2 Norsok Terje Lokke Sorensen

Download as pdf or txt
Download as pdf or txt
You are on page 1of 14

Revision 4 of NORSOK D-010 Well integrity in drilling and well operations

Revision update
NORSOK D-010, Rev.4

PAF Workshop
14.6.2012

by Terje Løkke-Sørensen, add energy


Revision 4 of NORSOK D-010 Well integrity in drilling and well operations

The short version


• We received over 300 comments,
variable degree of relevance /
complexity.
• 20 technical editors working
• 80% complete in processing
comments, 55% overall
• There will be changes: formation
strength, cement height/bonding,
P&A , MPD, more
• Original target date for issuing
industry hearing is 1.11. (30.3).
– >Your last chance to make a
difference!
Revision 4 of NORSOK D-010 Well integrity in drilling and well operations

Why update?
• Standard Norge has a
requirement for periodic revision.
Last revised Aug. 2004
• Change proposals has been
received
• Recommendations from OLF Well
Integrity and P&A Forum are
transfered to D-010
• Assess experience / learning from
Montara/Macondo incidents
• Make it more international?
Revision 4 of NORSOK D-010 Well integrity in drilling and well operations

The Work –> Milestones


Work Revised Milestones (original dates)
 Invite industry to submit comments  Obtain comments – round 1 (24.08.11)
 Read and evaluate comments  Obtain comments – round 2 (15.11.11)
• Formulate changes (80% complete)  Kick-off meeting w. Editor Group
• QA check changes (ongoing) (26.10.11)
• Tidy up language throughout the • New: Issue draft to EGD/DMF (15.8.12)
standard • Issue draft for Industry Hearing (30.3.
• Issue rev.4 for hearing 2012 1.11.2012)
• Processes comments from hearing • Industry hearing ( 8 4 weeks)
• Final issue • Final (4 12 weeks) -> 30.6..2012
1.5.2013

 10 months delay, mainly due to:


 large number of comments
 difficult comments/issues
 Editors busy with other work
Revision 4 of NORSOK D-010 Well integrity in drilling and well operations

Who does what?


• T.Løkke-Sørensen has been Clauses
engaged by Standard Norge to 1. Scope
2. Normative and informative
coordinate the work references

• Editor group process comments 3. Terms, definitions and


abbreviations
and formulate changes 4. General principles

• Standard Norge: 5. Drilling activities


6. Testing activities
– Ensure compliance with general 7. Completion activities
NORSOK requirements 8. Production activities
9. Sidetracks, suspension and
– host LiveLink / e.mail abandonment activities
– provide secretarial support 10. Wireline operations

– coordinate hearings 11. Coiled tubing operations

• Standard Norge Expert Group 12. Snubbing operations

13. Under balanced drilling


Drilling and OLF Drilling Manager and completion operations
Forum will act as reference group 14. Pumping operations
and provide guidance and quality 15. Well Barrier Elements
assessment Acceptance Tables

Annex A (Normative)
Revision 4 of NORSOK D-010 Well integrity in drilling and well operations

Editor Group
NORSOK D- 010 rev. 4 Main Editor Co-editor
Name, Company Name, Company
1. Scope Terje Løkke-Sørens en Mi chel l e Montea u, Statoi l
2. Normative & Informative Ref. Terje Løkke-Sørens en Mi chel l e Montea u, Statoi l
3. Definitions and Abbreviations Terje Løkke-Sørens en Mi chel l e Montea u, Statoi l
4. General Principles Tore Fjå ges und, Lundi n Da g Sa nde, Statoi l
5. Drilling Activities Ørja n Bus tnes , Spri ng Energy Arne Hjel l e, Statoi l
6. Testing Activities Ga ry McDona l d, Wi nters ha l l Ari l d Fos s å , Statoi l
7. Completion Activities La rs -Endre Hes tenes ,BG John Hel ge Ol s en, Statoi l
8. Production Activities Anders Hjel l en, BP Hi l de Bra nda nger Ha ga / WIF
9. ST, Susp. & Aban. Activities Ga rry Brews ter, Ta l i s ma n Svei n Inge Ra fos s , Statoi l
10. Wireline Operations Al i s tar Bucha na n, Statoi l Terje Ol s en, COP
11. Coiled Tubing Operations Kenneth Ma ri bu, COP Al i s tar Bucha na n, Statoi l
12. Snubbing Operations Ja ck Nerdrum, Wi l d Wel l Control Al i s tar Bucha na n, Statoi l
13. Under Balanced D&C Ops. Per Ca to Berg, Statoi l Connor Stri ckl a n, Shel l
14. Pumping Operations Kri s tia n Ha a res tad, PTC Not needed
Annex A Ørja n Bus tnes , Spri ng Energy Not needed
Revision 4 of NORSOK D-010 Well integrity in drilling and well operations

Sources of Comments
• Comments obtained through
invitation , + 300
• Recommendations from OLF’s
Macondo report
• Recommendations from PSA’s
Macondo report
Revision 4 of NORSOK D-010 Well integrity in drilling and well operations

Regulations vs. D-010


• D-010 has become a integral part Til § 84 Overvåking av brønnparametere
Kravet til innsamling innebærer blant annet at data som kan
of the guidelines to PSA’s indikere en mulig brønnkontrollhendelse blir målt, registrert
regulations and is often refered og behandlet.

to For å oppfylle kravet til innsamling bør standarden NORSOK


D-010 kapittel 4.7.2, 5.7.3 og 5.7.4.2 brukes, med følgende
• ”Short comings ” is corrected by tillegg: ved prøving av formasjonens oppsprekkingsstyrke
bør det trykkprøves til maksimalt forventet trykk for
adding regulatory requirements brønnseksjonen.
• We should consider to include
these ”Short comings ” in D-010
• Rev.4 will be included in the
regulations for 2014 (given
release by August 2013).
Revision 4 of NORSOK D-010 Well integrity in drilling and well operations

D-010 vs. Regulations


• D-010 has instructions which are 4.10.4 Special well incident reporting
The Petroleum Safety Authority (PSA) shall be notified
specifically linked to PSA -> immediately in the event of shallow-gas is detected
• PSA has expressed no concern if and in the event of well influx/inflow (kick) where the
following steps have occurred:
these links are removed in order a) Positive indication of flow from wellbore.
b) The wellbore is closed by shutting in the BOP/safety valve.
to make the standard less c) Pressure or pressure build up is registered in the closed-in
wellbore.
«Norwegian». d) Kill operation is initiated, which can be
1) bull heading;
2) driller's method or weight and weight method;
3) volumetric method.
Additional information shall be reported by completing the
relevant sections in SPA’s Common Data
Reporting system.
Revision 4 of NORSOK D-010 Well integrity in drilling and well operations

OLF Macondo recommendations


OLF’s Macondo recommendations;
1.1 - Include the requirement for locking casing
hangers in the applicable standard.

 1.2 - Expand the requirements related to


negative pressure testing in the applicable
standard.

 2.1 - Introduce and define the term ‘critical


cement job’ in the relevant standard.
http://www.olf.no/en/Activities/HSE-and-
 2.2 - Introduce the requirement for independent operation/Lessons-learned-for-the-Deepwater-
design verification of ‘critical cement jobs’ in the HorizonMacondo-accident
relevant standard

3.1 - Implement periodic physical testing of


emergency subsea well control activation systems as
a standard, and include the requirement in the
relevant standard.

3.5 - Establish a recommended practice for prepping


BOP’s for ROV activation in the relevant standard. -
Revision 4 of NORSOK D-010 Well integrity in drilling and well operations

Out - in
4. General 8. Production
• Significantly altered • Significantly altered
• Out: • Out: -
– WC equipment arrangement • In:
– Activity program content – Updated handover doc. (OLF 117)
– SIMOPS & Critical Activities – Requirements for operating envelopes
for pressures, temperature, flow rates,
• In (new/strongly enhanced): composition of well fluid and passive
annuli
– When and how to make WBS – Risk of communication between
– Inflow testing - how tubulars /annuli
– Formation testing and acceptance – “Zero” leakage for valves bordering to
– Reilef well plan & well capping external environment / surroundings
– WI management system (e.g. swab valve), (otherwise API RP
14B)
– If risk of loss of containment is
significantly increased by shutting in the
well -> keep producing, pending well
barrier reestablishment.
– Well integrity categorisation according
to OLF 117
Revision 4 of NORSOK D-010 Well integrity in drilling and well operations

Out - in
9. P&A 13 UBD / MPD
• Significantly upgraded • Significantly upgraded
• Out: - • Out: -
• In (new/strongly enhanced) • In:
– Definition of suspension vs. temp. – MPD with surface BOP
P&A – Operating limits
– Examples of P&A options – WC action procedures and drills
– Flow-chart decision making: – WBEAC:
• Section milling • UBD/MPD choke system (new)
• Squeeze or circ. cement into • Staticallly underbalanced fluid
annulus column(nw)
– WBEAC:
• Casing cement, 30 m of bonded
cement
• Cement plug
• Shale formation (new)
• Altenative (to cement) casing
bonding material (new)
Revision 4 of NORSOK D-010 Well integrity in drilling and well operations

!!!

WHEN IS YOU LAST CHANCE TO


COMMENT ON REV.4?
Revision 4 of NORSOK D-010 Well integrity in drilling and well operations

A standard is worth nothing


unless it is referred to!
Knut Heiren, Standard Norge, 2004

You might also like