Thryve - 2
Thryve - 2
StoryBoard
+Design Principles
Design Thinking
+Concept
Proposed Plans
+Zoning + Layout
+Mood Images
Inspiration
+Look
and feel
3D Visuals
+Base Building Analysis
Site Analysis
+
Lessons Learnt
Implementation Strategy
+
01-STORYBOARD
STORYBOARD I DESIGN STRATEGY
INSPIRATION FROM THE LOGO INSPIRATION FROM NATURE INSPIRATION FROM SCIENCE
CONCEPT I DESIGN THINKING
03-ZONING
ZONING I CONCEPT MAPPING
ZONING I SPACE PLANNING
Visitor’s zone
core-Meeting room
Reception
Cafeteria collaboration
Bain Marie
Recreation
Breakout
Critical rooms
Meeting room
MD room zoned
towards the sw corner
04-PROPOSED LAYOUT
PROPOSED LAYOUT I PLAN & SPACE BUDGET
2 120 DEGREE WS 56
3 CABIN 6
4 EXECUTIVE CABIN 1
5 UNASSIGNED SPACE 31
8 RESTING ROOM 2
9 VISITORS BOOTH 2
10 COLLAB AREA 2
11 COFFEE POINT 1
13 HUB ROOM 1
15 REPRO 3
15 WAITING LOUNGE 1
16 STORE ROOM 1
17 RECEPTION 1
PROPOSED LAYOUT I PLAN & SPACE BUDGET
2 120 DEGREE WS 56
3 CABIN 6
4 EXECUTIVE CABIN 1
5 UNASSIGNED SPACE 31
COLLAB SPACES - EARLIER DESIGN HAD COLLAB POCKETS IN THE CENTRAL SPACES, WHICH MADE THE PEOPLE CONSCIOUS AND
SENSE OF BEING WATCHED.
NOW ALL ARE COLLABS ARE ZONED IN SEMI PRIVATE SPACES. NICHES AND POCKETS ARE CREATED AWAY
FROM THE FOCUS AREA FOR BETTER EFFICIENCY. SINCE THE USERS ARE ASSIGNED TO THEIR SEATS (NO LAPTOPS), ITS
IMPORTANT TO INCULCATE THE USERS ABOUT THE TYPES OF COLLAB SPACES
LESSONS LEARNT
FURNITURES
OPEN CEILING - SINCE OUR CEILING IS EXPOSED, IT IS NEEDED TO HAVE ACOUSTIC ELEMENTS AT REGULAR INTERVAL.
STANDALONE ACOUSTIC INSTALLATIONS ARE BEING PROPOSED.
LESSONS LEARNT
VALUE ADDS
COST SAVING - BRANDED LOOK ALIKES, READILY AVAILABLE MATERIALS AND CARPETS CAN BE WORKED ECONOMICALLY.
10-BASE BUILDING ANALYSIS
22.4 m 16.0 m
29.8 m
30.8 m
30.4 m
21.2 m
16.6 m
28.3 m
TOILET RATIO AS PER NORMS - FOR HEADCOUNT OF 395
GENTS - 237 [60%]
WC 1:25 = 9 no.
WB 1:25 = 9 no.
URINALS
(HALF THE NUMBER OF WC) = 5 no.
TECHNOLOGY &
DESIGN TIME PROCUREMENT EHS
PROCESS
HOW ARE WE
DIFFERENT ?
●
●
DESIGN VALIDATION
ON SITE BY DEDICATED TEAM
03 Approach On Site Execution
BASE BUILD
READINESS
SITE LOGISTICS
EHS COMPLIANCE
●
●
PROJECT EXECUTION
●
●
● PROJECT CLOSEOUT
●
●
●
●
BASE BUILD
READINESS
●
SITE LOGISTICS
●
●
EHS COMPLIANCE
●
PROJECT EXECUTION
●
● PROJECT CLOSEOUT
BASE BUILD
READINESS
SITE LOGISTICS
● EHS COMPLIANCE
●
●
● PROJECT EXECUTION
●
PROJECT CLOSEOUT
●
BASE BUILD
READINESS
SITE LOGISTICS
EHS COMPLIANCE
PROJECT EXECUTION
PROJECT CLOSEOUT
SNAG LIST SNAG LIST
CONTINUOUS REVIEWS
REFERENCE
CHECKS
PROPER EMPANELMENT
Vendor Onboarding
•
•
•
•
•
•
05 IMPLEMENTATION STRATEGY
Services Delivery Strategy - People
06 RELEVANT PROJECTS
ASTRA ZENECA
SHELL
FORD
SYMANTEC
WORLD BANK
WORLD BANK
1,00,000 SF I INTERIOR DESIGN
ARUBA NETWORKS
ATHENA
LINKEDIN
Bangalore | 160,000 SF | Design & Build
ABBOTT
MUMBAI | 520,000 SF | Design & Build
ABBOTT
MUMBAI | 520,000 SF | Design & Build
NORTHERN TRUST
Pune | 230,000 SF | Design Consultancy
UBER
Singapore | 55,000 SF | Design Consultancy
CISCO
Singapore | 120,000 SF | Design Consultancy
COCA - COLA
ADOBE CAMPUS
AXIS BANK
MUMBAI | 425,000 SF |Design & Build
EPAM
AXIS BANK
MUMBAI | 425,000 SF |Design & Build
JPMC
AXIS BANK
MUMBAI | 425,000 SF |Design & Build
SYNECHRON
PUNE 600,000 SF Design & Build
SUZLON ONE EARTH
PUNE 600,000 SF Design & Build
FLOOR 7
CONCEPT – APPLYING THE VALUES TO THE PLAN
FLOOR 8
CONCEPT – APPLYING THE VALUES TO THE PLAN