Assumption/Estimation:: Reference Calculation Output
Assumption/Estimation:: Reference Calculation Output
Assumption/Estimation:: Reference Calculation Output
Assumption/Estimation:
10-year ARI (Minor System)
0.7𝑥25𝑥50
𝑄= = 2.43 m3/s
360
Assuming:
Drain longitudinal slope = 0.4% (1 in 250)
Width, B = 1.2 m
Side slope, Z = 0
Q = vA, where:
1
𝑣= 𝑆𝑜 1/2 𝑅 2/3 ;
𝑛
A = (B+ZD)D = 1.2D
𝑃 = 𝐵 + 2𝐷 1 + 𝑍 2 = 1.2 + 2𝐷
D (m) A (m2) P (m) R (m) v (m/s) Q (m3/s)
0.6 0.72 2.4 0.30 1.89 1.36
0.7 0.84 2.6 0.32 1.99 1.67
Check
0.8 0.96 2.8 0.34 2.07 1.98
&
0.9 1.08 3 0.36 2.13 2.30 (>Q= 2.43m3/s)
OK
0.95 1.14 3.1 0.37 2.16 2.47
Allowing a minimum freeboard = 50 mm
Required depth, D minimum = 0.95 m
Provided dimension of lined drain:
Width, B = 1.2 m
Depth, D = 1.0 m
Velocity, v = 2.19 m/s
Discharge, Q = 2.63 m3/s
Figure 14.2 The drain dimensions are 1.2 m wide x 1.0 m deep, which is within the recommended limits.
Depth between 0.6 m and 1.2 m, lined drain shall be covered with metal grates.
Also, a reinforced concrete drain shall be provided since the lined open drains > 0.9 m.
Service opening shall be provided along the open drain with maximum interval spacing at
every 100 m