges proportional rates
may be adopted.
7) The above rates be adopted for estimate
purposes for construction of ELSR for a
finished work including 2 coats of
snowcem painting for external surfaces,
lettering fixing of all required fixtures,
pipes, bends, valves etc., for pipe
connections but excluding cost of pipes,
bends and valves as per departmental
designs and drawings
8) The above rates are arrived considering a
wind pressure as per BIS No.875/88
9) For tribal/Agency / Rural area, the above
rates shall be increased by 5%
10) Fixtures include.
a) A balcony of 0.75 m width at floor slab level/ middle
ring beam level / top ring beam level with RCC post
with GI pipe hand railing.
b) C.I. Manhole frame and cover : 0.60 x 0.6 m size 2
Nos.
c) RCC Mosquito proof ventilators.
d) RCC Finial - 1 No.
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
e) RCC precast ladders 0.45 m wide - 2 Nos.
f) RCC dog legged stair case of 1.00 m width with
hand railing - 1 No.
g) RCC hand railing 0.75 m height alround at top of
reservoir.
h) Water level indicator of approved pattern - 1 No.
i) Lightening arrestor with all its accessories complete
including earthing - 1 No.
52 Rates for OHSRs/ELSRs including fixtures with a staging of 15 m.
a 40,000 Litres capacity Per litre 11.23
b 40,001 to 60,000 Litres capacity Per litre 8.53
c 60,001 to 1,00,000 Litres capacity Per litre 7.88
d 1,00,001 to 2,00,000 Litres capacity Per litre 6.91
e 2,00,001 to 3,00,000 Litres capacity Per litre 6.48
f 3,00,001 to 4,00,000 Litres capacity Per litre 5.72
g 4,00,001 to 4,50,000 Litres capacity Per litre 4.97
NOTE: -1) The above rates are applicable for Elevated
Level Services Reservoirs / OHSRs with
RAFT FOUNDATION and a rate of
Rs.2,700/- per tonne for cement and
Rs.28,000/- per tonne for steel.
2) For every metre height of staging above 15 m or less
than 15 m, the rate shall be increase/reduced by
Rs.0.02 paise per litre.
3) For every Rs.100/- increase/decrease in price of
cement per tonne increase/decrease the rate by
0.70%
4) For every Rs.1000/- increase/decrease in price of
steel per tonne increase/decrease the rate by 2%
5) Rate inclusive of three coats of epoxy paint to inner
surface of the reservoir including roof dome.
6) For intermediate ranges proportional rates may be
adopted.
7) The above rates be adopted for estimate purposes for
construction of ELSR for a finished work including 2
coats of snowcem painting for external surfaces,
lettering, fixing of all required fixtures, pipes, bends,
valves etc., for pipe connections, but excluding cost
of pipes, bends and valves, as per departmental
designs and drawings
8) The above rates are arrived considering a wind
pressure as per BIS No.875/88
9) For Tribal/Agency/ Rural area, the above rates shall
be increased by 5%.
10) Fixtures include :
a) RCC or Aluminium ladder inside 0.45 m wide.
b) Dog legged staircase of 1.0 m wide.
c) M.S. Ladder/spiral on the outside.
d) Lightening arrestor, including conductor and earthing
etc.
e) RCC ventilators with copper or stainless steel fly proof
mesh.
f) RCC finial ventilators with copper or stainless steel fly
proof mesh.
g) Manholes frame and cover 0.75x0.75 m with frame as
per IS specifications (light duty) – 2 Nos.
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
h) Railing with 32 mm dia G.I. Pipes (A class) in two
rows around OHSR fixed in RCC (1:2:4) posts of size
100x75x75 mm with 1.5 m intervals around periphery
on top of the OHSR for smaller capacities.
i) Water level indicator of good quality with ebonite/
copper float approved pattern- 1 No.
Construction of Rapid Gravity Filtration Plant including civil, mechanical
53 and electrical trial running etc., complete.
1) 2.0 Mld Per litre 1.25
2) 5.0 Mld Per litre 1.15
3) 10.0 Mld Per litre 1.04
4) 20.0 Mld Per litre 0.94
NOTE: - a) Above 20 mld the litre rate shall be arrived by reducing the litre
rate of 20 mld @ Rs.0.01 P per each additional mld. For intermediate
capacities, proportinal rates shall be adopted.
b) The above rates are applicable with cement @ rate of Rs.2,700/-MT and
steel of 28,000/MT.
c) For every Rs.100/MT increase/decrease the price of cement
increase/reduce the rate by 0.7%.
d) For every Rs.1000/MT increase/decrease in price of steel increase/reduce
the rate by 2%.
Code
No. Description
1 2
MANUFACTURE, SUPPLY AND DELIVERY OF R.C.C. COLLARS CONFORMING TO B.I.S. 458/1988 (RATE PER
SUITABLE FOR R.C.C. PLAIN ENDED PIPES INCLUDING TRANSPORTATION BUT EXCLUDING TAXES & DUTI
80 mm dia 10.00
100 mm dia 12.00
150 mm dia 21.00
200 mm dia 25.00
225 mm dia 27.00
250 mm dia 31.00
300 mm dia 38.00
350 mm dia 44.00
400 mm dia 48.00
450 mm dia 55.00
500 mm dia 72.00
600 mm dia 94.00
700 mm dia 129.00
800 mm dia 163.00
900 mm dia 204.00
1000 mm dia 239.00
1100 mm dia 288.00
1200 mm dia 460.00
1400 mm dia 506.00
1600 mm dia 630.00
1800 mm dia 785.00
Size P1 - Class
Rate upto
5 Kms
Lead
including Rate for
Loading, every
unloading additional 1
and KM lead or
Code No. Description stacking part thereof.
1 2 3 4
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
CONVEYANCE OF R.C.C. PLAIN ENDED PIPES ON ALL WEATHER ROADS INCLUDING LOADING, UNLOADING AND STAC
Meter)
NP - 2 Class
80 mm dia 1.30 0.06
100 mm dia 1.60 0.08
150 mm dia 2.25 0.13
200 mm dia 3.00 0.16
225 mm dia 3.50 0.20
250 mm dia 4.00 0.24
300 mm dia 6.00 0.30
350 mm dia 7.80 0.38
400 mm dia 9.00 0.50
450 mm dia 11.50 0.65
500 mm dia 12.50 0.75
600 mm dia 18.00 1.10
700 mm dia 23.00 1.60
800 mm dia 27.00 1.60
900 mm dia 31.00 1.60
1000 mm dia 46.00 3.25
1100 mm dia 50.50 3.25
1200 mm dia 57.00 3.45
1400 mm dia 69.00 3.45
1600 mm dia 80.00 3.50
1800 mm dia 92.00 3.50
Rate upto
5 Kms
Lead
including Rate for
Loading, every
unloading additional 1
and KM lead or
Code No. Description stacking part thereof.
1 2 3
CONVEYANCE OF R.C.C. SOCKET AND SPIGOT PIPES ON ALL WEATHER ROADS INCLUDING LOADING, UNL
STACKING (per Meter of effective length)
Size Unit
Class -5
80 mm dia Rate/Meter 77.27
100 mm dia Rate/Meter 97.34
125 mm dia Rate/Meter 122.3
150 mm dia Rate/Meter 151.63
200 mm dia Rate/Meter 211.85
250 mmdia Rate/Meter 261.77
300 mm dia Rate/Meter 337.27
350 mm dia Rate/Meter 494.21
400 mm dia Rate/Meter 613.08
450 mm dia Rate/Meter 739.13
500 mm dia Rate/Meter 913.54
600 mm dia Rate/Meter 1279.2
SCHEDULE OF RATES FOR TRANSPORTATION OF A.C. PRESSURE PIPES AT SITE OF WORK WITHIN TH
ANDHRA PRADESH
Stores delivery charges for transportation of AC pressure pipes at site of work anywhere in Andhra Pradesh on motorable roads f
including transit insurance, unloading, and stacking at Departmental stores etc., complete (A.C. couplings and Rubber rings are to
of transportation charges).
Note The duties and taxes as applicable may be added as per rules at the time of preparation of estimate.
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
Size Unit
Class - 5
80 mm dia Rate/Each 40.25
Size Unit
Class - 5
80 mm dia Each Set 25.27
100 mm dia Each Set 30.99
125 mm dia Each Set 40.56
150 mm dia Each Set 51.79
200 mm dia Each Set 53.04
250 mmdia Each Set 61.88
300 mm dia Each Set 62.09
350 mm dia Each Set 69.89
400 mm dia Each Set 85.38
450 mm dia Each Set 100.88
500 mm dia Each Set 116.48
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
600 mm dia Each Set 131.98
Size Unit
6 Kg/cm2
Cost of laying jointing, testing to Hydrostatic field test pressure including cost of rubber rings, cost of tr
completion of field testing etc.
350 MM DIA Meter 75.00
400 MM DIA Meter 85.00
450 MM DIA Meter 95.00
500 MM DIA Meter 100.00
600 MM DIA Meter 125.00
700 MM DIA Meter 145.00
800 MM DIA Meter 165.00
900 MM DIA Meter 185.00
1000 MM DIA Meter 210.00
1100 MM DIA Meter 235.00
1200 MM DIA Meter 255.00
Size Unit
4 - 12 Kg/cm2
Size Unit
4 - 12 Kg/cm2
Conveyance of Bar Wrapped steel Cylindrical (BWSC) pipes and accessories including loading at Factory, un
S S rate for
Code No. Description Unit 2005-06
1 2 3 4
CENTRIFUGALLY CAST (SPUN) DUCTILE IRON FITTINGS CONFORMING TO IS:9523/2000 HAVING DIMENTION
AS PER TABLE. THE RATES MENTIONED HERE UNDER ARE FOR FITTINGS, ZINC COATED EXTERNALLY WI
INSIDE MOTOR LINING (WITH FINISHING AS PER CLASS 13/IS 9523/2000) ( Ex-works) Excluding transportatio
taxes and duties etc.
1 2 3 4
Socket and spigot centrifugally cast (spun) iron pressure pipes for water, gas Note: The prevailing r
and sewage conforming to specification no: i..s 1536/1989 (third revision) with for Centrifugally
amdt. No: 1 & 2 in standard lengths of 3.66 m, 4 m, 4.5m, 5 m, 5.5 m & 6 m (Spun) Iron Pressure P
and details given below, suitable either for lead jointing or rubber gasket as per DGS & D
(pushon) jointing at purchasers option at ex-factory excluding transportation, Contract shall be adop
taxes & duties.
Size Unit
3 Bar
350 mm dia Meter 120.00
400 mm dia Meter 180.00
450 mm dia Meter 220.00
500 mm dia Meter 280.00
600 mm dia Meter 300.00
700 mm dia Meter 340.00
800 mm dia Meter 400.00
900 mm dia Meter 440.00
1000 mm dia Meter 510.00
S S RATES FOR H.D.P.E PIPES FOR THE YEAR 2005-06 (PE - 80 Grade)
S S Rates for
S.No. Description Unit 2005-06
1 2 3 4
DIA IN MM Rate/Each
40 1043.00
50 1440.00
80 1995.00
100 2475.00
150 6450.00
200 11250.00
5 Manufacture, Supply and delivery of CI D/F Kinetic Air Valve as per
IS:14845 Heavy Duty with isolating valve bevel gear operated as per IS
14846 excluding transportation, Central Excise duty and sales tax etc.,
complete.
DIA IN MM
Rate/Each in Rs.
PIN 1.0 PIN 1.6
40 4782.00 5500.00
50 5580.00 6417.00
80 7350.00 8450.00
100 10125.00 11650.00
150 19950.00 22950.00
200 29750.00 34215.00
6 Manufacture, Supply and delivery of CI D/F Kinetic Air Valve as per G&K
H42K with isolating valve bevel gear operated as per IS 14845 excluding
transportation, Central Excise duty and sales tax etc., complete.
DIA IN MM
Rate/Each in Rs.
PIN 1.0 PIN 1.6
40 3825.00 4782.00
50 4463.00 5580.00
80 5880.00 7350.00
100 8100.00 10125.00
150 15960.00 19950.00
200 23800.00 29750.00
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
Conveyance of valves and accessories including loading at factory and
unloading, stacking at site of work. 10% on basic cost of va
TEST PRESSURE
Manufacture, Supply and delivery of zero volocity valve/ PSLV with CI body with flanged ends as per AWWA,
Central Excise duty and sale tax etc., complete.
DIA IN MM Rate/Each
100
125
150 36375.00 42459.00
200 38000.00 43700.00
250 42875.00 49306.00
300 48250.00 55488.00
Manufacture, Supply and delivery of zero volocity valve/ PSLV with MS Fabricated Body with Plain ends. as
portation, Central Excise duty and sale tax etc., complete.
DIA IN MM Rate/Each
350 49055.00 56413.00
400 54223.00 62356.00
450 63066.00 72526.00
500 72888.00 83820.00
525/550 78290.00 89000.00
600 87659.00 100808.00
650 98125.00 107938.00
700 114375.00 125875.00
750 126688.00 139375.00
800 154328.00 177478.00
900 183429.00 210943.00
1000 222500.00 222500.00
1050 224725.00 224725.00
1100 283475.00 321438.00
1200 341188.00 375313.00
1400 511782.00 562969.50
1500 596313.00 655938.00
1600 608239.26 669056.76
Manufacture, Supply and delivery of Air Cushan valves / Quick Released damped Air Valves (QRDA)
transportation, Central Excise duty and sale tax etc., complete.
DIA IN MM Rate/Each
100 31750.00 36513.00
150 48250.00 55488.00
200 51500.00 59225.00
Conveyance of valves and accessories including loading at factory and
unloading, stacking at site of work. 10% on basic cost of va
RATES FOR RUBBER GASKETS SUITABLE FOR C.I/ D.I. S/S PIPES
S S Rates
For
Sl. No. Description Unit 2005-06
1 2 3 4
MANUFACTURE AS PER BIS 12820/89 WITH S.B.R. QUALITY RUBBER
CONFIRMING TO BIS: 5382/85, SUPPLY AND DELIVERY OF RUBBER
GASKETS SUITABLE FOR C.I/ D.I. S/S PIPES ANYWHERE IN A.P. F.O.R.
DESTINATION DEPARTMENTAL STORES INCLUDING COST OF
MATERIAL, LOADING, INCIDENTAL HANDLING WITH COMPANYS
STANDARD PACKING, TRANSPORTATION, UNLOADING & STACKING
BUT EXCLUDING CENTRAL EXCISE DUTY, SALES TAX, OCTROI AND
OTHER GOVT. LEVIES ETC., COMPLETE.
TEST PRESS
2.5
Code No. Description Kgs/cm2 4.0 Kgs/cm2
1 2 3 4
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
Manufacture, Supply and delivery of Unplasticised PVCs Pipes for
potable water supplies conforming to IS : 4985/2000 (third revision) with
bell ends (Socket) as per specification in light Grey/Natural Ivory Grey/
Any other Color (except White) inclusive of transportation to the sub-
divisional stores anywhere in AP excluding Excise duty and Sales Tax
etc.
DIA IN MM Rate/Metre
20 -- --
25 -- --
32 -- --
40 -- --
50 -- --
63 -- 24.50
75 -- 35.10
90 32.35 49.43
110 48.75 71.50
125 62.86 93.25
140 77.00 116.20
160 102.45 153.55
180 128.52 195.80
200 165.12 238.30
225 213.13 313.72
250 257.00 339.60
280 331.27 478.94
315 416.94 608.13
OTHER ITEMS
S S Rates
for
Sl. No. Description Unit 2005-06
1 2 3 4
Supply and delivery of pig lead 99.99 % pure including cost and conveyance 48.70
1 etc., complete. Per Kg
Supply and delivery of spun yarn of best quality including cost and 37.50
2 conveyance etc., complete. Per Kg
Supply and delivery of rubber packing including cost and conveyance
3 etc., complete.
a) 3 mm thick Per Kg 32.00
b) 6 mm thick Per Kg 35.50
Supply and delivery of bolts and nuts with double washers including cost and 34.50
4 conveyance etc., complete. (1/2" to 1") Per Kg
Rs.
1 2 3 4
MANUFACTURE, SUPPLY AND DELIVERY OF CAST IRON PIPES AND I.S. No. 33.25
FITTINGS (Spls.) CONFIRMING TO I.S. No. 7181/1986, 5531/1988, 7181/1986
3950/1979 AND C.I.D. JOINTS CONFIRMING TO IS No.8794/1988 AT SITE 5531/1988
OF WORK ANYWHERE IN A.P. INCLUDING, LOADING, UNLOADING, 3950/1979
TRANSPORTATION TO SITE OF WORK STACKING AT SITE TRANSIT
RISK AND PACKAGE, EXCLUDING TAXES AND DUTIES.
MANUFACTURE, SUPPLY AND DELIVERY OF CAST IRON PIPES AND
FITTINGS (Spls.) CONFIRMING TO I.S. No. 7181/1986, 5531/1988,
3950/1979 AND C.I.D. JOINTS CONFIRMING TO IS No.8794/1988 AT SITE
Item OF WORK ANYWHERE IN A.P. INCLUDING, LOADING, UNLOADING, Unit
Sl. S.S. Description S S RATE
TRANSPORTATION TO SITE OF WORK STACKING AT SITE TRANSIT (per)
No. FOR
RISK AND PACKAGE, EXCLUDING TAXES AND DUTIES. 2005-06
No.
&
8794/1988
Foot Note: The rate of CI pipes, CI Specials and CID
Joints etc., which are to be incorporated in
the SSR are based on the following raw
materials cost.
Pig Iron: Rs.20,000/- per M.T.
Coke : Rs.20,000/- per M.T.
S S Rate
for
Sl. No. Description Unit 2005-06
1 2 3 4
S S Rate for
Sl. No. Description Unit 2005-06
1 2 3 4
8964.00
Providing fusion bonded epoxy coating not less than 175 microns thickness
and upto 300 microns to reinforcement of all diameters as per IS 13620-1993
including testing of coating at plant. The rate is inclusive of cost on account of
careful handling, PVC coated binding wire instead of GI binding wire, touch up
material supplied by coating agency, repair work, transportation from the
source of supply of steel to the plant and transportation of coated steel from
the plant to site of work, loading, unloading and staightening of bent rods etc.,
complete as per specification and as directed by the Engineer-in-charge. per MT
SS rate
for
S.No. LEAD PER 2005-06
1 2 3 4
1 UP TO 250 METRES cum 37.00
2 250 To 500 METRES cum 54.60
3 1 Km. cum 71.60
4 2 Km. cum 75.00
5 3 Km. cum 79.40
6 4 Km. cum 82.90
7 5 Km. cum 86.40
8 6 Km. cum 89.70
9 7 Km. cum 94.20
10 8 Km. cum 97.70
11 9 Km. cum 102.10
12 10 Km. cum 105.70
13 11 Km. cum 111.00
14 12 Km. cum 113.50
15 13 Km. cum 117.00
16 14 Km. cum 121.20
17 15 Km. cum 124.90
18 16 Km. cum 127.30
19 17 Km. cum 132.70
20 18 Km. cum 136.40
21 19 Km. cum 139.70
22 20 Km. cum 144.10
23 Beyond 20 and up to 30 Km (Rate/Km) cum 3.10
24 Beyond 30 and up to 50 Km (Rate/Km) cum 3.00
25 Beyond 50 and up to 80 Km (Rate/Km) cum 2.90
26 Beyond 80 and up to 100 Km (Rate/Km) cum 2.80
27 Beyond 100 Km (Rate / Km) cum 2.60
28 LOADING cum 7.20
29 UNLOADING cum 5.90
30 STAC K I N G cum 3.80
S S RATES FOR CONVEYANCE OF METAL, STONE, RUBBLE INCLUDING CUDDAPAH SLABS INCLUDING
LOADING, UNLOADING &STACKING ON METALLED ROAD
SS Rate
for
S.No. LEAD UNIT 2005-06
1 2 3 4
1 UP TO 500 mts. cum 83.30
2 1 Km. cum 86.70
3 2 Km. cum 88.90
4 3 Km. cum 93.40
5 4 Km. cum 97.10
6 5 Km. cum 100.50
7 6 Km. cum 106.20
8 7 Km. cum 108.70
9 8 Km. cum 110.80
10 9 Km. cum 116.60
11 10 Km. cum 119.10
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
12 11 Km. cum 123.20
13 12 Km. cum 128.10
14 13 Km. cum 131.60
15 14 Km. cum 136.20
16 15 Km. cum 138.50
17 16 Km. cum 142.00
18 17 Km. cum 146.60
19 18 Km. cum 150.20
20 19 Km. cum 152.40
21 20 Km. cum 158.10
22 Beyond 20 and up to 30 Km (Rate/Km) cum 4.00
23 Beyond 30 and up to 50 Km (Rate/Km) cum 3.60
24 Beyond 50 and up to 80 Km (Rate/Km) cum 3.30
25 Beyond 80 and up to 100 Km (Rate/Km) cum 3.20
26 Beyond 100 Km (Rate / Km) cum 2.90
27 LOADING cum 9.20
28 UNLOADING cum 6.30
29 STAC K I N G cum 6.30
S S RATES FOR CONVEYANCE OF LIME STONE, BROKEN LATERITE AND BRICK JELLY INCLUDING
LOADING, UNLOADING &STACKING ON METALLED ROAD
SS Rate
for
S.No. LEAD UNIT 2005-06
1 2 3 4
1 0 To 250 mts. cum 79.90
2 251 To 500 mts. cum 80.50
3 1 Km. cum 83.20
4 2 Km. cum 85.20
5 3 Km. cum 89.50
6 4 Km. cum 93.30
7 5 Km. cum 97.00
8 6 Km. cum 99.90
9 7 Km. cum 103.70
10 8 Km. cum 107.40
11 9 Km. cum 110.80
12 10 Km. cum 112.90
13 11 Km. cum 117.70
14 12 Km. cum 120.30
15 13 Km. cum 125.20
16 14 Km. cum 128.10
17 15 Km. cum 131.20
18 16 Km. cum 134.40
19 17 Km. cum 137.70
20 18 Km. cum 141.70
21 19 Km. cum 145.60
22 20 Km. cum 148.10
23 Beyond 20 and up to 30 Km (Rate/Km) cum 3.70
24 Beyond 30 and up to 50 Km (Rate/Km) cum 3.50
25 Beyond 50 and up to 80 Km (Rate/Km) cum 2.90
26 Beyond 80 and up to 100 Km (Rate/Km) cum 2.80
27 Beyond 100 Km (Rate / Km) cum 2.50
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
28 L O A D I N G cum 7.30
29 U N L O A D I N G cum 5.80
30 S T A C K I N G cum 4.00
S S RATES FOR CONVEYANCE OF SURKI AND FLYASH INCLUDING LOADING, UNLOADING &STACKING ON
METALLED ROAD
SS Rate
for
S.No. LEAD UNIT 2005-06
1 2 3 4
1 0 To 250 mts. Tonne 68.30
2 250 To 500 mts. Tonne 68.70
3 1 Km. Tonne 71.80
4 2 Km. Tonne 75.40
5 3 Km. Tonne 77.40
6 4 Km. Tonne 80.90
7 5 Km. Tonne 84.20
8 6 Km. Tonne 87.00
9 7 Km. Tonne 90.30
10 8 Km. Tonne 93.10
11 9 Km. Tonne 95.80
12 10 Km. Tonne 99.00
13 11 Km. Tonne 101.70
14 12 Km. Tonne 104.50
15 13 Km. Tonne 108.00
16 14 Km. Tonne 110.10
17 15 Km. Tonne 113.10
18 16 Km. Tonne 116.50
19 17 Km. Tonne 119.10
20 18 Km. Tonne 122.70
21 19 Km. Tonne 125.10
22 20 Km. Tonne 127.70
23 Beyond 20 and up to 30 Km (Rate/Km) Tonne 2.80
24 Beyond 30 and up to 50 Km (Rate/Km) Tonne 2.80
25 Beyond 50 and up to 80 Km (Rate/Km) Tonne 2.60
26 Beyond 80 and up to 100 Km (Rate/Km) Tonne 2.20
27 Beyond 100 Km (Rate / Km) Tonne 2.20
28 LOADING Tonne 12.30
29 UNLOADING Tonne 7.90
30 STAC K I N G Tonne 5.00
S S RATES FOR CONVEYANCE OF STEEL AND LUBRICATING OIL INCLUDING LOADING, UNLOADING
&STACKING ON METALLED ROAD
SS Rate
for
S.No. LEAD UNIT 2005-06
1 2 3 4
1 0 To 500 mts. Tonne 93.90
2 1 Km. Tonne 95.30
3 2 Km. Tonne 99.10
4 3 Km. Tonne 103.30
5 4 Km. Tonne 107.10
6 5 Km. Tonne 110.80
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
7 6 Km. Tonne 115.20
8 7 Km. Tonne 118.30
9 8 Km. Tonne 122.50
10 9 Km. Tonne 125.90
11 10 Km. Tonne 130.30
12 11 Km. Tonne 134.30
13 12 Km. Tonne 137.70
14 13 Km. Tonne 141.80
15 14 Km. Tonne 145.10
16 15 Km. Tonne 149.40
17 16 Km. Tonne 152.60
18 17 Km. Tonne 156.30
19 18 Km. Tonne 160.20
20 19 Km. Tonne 163.80
21 20 Km. Tonne 168.70
22 Beyond 20 and up to 30 Km (Rate/Km) Tonne 3.50
23 Beyond 30 and up to 50 Km (Rate/Km) Tonne 2.90
24 Beyond 50 and up to 80 Km (Rate/Km) Tonne 2.90
25 Beyond 80 and up to 100 Km (Rate/Km) Tonne 2.50
26 Beyond 100 Km (Rate / Km) Tonne 2.30
27 LOADING Tonne 16.00
28 UNLOADING Tonne 12.40
29 STAC K I N G Tonne 7.20
S S RATES FOR CONVEYANCE OF C.I. PIPES, SPECIALS & VALVES PER METRIC TONNE EXCLUDING LOADING
UNLOADING & STACKING
Lead in
Kilometers 80 100 125
1 2 3 4
For every
K.M. or
part thereof
2005-06 2.70 2.80 2.90
RATES FOR CONVEYANCE OF BRICKS, MANGLORE TILES,TERRACE BRICKS, FLAT TILES, LIME, COKE,A.C. SHEET
INCLUDING LOADING, UNLOADING &STACKING ON METALLED ROAD
Terrace
Bricks Bricks, Flat
Mangalore Tiles pan
Tiles 2500 tiles 2500
Kgs per Kgs per 1000
S.No Description 1000 Nos Nos
1 2 3 4
1 0 - 500 Mts 152.00 42.30
2 1 km 156.10 42.80
3 2 Km 161.20 44.60
4 3 Km 166.40 45.80
5 4 Km 171.50 48.70
6 5 Km 176.70 50.00
7 6 Km 181.80 52.50
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
8 7 Km 188.20 53.80
9 8 Km 192.00 56.10
10 9 Km 196.70 57.10
11 10 Km 202.30 60.10
12 11 Km 208.70 61.50
13 12 Km 213.80 64.10
14 13 Km 217.20 65.20
15 14 Km 222.80 66.40
16 15 Km 228.70 68.60
17 16 Km 234.40 70.40
18 17 Km 239.00 73.00
19 18 Km 243.30 74.30
20 19 Km 249.30 76.70
21 20 Km 254.80 77.70
22 BEYOND 20 to 50 Km (per Km) 6.80 2.20
23 Above 50 Km (per Km) 5.70 1.70
24 loading 16.00 7.70
25 Unloadng 12.80 6.20
26 Stacking 6.20 4.60
Total 35.00 18.50
HIRE CHARGES
HIRE/USAGE CHARGES FOR PLANT AND MACHINERY FOR 2005-06
Capacity /
Output of Unit of
Sl. No. Description of Machine machine Measurement
1 2 3 4
1 Drum Mix Plant 40 / 60 TPH 50 TPH Per Hour
2 Hot Mix Plant 30/45 TPH 40 TPH Per Hour
3 Hot Mix Plant 30/45 TPH 20/30 25 TPH Per Hour
4 Hot Mix Plant 30/45 TPH 6/10 TPH 8 TPH Per Hour
5 Paver finisher Hydraulic with sensor 75 TPH Per Hour
6 Paver finisher mechanical sold 75 TPH Per Hour
7 1) Bitumen pressure 4T Per Hour
8 Generating get 125 KVA 100 KVA Per Hour
9 Loader of 1 Cu.M. 1 Cu. M Per Hour
10 Tipper 5 cum capacity one trip /hour
11 Tipper 10 T 10 T Per Km.
12 Tandam Road Roller 8.5 T Per Hour
13 Pneumatic tyre Roller 8T Per Hour
14 Road Roller 8/10 T Per Hour
15 JCB Excavator
0.24 / 1 Cu.M Per Hour
16 Wheeled Dozer. D 30 BEML Per Hour
17 Mortar Grader BEML Per Hour
18 Vibratory Roller 10 T Per Hour
19 Tractor 50 HP Per Hour
20 Air Compressor 170 Cu. M Per Hour
21 Bitumen Boilor 1.5 T Per Hour
22 Wet Mix Plant 60 T Per Hour
23 Batching Plant 30 Cu.M PH Per Hour
24 Batching Plant 15 Cu.M PH Per Hour
Sl. S.S. Item Description Unit S S RATE
No. (per) FOR
2005-06
No.
25 Transit Mixture 4 Cu. M. Per Hour
26 Concrete Pump 6 Cu. M. PH Per Hour
27 Grab dredging crane ( 1cum) (normally runs for 4 hours a day) Per Hour
28 Mastic Cooker 1T Per Hour
29 Drilling equipment Per Hour
30 Needle Vibrator Per Hour
31 Concrete Mixture Per Hour
32 Tipper /Dumper 1 hour Per Hour
33 Vibrating Roller Per Hour
34 Front End Roller Per Hour
35 Water Tanker Per Hour
36 Crane (Rate of sinking 0.8 mts. per day Per Hour
37 Compressor Charges ( 6 cum per minit capacity) Per Hour
38 Compressor Charges ( 10.5 cum per minit capacity) Per Hour
39 Pump ( 23 KW) Per Hour
40 Hydraulic Excavator 0.9 Cum bucket capacity at 60 CUM per hour Per Hour
41 Hydraulic Excavator 1 CUM per hour Per Hour
42 Water Tanker 6 KL. Per Hour
43 Electric Generator Set 33.KVA. per hour
44 Electric Generator Set 63.KVA. Per Hour
45 Electric Generator Set 125.KVA. Per Hour
46 Electric Generator Set 250.KVA. Per Hour
47 Plate Compactor @3.5 CUMt/Hour Per Hour
48 Crane with Grab Bucket of 0.75 CUM and 1 CUM of 35 tonnes to 80 tonnes Per Hour
49 Air Compressor 250 cum with two jack hammers Per Hour
50 Dozer-D-50-A15 Per Hour
51 Dozer-D-80-A-12. Per Hour
52 Mortor Grader 3.35 M Blade Per Hour
53 Front end loader 1 cum bucket capacity Per Hour
54 Vibratory Roller 8 Tonne Per Hour
55 Smooth Wheeled Roller -8 Ton Per Hour
56 Water tanker per KM. Per Km.
57 Rotavator Per Km.
58 Ripper-Scarifying Per Hour
59 Mechanical Broom Hydraulic Per Hour
60 Bitumen Pressure Distributor Per Hour
61 Emulsion Pressure Distributor Per Hour
62 Hot Mix Plant-120 T/PH Per Hour
63 Hot Mix Plant-100 T/PH Per Hour
64 Hydraulic Chip Spreader Per Hour
65 Pot hole repairing Machine Per Hour
66 Bitumen boiler oil fired Per Hour
67 GSB Plant 50 CUM Per Hour
68 Mastic Cooker Per Hour
69 Concrete Pump of 45 & 30 CUM capacity Per Hour
A. 80 TON
B 35 TON
have to be worked
n standard data
I.S. 458/1988 AT EX-FACTORY EXCLUDING
464.18 473.67
513.68 524.66
587.66 593.37
673.4 732.86
959.23 1136.44
1191.32 1521.73
1574.32 1988.2
1976.77 2475.24
2455.12 3381.2
2894.84 3919.23
3409.32 4581.2
4406.28 6338.46
5716.5 7630.38
7575.51 10229.11
67.45 67.45
76.72 76.72
101.98 101.98
121.19 121.19
160.06 160.06
214.94 214.94
272.11 272.11
317.84 317.84
397.87 397.87
503.05 503.05
629.96 629.96
798.02 798.02
1023.25 1023.25
1318.22 1318.22
58.00 58.00
66.00 66.00
75.00 75.00
86.00 86.00
125.00 125.00
150.00 150.00
182.00 182.00
246.00 246.00
297.00 297.00
380.00 380.00
478.00 478.00
526.00 526.00
642.00 642.00
820.00 820.00
P2 - Class P3 – Class
10.00 10.00
13.00 13.00
21.00 21.00
25.00 25.00
28.00 29.00
32.00 33.00
40.00 42.00
51.00 55.00
66.00 68.00
76.00 78.00
86.00 90.00
108.00 107.00
142.00 150.00
180.00 18.00
228.00
275.00
NP - 3 Class
&
NP - 4 Class
17.00 0.45
20.00 0.65
22.00 0.75
24.00 0.75
36.00 1.60
40.00 1.88
48.00 1.88
63.00 3.50
76.00 3.50
82.00 3.75
92.00 3.75
125.00 3.96
150.00 3.96
200.00 5.54
NP - 3 & NP - 4 Class
20.00 0.70
25.00 1.22
27.50 1.25
30.00 1.30
41.00 1.85
55.00 3.68
65.00 3.70
75.00 3.70
79.00 3.70
85.00 3.70
95.00 3.75
127.00 3.75
150.00 4.00
200.00 5.50
P3 – Class
1.65 0.10
1.90 0.11
2.65 0.15
5.00 0.33
5.60 0.38
6.60 0.50
11.50 0.60
16.00 0.75
21.50 1.22
26.50 1.25
32.50 1.75
46.50 2.32
68.50 3.70
87.00 3.70
motorable roads for full truck loads 10% on the value of AC Pressure
Rubber rings are to be supplied free pipes only. (on basic price)
Y OF A.C. COUPLINGS WITHOUT RUBBER RINGS TO SUIT AC
SPORTATION AND UNLOADING AT SITE TRANSIT RISK BUT
Description
2
-factory excluding transportation, taxes and duties etc., for Bar wrapped steel cylindrical pipes.
adopted.
e for
2005-06
4
ING DIMENTIONS
XTERNALLY WITH
ng transportation,
5 6
22½ o 11¼o
315.00 315.00
405.00 -
675.00 630.00
1035.00 945.00
1350.00 1260.00
1890.00 1710.00
2650.00 2350.00
3300.00 2900.00
4250.00 3700.00
5665.00 4840.00
8690.00 7370.00
es for
05-06
ates for
2005-06
4
594.00
765.00
821.00
880.00
65.00
5
FOR Enclosed Spur
Gear Arrangement with
Thrust bearing for easy
operation.
7500.00
7500.00
7500.00
7500.00
7500.00
9000.00
9000.00
9000.00
9000.00
P.N 0.6
basic cost of valves
ST PRESSURE
Additional charges for
Flanged ended valves
25
20 Kgs/cm2 Kgs/cm2
5 6 7
44968.00 49465.00
46978.00 51675.00
53004.00 58304.00
59650.00 65615.00
40164.00 44180.00
61036.00 67140.00
65148.00 71663.00
28500.00
29550.00
39675.00
48000.00
53500.00
162707.00 230632.00
191407.00
256595.00 285000.00
297828.00 312284.00
560925.00
818691.00
1187155.00
1326201.00
88628.00 116006.00
107640.00 136013.00
131040.00 166023.00
149058.00 181233.00
150930.00 196268.00
191295.00 251726.00
282000.00 364500.00
412900.00 523600.00
520650.00 659600.00
TEST PRESSURE
6 Kgs/cm2 10 Kgs/cm2
5 6
-- 6.28
-- 9.81
-- 15.66
15.48 24.02
22.80 37.29
34.91 53.92
48.69 77.00
69.77 109.15
101.28 163.87
127.24 214.75
165.93 264.11
215.82 348.90
279.39 447.96
337.91 542.59
453.06 721.52
559.95 880.41
706.08 1116.61
885.24 1407.87
Rate/ Kg
luding packing,
ing, transit risk and
y any where in A.P.
the year 2005-06
Rs.
4
te for
2005-06
4
ST PRESSURES
5
PN-1.0
Rs.
1720.00
1870.00
2200.00
2735.00
3650.00
4565.00
5475.00
8500.00
12200.00
18800.00
25200.00
30700.00
39500.00
53200.00
77500.00
113000.00
155150.00
192600.00
235400.00
278200.00
322000.00
ON METALLED ROAD
NG LOADING
150 200 250 300 350 400 450 500 600 700
5 6 7 8 9 10 11 12 13 14
2.90 3.10 3.20 3.30 3.40 3.50 3.70 3.90 3.90 4.70
582.00
1124.00
1128.00
754.00
223.00
196.00
120.00
721.00
1500.00
1250.00
625.00
312.50
2500.00
250.00
882.00
27.87
27.73
202.55
754.00
495.00
223.00
500.00
93.00
145.25
75.00
50.00
840.00
234.00
240.00
250.00
450.00
450.00
30.00
1250.00
206.00
1423.00
2400.00
1545.00
520.00
994.00
297.00
15.60
11.00
18.00
230.00
692.00
516.00
15100.00
11167.00
1700.00
585.00
128.00
670.00
40.00
165.00
825.00
550.00
230.00
10.00
200.00
150.00
150.00
3525.00
8930.00
7150.00
1725.00
629.00
1850.00
5590.00
83.00
450.00
2690.00
14.50
1.60
60.00
650.00
750 Remarks
15 16
6.40
RBR-BASC
Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 1.040
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 1.400
Air compressor 210 cfm hour 1.400
Bitumen emulsion pressure distributor @ 1750 sqm/hour hour 1.000
Water tanker 6 kl capacity 1 trip per hour hour 0.500
c) Material
Bitumen emulsion (SS-1) @ 0.85 kg per sqm t 1.480
Water kl 3.000
d&e) Overheads & Contractors Profit
Cost of 1750 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/1750
b Providing and applying primer coat with bitumen
emulsion (medium setting) on prepared surface of granular
Base including clearing of road surface and spraying
primer at the rate of 0.60 kg/sqm using mechanical means
as per Tech. specification No 502 MORTH.
Unit = sqm
Taking output = 3500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 2.080
b) Machinery
Mechanical broom @ 1250 sqm per hour hour 2.800
Air compressor 250 cfm hour 2.800
Bitumen pressure distributor @ 1750 sqm per hour hour 2.000
Water tanker 6 KL capacity @ 1 trip per hour hour 1.000
c) Material
Bitumen emulsion @ 0.6 kg per sqm t 2.100
Requirement of Water KL 6.000
d&e) Overheads & Contractors Profit
Cost for 3500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/3500
Note : Bitumen primer has been provided @ 0.60 kg per sqm as per clause 502.8. Payment
shall be made with adjustment, plus or minus, for the variation between this quantity and the
actual quantity approved by the Engineer after the preliminary trials referred to in clause No.
502.4.3.
351
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
ii Medium porosity
Providing and applying primer coat with Bitumen emulsion (SS-1)
(slow setting) on prepared surface of granular base including
cleaning of road surface and spraying primer at the rate of 0.90- 1.2
kg/sqm using mechanical means as per Technical Specification
Clause 502 MORD. (for use on Cement Stebilized Soil.)
Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 2.100
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 1.400
Air compressor 210 cfm hour 1.400
Bitumen emulsion pressure distributor @ 1750 sqm per hour hour 1.000
Water tanker 6 kl capacity 1 trip per hour hour 0.500
c) Material
Bitumen emulsion (SS-1) @ 1.05 kg per sqm t 1.830
Water kl 3.000
d&e) Overheads & Contractors Profit
Cost of 1750 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/1750
iii High porosity
Providing and applying primer coat with Bitumen emulsion (SS-1) on
prepared surface of granular base including cleaning of road surface
and spraying primer at the rate of 1.2-1.5 kg/sqm using mechanical
means as per Technical Specification Clause 502 MORD. (for use
on Gravel base)
Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 3.120
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 1.400
Air compressor 210 cfm hour 1.400
Bitumen emulsion pressure distributor @ 1750 sqm per hour hour 1.000
Water tanker 6 kl capacity 1 trip per hour hour 0.500
c) Material
Bitumen emulsion (SS-1) @ 1.35 kg per sqm t 2.360
Water kl 3.000
d&e) Overheads & Contractors Profit
Cost of 1750 sqm = (a+b+c+d+e)
Rate per sqm = a+b+c+d+e/1750
RBR-BASC-2 2 Tack Coat
i Providing and applying tack coat with Bitumen emulsion (RS-1)
(Rapid Setting) using emulsion distributor at the rate of 0.20 to 0.25
kg per sqm on the prepared bituminous surface cleaned with
Hydraulic broom as per Technical Specification Clause 503 MORD.
Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 1.040
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 1.400
Air compressor 210 cfm hour 1.400
Emulsion pressure distributor @1750 sqm per hour hour 1.000
c) Material
Bitumen emulsion (RS-1) @ 0.225 kg per sqm t 0.390
d&e) Overheads & Contractors Profit
Cost of 1750 sqm = (a+b+c+d+e)
Rate per sqm = a+b+c+d+e/1750
352
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
ii Providing and applying tack coat with Bitumen emulsion (RS-
1) using emulsion distributor at the rate of 0.25 to 0.30 kg per
sqm on the prepared dry and hungry bituminous surface
cleaned with Hydraulic broom as per Technical Specification
Clause 503 MORD.
Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 1.040
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 1.400
Air compressor 210 cfm hour 1.400
Emulsion pressure distributor @1750 sqm per hour hour 1.000
c) Material
Bitumen emulsion (RS-1) @ 0.275 kg per sqm t 0.480
d&e) Overheads & Contractors Profit
Cost of 1750 sqm = (a+b+c+d+e)
Rate per sqm = a+b+c+d+e/1750
iii Providing and applying tack coat with Bitumen emulsion (RS-
1) using emulsion distributor at the rate of 0.25 to 0.30 kg per
sqm on the prepared granular surfaces treated with primer &
cleaned with Hydraulic broom as per Technical Specification
Clause 503 MORD.
Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 1.040
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 1.400
Air compressor 210 cfm hour 1.400
Emulsion pressure distributor @1750 sqm per hour hour 1.000
c) Material
Bitumen emulsion (RS-1) @ 0.275 kg per sqm t 0.480
d&e) Overheads & Contractors Profit
Cost of 1750 sqm = (a+b+c+d+e)
Rate per sqm = a+b+c+d+e/1750
iv Providing and applying tack coat with Bitumen emulsion (RS-
1) using emulsion pressure distributor at the rate of 0.30 to
0.35 kg per sqm on the prepared non-bituminous surfaces
(cement concrete pavement) cleaned with Hydraulic broom as
per Technical Speciation 503 MORD.
Unit = sqm
Taking output = 1750 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 1.040
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 1.400
Air compressor 210 cfm hour 1.400
Emulsion pressure distributor @1750 sqm per hour hour 1.000
c) Material
Bitumen emulsion (RS-1) @ 0.325 kg per sqm t 0.570
d&e) Overheads & Contractors Profit
Cost of 1750 sqm = (a+b+c+d+e)
Rate per sqm = a+b+c+d+e/1750
Note : 1. An output of 1750 sqm has been considered in case of tack coat
which can be covered by bituminous courses on the same day.
2. The use of cutback bitumen (Medium Curing grade) as per IS:217 shall
be restricted only for sites at sub-zero temperature or for emergency
applications as directed by the Engineer.
353
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
v Providing and applying tack coat with bitumen emulsion using
emulsion pressure distributor at the rate of 0.20 kg per sqm on
the prepared bituminous/granular surface cleaned with
mechanical broom as per Tech. specification No 503 MORTH
Unit = sqm
Taking output = 3500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 2.080
b) Machinery
Mechanical broom @ 1250 sqm per hour hour 2.800
Air compressor 250 cfm hour 2.800
Emulsion pressure distributor @ 1750 sqm per hour hour 2.000
c) Material
Bitumen emulsion @ 0.2 kg per sqm t 0.700
d&e) Overheads & Contractors Profit
Cost for 3500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/3500
Note : 1. Bitumen emulsion has been provided @ 0.20 kg per sqm as per clause 503.8.
Payment shall be made with adjustment, plus or minus, for the variation between this quantity
and actual quantity approved by the Engineer after preliminary trials referred to in clause No.
503.4.3
2. An output of 3500 sqm has been considered in case of prime coat and tack coat which can
be covered by bituminous courses on the same day.
RBR-BASC-3 3 Bituminous Macadam
i Providing and laying bituminous macadam with 40-60 TPH
hot mix plant using crushed aggregates of grading as per
Table 500.4 premixed with bituminous binder, transported to
site upto a lead of 1000 m laid over a previously prepared
surface with paver finisher to the required grade, level and
alignment and rolled to achieved the desired compaction as
per Technical Specification Clause 504 MORD (using
vibratory Roller 80-100 KN for intermediate rolling and 3
wheel roller 80-100 KN for initial and final rolling).
Unit = cum
Taking output = 102.5 cum (225 t)
a) Labour
Mate day -
Mazdoor (Unskilled) day 10.000
Mazdoor (Skilled) day 3.520
b) Machinery
Batch mix HMP 40-60 THP @ 40 t per hour actual output hour 6.000
Hydraulic broom @ 1250 sqm per hour hour 1.100
Air compressor 210 cfm hour 1.100
Paver finisher hour 6.000
Generator 125 KVA hour 6.000
Front end loader 1 cum bucket capacity hour 6.000
Tipper 5.5 cum, 10 t / 5-6 t capacity hour 6.210
Three wheel 80-100 kN static roller for initial break down hour 12.000
rolling, final and finishing rolling
Vibratory roller 80-100 kN for intermediate rolling hour 6.000
c) Material
(i) Bitumen @ 3.3 per cent of mix t 7.425
(Weight of mix = 102.5 x 2.2 = 225 t)
(ii) Aggregate
Total weight of mix = 225 t
Weight of bitumen = 7.425 t
Weight of aggregate = 225 – 7.425 = 217.575 t
Taking density of aggregate = 1.5 t/cum
Volume of aggregate = 145.05 cum
354
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Grading (19 mm nominal size) :
25 -10 mm - 40 per cent cum 58.020
10– 5 mm - 40 per cent cum 58.020
5 mm and below - 20 per cent cum 29.010
d&e) Overheads & Contractors Profit
Cost for 102.5 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/102.5
Note : 1. Although the rollers are required only for 3 hours as per norms of output, but the same have to
be available at site for six hours as the hot mix plant and paver will take six hours for mixing and paving
the output of 225 t considered in these analysis.
2. Quantity of bitumen has been taken for analysis purpose. The actual quantity will depend upon job mix
formula.
3. Labour for traffic control, watch and ward and other miscellaneous duties at site, including sundries
have been included in administrative overheads of the contractor.
4. In case BM is laid over freshly laid tack coat, provision of Hydraulic broom and 2 mazdoor for the same
shall be deleted as the same has been included in the cost of tack coat.
5. Analysis is based on 1000 m lead of mixed material. Cost of additional cartage may be added as per
site requirements.
ii Providing and laying bituminous macadam with 100-120
TPH / 40-60 TPH hot mix plant producing an average
output of 75 tonnes/ 37.50 t per hour using crushed
aggregates of specified grading premixed with
bituminous binder, transported to site, laid over a
previously prepared surface with paver finisher to the
required grade, level and alignment and rolled as per
clauses 501.6 and 501.7 to achieve the desired
compaction as per Tech. specification No. 504 MORTH.
Unit = cum
Taking output = 205 cum (450 tonnes)
a) Labour
Mate day -
Mazdoor working with HMP, mechanical broom, paver, roller, day 14.000
asphalt cutter and assistance for setting out lines, levels and
layout of construction
Skilled mazdoor for checking line & levels day 5.840
b) Machinery
Batch mix HMP 100-120 TPH @ 75 tonne per hour actual output hour 6.000
OR
HMP 40-60 TPH @ 17 cum (37.5 Tonnes) / hour hour 12.000
Air compressor 250 cfm hour 2.200
Paver finisher 100 TPH hour 6.000
Generator 250 KVA hour 6.000
Front end loader 1 cum bucket capacity hour 6.000
Smooth wheeled roller 8-10 tonnes for initial break down rolling. hour 3.900
Vibratory roller 8 tonnes for intermediate rolling. hour 3.900
Finish rolling with 6-8 tonnes smooth wheeled tandem roller. hour 3.900
c) Material
i) Bitumen@ 3.3 per cent of mix t 14.850
weight of mix = 205 x 2.2 = 450 tonne
ii) Aggregate
Total weight of mix = 450 tonnes
Weight of bitumen = 14.85 tonnes
Weight of aggregate = 450 -14.85 = 435.15 tonnes
Taking density of aggregate = 1.5 ton/cum
Volume of aggregate = 290.1 cum
Grading I ( 40 mm nominal size )
37.5 - 25 mm 15 per cent cum 43.510
25 - 10 mm 45 per cent cum 130.550
10 - 5 mm 25 per cent cum 72.530
5 mm and below15 per cent cum 43.510
or
355
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Grading II (19 mm nominal size)
116.04 Cum of 25-10mm @ 40%
25 to 27mm IRC HBGM/C metal @ 40% cum 29.010
19 to 22mm IRC HBGM/C metal @ 10% cum 29.010
12 to 14mm IRC HBGM/C metal @ 10% cum 29.010
9.5 to 11.2mm IRC HBGM/C metal @ 10% cum 29.010
116.04 Cum of 10-5mm @ 40%
9.5 to 11.2mm IRC HBGM/C metal @ 20% cum 58.020
5 to 7mm IRC HBGM/C metal @ 20% cum 58.020
58.02 Cum of 5mm below @ 20%
5 to 7mm IRC HBGM/C metal @ 10% cum 29.010
2.36mm & below @ 10% cum 29.010
* Any one of the alternative may be adopted as per approved
design
(i) for Grading I ( 40 mm nominal size )
d&e) Overheads & Contractors Profit
Cost for 205 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/205
(ii) for Grading II (19 mm nominal size)
d&e) Overheads & Contractors Profit
Cost for 205 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/205
Note in MORTH : 1. Although the rollers are required only for 3 hours as per norms of output,
but the same have to be available at site for six hours as the hot mix plant and paver will take
six hours for mixing and paving the output of 450 tonnes considered in this analysis. To cater
for the idle period of these rollers, their usage rates have been multiplied by a factor of 0.65.
2. Quantity of Bitumen has been taken for analysis purpose. The actual quantity will depend
upon job mix formula.
3. Labour for traffic control, watch and ward and other miscellaneous duties at site including
sundries have been included in administrative overheads of the contractor.
4. In case BM is laid over freshly laid tack coat, provision of Mechanical broom and 2
mazdoors for the same shall be deleted as the same has been included in the cost of tack
coat.
RBR-BASC-4 4 Built-Up Spray Grout
i Providing, laying and rolling of built-up spray grout layer over
prepared base consisting of a two layer composite
construction of crushed coarse aggregates using motor grader
for aggregates. Key stone chips spreader may be used with
application of bituminous binder after each layer, and with key
aggregates placed on top of the second layer to serve as a
base, conforming to the line, grades and cross-section
specified, the compacted layer thickness being 75 mm as per
Technical Specification Clause 505 MORD. (using Three
wheel 80-100 KN static Roller/ Vibratory Roller 80-100 kN).
A By Manual Means
Unit = sqm
Taking output = 800 sqm (60 cum)
(I) Bitumen (S-90)
a) Labour
Mate day -
Mazdoor (Unskilled) day 106.000
Chips spreader (Stone Packer) day 10.000
Bitumen Sprayer day 2.500
Mazdoor (Semi-Skilled) day 25.500
b) Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted with spray set hour 6.000
356
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
c) Material
Bitumen 30 kg per 10 sqm @ 15 kg per 10 sqm for each layer t 2.400
(80 / 100 Grade)
Crushed stone coarse aggregate passing 53 mm and retained cum 80.000
on 2.8 mm sieve @ 0.5 cum per 10 sqm for each layer
357
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
RBR-BASC-5 5 Modified Penetration Macadam
Construction of penetration macadam over prepared base by
providing a layer of compacted crushed coarse aggregate
using chips spreader with alternate applications of bituminous
binder and key aggregates and rolling with a three wheel 80-
100 kN static roller as per Tech. Specification No 506 MORD.
A 50 mm thick
Unit = sqm
Taking output = 4500 sqm (225 cum)
(I) Bitumen (S-90)
a) Labour
Mate day -
Mazdoor (Unskilled) day 6.000
Mazdoor (Skilled) day 2.320
b) Machinery
Hydraulic self propelled chip spreader both for aggregates hour 6.000
and key aggregates @ 1500 sqm per hour for 4500 x 2 sqm =
9000 sqm
Bitumen pressure distributor for @ 1750 sqm per hour hour 2.570
Tipper 5.5 cum capacity for carriage of aggregates from hour 10.000
stockpile to chip spreader
Three wheel 80-100 kN Static Roller hour 22.500
Front end loader 1 cum bucked capacity hour 6.000
c) Material
Bitumen @ 1.75 kg per sqm t 7.870
40 mm size hand broken metal @ 0.06 cum per sqm cum 270.000
12 mm size stone chips @ 0.018 cum per sqm cum 81.000
d&e) Overheads & Contractors Profit
Cost of 4500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/4500
B 75 mm thick
Unit = sqm
Taking output = 4500 sqm (337.5 cum)
(I) Bitumen (S-90)
a) Labour
Mate day -
Mazdoor (Unskilled) day 8.000
Mazdoor (Skilled) day 2.400
b) Machinery
Hydraulic self propelled chip spreader both for aggregates hour 6.000
and key aggregates @ 1500 sqm per hour for 4500 x 2 sqm =
9000 sqm
Bitumen pressure distributor for @ 1750 sqm per hour hour 2.570
Tipper 5.5 cum capacity for carriage of aggregates from hour 10.000
stockpile to chip spreader
Three wheel 80-100 kN Static Roller hour 33.750
Front end loader 1 cum bucked capacity hour 6.000
c) Material
Bitumen @ 2 kg per sqm t 9.000
40 mm size hand broken metal @ 0.09 cum per sqm cum 405.000
12 mm size stone chips @ 0.018 cum per sqm cum 81.000
d&e) Overheads & Contractors Profit
Cost of 4500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/4500
358
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
(II) Bitumen (S-65)
a) Labour
Mate day -
Mazdoor (Unskilled) day 8.000
Mazdoor (Skilled) day 2.400
b) Machinery
Hydraulic self propelled chip spreader both for aggregates hour 6.000
and key aggregates @ 1500 sqm per hour for 4500 x 2 sqm =
9000 sqm
Bitumen pressure distributor for @ 1750 sqm per hour hour 2.570
Tipper 5.5 cum capacity for carriage of aggregates from hour 10.000
stockpile to chip spreader
Three wheel 80-100 kN Static Roller hour 33.750
Front end loader 1 cum bucked capacity hour 6.000
c) Material
Bitumen @ 2 kg per sqm t 9.000
40 mm size hand broken metal @ 0.09 cum per sqm cum 405.000
12 mm size stone chips @ 0.018 cum per sqm cum 81.000
d&e) Overheads & Contractors Profit
Cost of 4500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/4500
RBR-BASC-6 6 Bituminous Penetration Macadam
Construction of penetration macadam over prepared Base by
providing a layer of compacted crushed coarse aggregate
using chips spreader with alternate applications of bituminous
binder and key aggregates and rolling with a smooth wheeled
steel roller 8-10 tonne capacity to achieve the desired degree
of compaction as per Tech. Specification No 505 MORTH.
A 50 mm thick
Unit = sqm
Taking output = 4500 sqm (225 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) including for brooming of key aggregates day 6.000
Mazdoor skilled day 2.320
b) Machinery
Hydraulic self propelled chip spreader both for aggregates hour 6.000
and key aggregates@ 1500 sqm per hour for 4500 x 2 sqm =
9000 sqm
Bitumen pressure distributor for @ 1750 sqm per hour hour 2.570
Tipper 5.5 cum capacity for carriage of aggregates from hour 10.000
stockpile to chip spreader
Vibratory roller 8 tonnes hour 6.000
Front end loader 1 cum bucket capacity hour 6.000
c) Material
Bitumen@ 5 kg per sqm t 22.500
Crushed stone coarse aggregate passing 45 mm and retained cum 270.000
on 2.8 mm sieve @ 0.06 cum per sqm
Key aggregates passing 22.4 mm and retained on 2.8 mm cum 67.500
sieve @ 0.015 cum per sqm
d&e) Overheads & Contractors Profit
Cost for 4500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/4500
Note : 2 tippers will be needed to match the capacity of chip
spreader and front end loader.
359
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
B 75 mm thick
Unit = sqm
Taking output = 4500 sqm (337.5 cum compacted).
a) Labour
Mate day -
Mazdoor (Unskilled) including for brooming of key aggregates day 8.000
Mazdoor skilled day 2.400
b) Machinery
Hydraulic self propelled chip spreader both for aggregates hour 6.000
and key aggregates@ 1500 sqm per hour for 4500 x 2 sqm
Bitumen pressure distributor for@ 1750 sqm per hour hour 2.570
Tipper 5.5 cum capacity for carriage of aggregates from hour 10.000
stockpile to chip spreader
Vibratory roller 8 tonnes hour 6.000
Front end loader 1 cum bucket capacity hour 6.000
c) Material
Bitumen@ 6.8 kg per sqm t 30.600
Crushed stone coarse aggregate (loose passing 63 mm and cum 405.000
retained on 2.8 mm sieve @ 0.09 cum per sqm
Key aggregates passing 26.5 mm and retained on 2.8 mm cum 81.000
sieve @ 0.018 cum per sqm
d&e) Overheads & Contractors Profit
Cost for 4500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/4500
Note : 2 tippers and 2 rollers will be needed to match the capacity
of chip spreader and front end loader.
RBR-BASC-7 7 Dense Graded Bituminous Macadam
Providing and laying dense graded bituminous macadam with 100-
120 TPH batch type HMP producing an average output of 75 tonnes
per hour using crushed aggregates of specified grading, premixed
with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix
and filler, transporting the hot mix to work site, laying with a
hydrostatic paver finisher with sensor control to the required grade,
level and alignment, rolling with smooth wheeled, vibratory and
tandem rollers to achieve the desired compaction as per MoRTH
specification clause No. 507 complete in all respects.
Unit = cum
Taking output = 195 cum (450 tonnes)
a) Labour
Mate day -
Mazdoor (Unskilled) working with HMP, mechanical broom, day 16.000
paver, roller, asphalt cutter and assistance for setting out
lines, levels and layout of construction
Skilled mazdoor for checking line & levels day 5.840
b) Machinery
Batch mix HMP @ 75 tonne per hour hour 6.000
Paver finisher hydrostatic with sensor control @ 75 cum per hour hour 6.000
Generator 250 KVA hour 6.000
Front end loader 1 cum bucket capacity hour 6.000
Tipper 10 tonne capacity t.km 450 x L
Add 10 per cent of cost of carriage to cover cost of loading
and unloading
smooth wheeled roller 8-10 tonnes for initial break down hour 3.900
rolling.
Vibratory roller 8 tonnes for intermediate rolling. hour 3.900
Finish rolling with 6-8 tonnes smooth wheeled tandem roller. hour 3.900
360
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
c) Materials
Bitumen @ 4.25 per cent of weight of mix t 19.130
Aggregate
Total weight of mix = 450 tonnes
Weight of bitumen = 19.13 tonnes
Weight of aggregate = 450 -19.13 = 430.87 tonnes
Taking density of aggregate = 1.5 ton/cum
Volume of aggregate = 287.25 cum
Grading - I 40 mm (Nominal Size)
37.5 - 25 mm 22 per cent cum 63.190
25 - 10 mm 13 per cent cum 37.340
10 -4.75 mm 19 per cent cum 54.580
4.75 mm and below 44 per cent cum 126.390
Filler @ 2 per cent of weight of aggregates (Cement) t 8.620
or
Grading - II 19 mm (Nominal Size)
25 - 10 mm 30 per cent cum 86.160
10 - 5 mm 28 per cent cum 80.430
5 mm and below 40 per cent cum 114.900
Filler @ 2 per cent of weight of aggregates (Cement). t 8.620
Any one of the alternative may be adopted as per approved
design
(i) For Grading I ( 40 mm nominal size )
d&e) Overheads & Contractors Profit
Cost for 195 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/195
(ii) For GradingII(19 mm nominal size)
d&e) Overheads & Contractors Profit
Cost for 195 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/195
Note : 1. Although the roller are required only for 3 hours as per norms of output, but the same have to be
available at site for six hours as the hot mix plant and paver will take six hours for mixing and paving the
output of 450 tonnes considered in this analysis. To cater for the idle period of these rollers, their usage
rates have been multiplied by a factor of 0.65.
2. Quantity of Bitumen has been taken for analysis purpose. The actual quantity will depend upon job mix
formula.
3. Labour for traffic control, watch and ward and other miscellaneous duties at site including sundries
have been included in administrative overheads of the contractor.
4. In case DBM is laid over freshly laid tack coat, provision of mechanical broom and 2 mazdoors shall be
deleted as the same has been included in the cost of tack coat.
5. The individual density for each size of aggregates to be used for construction I.e. 37.5-25 mm, 25-10
mm etc. should be found in the laboratory and accordingly the quantities should be amended for use in
field. The average density of 1.5 tonne/cum is only a reference density in this Data Book.
6. The individual percentage of aggregates should be calculated from the total weight of dry aggregates
i.e.. excluding the weight of bitumen. The weight of filler will also be 2 per cent by weight of dry
aggregates.
Unit = cum
Taking output = 195 cum (450 tonnes)
a) Labour
Mate day -
Mazdoor (Unskilled) working with HMP, mechanical broom, day 14.000
paver, roller, asphalt cutter and assistance for setting out
lines, levels and layout of construction
361
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Front end loader 1 cum bucket capacity hour 6.000
Smooth wheeled roller 8-10 tonnes for initial break rolling. (6 x hour 3.900
0.65)
Vibratory roller 8 tonnes for intermediate rolling. hour 3.900
Finish rolling with 6-8 tonnes smooth wheeled tandem roller hour 3.900
c) Material
Grading I: 13 mm (Nominal Size)
i) Bitumen@ 4.5 per cent of weight of mix t 20.250
ii) Aggregate
Total weight of mix = 450 tonnes
Weight of bitumen = 20.25 tonnes
Weight of aggregate = 450-20.25 = 429.75 tonnes
Taking density of aggregate = 1.5 ton/cum
Volume of aggregate = 286.5 cum
13.2 - 10 mm20 per cent cum 57.300
10 - 5 mm 38 per cent cum 108.870
5 mm and below 40 per cent cum 114.600
Filler @ 2 per cent of weight of aggregates.(Cement) t 8.620
or
Grading II: 10 mm (Nominal Size)
Bitumen 80/100 Grade @ 5 per cent of weight of mix t 22.500
OR
Bitumen 60/70 Grade @ 5 per cent of weight of mix t 22.500
weight of mix = 450 tonne
Aggregate
Total weight of mix = 450 tonnes
Weight of bitumen = 22.5 tonnes
Weight of aggregate = 450 -22.50 = 427.50 tonnes
Taking density of aggregate = 1.5 ton/cum
Volume of aggregate = 285 cum
9.5 - 11.2 mm IRC HBG M/C Chips cum 81.225
5 - 7 mm IRC HBG M/C Chips cum 81.225
5 - 7 mm IRC HBG M/C Chips cum 58.425
Below 2.36 mm cum 58.425
Filler @ 2 per cent of weight of aggregates. cum 5.700
*Any one of the alternative may be adopted as per
approved design
(i) For Grading I ( 13 mm nominal size )
d&e) Overheads & Contractors Profit
Cost for 195 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/195
362
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
(ii) For Grading II (10 mm nominal size)
d&e) Overheads & Contractors Profit
Cost for 195 cum = a+b+c+d+e (80 / 100 Grade BT)
Rate per cum = (a+b+c+d+e)/195
Cost for 195 cum = a+b+c+d+e (60 / 70 Grade BT)
Rate per cum = (a+b+c+d+e)/195
Note : 1. Although the rollers are required only for 3 hours as per norms of output, but the same have to
be available at site for six hours as the hot mix plant and paver will take six hours for mixing and paving
the output of 450 tonnes considered in this analysis. To cater for the idle period of these rollers, their
usage rates have been multiplied by a factor of 0.65
2. Quantity of Bitumen has been taken for analysis purpose. The actual quantity will depend upon job mix
formula.
3. Labour for traffic control, watch and ward and other miscellaneous duties at site including sundries
have been included in administrative overheads of the contractor.
4. In case SDBC is laid over freshly laid tack coat, provision of broom and 2 mazdoor shall be deleted as
the same has been included in the cost of tack coat.
5. The quantity of Bitumen to be adjusted as per job mix formula.
RBR-BASC-9 9 Bituminous Concrete
Providing and laying bituminous concrete with 100-120 TPH
batch type hot mix plant producing an average output of 75
tonnes per hour using crushed aggregates of specified
grading, premixed with bituminous binder @ 5.4 to 5.6 per
cent of mix and filler, transporting the hot mix to work site,
laying with a hydrostatic paver finisher with sensor control to
the required grade, level and alignment, rolling with smooth
wheeled, vibratory and tandem rollers to achieve the desired
compaction as per MORTH specification clause No. 509
complete in all respects
Unit = cum
Taking output = 191 cum (450 tonnes)
a) Labour
Mate day -
Mazdoor (Unskilled) working with HMP, mechanical broom, day 16.000
paver, roller, asphalt cutter and assistance for setting out
lines, levels and layout of construction
Skilled mazdoor for checking line & levels day 5.840
b) Machinery
Batch mix HMP @ 75 tonne per hour hour 6.000
Paver finisher hydrostatic with sensor control @ 75 cum per hour hour 6.000
Generator 250 KVA hour 6.000
Front end loader 1 cum bucket capacity hour 6.000
Tipper 10 tonne capacity t.km 450 x L
Add 10 per cent of cost of carriage to cover cost of loading
and unloading
Smooth wheeled roller 8-10 tonnes for initial break down rolling. hour 3.900
Vibratory roller 8 tonnes for intermediate rolling. hour 3.900
Finish rolling with 6-8 tonnes smooth wheeled tandem roller. hour 3.900
c) Material
i) Bitumen@ 5 per cent of weight of mix t 22.500
ii) Aggregate
Total weight of mix = 450 tonnes
Weight of bitumen = 22.5 tonnes
Weight of aggregate = 450 -22.50 = 427.50 tonnes
Taking density of aggregate = 1.5 ton/cum
Volume of aggregate = 285 cum
* Grading - I-19 mm (Nominal Size)
20 - 10 mm 35 per cent cum 99.750
10 - 5 mm 23 per cent cum 65.550
5 mm and below 40 per cent cum 114.000
Filler @ 2 per cent of weight of aggregates.(Cement) t 8.620
363
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
or
Grading - II-13 mm (Nominal Size)
13.2 - 10 mm 30 per cent cum 85.500
10 - 5 mm 25 per cent cum 71.250
5 mm and below43 per cent cum 122.550
Filler @ 2 per cent of weight of aggregates.(Cement) t 8.620
Any one of the alternative may be adopted as per
approved design
(i) for Grading-I ( 19 mm nominal size )
d&e) Overheads & Contractors Profit
Cost for 191 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/191
(ii) For Grading-II(13 mm nominal size)
d&e) Overheads & Contractors Profit
Cost for 191 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/191
Note : 1. Although the rollers are required only for 3 hours as per norms of output, but the same have to
be available at site for six hours as the hot mix plant and paver will take six hours for mixing and paving
the output of 450 tonnes considered in this analysis. To cater for the idle period of these rollers, their
usage rates have been multiplied by a factor of 0.65
2.Quantity of Bitumen has been taken for analysis purpose. The actual quantity will depend upon job mix
formula.
3. Labour for traffic control, watch and ward and other miscellaneous duties at site including sundries
have been included in administrative overheads of the contractor.
4. In case BC is laid over freshly laid tack coat, provision of mechanical broom and 2 mazdoors shall be
deleted as the same has been included in the cost of tack coat.
5. The individual density for each size of aggregates to be used for construction i.e. 37.5-25 mm, 25-10
mm etc. should be found in the laboratory and accordingly the quantities should be amended for use in
field. The average density of 1.5 tonne/cum is only a reference density in this Data Book.
6. The individual percentage of aggregates should be calculated from the total weight of dry aggregates
i.e.. excluding the weight of bitumen. The weight of filler will also be 2 per cent by weight of dry
aggregates.
A By Manual Means
Case – I: Using Nominal chipping size 13.2 mm
(I) Bitumen (S-90)
Unit = sqm
Taking output = 900 sqm
a) Labour
Mate day -
Bitumen Sprayer day 1.000
Mazdoor (Unskilled) day 58.000
Mazdoor (Semi-Skilled) day 8.600
b) Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted with spray set hour 2.250
Three wheel 80-100 kN static roller hour 2.250
Add: 0.5 per cent of (a) Labour for sundries L.S.
c) Material
Bitumen (S-90) @ 1.00 kg per sqm t 0.900
Crushed stone chipping, 13.2 mm nominal size @ 0.010 cum cum 9.000
per sqm
d&e) Overheads & Contractors Profit
Cost of 900 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/900
364
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
(II) Bitumen (S-65)
Unit = sqm
Taking output = 900 sqm
a) Labour
Mate day -
Bitumen Sprayer day 1.000
Mazdoor (Unskilled) day 58.000
Mazdoor (Semi-Skilled) day 8.600
b) Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted with spray set hour 2.250
365
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 900 sqm
a) Labour
Mate day -
Bitumen Sprayer day 1.000
Mazdoor (Unskilled) day 58.000
Mazdoor (Semi-Skilled) day 8.600
b) Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted with spray set hour 2.250
366
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
(III) Polymer Modified Bitumen
Unit = sqm
Taking output = 1000 sqm
a) Labour
Mate day -
Bitumen Sprayer day 1.000
Mazdoor (Unskilled) day 58.000
Mazdoor (Semi-Skilled) day 8.600
b) Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted with spray set hour 2.000
367
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
B By Mechanical Means
Case – I: Using Nominal chipping size 13.2 mm
(I) Bitumen (S-90)
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 9.000
Mazdoor (Skilled) day 2.440
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 6.000
Air compressor 210 cfm hour 6.000
Hydraulic self propelled chip spreader @ 1500 sqm per hour hour 6.000
Tipper 5.5 cum - 10 t capacity for carriage of stone chips from hour 6.000
stockpile on road side to chip spreader
Front end loader 1 cum bucket capacity hour 6.000
Bitumen pressure distributor hour 6.000
Three wheel 80-100 kN static roller weight hour 18.750
c) Material
Bitumen (S-90) @ 1.00 kg per sqm t 7.500
Crushed stone chipping, 13.2 mm nominal size @ 0.010 cum cum 75.000
per sqm
d&e) Overheads & Contractors Profit
Cost of 7500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/7500
(II) Bitumen (S-65)
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 9.000
Mazdoor (Skilled) day 2.440
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 6.000
Air compressor 210 cfm hour 6.000
Hydraulic self propelled chip spreader @ 1500 sqm per hour hour 6.000
Tipper 5.5 cum - 10 t capacity for carriage of stone chips from hour 6.000
stockpile on road side to chip spreader
Front end loader 1 cum bucket capacity hour 6.000
Bitumen pressure distributor hour 6.000
Three wheel 80-100 kN static roller weight hour 18.750
c) Material
Bitumen (S-65) @ 1.00 kg per sqm t 7.500
Crushed stone chipping, 13.2 mm nominal size @ 0.010 cum cum 75.000
per sqm
d&e) Overheads & Contractors Profit
Cost of 7500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/7500
(III) Polymer Modified Bitumen
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 9.000
Mazdoor (Skilled) day 2.440
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 6.000
Air compressor 210 cfm hour 6.000
Hydraulic self propelled chip spreader @ 1500 sqm per hour hour 6.000
Tipper 5.5 cum - 10 t capacity for carriage of stone chips from hour 6.000
stockpile on road side to chip spreader
368
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Front end loader 1 cum bucket capacity hour 6.000
Bitumen pressure distributor hour 6.000
Three wheel 80-100 kN static roller weight hour 18.750
c) Material
Polymer Modified Bitumen @ 1.00 kg per sqm t 7.500
Crushed stone chipping, 13.2 mm nominal size @ 0.010 cum cum 75.000
per sqm
d&e) Overheads & Contractors Profit
Cost of 7500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/7500
(IV) Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 9.000
Mazdoor (Skilled) day 2.440
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 6.000
Air compressor 210 cfm hour 6.000
Hydraulic self propelled chip spreader @ 1500 sqm /hour hour 6.000
Tipper 5.5 cum - 10 t capacity for carriage of stone chips from hour 6.000
stockpile on road side to chip spreader
Front end loader 1 cum bucket capacity hour 6.000
Bitumen pressure distributor hour 6.000
Three wheel 80-100 kN static roller weight hour 18.750
c) Material
Crumb Rubber Modified Bitumen @ 1.00 kg per sqm t 7.500
Crushed stone chipping, 13.2 mm nominal size @ 0.010 cum cum 75.000
per sqm
d&e) Overheads & Contractors Profit
Cost of 7500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/7500
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 9.000
Mazdoor (Skilled) day 2.440
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 6.000
Air compressor 210 cfm hour 6.000
Hydraulic self propelled chip spreader @ 1500 sqm per hour hour 6.000
Tipper 5.5 cum - 10 t capacity for carriage of stone chips from hour 6.000
stockpile on road side to chip spreader
Front end loader 1 cum bucket capacity hour 6.000
Bitumen pressure distributor hour 6.000
Three wheel 80-100 kN static roller weight hour 18.750
c) Material
Natural Rubber Modified Bitumen @ 1.00 kg per sqm t 7.500
Crushed stone chipping, 13.2 mm nominal size @ 0.010 cum cum 75.000
per sqm
d&e) Overheads & Contractors Profit
Cost of 7500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/7500
369
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Case – II: Using Nominal chipping size 9.5 mm
Mechanical Means
(I) Bitumen (S-90)
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 9.000
Mazdoor (Skilled) day 2.440
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 6.000
Air compressor 210 cfm hour 6.000
Hydraulic self propelled chips spreader @ 1500 sqm / hour hour 6.000
Tipper 5.5 cum - 10 t capacity for carriage of stone chips from hour 6.000
stockpile on road side to chips spreader
Front end loader 1 cum bucket capacity hour 6.000
Bitumen pressure distributor @ 1750 sqm per hour hour 6.000
Three wheel 80-100 kN static roller weight hour 15.000
c) Material
Bitumen (S-90) @ 0.90 kg per sqm t 6.750
Crushed stone chipping, 9.5 mm nominal size @ 0.008 cum cum 60.000
per sqm
d&e) Overheads & Contractors Profit
Cost of 7500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/7500
(II) Bitumen (S-65)
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 9.000
Mazdoor (Skilled) day 2.440
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 6.000
Air compressor 210 cfm hour 6.000
Hydraulic self propelled chips spreader @1500 sqm per hour hour 6.000
Tipper 5.5 cum - 10 t capacity for carriage of stone chips from hour 6.000
stockpile on road side to chips spreader
Front end loader 1 cum bucket capacity hour 6.000
Bitumen pressure distributor @ 1750 sqm per hour hour 6.000
Three wheel 80-100 kN static roller weight hour 15.000
c) Material
Bitumen (S-65) @ 0.90 kg per sqm t 6.750
Crushed stone chipping, 9.5 mm nominal size @ 0.008 cum cum 60.000
per sqm
d&e) Overheads & Contractors Profit
Cost of 7500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/7500
(III) Polymer Modified Bitumen
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 9.000
Mazdoor (Skilled) day 2.440
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 6.000
Air compressor 210 cfm hour 6.000
Hydraulic self propelled chips spreader @ 1500 sqm per hour hour 6.000
Tipper 5.5 cum - 10 t capacity for carriage of stone chips from hour 6.000
stockpile on road side to chips spreader
370
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Front end loader 1 cum bucket capacity hour 6.000
Bitumen pressure distributor @ 1750 sqm per hour hour 6.000
Three wheel 80-100 kN static roller weight hour 15.000
c) Material
Polymer Modified Bitumen @ 0.90 kg per sqm t 6.750
Crushed stone chipping, 9.5 mm nominal size @ 0.008 cum cum 60.000
per sqm
d&e) Overheads & Contractors Profit
Cost of 7500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/7500
(IV) Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 9.000
Mazdoor (Skilled) day 2.440
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 6.000
Air compressor 210 cfm hour 6.000
Hydraulic self propelled chips spreader @ 1500 sqm per hour hour 6.000
Tipper 5.5 cum - 10 t capacity for carriage of stone chips from hour 6.000
stockpile on road side to chips spreader
Front end loader 1 cum bucket capacity hour 6.000
Bitumen pressure distributor @ 1750 sqm per hour hour 6.000
Three wheel 80-100 kN static roller weight hour 15.000
c) Material
Crumb Rubber Modified Bitumen @ 0.90 kg per sqm t 6.750
Crushed stone chipping, 9.5 mm nominal size @ 0.008 cum cum 60.000
per sqm
d&e) Overheads & Contractors Profit
Cost of 7500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/7500
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 9.000
Mazdoor (Skilled) day 2.440
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 6.000
Air compressor 210 cfm hour 6.000
Hydraulic self propelled chips spreader @ 1500 sqm per hour hour 6.000
Tipper 5.5 cum - 10 t capacity for carriage of stone chips from hour 6.000
stockpile on road side to chips spreader
Front end loader 1 cum bucket capacity hour 6.000
Bitumen pressure distributor @ 1750 sqm per hour hour 6.000
Three wheel 80-100 kN static roller weight hour 15.000
c) Material
Natural Rubber Modified Bitumen @ 0.90 kg per sqm t 6.750
Crushed stone chipping, 9.5 mm nominal size @ 0.008 cum cum 60.000
per sqm
d&e) Overheads & Contractors Profit
Cost of 7500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/7500
371
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
11 Providing and laying surface dressing as wearing course in
single coat using crushed stone aggregates of specified size
on a layer of bituminous binder laid on prepared surface and
RBR-BASC-11 rolling with 8-10 tonne smooth wheeled steel roller as per
Tech Specification No 509 & 510 MORTH
Mechanical Means
Unit = sqm
Taking output = 9000 sqm
Case 1 :-19 mm nominal chipping size
a) Labour
Mate day -
Mazdoor (Unskilled) day 9.000
Mazdoor skilled day 2.440
b) Machinery
Mechanical broom @ 1250 sqm per hour hour 7.200
Air compressor 250 cfm hour 7.200
Hydraulic self propelled chip spreader @ 1500 sqm/hour hour 6.000
Tipper 10 tonne capacity for carriage of stone chips from hour 6.000
stockpile on road side to chip spreader
Front end loader 1 cum bucket capacity hour 6.000
Bitumen pressure distributor hour 6.000
Smooth wheeled roller 8-10 tonne weight hour 6.000
c) Material
Bitumen@ 1.20 kg per sqm t 10.800
Crushed stone chipping, 19 mm nominal size @ 0.015 cum cum 135.000
per sqm
d&e) Overheads & Contractors Profit
Cost for 9000 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/9000
Case 2 : 13 mm nominal size chipping
a) Labour
Mate day -
Mazdoor (Unskilled) day 9.000
Mazdoor skilled day 2.440
b) Machinery
Mechanical broom @ 1250 sqm per hour hour 7.200
Air compressor 250 cfm hour 7.200
Hydraulic self propelled chip spreader @ 1500 sqm per hour hour 6.000
Tipper 10 tonne capacity for carriage of stone chips from hour 6.000
stockpile on road side to chip spreader
Front end loader 1 cum bucket capacity hour 6.000
Bitumen pressure distributor @ 1750 sqm per hour hour 6.000
Vibratory roller 8-10 tonne weight hour 6.000
c) Material
Bitumen@ 1.00 kg per sqm t 9.000
Crushed stone chipping,13 mm nominal size @ 0.01 cum per cum 90.000
sqm
d&e) Overheads & Contractors Profit
Cost for 9000 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/9000
Note : 1. Where the proposed aggregate fails to pass the stripping test, an approved adhesion agent may
be added to the binder as per clause 510.2.4. Alternatively, chips may be pre-coated as per clause
510.2.5
2. Input for the second coat, where required, will be the same as per the Ist coat mentioned above
372
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Case 3 : Using 6 mm nominal size chipping
ii Providing and laying surface dressing in single coat
using 6 mm nominal size IRC HBG machine crushed
stone aggregates @ 0.004 cum / sqm on a layer of
bitumen binder of 80/100 grade @ 0.75 kg / sqm laid on
prepared surface and rolling with 8-10 T Power Road
Roller etc., complete for finished item of work as per
MoRT&H Specification 510 (4th Revision) and as directed
by the Engineer-in-charge.
Unit = sqm
Taking output = 9000 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 9.000
Mazdoor skilled day 2.440
b) Machinery
Mechanical broom @ 1250 sqm/hr. hour 7.200
Air compressor 250 cfm hour 7.200
Hydraulic self propelled chip spreader @ 1500 sqm/hr. hour 6.000
Tipper 10Tonne capacity for carriage of stone chips from stock hour 6.000
pile on road side to chip spreader
Front end loader 1 cum bucket capacity hour 6.000
Bitumen pressure distributor @1750 sqm/hr hour 6.000
Smooth wheeled roller 8 Ton hour 6.000
c) Material
Bitumen 80/100 @0.75 Kg/sqm MT 6.750
or
Bitumen 60/70 @0.75 Kg/sqm MT 6.750
Crushed stone chippings 6 mm nominal size @0.004 cum 36.000
cum/sqm
d&e) Overheads & Contractors Profit
Cost for 9000 sqm = a+b+c+d (80/100 BT)
Rate per sqm = (a+b+c+d)/9000
Cost for 9000 sqm = a+b+c+d (60/70 BT)
Rate per sqm = (a+b+c+d)/9000
RBR-BASC-12 12 Surface Dressing using Bitumen Emulsion
Providing and laying surface dressing as wearing course
consisting of a layer of bitumen emulsion laid on the prepared
surface, followed by a cover of crushed stone chippings of
specified size and rolling with 80-100 kN roller including
cleaning the road surface as per Technical Specification
Clause 507 MORD.
A By Manual Means
Case – I: Nominal aggregate size 13.2 mm
Unit = sqm
Taking output = 900 sqm
a) Labour
Mate day -
Bitumen Emulsion Sprayer day 1.000
Mazdoor (Unskilled) day 60.360
b) Machinery
Emulsion sprayer, capacity 1000 litre fitted with spray set hour 2.250
Three wheel 80-100 kN static roller hour 2.250
Add: 0.5 per cent of (a) Labour for sundries L.S.
c) Material
Bitumen Emulsion (RS-1) @ 1.50 kg per sqm t 1.350
Crushed stone chipping, 13.2 mm nominal size @ 0.010 cum cum 9.000
per sqm
d&e) Overheads & Contractors Profit
Cost of 900 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/900
373
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Case – II: Nominal chipping size 9.5 mm
Unit = sqm
Taking output = 1000 sqm
a) Labour
Mate day -
Bitumen Sprayer day 1.000
Mazdoor (Unskilled) day 60.360
b) Machinery
Emulsion sprayer, capacity 1000 litre fitted with spray set hour 2.000
Three wheel 80-100 kN static roller hour 2.000
c) Material
Bitumen Emulsion (RS-1) @ 1.40 kg per sqm t 1.400
Crushed stone chipping, 9.5 mm nominal size @ 0.008 cum/ sqm cum 8.000
d&e) Overheads & Contractors Profit
Cost of 1000 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/1000
B By Mechanical Means
Case – I: Nominal chipping size 13.2 mm
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 9.000
Mazdoor (Skilled) day 2.440
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 6.000
Air compressor 210 cfm hour 6.000
Hydraulic self propelled chip spreader @ 1500 sqm / hour hour 6.000
Tipper 5.5 cum - 10 t capacity for carriage of stone chips from hour 6.000
stockpile on road side to chip spreader
Front end loader 1 cum bucket capacity hour 6.000
Bitumen Emulsion pressure distributor hour 6.000
Three wheel 80-100 kN static roller hour 18.750
c) Material
Bitumen Emulsion (RS-1) @ 1.50 kg per sqm t 11.250
Crushed stone chipping, 13.2 mm nominal size @ 0.010 cum/sqm cum 75.000
d&e) Overheads & Contractors Profit
Cost of 7500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/7500
Case – II: Nominal chipping size 9.5 mm
Unit = sqm
Taking output = 7500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 9.000
Mazdoor (Skilled) day 2.440
b) Machinery
Hydraulic broom @ 1250 sqm per hour hour 6.000
Air compressor 210 cfm hour 6.000
Hydraulic self propelled chip spreader @1500 sqm per hour hour 6.000
Tipper 5.5 cum - 10 t capacity for carriage of stone chips from hour 6.000
stockpile on road side to chip spreader
Front end loader 1 cum bucket capacity hour 6.000
Bitumen Emulsion pressure distributor hour 6.000
Three wheel 80-100 kN static roller hour 15.000
c) Material
Bitumen Emulsion (RS-1) @ 1.40 kg per sqm t 10.500
Crushed stone chipping, 9.5 mm nominal size @ 0.008 cum/sqm cum 60.000
d&e) Overheads & Contractors Profit
Cost of 7500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/7500
Note : Where the proposed aggregate fails to pass the stripping value test, an approved adhesion agent
may be added to the binder as per Clause 507.24. Alternatively, chips may be pre-coated as per Clause
507.25.
374
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
RBR-BASC-13 13 Pre-coating Chips
Pre-coating of chips with 1 per cent of paving bitumen by
weight of chips in a suitable mixer duly heated to 160 degree
C as per Technical Specification Clause 507.2.5 MORD
Unit = cum
Taking output = 30 cum
(I) Bitumen (S-90)
a) Labour
Mate day -
Mazdoor (Unskilled) day 15.600
b) Machinery
Bitumen boiler oil fired, capacity 1000 litre tire hour 6.000
Mixall 6-10 t capacity hour 6.000
c) Material
Bitumen @1 per cent by weight of chips (30x1.6)/100 t 0.480
d&e) Overheads & Contractors Profit
Cost of 30 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/30
(II) Bitumen (S-65)
a) Labour
Mate day -
Mazdoor (Unskilled) day 15.600
b) Machinery
Bitumen boiler oil fired, capacity 1000 litre tire hour 6.000
Mixall 6-10 t capacity hour 6.000
c) Material
Bitumen @1 per cent by weight of chips (30x1.6)/100 t 0.480
d&e) Overheads & Contractors Profit
Cost of 30 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/30
14 i 20mm thick Open-Graded Premix Carpet using
RBR-BASC-14 Bituminous (penetration grade/modified bitumen) Binder
375
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
(II) Bitumen (S-65)
Unit = sqm
Taking output = 500 sqm (10 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 21.000
Mazdoor (Semi-Skilled) day 7.080
b) Machinery
Mixall 6/10 t capacity hour 4.000
Bitumen boiler oil fired 1000 litre capacity fitted with spray set hour 4.000
Three wheel 80-100 kN static roller hour 2.000
c) Material
Bitumen (S-65) @ 14.60 kg per 10 sqm t 0.730
Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum per cum 13.500
10 sqm
d&e) Overheads & Contractors Profit
Cost of 500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/500
(III) Polymer Modified Bitumen
Unit = sqm
Taking output = 500 sqm (10 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 21.000
Mazdoor (Semi-Skilled) day 7.080
b) Machinery
Mixall 6/10 t capacity hour 4.000
Bitumen boiler oil fired 1000 litre capacity fitted with spray set hour 4.000
Three wheel 80-100 kN static roller hour 2.000
c) Material
Polymer Modified Bitumen @ 14.60 kg per 10 sqm t 0.730
Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum per cum 13.500
10 sqm
d&e) Overheads & Contractors Profit
Cost of 500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/500
(IV) Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 500 sqm (10 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 21.000
Mazdoor (Semi-Skilled) day 7.080
b) Machinery
Mixall 6/10 t capacity hour 4.000
Bitumen boiler oil fired 1000 litre capacity fitted with spray set hour 4.000
Three wheel 80-100 kN static roller hour 2.000
c) Material
Crumb Rubber Modified Bitumen @ 14.60 kg per 10 sqm t 0.730
Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum per cum 13.500
10 sqm
d&e) Overheads & Contractors Profit
Cost of 500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/500
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 500 sqm (10 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 21.000
Mazdoor (Semi-Skilled) day 7.080
376
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
b) Machinery
Mixall 6/10 t capacity hour 4.000
Bitumen boiler oil fired 1000 litre capacity fitted with spray set hour 4.000
Three wheel 80-100 kN static roller hour 2.000
c) Material
Natural Rubber Modified Bitumen @ 14.60 kg per 10 sqm t 0.730
Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum per cum 13.500
10 sqm
d&e) Overheads & Contractors Profit
Cost of 500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/500
Case - II By Mechanical Means
(I) Bitumen (S-90)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 10.000
Mazdoor (Skilled) day 3.520
b) Machinery
HMP 30/40 t per hour hour 6.000
Electric generator set 125 KVA hour 6.000
Front end loader 1 cum bucket capacity hour 6.000
Tipper 5.5 cum - 10 t/ 5-6t capacity hour 3.640
Paver finisher hour 6.000
Three wheel 80-100 kN static roller hour 16.000
c) Material
Bitumen (S-90) @ 14.60 kg per 10 sqm t 5.840
Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum per cum 108.000
10 sqm
d&e) Overheads & Contractors Profit
Cost of 4000 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/4000
(II) Bitumen (S-65)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 10.000
Mazdoor (Skilled) day 3.520
b) Machinery
HMP 30/40 t per hour hour 6.000
Electric generator set 125 KVA hour 6.000
Front end loader 1 cum bucket capacity hour 6.000
Tipper 5.5 cum - 10 t capacity hour 3.640
Paver finisher hour 6.000
Three wheel 80-100 kN static roller hour 16.000
c) Material
Bitumen (S-65) @ 14.60 kg per 10 sqm t 5.840
Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum per cum 108.000
10 sqm
d&e) Overheads & Contractors Profit
Cost of 4000 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/4000
377
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
(III) Polymer Modified Bitumen
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 10.000
Mazdoor (Skilled) day 3.520
b) Machinery
HMP 30/40 t per hour hour 6.000
Electric generator set 125 KVA hour 6.000
Front end loader 1 cum bucket capacity hour 6.000
Tipper 5.5 cum - 10 t capacity hour 3.640
Paver finisher hour 6.000
Three wheel 80-100 kN static roller hour 16.000
c) Material
Polymer Modified Bitumen @ 14.60 kg per 10 sqm t 5.840
Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum/ 10 sqm cum 108.000
d&e) Overheads & Contractors Profit
Cost of 4000 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/4000
(IV) Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 10.000
Mazdoor (Skilled) day 3.520
b) Machinery
HMP 30/40 t per hour hour 6.000
Electric generator set 125 KVA hour 6.000
Front end loader 1 cum bucket capacity hour 6.000
Tipper 5.5 cum - 10 t / 5-6 t capacity hour 3.640
Paver finisher hour 6.000
Three wheel 80-100 kN static roller hour 16.000
c) Material
Crumb Rubber Modified Bitumen @ 14.60 kg per 10 sqm t 5.840
Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum/ 10 sqm cum 108.000
d&e) Overheads & Contractors Profit
Cost of 4000 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/4000
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 10.000
Mazdoor (Skilled) day 3.520
b) Machinery
HMP 30/40 t per hour hour 6.000
Electric generator set 125 KVA hour 6.000
Front end loader 1 cum bucket capacity hour 6.000
Tipper 5.5 cum - 10 t capacity hour 3.640
Paver finisher hour 6.000
Three wheel 80-100 kN static roller hour 16.000
c) Material
Natural Rubber Modified Bitumen @ 14.60 kg per 10 sqm t 5.840
Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum/ 10 sqm cum 108.000
d&e) Overheads & Contractors Profit
Cost of 4000 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/4000
378
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
ii 20 mm thick Open Graded Premix Carpet using Bitumen
Emulsion as per Technical Specification Clause 508.2
MORTH
Unit = sqm
Taking output = 900 sqm (24.3 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 18.000
Mazdoor (Skilled) day 2.800
b) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 6.000
Three wheel 80-100 kN static roller hour 3.600
c) Material
Bitumen emulsion (RS-1) @ 21.50 kg per 10 sqm t 1.940
Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum/ 10 sqm cum 24.300
d&e) Overheads & Contractors Profit
Cost of 900 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/900
RBR-BASC-15 15 Open - Graded Premix Surfacing
Providing, laying and rolling of open - graded premix surfacing
of 20 mm thickness composed of 13.2 mm to 5.6 mm
aggregates either using penetration grade bitumen or cut-
back or emulsion to required line, grade and level to serve as
wearing course on a previously prepared base, including
mixing in a suitable plant, laying and rolling with a smooth
wheeled roller 8-10 tonne capacity, finished to required level
and grades as per Tech. Specification No. 511 MORTH.
Unit = sqm
Taking output = 10250 sqm (205 cum)
i Case - I: Mechanical method using Penetration grade
Bitumen and HMP of appropriate capacity not less than
75 tonnes/hour .
a) Labour
Mate day -
Mazdoor (Unskilled) working with HMP, road sweeper, paver and roller day 16.000
379
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
ii Case - II: Open-Graded Premix Surfacing using cationic
Bitumen Emulsion
Unit = sqm
Taking output = 900 sqm (24.3 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 18.000
Mazdoor skilled day 2.800
b) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 6.000
Smooth wheeled steel roller 8-10 tonne hour 6.000
c) Material
Cationic Bitumen Emulsion @ 21.50 kg per 10 sqm t 1.940
Crushed stone chipping, 13.2 mm to 5.6 mm @ 0.27 cum/ 10 sqm cum 24.300
d&e) Overheads & Contractors Profit
Cost for 900 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/900
RBR-BASC-16 16 Mix Seal Surfacing
i Providing, laying and rolling of close-graded premix surfacing
material of 20 mm thickness composed of 11.2 mm to 0.9 mm
(Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using
penetration grade bitumen to required line, grade and level to
serve as wearing course on a previously prepared base,
including mixing in a suitable plant, laying and rolling with a
three wheel 8-10 kN static roller and finishing to required level
and grades as per Technical Specification Clause 509 MORD
By Manual Means
Type A
(I) Bitumen (S-90)
Unit = sqm
Taking output = 500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 21.000
Mazdoor (Skilled) day 8.400
b) Machinery
Mixall 6-10 t capacity hour 6.000
Oil fired bitumen boiler 1000 litre capacity fitted with spray set hour 6.000
Three wheel 80-100 kN static roller hour 6.000
c) Material
Bitumen (S-90) @ 22 kg per 10 sqm t 1.100
Stone crushed aggregates 11.2 mm to 0.09 mm @ 0.27 cum cum 13.500
per 10 sqm
d&e) Overheads & Contractors Profit
Cost of 500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/500
(II) Bitumen (S-65)
Unit = sqm
Taking output = 500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 21.000
Mazdoor (Skilled) day 8.400
b) Machinery
Mixall 6-10 t capacity hour 6.000
Oil fired bitumen boiler 1000 litre capacity fitted with spray set hour 6.000
Three wheel 80-100 kN static roller hour 6.000
380
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
c) Material
Bitumen (S-65) @ 22 kg per 10 sqm t 1.100
Stone crushed aggregates 11.2 mm to 0.09 mm @ 0.27 cum cum 13.500
per 10 sqm
d&e) Overheads & Contractors Profit
Cost of 500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/500
(III) Polymer Modified Bitumen
Unit = sqm
Taking output = 500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 21.000
Mazdoor (Skilled) day 8.400
b) Machinery
Mixall 6-10 t capacity hour 6.000
Oil fired bitumen boiler 1000 litre capacity fitted with spray set hour 6.000
Three wheel 80-100 kN static roller hour 6.000
c) Material
Polymer Modified Bitumen @ 22 kg per 10 sqm t 1.100
Stone crushed aggregates 11.2 mm to 0.09 mm @ 0.27 cum cum 13.500
per 10 sqm
d&e) Overheads & Contractors Profit
Cost of 500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/500
(IV) Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 21.000
Mazdoor (Skilled) day 8.400
b) Machinery
Mixall 6-10 t capacity hour 6.000
Oil fired bitumen boiler 1000 litre capacity fitted with spray set hour 6.000
Three wheel 80-100 kN static roller hour 6.000
c) Material
Crumb Rubber Modified Bitumen @ 22 kg per 10 sqm t 1.100
Stone crushed aggregates 11.2 mm to 0.09 mm @ 0.27 cum cum 13.500
per 10 sqm
d&e) Overheads & Contractors Profit
Cost of 500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/500
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 21.000
Mazdoor (Skilled) day 8.400
b) Machinery
Mixall 6-10 t capacity hour 6.000
Oil fired bitumen boiler 1000 lt capacity fitted with spray set hour 6.000
Three wheel 80-100 kN static roller hour 6.000
c) Material
Natural Rubber Modified Bitumen @ 22 kg per 10 sqm t 1.100
Stone crushed aggregates 11.2 mm to 0.09 mm @ 0.27 cum cum 13.500
per 10 sqm
d&e) Overheads & Contractors Profit
Cost of 500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/500
381
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Type B
(I) Bitumen (S-90)
Unit = sqm
Taking output = 500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 21.000
Mazdoor (Skilled) day 8.400
b) Machinery
Mixall 6-10 t capacity hour 6.000
Oil fired bitumen boiler 1000 lt capacity fitted with spray set hour 6.000
Three wheel 80-100 kN static roller hour 6.000
c) Material
Bitumen (S-90) @ 19 kg per 10 sqm t 0.950
Stone crushed aggregates 13.2 mm to 0.09 mm @ 0.27cum cum 13.500
per 10 sqm
d&e) Overheads & Contractors Profit
Cost of 500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/500
(II) Bitumen (S-65)
Unit = sqm
Taking output = 500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 21.000
Mazdoor (Skilled) day 8.400
b) Machinery
Mixall 6-10 t capacity hour 6.000
Oil fired bitumen boiler 1000 lt capacity fitted with spray set hour 6.000
Three wheel 80-100 kN static roller hour 6.000
c) Material
Bitumen (S-65) @ 19 kg per 10 sqm t 0.950
Stone crushed aggregates 13.2 mm to 0.09 mm @ 0.27cum cum 13.500
per 10 sqm
d&e) Overheads & Contractors Profit
Cost of 500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/500
(III) Polymer Modified Bitumen
Unit = sqm
Taking output = 500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 21.000
Mazdoor (Skilled) day 8.400
b) Machinery
Mixall 6-10 t capacity hour 6.000
Oil fired bitumen boiler 1000 lt capacity fitted with spray set hour 6.000
Three wheel 80-100 kN static roller hour 6.000
c) Material
Polymer Modified Bitumen @ 19 kg per 10 sqm t 0.950
Stone crushed aggregates 13.2 mm to 0.09 mm @ 0.27cum cum 13.500
per 10 sqm
d&e) Overheads & Contractors Profit
Cost of 500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/500
382
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
(IV) Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 21.000
Mazdoor (Skilled) day 8.400
b) Machinery
Mixall 6-10 t capacity hour 6.000
Oil fired bitumen boiler 1000 lt capacity fitted with spray set hour 6.000
Three wheel 80-100 kN static roller hour 6.000
c) Material
Crumb Rubber Modified Bitumen @ 19 kg per 10 sqm t 0.950
Stone crushed aggregates 13.2 mm to 0.09 mm @ 0.27cum cum 13.500
per 10 sqm
d&e) Overheads & Contractors Profit
Cost of 500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/500
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 21.000
Mazdoor (Skilled) day 8.400
b) Machinery
Mixall 6-10 t capacity hour 6.000
Oil fired bitumen boiler 1000 lt capacity fitted with spray set hour 6.000
Three wheel 80-100 kN static roller hour 6.000
c) Material
Natural Rubber Modified Bitumen @ 19 kg per 10 sqm t 0.950
Stone crushed aggregates 13.2 mm to 0.09 mm @ 0.27cum cum 13.500
per 10 sqm
d&e) Overheads & Contractors Profit
Cost of 500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/500
By Mechanical Means
Type A
(I) Bitumen (S-90)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 10.000
Mazdoor (Skilled) day 3.520
b) Machinery
HMP of appropriate capacity hour 6.000
Electric generator set 125 KVA hour 6.000
Front end loader 1 cum bucket capacity hour 6.000
Tipper 5.5 cum - 10 t capacity hour 3.600
Paver finisher hour 6.000
Three wheel 80-100 kN static roller hour 18.000
c) Material
Bitumen (S-90) @ 22 kg per 10 sqm t 8.800
Stone crushed aggregates 11.2 mm to 0.09 mm @ 0.27 cum cum 108.000
per 10 sqm
d&e) Overheads & Contractors Profit
Cost of 4000 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/4000
383
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
(II) Bitumen (S-65)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 10.000
Mazdoor (Skilled) day 3.520
b) Machinery
HMP of appropriate capacity hour 6.000
Electric generator set 125 KVA hour 6.000
Front end loader 1 cum bucket capacity hour 6.000
Tipper 5.5 cum - 10 t capacity hour 3.600
Paver finisher hour 6.000
Three wheel 80-100 kN static roller hour 18.000
c) Material
Bitumen (S-65) @ 22 kg per 10 sqm t 8.800
Stone crushed aggregates 11.2 mm to 0.09 mm @ 0.27 cum cum 108.000
per 10 sqm
d&e) Overheads & Contractors Profit
Cost of 4000 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/4000
(III) Polymer Modified Bitumen
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 10.000
Mazdoor (Skilled) day 3.520
b) Machinery
HMP of appropriate capacity hour 6.000
Electric generator set 125 KVA hour 6.000
Front end loader 1 cum bucket capacity hour 6.000
Tipper 5.5 cum - 10 t capacity hour 3.600
Paver finisher hour 6.000
Three wheel 80-100 kN static roller hour 18.000
c) Material
Polymer Modified Bitumen @ 22 kg per 10 sqm t 8.800
Stone crushed aggregates 11.2 mm to 0.09 mm @ 0.27 cum cum 108.000
per 10 sqm
d&e) Overheads & Contractors Profit
Cost of 4000 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/4000
(IV) Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 10.000
Mazdoor (Skilled) day 3.520
b) Machinery
HMP of appropriate capacity hour 6.000
Electric generator set 125 KVA hour 6.000
Front end loader 1 cum bucket capacity hour 6.000
Tipper 5.5 cum - 10 t capacity hour 3.600
Paver finisher hour 6.000
Three wheel 80-100 kN static roller hour 18.000
c) Material
Crumb Rubber Modified Bitumen @ 22 kg per 10 sqm t 8.800
Stone crushed aggregates 11.2 mm to 0.09 mm @ 0.27 cum cum 108.000
per 10 sqm
d&e) Overheads & Contractors Profit
Cost of 4000 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/4000
384
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 10.000
Mazdoor (Skilled) day 3.520
b) Machinery
HMP of appropriate capacity hour 6.000
Electric generator set 125 KVA hour 6.000
Front end loader 1 cum bucket capacity hour 6.000
Tipper 5.5 cum - 10 t capacity hour 3.600
Paver finisher hour 6.000
Three wheel 80-100 kN static roller hour 18.000
c) Material
Natural Rubber Modified Bitumen @ 22 kg per 10 sqm t 8.800
Stone crushed aggregates 11.2 mm to 0.09 mm @ 0.27 cum cum 108.000
per 10 sqm
d&e) Overheads & Contractors Profit
Cost of 4000 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/4000
Type B
(I) Bitumen (S-90)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 10.000
Mazdoor (Skilled) day 3.520
b) Machinery
HMP of appropriate capacity hour 6.000
Electric generator set 125 KVA hour 6.000
Front end loader 1 cum bucket capacity hour 6.000
Tipper 5.5 cum - 10 t / 5-6 t capacity hour 3.600
Add 10 per cent of cost of carriage to cover cost of loading
and unloading
Paver finisher hour 6.000
Three wheel 80-100 kN static roller hour 18.000
c) Material
Bitumen (S-90) @ 19 kg per 10 sqm t 7.600
Stone crushed aggregates 13.2 mm to 0.09 mm @ 0.27 cum cum 108.000
per 10 sqm
d&e) Overheads & Contractors Profit
Cost of 4000 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/4000
(II) Bitumen (S-65)
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 10.000
Mazdoor (Skilled) day 3.520
b) Machinery
HMP of appropriate capacity hour 6.000
Electric generator set 125 KVA hour 6.000
Tipper 5.5 cum - 10 t capacity hour 3.600
Paver finisher hour 6.000
Three wheel 80-100 kN static roller hour 18.000
385
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
c) Material
Bitumen (S-65) @ 19 kg per 10 sqm t 7.600
Stone crushed aggregates 13.2 mm to 0.09 mm @ 0.27 cum cum 108.000
per 10 sqm
d&e) Overheads & Contractors Profit
Cost of 4000 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/4000
(III) Polymer Modified Bitumen
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 10.000
Mazdoor (Skilled) day 3.520
b) Machinery
HMP of appropriate capacity hour 6.000
Electric generator set 125 KVA hour 6.000
Tipper 5.5 cum - 10 t capacity hour 3.600
Paver finisher hour 6.000
Three wheel 80-100 kN static roller hour 18.000
c) Material
Polymer Modified Bitumen @ 19 kg per 10 sqm t 7.600
Stone crushed aggregates 13.2 mm to 0.09 mm @ 0.27 cum / cum 108.000
10 sqm
d&e) Overheads & Contractors Profit
Cost of 4000 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/4000
(IV) Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 10.000
Mazdoor (Skilled) day 3.520
b) Machinery
HMP of appropriate capacity hour 6.000
Electric generator set 125 KVA hour 6.000
Tipper 5.5 cum - 10 t capacity hour 3.600
Paver finisher hour 6.000
Three wheel 80-100 kN static roller hour 18.000
c) Material
Crumb Rubber Modified Bitumen @ 19 kg per 10 sqm t 7.600
Stone crushed aggregates 13.2 mm to 0.09 mm @ 0.27 cum / cum 108.000
10 sqm
d&e) Overheads & Contractors Profit
Cost of 4000 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/4000
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 4000 sqm (80 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 10.000
Mazdoor (Skilled) day 3.520
b) Machinery
HMP of appropriate capacity hour 6.000
Electric generator set 125 KVA hour 6.000
Tipper 5.5 cum - 10 t capacity hour 3.600
Paver finisher hour 6.000
Three wheel 80-100 kN static roller hour 18.000
386
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
c) Material
Natural Rubber Modified Bitumen @ 19 kg per 10 sqm t 7.600
Stone crushed aggregates 13.2 mm to 0.09 mm @ 0.27 cum / cum 108.000
10 sqm
d&e) Overheads & Contractors Profit
Cost of 4000 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/4000
ii Close Graded Premix Surfacing/Mixed Seal Surfacing
Case 1 : Mechanical means using HMP of appropriate capacity not
less than 75 tonnes/hour.
Providing, laying and rolling of close-graded premix surfacing
material of 20 mm thickness composed of 11.2 mm to 0.09 mm
(Type-a) or 13.2 mm to 0.09 mm (Type-b) aggregates using
penetration grade bitumen to the required line, grade and level to
serve as wearing course on a previously prepared base, including
mixing in a suitable plant, laying and rolling with a Smooth wheeled
roller 8-10 tonne capacity, and finishing to required level and grade
as per Tech. Specification No 512 MORTH.
A Type - A
Unit = sqm
Taking output = 10250 sqm (205 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) working with HMP, road sweeper, paver and roller day 16.000
387
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
c) Material
Type - B
Bitumen @ 19 kg per 10 sqm t 19.480
Stone crushed aggregates 13.2 mm to 0.09 mm @ 0.27 cum cum 276.750
per 10 sqm
d&e) Overheads & Contractors Profit
Cost for 10250 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/10250
RBR-BASC-17 17 Seal Coat
i Providing and laying seal coat sealing the voids in a
bituminous surface laid to the specified levels, grade and
cross fall using Type A, Type B and Type C as per Technical
Specification Clause 510 MORD. (using Three wheel 80-100
kN static roller)
A By Manual Means
Case - I : Type A
(I) Bitumen (S-90)
Unit = sqm
Taking output = 1100 sqm
a) Labour
Mate day -
Bitumen Sprayer day 1.000
Mazdoor (Unskilled) day 22.000
Mazdoor (Semi-Skilled) day 7.150
b) Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted with spray set hour 2.200
388
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
(III) Polymer Modified Bitumen
Unit = sqm
Taking output = 1100 sqm
a) Labour
Mate day -
Bitumen Sprayer day 1.000
Mazdoor (Unskilled) day 22.000
Mazdoor (Semi-Skilled) day 7.150
b) Machinery
Bitumen boiler oil fired, capacity 1000 litre fitted with spray set hour 2.200
389
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Case - II : Type B (510 - MORD)
(I) Bitumen (S-90)
Unit = sqm
Taking output = 1250 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 15.000
Mazdoor (Semi-Skilled) day 2.850
b) Machinery
Mixall 6/10 t capacity hour 2.500
Three wheel 80-100 kN static roller hour 2.500
Bitumen boiler oil fired 1000 litre capacity fitted with spray set hour 2.500
c) Material
Bitumen (S-90) @ 6.80 kg per 10 sqm t 0.850
Crushed sand or grit as passing 2.36 mm sieve and retained on 180 cum 7.500
micron sieve applied @ 0.06 cum per 10 sqm
d&e) Overheads & Contractors Profit
Cost of 1250 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/1250
(II) Bitumen (S-65)
Unit = sqm
Taking output = 1250 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 15.000
Mazdoor (Semi-Skilled) day 2.850
b) Machinery
Mixall 6/10 t capacity hour 2.500
Three wheel 80-100 kN static roller hour 2.500
Bitumen boiler oil fired 1000 litre capacity fitted with spray set hour 2.500
c) Material
Bitumen (S-65) @ 6.80 kg per 10 sqm t 0.850
Crushed sand or grit as passing 2.36 mm sieve and retained on 180 cum 7.500
micron sieve applied @ 0.06 cum/10 sqm
d&e) Overheads & Contractors Profit
Cost of 1250 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/1250
(III) Polymer Modified Bitumen
Unit = sqm
Taking output = 1250 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 15.000
Mazdoor (Semi-Skilled) day 2.850
b) Machinery
Mixall 6/10 t capacity hour 2.500
Three wheel 80-100 kN static roller hour 2.500
Bitumen boiler oil fired 1000 litre capacity fitted with spray set hour 2.500
c) Material
Polymer Modified Bitumen @ 6.80 kg per 10 sqm t 0.850
Crushed sand or grit as passing 2.36 mm sieve and retained cum 7.500
on 180 micron sieve applied @ 0.06 cum/10 sqm
390
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
(IV) Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 1250 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 15.000
Mazdoor (Semi-Skilled) day 2.850
b) Machinery
Mixall 6/10 t capacity hour 2.500
Three wheel 80-100 kN static roller hour 2.500
Bitumen boiler oil fired 1000 litre capacity fitted with spray set hour 2.500
c) Material
Crumb Rubber Modified Bitumen @ 6.80 kg per 10 sqm t 0.850
Crushed sand or grit as passing 2.36 mm sieve and retained cum 7.500
on 180 micron sieve applied @ 0.06 cum /10 sqm
d&e) Overheads & Contractors Profit
Cost of 1250 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/1250
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 1250 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 15.000
Mazdoor (Semi-Skilled) day 2.850
b) Machinery
Mixall 6/10 t capacity hour 2.500
Three wheel 80-100 kN static roller hour 2.500
Bitumen boiler oil fired 1000 litre capacity fitted with spray set hour 2.500
c) Material
Natural Rubber Modified Bitumen @ 6.80 kg per 10 sqm t 0.850
Crushed sand or grit as passing 2.36 mm sieve and retained cum 7.500
on 180 micron sieve applied @ 0.06 cum /10 sqm
d&e) Overheads & Contractors Profit
Cost of 1250 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/1250
Case - III : Type C (510 - MORD)
(I) Bitumen (S-90)
Unit = sqm
Taking output = 1100 sqm
a) Labour
Mate day -
Bitumen Sprayer day 1.000
Mazdoor (Unskilled) for carrying of chips & spraying day 22.000
Mazdoor (Semi-Skilled) day 6.150
b) Machinery
Bitumen boiler oil fired 1000 litre capacity fitted with spray set hour 2.200
Three wheel 80-100 kN static roller hour 2.200
c) Material
Bitumen (S-90) @ 6.50 kg per 10 sqm t 0.715
Crushed stone chipping of 6.7 mm size defined as 100% cum 9.900
passing 9.5 mm sieve and retained on 2.36 mm sieve applied
@ 0.09 cum.
d&e) Overheads & Contractors Profit
Cost of 1100 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/1100
391
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
(II) Bitumen (S-65)
Unit = sqm
Taking output = 1100 sqm
a) Labour
Mate day -
Bitumen Sprayer day 1.000
Mazdoor (Unskilled) day 22.000
Mazdoor (Semi-Skilled) day 6.150
b) Machinery
Bitumen boiler oil fired 1000 litre capacity fitted with spray set hour 2.200
Three wheel 80-100 kN static roller hour 2.200
c) Material
Bitumen (S-65) @ 6.50 kg per 10 sqm t 0.715
Crushed stone chipping of 6.7 mm size defined as 100% passing 9.5 cum 9.900
mm sieve and retained on 2.36 mm sieve applied @ 0.09 cum.
392
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 1100 sqm
a) Labour
Mate day -
Bitumen Sprayer day 1.000
Mazdoor (Unskilled) day 22.000
Mazdoor (Semi-Skilled) day 6.150
b) Machinery
Bitumen boiler oil fired 1000 litre capacity fitted with spray set hour 2.200
Three wheel 80-100 kN static roller hour 2.200
c) Material
Natural Rubber Modified Bitumen @ 6.50 kg per 10 sqm t 0.715
Crushed stone chipping of 6.7 mm size defined as 100% passing 9.5 cum 9.900
mm sieve and retained on 2.36 mm sieve applied @ 0.09 cum.
393
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
(III) Polymer Modified Bitumen
Unit = sqm
Taking output = 7500 sqm (67.5 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 6.240
b) Machinery
Hydraulic self propelled chips spreader hour 6.000
Tipper 5.5 cum capacity hour 6.000
Front end loader 1 cum bucket capacity hour 6.000
Bitumen pressure distributor hour 6.000
Three wheel 80-100 kN static roller hour 15.000
c) Material
Polymer Modified Bitumen @ 9.80 kg per 10 sqm t 7.350
Crushed stone chipping of 6.7 mm size 100 per cent passing 11.2 cum 67.500
mm sieve and retained on 2.36 mm sieve applied @ 0.09 cum per 10
sqm
394
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Case - II : Type B
(I) Bitumen (S-90)
Unit = sqm
Taking output = 5000 sqm (30 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 4.160
b) Machinery
HMP of 30/40 t per hour hour 2.000
Electric generator set 125 KVA hour 2.000
Front end loader 1 cum bucket capacity hour 2.000
Tipper 5.5 cum - 10 t capacity hour 1.360
Paver finisher hour 2.000
Three wheel 80-100 kN static roller hour 10.000
c) Material
Bitumen (S-90) @ 6.80 kg per 10 sqm t 3.400
Crushed sand defined as passing 2.36 mm sieve and retained on cum 30.000
180 micron sieve applied @ 0.06 cum per 10 sqm
d&e) Overheads & Contractors Profit
Cost of 5000 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/5000
(II) Bitumen (S-65)
Unit = sqm
Taking output = 5000 sqm (30 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 4.160
b) Machinery
HMP of 30/40 t per hour hour 2.000
Electric generator set 125 KVA hour 2.000
Front end loader 1 cum bucket capacity hour 2.000
Tipper 5.5 cum - 10 t capacity hour 1.360
Paver finisher hour 2.000
Three wheel 80-100 kN static roller hour 10.000
c) Material
Bitumen (S-65) @ 6.80 kg per 10 sqm t 3.400
Crushed sand defined as passing 2.36 mm sieve and retained on cum 30.000
180 micron sieve applied @ 0.06 cum /10 sqm
d&e) Overheads & Contractors Profit
Cost of 5000 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/5000
(III) Polymer Modified Bitumen
Unit = sqm
Taking output = 5000 sqm (30 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 4.160
b) Machinery
HMP of 30/40 t per hour hour 2.000
Electric generator set 125 KVA hour 2.000
Front end loader 1 cum bucket capacity hour 2.000
Tipper 5.5 cum - 10 t capacity hour 1.360
Paver finisher hour 2.000
Three wheel 80-100 kN static roller hour 10.000
c) Material
Polymer Modified Bitumen @ 6.80 kg per 10 sqm t 3.400
Crushed sand defined as passing 2.36 mm sieve and retained on cum 30.000
180 micron sieve applied @ 0.06 cum per 10 sqm
d&e) Overheads & Contractors Profit
Cost of 5000 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/5000
395
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
(IV) Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 5000 sqm (30 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 4.160
b) Machinery
HMP of 30/40 t per hour hour 2.000
Electric generator set 125 KVA hour 2.000
Front end loader 1 cum bucket capacity hour 2.000
Tipper 5.5 cum - 10 t capacity hour 1.360
Paver finisher hour 2.000
Three wheel 80-100 kN static roller hour 10.000
c) Material
Crumb Rubber Modified Bitumen @ 6.80 kg per 10 sqm t 3.400
Crushed sand defined as passing 2.36 mm sieve and retained on cum 30.000
180 micron sieve applied @ 0.06 cum per 10 sqm
d&e) Overheads & Contractors Profit
Cost of 5000 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/5000
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 5000 sqm (30 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 4.160
b) Machinery
HMP of 30/40 t per hour hour 2.000
Electric generator set 125 KVA hour 2.000
Front end loader 1 cum bucket capacity hour 2.000
Tipper 5.5 cum - 10 t capacity hour 1.360
Paver finisher hour 2.000
Three wheel 80-100 kN static roller hour 10.000
c) Material
Natural Rubber Modified Bitumen @ 6.80 kg per 10 sqm t 3.400
Crushed sand defined as passing 2.36 mm sieve and retained on cum 30.000
180 micron sieve applied @ 0.06 cum per 10 sqm
d&e) Overheads & Contractors Profit
Cost of 5000 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/5000
Note : Since seal coat is required to be provided over the premix carpet on
the same day, out of the 6 working hours of the HMP, 4.00 hours are
proposed to be utilised for the premix carpet and the balance 2.00 hours
have been considered for this case.
396
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
(II) Bitumen (S-65)
Unit = sqm
Taking output = 7500 sqm (67.5 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 5.200
b) Machinery
Hydraulic self propelled chips spreader hour 6.000
Tipper 5.5 cum capacity hour 6.000
Front end loader 1 cum bucket capacity hour 6.000
Bitumen pressure distributor hour 6.000
Three wheel 80-100 kN static roller hour 15.000
c) Material
Bitumen (S-65) @ 6.50 kg per 10 sqm t 4.880
Crushed stone chipping of 6.7 mm size 100 per cent passing cum 67.500
9.5 mm sieve and retained on 2.36 mm sieve applied @ 0.09
cum per 10 sqm
d&e) Overheads & Contractors Profit
Cost of 7500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/7500
(III) Polymer Modified Bitumen
Unit = sqm
Taking output = 7500 sqm (67.5 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 5.200
b) Machinery
Hydraulic self propelled chips spreader hour 6.000
Tipper 5.5 cum capacity hour 6.000
Front end loader 1 cum bucket capacity hour 6.000
Bitumen pressure distributor hour 6.000
Three wheel 80-100 kN static roller hour 15.000
c) Material
Polymer Modified Bitumen @ 6.50 kg per 10 sqm t 4.880
Crushed stone chipping of 6.7 mm size 100 per cent passing cum 67.500
9.5 mm sieve and retained on 2.36 mm sieve applied @ 0.09
cum per 10 sqm
d&e) Overheads & Contractors Profit
Cost of 7500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/7500
(IV) Crumb Rubber Modified Bitumen
Unit = sqm
Taking output = 7500 sqm (67.5 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 5.200
b) Machinery
Hydraulic self propelled chips spreader hour 6.000
Tipper 5.5 cum capacity hour 6.000
Front end loader 1 cum bucket capacity hour 6.000
Bitumen pressure distributor hour 6.000
Three wheel 80-100 kN static roller hour 15.000
c) Material
Crumb Rubber Modified Bitumen @ 6.50 kg per 10 sqm t 4.880
Crushed stone chipping of 6.7 mm size 100 per cent passing cum 67.500
9.5 mm sieve and retained on 2.36 mm sieve applied @ 0.09
cum per 10 sqm
d&e) Overheads & Contractors Profit
Cost of 7500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/7500
397
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
(V) Natural Rubber Modified Bitumen
Unit = sqm
Taking output = 7500 sqm (67.5 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 5.200
b) Machinery
Hydraulic self propelled chips spreader hour 6.000
Tipper 5.5 cum capacity hour 6.000
Front end loader 1 cum bucket capacity hour 6.000
Bitumen pressure distributor hour 6.000
Three wheel 80-100 kN static roller hour 15.000
c) Material
Natural Rubber Modified Bitumen @ 6.50 kg per 10 sqm t 4.880
Crushed stone chipping of 6.7 mm size 100 per cent passing cum 67.500
9.5 mm sieve and retained on 2.36 mm sieve applied @ 0.09
cum per 10 sqm
d&e) Overheads & Contractors Profit
Cost of 7500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/7500
Note : Since seal coat is provided immediately over the bituminous layers,
Hydraulic broom for cleaning has not been catered.
ii Providing and laying seal coat sealing the voids in a
bituminous surface laid to the specified levels, grade and
cross fall using Type A and B seal coats as per Tech.
specification No. 513 MORTH
Unit = sqm
Taking output = 10250 sqm (92.25 cum)
Case - I : Type A
a) Labour
Mate day -
Mazdoor (Unskilled) day 6.240
b) Machinery
Hydraulic self propelled chip spreader hour 6.000
Tipper 5.5 cum capacity hour 6.000
Front end loader 1 cum bucket capacity hour 6.000
Bitumen pressure distributor @ 1750 sqm per hour hour 6.000
Smooth wheeled roller 8 -10 tonne weight hour 6.000
c) Material
Bitumen@ 9.80 kg per 10 sqm t 10.050
Crushed stone chipping of 6.7 mm size defined as 100 per cent cum 92.250
passing 11.2 mm sieve and retained on 2.36 mm sieve applied @
0.09 cum per 10 sqm
d&e) Overheads & Contractors Profit
Cost for 10250 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/10250
Note : Since seal coat is provided immediately over the bituminous layers,
mechanical broom for clearing has not been catered.
398
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Case - II : Type B
Providing and laying of premix sand seal coat with HMP of
appropriate capacity not less than 75 tonnes/ hours using crushed
stone chipping 6.7 mm size and penetration bitumen of suitable
grade.
Unit = sqm
Taking output = 7858 sqm (47.16 cum)
a) Labour
Mate day -
Mazdoor (Unskilled) day 4.160
b) Machinery
HMP of 75 tonnes/hour. hour 2.000
Electric Generator Set 250 KVA hour 2.000
Front end loader 1 cum bucket capacity hour 2.000
Tipper 10 tonne capacity t.km 104 x 'L'
Add 10 per cent of cost of carriage to cover cost of loading and
unloading
Paver finisher hydrostatic with sensor attachment hour 2.000
Smooth wheeled 8-10 tonnes capacity hour 2.000
c) Material
Bitumen@ 6.80 kg per 10 sqm t 5.340
Crushed stone chipping of 6.7 mm size defined as passing 11.2 mm sieve 47.160
and retained on 2.36 mm sieve applied @ 0.06 cum per 10 sqm
Unit = sqm
Taking output = 35.00 sqm (0.87 cum ) assuming a
density of 2.3 tonnes/cum.-2 tonnes
a) Labour
Mate day -
Mazdoor (Unskilled) day 10.000
Mazdoor skilled day 1.440
399
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
b) Machinery
Mechanical broom @ 1250 sqm per hour hour 0.060
Air compressor 250 cfm hour 0.060
Mastic cooker 1 tonne capacity hour 6.000
Bitumen boiler 1500 litres capacity hour 6.000
Tractor for towing and positioning of mastic cooker and hour 1.000
bitumen boiler
c) Material
Base mastic (without coarse aggregates) = 60 per cent
Coarse aggregate (6.3mm to 13.2 mm) = 40 per cent
Proportion of material required for mastic asphalt with coarse
aggregates (based on mix design done by CRRI for a specific
case)
I) Bitumen 80 / 100 or 30/40 @ 10.2 per cent by weight of t 0.204
mix. 2 x 10.2/100 = 0.204
ii) Fine aggregate passing 2.36mm and retained on 0.075mm cum 0.390
sieve @ 31.9 per cent by weight of mix = 2 x 31.9/100 =
0.638 tonnes = 0.638/1.625 = 0.39
iii) Lime stone dust filler with calcium content not less than 80 t 0.360
per cent by weight @ 17.92 per cent by weight of mix = 2 x
17.92/100 = 0.36
iv) Coarse aggregates 6.3 mm to 13.2 mm @ 40 per cent by cum 0.550
weight of mix = 2 x 40/100 = 0.8 MT = 0.8/1.456 = 0.55
v) Pre-coated stone chips of 13.2 mm nominal size for skid cum 0.018
resistance = 35 x 0.005/10 = 0.018
vi) Bitumen for coating of chips @ 2 per cent by weight = kg 0.500
0.018 x 1.456 x 2/100 = 0.0005 MT = 0.5kg
d&e) Overheads & Contractors Profit
Cost for 35.00 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/35
Note : 1.The rates for 50 mm & 40 mm thick layers may be worked out on pro-rata basis.
2. Where tack coat is required to be provided before laying mastic asphalt, the same is
required to be measured and paid separately.
3. The quantities of binder, filler and aggregates are for estimating purpose. Exact quantities
shall be as per mix design.
4. This rate analysis is based on design made by CRRI for a specific case and is meant for
estimating purposes only. Actual design is required to be done for each case.
(i) 5 mm thickness
Unit = sqm
Taking output = 16000 sqm (80 cum)
Taking density of 2.2 tonnes per cum
weight of mix = 176 tonnes
a) Labour
Mate day -
Mazdoor (Unskilled) day 6.240
b) Machinery
Mechanical broom hour 6.000
Air compressor 250 cfm hour 6.000
Mobile slurry seal equipment hour 6.000
Front end loader 1 cum bucket capacity hour 6.000
Tipper 5.5 cum capacity for carriage of aggregate from hour 6.000
stockpile on road side to slurry equipment, bitumen emulsion
and filler.
400
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Pneumatic tyred roller with individual wheel load not exceeding 1.5 hour 6.000
tonnes
Water tanker6 KL capacity hour 2.000
c) Material
Residual Binder (BT Emulsion - medium setting) @ 11 per t 19.360
cent of mix 80 x 2.2 x 0.11
Fine aggregate 4.75 mm and below 87 per cent of total cum 102.080
mix,80 x 2.2 x 0.87 = 153.12 tonnes. Taking density1.5, =
153.12/1.5 = 102.08 cum
Filler @ 2 per cent of total mix = 80 x 2.2 x 0.02 (Cement) t 3.520
401
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
21 Recycling of Bituminous Pavement with Central
RBR-BASC-21
Recycling Plant
Recycling pavement by cold milling of existing bituminous layers,
planning the surface after cold milling, reclaiming excavated material
to the extent of 30 per cent of the required quantity, hauling and
stock piling the reclaimed material near the central recycling plant
after carrying out necessary checks and evaluation, adding fresh
material including rejuvenators as required, mixing in a hot mix plant,
transporting and laying at site and compacting to the required grade,
level and thickness, all as specified in clause 517 MORTH.
Unit = cum
Taking output = 120 cum (276 tonnes)
a) Labour
Mate day -
Mazdoor (Unskilled) day 10.000
Mazdoor skilled day 2.480
b) Machinery
Cold milling machine @ 20 cum per hour hour 6.000
Mechanical broom @ 1250 sqm per hour hour 1.280
Air compressor 250 cfm hour 1.280
Bitumen pressure distributor @ 1750 sqm per hour hour 0.910
Hot mix plant 100-120 TPH producing an average of 75 tonnes per hour 3.000
hour
Electric generator set 250 KVA hour 3.000
Front end loader 1.00 cum bucket capacity hour 3.000
Tipper 5.5 cum capacity hour 18.000
Smooth wheeled roller 8-10 tonnes hour 1.950
Vibratory roller 8 tonnes hour 1.950
Smooth wheeled tandem roller 6-8 tonnes hour 1.950
c) Material
i) Bitumen
A bitumen content is 4.5 per cent bitumen weight of mix. For
reclaimed material, fresh bitumen will be required to the extent of 60
per cent of normal requirement.
In a mix of 276 tonnes, 82.8 tonne is reclaimed and balance 193.2
tonne is fresh mix.
Bitumen required for reclaimed mix of 82.8 tonne @ 60 per t 1.987
cent = 82.8 x 0.60 x0.04 = 1.99
Bitumen required for fresh mix of 193.2 tonnes = 193.2 x 0.04 t 7.728
= 7.73
ii) Aggregates
Percentage of mix requiring fresh aggregates - 70 per cent
Weight of fresh mix = 276 x 0.70 = 193.2 tonne
Weight of fresh aggregate in the mix = 193.2 x 0.96 = 185.47 tonne
Taking average density of 1.5 tonnes/cum, total volume of
aggregate = 123.65 cum.
Size wise requirement of fresh aggregates
37.5 - 25 mm @ 23 per cent cum 28.440
25 - 10 mm @ 15 per cent cum 18.550
10- 5 mm @ 20 per cent cum 24.730
Below 5 mm @40 per cent cum 49.460
Filler (cement) @ 2 % of 276 tonne = 5.52 tonnes t 5.520
d&e) Overheads & Contractors Profit
Cost for 120 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/120
Note : Although the total rolling time is only 4 hours as per norms, all the
three rollers have to be available at site for 3 hours each to match with the
output of re-cycling plant. To cater for their idling time, these have been
multiplied with a factor of 0.65.
402
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
RBR-BASC-22 22 Fog Spray
Providing and applying low viscosity bitumen emulsion for sealing
cracks less than 3 mm wide or incipient fretting or disintegration in an
existing bituminous surfacing as per Tech. Specification 518 MORTH.
Unit = sqm
Taking output = 10500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 3.120
b) Machinery
Mechanical broom @ 1250 sqm per hour hour 6.000
Air compressor 250 cfm hour 6.000
Bitumen emulsion pressure distributor @ 1750 sqm per hour hour 6.000
c) Material
Bitumen emulsion (Medium setting) @ 0.75 kg/sqm t 7.880
d&e) Overheads & Contractors Profit
Cost for 10500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/10500
1.In case it is decided by the engineer to blind the fog spray,
the following may be added
a) Labour
Mate day 0.160
Mazdoor (Unskilled) for precoating of grit day 4.000
b) Material
Crushed stone grit 3 mm size @ 3.75 kg per sqm cum 26.250
Bitumen emulsion for precoating grit @ 2 per cent of t 0.790
grit,39.38 x 0.02
d&e) Overheads & Contractors Profit
Cost for 10500 sqm = a+b
Rate per sqm = (a+b)/10500
RBR-BASC-23 23 Bituminous Cold Mix ( Including Gravel Emulsion)
Providing, laying and rolling of bituminous cold mix on prepared base
consisting of a mixture of unheated mineral aggregate and emulsified
or cutback bitumen, including mixing in a plant of suitable type and
capacity, transporting, laying, compacting and finishing to specified
grades and levels as per Tech. Specification 519 MORTH.
Unit = cum
Taking output = 205 cum (450 tonne)
(i) Using bitumen emulsion and 9.5 mm or 13.2 mm size
aggregate
Composition of mix (450 tonne) is assumed to be as under:-
Bitumen Emulsion 8 per cent by weight of Total Mixture
Filler2 per cent
Total aggregates 90 per cent
Proportion of aggregates
19 mm to 9.5 mm25 per cent
9.5 mm to 6 mm29 per cent
6 mm to 0.075 mm 36 per cent
a) Labour
Mate day -
Mazdoor (Unskilled) day 16.000
Mazdoor skilled day 5.840
b) Machinery
Drum mix plant for cold mixes of appropriate capacity but not hour 6.000
less than 75 tonnes/hour.
Electric generator 125 KVA hour 6.000
Front end loader 1 cum bucket capacity hour 6.000
Tipper 10 tonne capacity t.km 450 x L
Add 10 per cent of cost of carriage to cover cost of loading
and unloading
Paver finisher hour 6.000
Pneumatic tyred roller 12-15 tonnes hour 3.900
Smooth wheeled steel tandem roller 6-8 tonnes hour 3.900
c) Material
Bitumen emulsion (Medium setting) @ 8 per cent t 36.000
Filler (lime)@ 2 per cent t 9.000
Aggregates size 19 to 9.5 mm - 450 x 0.25 x 1/1.5 cum 75.000
Aggregates size 9.5 to 6 mm - 450 x 0.29 x 1/1.5 cum 87.000
403
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Aggregates size 6 to 0.075 mm - 450 x 0.36 x 1/1.5 cum 108.000
d&e) Overheads & Contractors Profit
Cost for 205 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/205
(Applicable to cases I to IV)
Note : 1. Density of aggregates has been assumed 1.5 gms/cc
2. Tack coat where provided will be measured and paid separately.
3. Though the rollers are required only for 3.5 hours each as per norms of output, but these are required
to be available at site for 6 hours as the drum mix plant and the paver would take 6 hours for mixing and
paving. To cater for the idle period, their usage rates have been multiplied by a factor of 0.65
404
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
(iii) Using cutback bitumen and 9.5 mm or 13.2 mm nominal
size aggregate
Composition of mix (450 tonne) is assumed to be as under:-
405
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
d&e) Overheads & Contractors Profit
Cost for 205 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/205
Note : 1. Density of aggregates has been assumed 1.5 gms/cc
2. Tack coat where provided will be measured and paid separately.
3. Though the rollers are required only for 3.5 hours each as per norms of output, but these are required
to be available at site for 6 hours as the drum mix plant and the paver would take 6 hours for mixing and
paving. To cater for the idle period, their usage rates have been multiplied by a factor of 0.65
Unit = cum
Taking output = 205 cum (450 tonne)
a) Labour
Mate day -
Mazdoor (Unskilled) day 16.000
Mazdoor skilled day 5.840
b) Machinery
Hot Mix Plant of appropriate capacity but not less than 75 tonnes/hour hour 6.000
406
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
RBR-BASC-25 25 Modified Binder
Supply of modified binder produced by mixing bitumen with modifier such as natural rubber or
crumb rubber or any other polymer found compatible with bitumen and which allows properties
given in clause 521.3 and IRC:SP: 53 blending of modifier with bitumen to be done either at
the refinery or at central unit with all facilities by proper industrial process, is essential. See
Tech. specification 521 MORTH.
Unit = tonne
The use of modified binder is expected to result in an extended service life of bituminous
pavements subject to heavy traffic loads in extreme climatic conditions, thus justifying the
entire cost of adding modifiers/fibers. Other advantages include lower temperature
susceptibility, higher resistance to aging, higher fatigue life, higher resistance to cracking and
better adhesion between aggregates and binder.
Detailed information and inductive dose level on the use of polymer modified binder is
available in IRC : SP-53 / 2002. A number of proprietary products are now available in the
market. For such proprietary products, test reports and cost effectiveness should be the basis
for their selection in road works.
The modifier, in the required quantity shall be blended at the refinery or at central unit with all
facilities by proper industrial process, is essential. If supplied in drums it shall be agitated in
melted condition with suitable device for achieving homogeneity
Proposals to use glass fiber, polypropylene fibers or any other similar material in a bituminous
mixture should be substantiated, complete with all details including test results, manufacturer's
recommendations for addition or means of incorporating the fibers, homogeneously, without
segregation, into the mixture.
Before agreeing to the use of a fiber, it should have been proved to be satisfactory in use
under circumstances, similar to the work, elsewhere or it would have under gone appropriate
performance trials. Documented evidence of use and trials of the fiber, in any country having
conditions similar to Indian will be acceptable.
where information on use of trials is inadequate or lacking, trials may be required to be under
taken before agreeing to the use of the fiber.
Note : 1. The modified binder is usually manufactured by specialised firms as a proprietary product. The
rate for this product is required to be as certained from the market.
2.The specifications for various item of road works using polymer/rubber modified bitumens are same as
those for penetration grade bitumen except those for any special conditions which the manufacturer may
indicate
3.The other controls during mixing, laying shall be same as specified in IRC - 14, 29, 94 and 95 for open
graded premix carpet, bituminous concrete, DBM and SDBC respectively
4.The temperature of mixing and rolling will be slightly higher than conventional bituminous mixes as
indicated in Table 8 of IRC: SP: 53 - 2002
RBR-BASC-26 26 Crack Prevention Courses
i Stress absorbing membrane (SAM) crack width less than
6 mm
Providing and laying of a stress absorbing membrane over a cracked
road surface, with crack width below 6 mm after cleaning with a
mechanical broom, using modified binder complying with clause 521,
sprayed at the rate of 9 kg per 10 sqm and spreading 5.6 mm
crushed stone aggregates @ 0.11 cum per 10 sqm with hydraulic
chip spreader, sweeping the surface for uniform spread of aggregates
and surface finished to conform to clause 902. Tech. Specification
522 MORTH.
Unit = sqm
Taking output = 10500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 6.240
b) Machinery
Mechanical broom @ 1250 sqm per hour hour 6.000
Air compressor 250 cfm hour 6.000
Bitumen pressure distributor @ 1750 sqm per hour hour 6.000
Hydraulic Chip spreader hour 6.000
Smooth wheeled road roller 8-10 tonne hour 6.000
c) Material
Modified binder t 9.450
Crushed stone aggregates 5.6 mm size cum 105.000
d&e) Overheads & Contractors Profit
Cost for 10500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/10500
(ii) Stress absorbing membrane (SAM) with crack width 6
mm to 9 mm
407
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Providing and laying of a stress absorbing membrane over a cracked
road surface, with crack width 6 to 9 mm after cleaning with a
mechanical broom, using modified binder complying with clause 521,
sprayed at the rate of 11 kg per 10 sqm and spreading 11.2 mm
crushed stone aggregates @ 0.12 cum per 10 sqm, sweeping the
surface for uniform spread of aggregates and surface finished to
conform to clause 902, Tech. Specification 522 MORTH.
Unit = sqm
Taking output = 10500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 6.240
b) Machinery
Mechanical broom @ 1250 sqm per hour hour 6.000
Air compressor 250 cfm capacity hour 6.000
Bitumen pressure distributor @ 1750 sqm per hour hour 6.000
Hydraulic Chip spreader hour 6.000
Smooth wheeled road roller 8-10 tonne hour 6.000
c) Material
Modified binder t 11.550
Crushed stone chipping 11.2 mm size cum 105.000
d&e) Overheads & Contractors Profit
Cost for 10500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/10500
(iii) Stress absorbing membrane (SAM) crack width above 9
mm and cracked area above 50 per cent
Providing and laying a single coat of a stress absorbing membrane
over a cracked road surface, with crack width above 9 mm and
cracked area above 50 per cent after cleaning with a mechanical
broom, using modified binder complying with clause 521, sprayed at
the rate of 15 kg per 10 sqm and spreading 11.2 mm crushed stone
aggregates @ 0.12 cum per 10 sqm, sweeping the surface for
uniform spread of aggregates and surface finished to conform to
clause 902, Tech. Specification 522 MORTH.
Unit = sqm
Taking output = 10500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 6.000
Mazdoor skilled day 2.240
b) Machinery
Mechanical broom @ 1250 sqm per hour hour 6.000
Air compressor 250 cfm capacity hour 6.000
Bitumen pressure distributor @ 1750 sqm per hour hour 6.000
Hydraulic Chip spreader hour 6.000
Smooth wheeled road roller 8-10 tonne hour 6.000
c) Material
Modified binder t 15.750
Crushed stone aggregates 11.2 mm size cum 126.000
d&e) Overheads & Contractors Profit
Cost for 10500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/10500
Note : In case 2nd coat is also required to be provided, material provided for the 2nd coat
shall be as per table 500-47.
408
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
(iv) Case-IV : Bitumen impregnated geotextile
Providing and laying a bitumen impregnated geotextile layer
after cleaning the road surface, geotextile conforming to
requirements of clause 703.3, laid over a tack coat with 1.05
kg per sqm of paving grade bitumen 80 - 100 penetration and
constructed to the requirement of clause 703.4.5, Tech.
Specification 522 MORTH.
Unit = sqm
Taking output = 3500 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 12.000
Mazdoor skilled day 2.560
b) Machinery
Mechanical broom @ 1250 sqm per hour hour 2.800
Air compressor 250 cfm capacity hour 2.800
Bitumen pressure distributor @ 1750 sqm per hour t 2.000
Pneumatic roller hour 2.000
c) Material
Paving grade bitumen of 80 - 100 penetration @ 1.05 kg per sqm t 3.680
Geotextile including 10 per cent for overlaps sqm 3850.000
d&e) Overheads & Contractors Profit
Cost for 3500 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/3500
Note : As bitumen overlay construction shall follow closely the fabric
placement on the same day, an output of 3500 sqm only has been
considered for the analysis which will cover a length of 500 m, of 7 m wide
carriageway. This can be conveniently overlaid by a bituminous course in a
day
Unit = cum
Taking output = 205 sqm (450 tonnes)
(i) 75 mm thickness
a) Labour
Mate day -
Mazdoor (Unskilled) day 12.000
Mazdoor skilled day 6.000
b) Machinery
Drum mix plant for cold mixes 40 / 60 tonne per hour hour 9.000
producing output of 50 tonnes per hour
Electric generator 125 KVA hour 6.000
Front end loader 1 cum capacity hour 6.000
Paver finisher hydrostatic with sensor control @ 75 cum/ hour hour 6.000
Tipper 10 tonne capacity t.km 450 x L
Add 10 per cent of cost of carriage to cover cost of loading
and unloading
Pneumatic tyred roller12-15 tonnes. hour 3.900
Smooth wheeled steel roller6-8 tonnes. hour 3.900
Water tanker6 KL capacity hour 1.000
c) Material
Bitumen emulsion (MS) @ 45 litres per tonne t 20.250
Crushed stone aggregates 40 mm nominal size cum 297.000
Cost of water KL 6.000
d&e) Overheads & Contractors Profit
Cost for 205 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/205
409
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
ii 40 mm thickness
a) Labour
Mate day -
Mazdoor (Unskilled) day 12.000
Mazdoor skilled day 6.000
b) Machinery
Batch type cold mixing plant100-120 TPH capacity producing an hour -
average output of 75 tonne per hour
Drum mix plant for cold mixes 40 / 60 tonne per hour hour 9.000
producing output of 50 tonnes per hour
Electric generator 125 KVA hour 6.000
Front end loader 1 cum capacity hour 6.000
Paver finisher hydrostatic with sensor control @ 75 cum per hour 6.000
hour
Tipper 10 tonne capacity t.km 450 x L
Add 10 per cent of cost of carriage to cover cost of loading and
unloading
Pneumatic tyred roller 12-15 tonnes. hour 3.900
Smooth wheeled steel roller 6-8 tonnes. hour 3.900
Water tanker6 KL capacity hour 1.000
c) Material
Bitumen emulsion (MS) @ 70 litres per tonne t 31.500
Crushed stone aggregates 14 mm nominal size cum 287.000
Cost of water KL 6.000
d&e) Overheads & Contractors Profit
Cost for 205 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/205
iii 25 mm thickness
a) Labour
Mate day -
Mazdoor (Unskilled) day 12.000
Mazdoor skilled day 6.000
b) Machinery
Batch type cold mixing plant 100-120 TPH capacity producing hour -
an average output of 75 tonne per hour
Drum mix plant for cold mixes 40 / 60 tonne per hour hour 9.000
producing output of 50 tonnes per hour
Electric generator 125 KVA hour 6.000
Front end loader 1 cum capacity hour 6.000
Paver finisher hydrostatic with sensor control @ 75 cum per hour 6.000
hour
Tipper 10 tonne capacity t.km 450 x L
Add 10 per cent of cost of carriage to cover cost of loading
and unloading
Pneumatic tyred roller hour 3.900
Smooth wheeled steel roller hour 3.900
Water tanker6 KL capacity hour 1.000
c) Material
Bitumen emulsion (MS) @ 85 litres per tonne t 38.250
Crushed stone aggregates 6 mm nominal size cum 270.000
Cost of water KL 6.000
d&e) Overheads & Contractors Profit
Cost for 205 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/205
410
RBR-BASC
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Note : (Case I to III)
1. These mixes are considered suitable for minor repair work and temporary road surface
improvement.
2. In case concrete mixtures are required to be used for mixing, a number of these will be
needed to match the capacity of road rollers.
3. Tack coat, where provided, will be measured and paid separately.
4. Both the rollers have to be available at site to match with the output of batch mixing plant
and paver finisher. A multiplying factor of 0.65 has been adopted to cater for the idling period
of road rollers.
General Note :
1. The provisions towards Mate is included in the provision towards unskilled
Mazdoor upto item 2.
2. The provisions towards Mate is included in the provision towards skilled Mazdoor
from item 3.
411
RBR-CCPV
Unit = cum
Taking output = 450 cum (990 tonne)
a) Labour
Mate day -
Mazdoor skilled day 7.12
Mazdoor (Unskilled) day 22.00
b) Machinery
Front end loader 1 cum bucket capacity hour 6.00
Cement concrete batch mix plant @ 75 cum per hour hour 6.00
Electric generator 100 KVA hour 6.00
Paver with electronic sensor hour 6.00
Vibratory roller 8-10 t capacity hour 8.00
Water tanker 6 KL capacity hour 8.00
Tipper t.km 990 x L
c) Material
Crushed stone coarse aggregate of 25 mm and 12.5 mm cum 405.00
nominal sizes graded as per table 600-1 @ 0.90 cum/cum of
concrete conforming to clause 602.2.4.
Coarse Sand as per IS: 383 @ 0.45 cum/cum of concrete cum 203.00
Cement @ 150 kg/cum of concrete tonn 67.50
e
Cost of water KL 48.00
d&e) Overheads & Contractors Profit
Cost for 450 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/450
Note : Quantity provided for aggregate is for estimating purpose.
Exact quantity shall be as per mix design.
413
RBR-CCPV
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
RBR-CCPV-5 5 Cement Concrete Pavement
Construction of un-reinforced, dowel jointed at expansion and
construction joint only, plain cement concrete pavement, thickness
as per design, over a prepared sub base, with 43 grade cement or
any other type as per Clause 1501.2.2 M30 (Grade), coarse and
fine aggregates conforming to IS : 383, maximum in a concrete
mixer of not less than 0.2 cum capacity and appropeiate weigh
batcher using approved mix design, laid in approved fixed side
formwork (steel channel, laying and fixing of 125 mictron thick
polythene film, wedges, steel plates including levelling the formwork
as per drawing), spreading the concrete with sholvels, rakes,
compacted using needle, scareed and plate vibrators and finished
in continuous operation including provision of contraction and
expansion, construction joints, applying debonding strips, primer,
sealant, dowel bars, near approaches to bridge / culvert and
construction joints, admixtures as approved, curing of concrete
slabs for 14- days, curing compound (where specified) and water
finishing to lines and grade as per drawing and Technical
Specification Clause 1501 MORD.
Unit = cum
Taking output = 75 cum (172.50 t)
(100 x 3.75 x 0.200)
a) Labour
Mate day -
Mason (1st class) day 5.00
Mason (2nd class) day 5.00
Mazdoor (Unskilled) day 150.00
Mazdoor (Skilled) day 6.00
Surveyor day 2.00
Mazdoor (Semi-Skilled) day 6.00
Blacksmith for cutting of dowel bars including removal of day 1.00
burrs, fabrications & fixing of dowel bars.
b) Machinery
Concrete mixer 0.28 / 0.4 cum capacity (6 mixers) with weigh hour 36.00
batcher and suitable capacity calibrated water tank
Needle vibrator hour 9.00
Screed vibrator hour 9.00
Plate vibrator hour 9.00
Concrete joint cutting machine for initial & final cuts hour 4.00
Water tanker 6 kl capacity hour 5.00
Air Compressor (1 hour initial + 1 hour final) hour 2.00
c) Material
Crushed stone coarse aggregates, grading will be as per cum 67.50
Clause 1501.2.4.1 (Table 1500.1) of specifications @ 0.90
cum/cum of concrete (25 mm & 12.5 mm blending)
Sand as per IS:383 and conforming to Clause 1500.2.4.2 @ cum 33.75
0.45 cum/cum of concrete
Cement @ 310 kg/cum of concrete t 26.25
Polythene sheet 125 micron sqm 412.50
Mild steel dowel bar 25 mm dia of grade S 240. 500 mm long
20 Nos. at culvert/bridge slab and at construction joint
including 5 per cent wastage.
(4 x 20 x 0.500) + 5 per cent wastage = 42 m @ 2.80 kg per t 0.118
m = 117.6 kg.
Bitumen primer @ 200 ml per joint for 23 joints kg 5.00
Bituminous sealant 800 ml per joint for 23 joints litre 19.00
Jute rope 12 mm dia including 5 per cent wastage m 90.00
Debonding strips 3.75 m (length) x 10 mm (width) x 5 mm m 90.00
(thick) cut-out of rubber filler board or similar material
including 5 per cent wastage
Polythene sheathing, covering 2/3rd dowel bars (20x23) and No. 483.00
tight fit including 5 per cent wastage
Plasticizer 0.5 per cent by weight of cement litre 122.00
Curing compound (if used) @ 0.33 litre per sqm litre 131.25
Water for curing kl 18.00
Joint filler board 20 mm thick as per IS:1838 sqm 3.00
(4 x 3.75 x 0.200 = 3 sqm)
d) Formwork @ 3% of (a+b+c)
e&f) Overheads & Contractors Profit
414
RBR-CCPV
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Cost for 75 cum = a+b+c+d+e+f
Rate per cum = (a+b+c+d+e+f)/75
6 Construction of un-reinforced, dowel jointed, plain cement concrete
pavement over a prepared sub base with 43 grade cement @ 400 kg
per cum, coarse and fine aggregate conforming to IS 383, maximum
size of coarse aggregate not exceeding 25 mm, mixed in a batching
and mixing plant as per approved mix design, transported to site, laid
with a fixed form or slip form paver, spread, compacted and finished
in a continuous operation including provision of contraction,
expansion, construction and longitudinal joints, joint filler, separation
RBR-CCPV-6 membrane, sealant primer, joint sealant, debonding strip, dowel bar,
tie rod, admixtures as approved, curing compound, finishing to lines
and grades as per drawing and Technical Specification 602 MORTH.
Unit = cum
Taking output = 1050 cum (2415 tonne)
a) Labour
Mate day -
Mazdoor skilled day 15.00
Mazdoor (Unskilled) day 37.00
b) Machinery
Road Sweeper @ 1250 sqm per hour hour 2.80
Front end loader 1 cum bucket capacity hour 18.00
Cement concrete batch mix plant @ 175 cum per hour hour 6.00
(effective output) 250 KVA
Electric generator hour 6.00
Slip form paver with electronic sensor hour 6.00
Water tanker6 KL capacity hour 36.00
Transit truck agitator 5 cum capacity. tonn 2415xL
e.km
Concrete joint cutting machine hour 12.00
Texturing machine hour 12.00
c) Material
Crushed stone coarse aggregates of 25mm and 12.5mm cum 945.00
nominal size @ 0.90 cum/cum of concrete conforming to
clause 602.2.4.
Sand as per IS: 383 and conforming to clause 602.2.4 @ 0.45 cum 473.00
cum/cum of concrete
Cement 43 grade @ 400 kg/cum of concrete tonn 414.00
e
32 mm mild steel dowel bars of grade S 240 tonn 9.45
e
16 mm deformed steel tie bars of grade S 415 tonn 1.17
e
Separation Membrane of impermeable plastic sheeting 125 sqm 3675.00
micron thick
Pre moulded Joint filler, 25 mm thick for expansion joint. sqm 16.33
Joint sealant kg 875.00
415
RBR-CCPV
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Sealant primer kg 116.67
Plastic sheath,1.25 mm thick for dowel bars sqm 46.67
Curing compound liter 1850.00
Super plastisizer admixture IS marked as per 9103-1999 @ kg 2070.00
0.5 per cent by weight of cement
Cost of water KL 216.00
Add 1 per cent of material for cost of miscellaneous materials
like tarpaulin, Hessian cloth, metal cap, cotton / compressible
sponge and cradle for dowel bars, work bridges for men to
approach concrete surface without walking over it, cutting
blades and bites, minor equipments like scrabbling machine,
threads, ropes, guide wires and any other unforeseen items.
Unit = cum
Taking output = 75 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 152.00
Mason (1st class) day 4.00
Mason (2nd class) day 4.00
Surveyor day 2.00
b) Machinery
Concrete mixer 0.28 / 0.4 cum capacity (6 mixers) with weigh hour 36.00
batcher and suitable capacity calibrated water tank
Three wheel 80-100 kN static roller hour 7.50
OR
Vibratory roller 80-100 kN hour 6.00
Concrete joint cutting machine for day’s end work and regular hour 6.00
joint
Water cutting.
tanker 6 kl capacity hour 6.00
Air compressor (1 hour initial + 1 hour final) hour 2.00
c) Material
Crushed stone coarse aggregates grading as per Clause cum 67.50
1501.2.4.1 (Table 1500.3) @ 0.90 cum/cum of concrete
conforming to Clause 600.4.4 (25 mm & 12.5 mm blending)
416
RBR-CCPV
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Cement @ 310 kg/cum of concrete t 23.25
Bituminous primer @ 200 ml per joint for 21 joints kg 4.00
Jute rope 10 mm dia including 5 per cent wastage m 90.00
Bituminous sealant @ 800 ml per joint for 21 joints kg 16.80
Curing compound @ 0.33 litre per sqm l 131.25
Water for mixing and curing for 14-days kl 18.00
d) Formwork @ 3% of (a+b+c)
e&f) Overheads & Contractors Profit
Cost for 75 cum = a+b+c+d+e (3 Wheel Roller)
Rate per cum = (a+b+c+d+e)/75
Cost for 75 cum = a+b+c+d+e (Vibratory Roller)
Rate per cum = (a+b+c+d+e)/75
Note : When curing compound is used 4-days water curing will be done
RBR-CCPV-8 8 Rolled Cement Concrete Base
Construction of rolled cement concrete base course with coarse and
fine aggregate conforming to IS:383, the size of coarse aggregate
not exceeding 25 mm with minimum, aggregate cement ratio15:1 and
minimum cement content of 200 kg/cum, aggregate gradation to be
as per table 600-4 after blending, mixing in batching plant at optimum
moisture content, transporting to site, laying with a paver with
electronic sensor, compacting with 8-10 tonnes smooth wheeled
vibratory roller to achieve, the designed flexural strength, finishing
and curing as per Technical Specification 603 MORTH.
Unit = cum
Taking output = 450 cum (990 tonne)
a) Labour
Mate day -
Mazdoor skilled day 7.00
Mazdoor (Unskilled) day 24.20
b) Machinery
Front end loader 1 cum bucket capacity hour 6.00
Cement concrete batch mix plant @ 75 cum per hour hour 6.00
Electric generator 100 KVA hour 6.00
Paver with electronic sensor @ 75 cum/hr. hour 6.00
Vibratory roller 8-10 t capacity hour 8.00
Water tanker with 5 km lead 6 KL capacity hour 8.00
Tipper tonn 990xL
Add 10 per cent of cost of carriage to cover cost of loading and e.km
unloading
c) Material
Crushed stone coarse aggregates of 25mm and 12.5mm nominal cum 405.00
size @ 0.90 cum/cum of concrete conforming to clause 602.2.3.
Sand as per IS: 383 and conforming to clause 602.2.3 @ 0.45 cum 203.00
cum/cum of concrete
Cement @ 200 kg/cum of concrete tonn 90.00
e
Cost of water KL 48.00
d&e) Overheads & Contractors Profit
Cost for 450cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/450
Note : The quantities for cement, coarse aggregate and fine aggregates
are for estimating only .The exact quantities will be as per mix design.
417
RBR-CCPV
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
9 Transition Section between Rigid and Flexible Pavement
RBR-CCPV-9
Due to change in the properties of materials and type of construction,
a gradual changeover from rigid pavement to flexible pavement is
desirable to avoid any damage at the butting joint. After provision of
an expansion joint in the cement concrete slab, the thickness of slab
should be tapered to 10 cm over a length of 3 m towards the flexible
pavement. The deficiency of thickness caused due to tapering of the
slab should be made up by the asphaltic layers.
Unit = cum
Taking output = 450 cum (990 tonne)
a) Labour
Mate day -
Mazdoor skilled day 6.00
Mazdoor (Unskilled) day 23.12
b) Machinery
Front end loader 1 cum bucket capacity hour 6.00
Cement concrete batch mix plant @ 75 cum per hour hour 6.00
Electric generator 100 KVA hour 6.00
Paver finisher with electronic sensor hour 6.00
Vibratory roller 8-10 t capacity hour 8.00
Water tanker6 KL capacity hour 8.00
Tipper 10 T Capacity t.km 990 x L
Add 10 per cent of cost of carriage to cover cost of loading -
and unloading
c) Material
Crushed stone coarse aggregate of 40 mm nominal size @ 0.90 cum 405.00
cum/cum of concrete conforming to table 2 of IRC: 74-1979.
Coarse Sand as per IS: 383 - 1970 cum 110.96
Cement @ 150 kg/cum of concrete tonn 67.50
e
Fly ash conforming to IS: 3812 ( Part II ) cum 91.54
( Total fine aggregates = 450 x 0.45 = 202.50 cum To be divided in
ratio of 2 sand : 1.65 flyash. Refer table 4 of IRC: 74-1979).
d&e) Overheads & Contractors Profit
Cost for 450cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/450
Note : 1. Depending upon approved designs, crushed stone aggregates of
nominal size 20mm can also be used as per gradation given in table 2 of
IRC: 74-1979.
2. The ratio of specific gravities of fly ash and sand has been assumed to
be 0.827.
3. The quantities of materials given in the analyses are for estimating
purposes. Actual quantities shall be as per job mix formula.
4. Construction procedure as laid down in clause, of IRC: 74-1979 shall be
followed.
418
RBR-CCPV
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
RBR-CCPV-11 11 Cement - Flyash Concrete Pavement.
Construction reinforced-reinforced, dowel jointed, plain cement
concrete pavement over a prepared sub base with 43 grade cement,
coarse and fine aggregate conforming to IS 383, maximum size of
coarse aggregate not exceeding 25 mm, replacing cement by fly ash
to the extent of 15 per cent and sand by 10 per cent, mixed in a
batching and mixing plant as per approved mix design, transported to
site, laid with a fixed form or slip form paver, spread, compacted and
finished in a continuous operation including provision of contraction,
expansion, construction and longitudinal joints, joint filler, separation
membrane, sealant primer, joint sealant, debonding strip, dowel bar,
tie rod, admixtures as approved, curing compound, finishing to lines
and grades as per drawing. (Suggestive MORTH)
Unit = cum
Taking output = 1050 cum (2415 tonne)
a) Labour
Mate day -
Mazdoor skilled day 15.00
Mazdoor (Unskilled) day 37.00
b) Machinery
Road Sweeper @ 1250 sqm per hour hour 2.80
Front end loader 1 cum bucket capacity hour 18.00
Cement concrete batch mix plant @ 175 cum per hour hour 6.00
(effective output)
Electric generator 250 KVA hour 6.00
Slip form paver with electronic sensor hour 6.00
Water tanker6 KL capacity hour 36.00
Transit truck agitator 5 cum capacity. tonn 2415xL
e.km
Add 10 per cent of cost of carriage to cover cost of loading -
and unloading
Concrete joint cutting machine . hour 12.00
Texturing machine . hour 12.00
c) Material
Crushed stone coarse aggregates of 25mm and 12.5mm cum 945.00
nominal size @ 0.90 cum/cum of concrete conforming to
clause 602.2.4.
Sand as per IS: 383 and conforming to clause 602.2.4 cum 425.00
Cement 43 grade tonn 357.00
e
Fly ash conforming to IS: 3812-1966 (Part-I) tonn 109.00
e
32 mm mild steel dowel bars of grade S 240 tonn 9.45
e
16 mm deformed steel tie bars of grade S 415 tonn 1.17
e
Separation Membrane of impermeable plastic sheeting 125 sqm 3675.00
micron thick
Pre moulded Joint filler, 25 mm thick for expansion joint ('SILFLEX' sqm 16.33
CAPCELL HD -100)
Joint sealant kg 875.00
Sealant primer kg 116.67
Plastic sheath,1.25 mm thick for dowel bars sqm 46.67
Curing compound liter 1850.00
Super plastisizer admixture IS marked as per 9103-1999 @ kg 2070.00
0.5 per cent by weight of cement
419
RBR-CCPV
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
Add 1 per cent of material for cost of miscellaneous materials like
tarpaulin, Hessian cloth, metal cap, cotton / compressible sponge
and cradle for dowel bars, work bridges for men to approach
concrete surface without walking over it, cutting blades and bites,
minor equipments like scabbling machine, threads, ropes, guide
wires and any other unforeseen items.
Sand @ 0.45 cum / cum of concrete = 1050 x 0.45 = 472.50 x 1.6 = 756 tonnes.10 per cent to be
replaced by flyash. Balance sand = 756 x 0.9 = 680.4 tonnes = 680.4 / 1.6 = 425 cum. Quantity of
flyash = (756-680.4) x specific gravity of fly ash/specific gravity of sand = 76.4 x 2.25 / 2.687 =
63.97 tonnes (say 64 tonnes)
Unit = sqm
Taking output = 112.5 sqm
Concrete M30 grade for block, 400 x (0.450 x 0.300 x 0.150) cum
= 8.10
Concrete M30 for edge block, 2 x 50 x (0.300 x 0.300 x 0.150) = 1.35 cum
cum
TOTAL cum
a) Labour
Labour for Manufacturing the Cement Concrete Block :
Mate day -
Mazdoor (Unskilled) day 44.10
Mason (2nd class) day 6.00
Bhisti day -
b) Machinery
Concrete mixer 0.28 / 0.4 cum hour 6.00
Plate vibrator hour 12.00
Water tanker 6 kl capacity hour 2.00
c) Material
For CC Blocks M 30
Coarse aggregates (9.45 x 0.90) cum 8.505
Sand (9.450 x 0.45) cum 4.25
Cement t 3.80
Sand as per Table 1500.5 cum 1.73
Bed = 60*0.025 = 1.5 cum
Joints = 1.5*0.15 = 0.225 cum
Cost of water kl 6.00
d) Formwork @ 3% of (a+b+c)
e&f) Overheads & Contractors Profit
Cost for 112.5 sqm = a+b+c+d+e+f
Rate per sqm = (a+b+c+d+e+f)/112.5
Note : 1. In case curing compound is used in places where there is scarcity of water, the water curing will
be used for 4-days and rate analysis will be amended accordingly
2. Carriage of C.C. block to site of is payable separately as per Chapter of carriage of material from
manufacturing site to the site of work.
420
RBR-CCPV
Rate Amount
Index-code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
RBR-CCPV-13 13 Interlocking Concrete Block Pavement
i Providing and Laying of Interlocking Concrete Block
Pavements using CC M30 having thickness 80 mm as per
drawings and Technical Specification Clause 1504 MORD.
Unit = sqm
Taking output = 225 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 18.00
Mason (2nd class) day 8.00
b) Machinery
Water tanker 6 kl capacity hour 2.00
c) Material
(i) Providing inter-locking blocks of approved shape, thickness sqm 225.00
and size.
(ii) Edge blocks 60 mx2 m 120.00
(iii) Sand as per Table 1500.5 cum 7.23
Bed = 603x75x 0.03 = 6.75 cum
Joints = 60x0.08 = 0.48 cum
(iv) Water for wetting of bedding sand kl 3.00
d&e) Overheads & Contractors Profit
Cost for 225 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/225
ii Providing and Laying of Interlocking Concrete Block
Pavements using CC M30 having thickness 60 mm as per
drawing and Technical Specification Clause 1504 MORD
Unit = sqm
Taking output = 225 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 15.90
Mason (2nd class) day 7.00
b) Machinery
Water tanker 6 kl capacity hour 2.00
c) Material
(i) Providing inter-locking blocks of approved shape, thickness sqm 225.00
and size.
(ii) Edge blocks 60 mx2 m 120.00
(iii) Sand as per Table 1500.5 cum 5.42
(iv) Water kl 3.00
d&e) Overheads & Contractors Profit
Cost for 225 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/225
Note : 1. Carriage of interlocking blocks is payable separately as
per Chapter of carriage of material from manufacturing site to the
site of work.
2. Edge blocks may be cast-in-situ. Brick masonry toe wall or CC
block 300 mm x 300 mm x 150 mm or any other shape can also be
used and their cost shall be analysed/included accordingly
3. The rates for sub-grade, sub-base and base course can be taken
from Chapters 3 and 4
General Note :
The provisions towards Mate is included in the provision towards unskilled Mazdoor
421
RBR-CWSB
Andhra Pradesh Standard Data
I. Roads and Bridges
Chapter - 7
CAUSEWAY AND SUBMERSIBLE BRIDGES
Rate Amount
Index-Code S. No Description Unit Quantity Remarks
Rs. Rs.
1 2 3 4 5 6 7
423
RBR-HLRD
Rate as per item No. 6 (I) (ii) or 6 (II) (ii) of Chapter 11 cum 1.20
(c) Plaster with cement mortar 1:4 as per technical
specifications
Rate as per item No. 3 (A) or (B) or (C) of Chapter 12 sqm 4.00
Add 5% of (a+b+c) for white washing, lettering and painting, etc.
Total Cost for each Reference Pillar
(2) Construction of back piller as per Fig. 1600.1( c) as per drawing
and Technical Specification Clause 1602.3
(a) Earthwork in excavation for foundation as per drawing
and technical specifications.
Rate as per item No.1 of Chapter 11 cum 3.60
(b) Stone masonry work in cement mortar 1:4 in foundation
complete as per drawing and technical specifications
Rate as per item No. 6 (I) (ii) or 6 (II) (ii) of Chapter 11 cum 3.60
(c) Plaster with cement mortar 1:4 as per technical
specifications
Rate as per item No. 3 (A) or (B) or (C) of Chapter 12 sqm 45.00
Add 5% of (a+b+c) for white washing, lettering and painting, etc.
Total Cost for each Reference Pillar
(3) Construction of Job pillers as per Fig. 1600.1 (d) and Technical
Specification Clause 1602.4
Rate as per item No. 6 (I) (ii) or 6 (II) (ii) of Chapter 11 cum 0.10
(c) Plaster with cement mortar 1:4 as per technical
specifications
Rate as per item No. 3 (A) or (B) or (C) of Chapter 12 sqm 0.96
Add 5% of (a+b+c) for white washing, lettering and painting, etc.
Total Cost for each Reference Pillar
425
RBR-HLRD
Rate Amount
Index-code S. No Description Unit Quantity
Rs. Rs.
1 2 3 4 5 6
Note : 1. The dimensions of reference pillars, back pillars and job pillars
are as per figure/site conditions. The above items are covered under
different Chapters of MORD Specifications for payment.
2. The marking of centre line, setting out, curves, recording of levels, etc.
by the surveyor will be incidental to work and no extra payment shall be
made for the same.
RBR-HLRD-3 3 Earthwork in Hill Road
i Excavation in Hilly Areas in Soil by manual means.
A Excavation in soil in Hilly Area by manual means
including cutting and trimming of side slopes and
disposing of excavated earth with a lift upto 1.5 m and
a lead upto 20 m as per drawing and Technical
Specification Clause 1603.1
Unit = cum
Taking output = 120 cum
a) Labour
Mate day
Mazdoor (Unskilled) day 62.40
b&c) Overheads & Contractors Profit
Cost for 120 cum = (a+b+c)
Rate per cum = (a+b+c)/120
B Extra for Every Additional Lift of 1.5 m or Part thereof
Excavation in Soil
Unit = cum
Taking output = 10 cum
a) Labour
Mazdoor (Unskilled) day 0.55
b&c) Overheads & Contractors Profit
Cost for 10 cum = (a+b+c)
Rate per cum = (a+b+c)/10
ii Excavation in Hilly Areas in Soil by mechanical means
A Excavation in soil in Hilly Area by mechanical means
including cutting and trimming of side slopes and
disposing of excavated earth with a lift upto 1.5 m and
a lead upto 20 m as per Technical Specification Clause
1603.1
Unit = cum
Taking output = 260 cum
a) Labour
Mate day
Mazdoor (Unskilled) for trimming slopes and helping in day 20.80
excavation, etc.
b) Machinery
Dozer D-50 @ 43.28 cum per hour hour 6.00
Front end loader hour 6.00
c&d) Overheads & Contractors Profit
Cost for 260 cum = a+b+c+d
Rate per cum = (a+b+c+d)/260
B Extra for Every Additional Lift of 1.5 m or Part thereof
Excavation in Soil
Unit = cum
Taking output = 10 cum
a) Labour
Mazdoor (Unskilled) day 0.55
b&c) Overheads & Contractors Profit
Cost for 10 cum = (a+b+c)
Rate per cum = (a+b+c)/10
Note : 1. In case the land on the valley side is barren and there is no
objection for disposing of excavated earth on the valley side, the provision
of front end loader and tipper shall be deleted as excavated earth shall be
disposed off on the valley side.
426
RBR-HLRD
Rate Amount
Index-code S. No Description Unit Quantity
Rs. Rs.
1 2 3 4 5 6
C Excavation in soil in hilly area by mechanical means including
cutting and trimming of side slopes and disposing of
excavated earth with all lifts and lead upto 1000 metres as per
Tech Specification 301 MORTH
Unit = cum
Taking output = 260 cum
a) Labour
Mate day
Mazdoor (Unskilled) for trimming slopes and helping in day 6.24
excavation
b) etc.
Machinery
Dozer 80 HP (D-80 A 12)@ 43.28 cum per hour hour 6.00
Front end loader hour 6.00
Tipper 5.5cum capacity, 4 trips per hour. hour 12.00
c&d) Overheads & Contractors Profit
Cost for 260 cum = a+b+c+d
Rate per cum = (a+b+c+d)/260
Note : In case the land on the valley side is barren and there is no
objection for disposing of excavated earth on the valley side, the provision
of front end loader and tipper shall be deleted as excavated earth shall be
disposed off on the valley side.
427
RBR-HLRD
Rate Amount
Index-code S. No Description Unit Quantity
Rs. Rs.
1 2 3 4 5 6
iv Excavation in Hilly Areas in Ordinary Rock by
mechanical means not requiring blasting
A Excavation in hilly area in ordinary rock not requiring
blasting by mechanical means including cutting and
trimming of slopes and disposal of cut material with a lift
upto 1.5 m and lead upto 20 m as per Clause 1603.2.
Unit = cum
Taking output = 170 cum
a) Labour
Mate day
Mazdoor (Unskilled) day 17.68
Mazdoor for disposing of earth upto 20 m day 9.00
b) Machinery
Dozer D-50 @ 28.32 cum per hour hour 6.00
Hydraulic Excavator 0.9 cum bucket capacity @ 40 cum per hour 4.25
hour
c&d) Overheads & Contractors Profit
Cost for 170 cum = a+b+c+d
Rate per cum = (a+b+c+d)/170
Note : 1. In case the land on the valley side is barren and there is no
objection for disposing of excavated earth on the valley side, the provision
of front end loader and tipper shall be deleted as excavated earth shall be
disposed off on the valley side.
Unit = cum
Taking output = 170 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 8.32
b) Machinery
Dozer 80 HP (D-80 A 12)@ 28.32 cum per hour hour 6.00
Front end loader hour 7.00
Tipper 5.5cum capacity, 4 trips per hour. hour 7.00
c&d) Overheads & Contractors Profit
Cost for 170 cum = a+b+c+d
Rate per cum = (a+b+c+d)/170
Note : In case the land on the valley side is barren and there is no
objection for disposing of excavated earth on the valley side, the provision
of front end loader and tipper shall be deleted as excavated earth can be
disposed off on the valley side.
Unit = cum
Taking output = 170 cum
a) Labour
Mate day
Mazdoor (Unskilled) day 23.36
428
RBR-HLRD
Rate Amount
Index-code S. No Description Unit Quantity
Rs. Rs.
1 2 3 4 5 6
Driller day 2.00
Blaster day 10.00
b) Machinery
Dozer D-50 @ 56.67 cum per hour (blasted rock) hour 3.00
Hydraulic Excavator 0.9 cum bucket capacity @ 34 cum/hour hour 5.00
Air compressor 210 cfm with two jack hammer @ 6 cum/ hour hour 28.00
c) Material
Gelatin 80 per cent kg 67.00
Electric detonators @ 1 detonator for 1 Gelatin stick of 285 nos 235.00
gm each
d&e) Overheads & Contractors Profit
Cost for 170 cum = a+b+c+d+e
Rate per cum = (a+b+c+d+e)/170
B Extra for Every Additional Lift of 1.5 m or Part thereof
For Hard Rock
Unit = cum
Taking output = 10 cum
a) Labour
Mazdoor (Unskilled) day 1.08
b&c) Overheads & Contractors Profit
Cost for 10 cum = (a+b+c)
Rate per cum = (a+b+c)/10
C Excavation in hilly areas in hard rock requiring
blasting, by mechanical means including trimming of
slopes and disposal of cut material with all lifts and
lead upto 1000 metres as per Tech Specification 301
MORTH
Unit = cum
Taking output = 170 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 10.49
Driller day 2.00
Blaster day 0.25
b) Machinery
Dozer 80 HP (D-80 A 12)@ 28.32 cum per hour hour 6.00
Air compressor 250 cfm with two jack hammer @ 20 cum per hour hour 5.00
2. In case of hill roads, the altitude effect comes into play. The output of
men and machines decreases progressively after 2100 m elevation
leading to increase in cost. High altitude effect has been explained in the
basic approach.
3. The arrangement for igniting the detonator is covered under overheads
429
RBR-HLRD
Rate Amount
Index-code S. No Description Unit Quantity
Rs. Rs.
1 2 3 4 5 6
RBR-HLRD-4 4 Retaining Walls / Breast Walls
Construction of retaining walls/breast walls in cement
mortar 1:5 as per drawing and technical specifications
Clause 1604
(i) Earthwork in excavation for structures
Rate as per item No. 1 of Chapter 11 cum
(ii) Plain cement concrete M 10 grade
Rate as per item No. 4 (A) (i) or (ii) of Chapter 11 cum
(iii) Stone masonry in cement mortar 1:5
Rate as per item No. 4 (I) (iii) or 4 (II) (iii) of Chapter 12 cum
(iv) Pointing with cement mortar 1:3
Rate as per item No 2 of Chapter 12 sqm
(v) Providing P.C.C. M 20 architectural coping on top of
retaining wall/breast wall
Rate as per item No. 13 of Chapter 12 m
(vi) Filter material behind retaining wall / breast wall as
per Specification 1204.3.8 in a width of 600 m
Rate as per item No. 11 of Chapter 12 cum
(vii) Back filling behind retaining wall/breast wall
Rate as per item No. 10 of Chapter 12 cum
Note : 1. Quantities of material/work shall be as per design and
drawings
2. Earth work in excavation may be taken as per site conditions. It
may comprise of a number of sub-items depending upon the type
of soil/rock encountered.
RBR-HLRD-5 5 Construction of Hill Side Drain
Construction of hill side drain in accordance with the
requirement of specifications true to lines and grades.
Dimensions and other particulars as per drawing and
Technical Specification Clause 1606.1
Unit = 1 m
(i) Earthwork in excavation for structures as per
drawing and technical specification
Rate as per item No. 1 of Chapter 11 cum
(ii) Plain cement concrete M10 grade
Rate as per item No. 4 (A) (i) or (ii) of Chapter 11 cum
(iii) Stone masonry in cement mortar 1:5
Rate as per item No. 4 (I) (iii) or 4 (II) (iii) of Chapter 12 cum
(iv) Plain cement concrete M15 grade
Rate as per item No. 4 (A) (iii) or (iv) of Chapter 11 cum
(v) Cement plaster 15 mm thick 1:4 on stone masonry
430
RBR-HLRD
Rate Amount
Index-code S. No Description Unit Quantity
Rs. Rs.
1 2 3 4 5 6
RBR-HLRD-6 6 Construction of Catch Water / Intercepting Drain
Construction of catch water/intercepting drain in random
rubble masonry in 1:5 cement mortar true to the specified
lines grades levels and dimensions as per the requirement
of the specifications Clause 1606.2
Unit = 1 m
(i) Earthwork in excavation for structures as per
drawing and technical specification
Rate as per item No. 1 of Chapter 11 cum
(ii) Plain cement concrete M10 grade
Rate as per item No. 4 (A) (i) or (ii) of Chapter 11 cum
(iii) Stone masonry in cement mortar 1:5
Rate as per item No. 4 (I) (iii) or 4 (II) (iii) of Chapter 12 cum
(iv) Plain cement concrete M15 grade
Rate as per item No. 4 (A) (iii) or (iv) of Chapter 11 cum
(v) Cement plaster 15 mm thick 1:4 on stone masonry
Unit = 1 m
Taking output = 6 m
i Earthwork in excavation for structures as per drawing
and technical specifications
Quantity for 6 m formation width of hill side rock cutting and
foundation as per plate No. 7.27 of Rural Road Manual
Rate as per item No. 1 of Chapter 11 cum 115.00
Rate per m = a/6
ii Random rubble dry stone masonry
Quantity for 6 m formation width = 38 cum
a) Labour
Mate day -
Mason (1st Class) day 38.00
Mazdoor (Unskilled) day 60.80
b) Material
Stone for RR masonry cum 35.72
Bond stone nos 6.08
c&d) Overheads & Contractors Profit
Cost for 6 m = a+b+c+d
Rate per m = (a+b+c+d)/6
431
RBR-HLRD
Rate Amount
Index-code S. No Description Unit Quantity
Rs. Rs.
1 2 3 4 5 6
iii Random course rubble dry stone masonry in
corbelling
Quantity for 6 m formation width = 9 cum
a) Labour
Mate day -
Mason (2nd class) day 6.00
Mazdoor (Unskilled) day 12.72
b) Material
Corbelling Stones size 300 mm x 150 mm x 150 mm nos 1335.00
including wastage
c&d) Overheads & Contractors Profit
Cost for 6 m = a+b+c+d
Rate per m = (a+b+c+d)/6
iv Stone filling in foundation trenches as per drawing and
technical specification
Quantity for 6 m formation width = 10 cum
a) Labour
Mate day -
Mazdoor (Unskilled) day 3.12
b) Material
Loose stone cum 12.00
c&d) Overheads & Contractors Profit
Cost for 6 m = a+b+c+d
Rate per m = (a+b+c+d)/6
Rate per m length= (i + ii + iii + iv)
Note : 1. Quantities of parapet are not included in the
quantities of scupper.
2. The above analysis is based on plate No.7.27 of Rural
Roads Manual.
3. Rates for earth work are to be taken appropriate to the
type of soil/rock
8 Construction of RCC guide posts of 250 mm dia M 20 grade
cast-in-situ with 20 mm nominal size aggregate, true to line
and grade, tolerance of vertical RCC posts not to exceed 1 in
500 as per drawing and Technical Specification Clause 1608.2
RBR-HLRD-8
i Earth work in excavation for structures
Unit = cum
Rates as per item No. 1 of Chapter 11 cum
ii RCC M20 grade
Unit = cum
Rate as per item No. 4 (C) (i) of Chapter 11 cum
iii HYSD steel bars
Unit = t
Rate as per item No. 7 of Chapter 11 t
iv Painting two coats including prime coat on new
concrete surface
Unit = sqm
Rate as per item No. 5 of Chapter 10 sqm
Note : Quantities are to be taken as per drawing
9 Providing edge stones on valley side of formation as
per drawing and Technical Specification Clause
RBR-HLRD-9 1608.2.6
Unit = 1 m
Taking Output = 45 m (100 no of edge stones of size 450
mm x 300 mm x 100 mm)
a) Labour
Mate day -
Mazdoor (Unskilled) day 3.18
432
RBR-HLRD
Rate Amount
Index-code S. No Description Unit Quantity
Rs. Rs.
1 2 3 4 5 6
Mason (2nd class) day 1.50
b) Material
Stones of size 450 mmx300 mmx100 mm nos 100.00
c) Painting two coats including priming coat on new
concrete/stone surfaces
45 x 0.500 = 22.50
Rate as per item No. 5 of Chapter 10 sqm 22.50
d&e) Overheads & Contractors Profit
Cost for 45 m = a+b+c+d+e
Rate per m = (a+b+c+d+e)/45
RBR-HLRD-10 10 Turfing with Sods
Furnishing and laying of the live sods of perennial turf forming
grass on embankment slope, verges or other locations shown on
the drawing or as directed by the Engineer including preparation of
ground, stacking the sods and watering as per Clause 309
Unit = sqm
Taking output = 100 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 4.16
b) Machinery
Water tanker including watering for 3 months hour 4.00
Tractor with Trolley hour 1.00
c) Material
Farmyard manure @ 0.18 cum per 100 sqm at site of work cum 0.18
Water kl 24.00
d&e) Overheads & Contractors Profit
Cost for 100 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/100
RBR-HLRD-11 11 Seeding and Mulching
Preparation of seed bed on previously laid top soil,
furnishing and placing of seeds, fertilizer, multching
material, applying bituminous emulsion at the rate of 0.23 l
per sqm and laying and fixing jute netting, including
watering for 3 months as per clause 310 & 1600 MORD.
Unit = sqm
Taking output = 240 sqm
a) Labour
Mate day -
Mazdoor (Unskilled) day 15.60
b) Machinery
Water tanker 6 kl capacity including watering for 3 months hour 13.00
(for one hour per week)
Tractor with Trolley hour 2.40
c) Material
Seeds kg 3.60
Sludge / Farm yard manure @ 0.18 cum per 100 sqm cum 0.43
Bitumen Emulsion t 0.06
Jute netting, open weave, 25 mm square opening sqm 264.00
Water for 3 months kl 84.00
d&e) Overheads & Contractors Profit
Cost for 240 sqm = a+b+c+d+e
Rate per sqm = (a+b+c+d+e)/240
General Note :
The provisions towards Mate is included in the provision towards unskilled Mazdoor.
433
RBR-HLRD
Remarks
434
RBR-HLRD
Remarks
435
RBR-HLRD
Remarks
436
RBR-HLRD
Remarks
437
RBR-HLRD
Remarks
438
RBR-HLRD
Remarks
439
RBR-HLRD
Remarks
440
RBR-HLRD
Remarks
441
RBR-HLRD
Remarks
442