Customer Presentation - Varnish Pall VRF
Customer Presentation - Varnish Pall VRF
Customer Presentation - Varnish Pall VRF
• Thin, insoluble film deposit that forms on surfaces inside the turbine lube system
(pipes, tank, bearings heat exchanger, servo-valves, etc)
Varnish
Compressor/Turbine Shaft
Hydraulic circuit:
High VPR impact
Lube circuit Low
VPR impact Inlet Vane Control Fail open valve Gas valve
Higher
Higherlube
lube
flow Cooling on main
New oil formulation
flowrates
rates pump outlet
• All turbine oils create varnish precursors under normal operating conditions.
• Oil test for visc., TAN, RPVOT, metals, foam, etc will not indicate varnish
potential
• Varnish forming potential of oil can be measured by:
– FTIR - nitration procedure
– Gravimetric analysis (Toluene soluble)
– Ultracentrifuge (~17,500 RPM for 30 minutes)
– 0.2 – 2.0 um Particle Count (Modified ASTM D312) OR
• Color patch - Quantitative Spectrophotometer Analysis (QSATM) –
Analysts Inc)
– Most commonly used – Draft stage ASTM procedure
– Measures discoloration / stain on patch
– Proprietary calculations determines varnish potential rating (VPR)
– Significant variation in VPR values between labs
– VPR of <35 normal - no action
– VPR of 38-58 - active monitoring
– VPR 60-79 - abnormal
– VPR >79 - critical - immediate action
Filtration. Separation. Solution. SM Ref: ExxonMobil Presentation STLE 2005 4 Kleentek units on©GE 7FA
2009, Pall Corporation
Varnish Removal Technologies Presentation
• Chemical cleaning/flushing
Principle of VRF-PGG
Low precursor
High precursor
concentration in the oil
concentration in the oil
(Low VPR). Elimination of
(High VPR). Formation of
varnish deposits
varnish
+
-
Varnish Precursors +
- - +
Varnish
Varnish removal
Compressor/Turbine Shaft
Hydraulic circuit:
High VPR impact
Lube circuit Low
VPR impact Inlet Vane Control Fail open valve Gas valve
• VRF-PGG modules
• Number of modules per VRF skid: 3
• Change-out interval: recommended 90 days
• By removing varnish precursors from the lubrication oil, Pall VRF reduces the
varnish deposits on lube and hydraulics systems internals
• By protecting valves and other critical components from stiction, Pall VRF
increases turbine availability and reliability. Instances of “fail to start” and “trip”
conditions are greatly reduced.
• VRF is combined with Ultipor SRT lubrication filters on the main lube line,
eliminating filter static discharge while still providing efficient particulate control
90 3-Sep-08
Varnish Potential Rating
80 4-Sep-08
70
60
50
40 5-Sep-08
30
20 25-Sep-08
10 10-Sep-08 16-Sep-08 7-Oct-08
0
8/28 9/5 9/13 9/21 9/29 10/7 10/15
Varnish Deposits
Thank You.
Questions?