First Basis Vaccum Requirements Pressure Requirements
This document contains information about pump rates and pressure requirements for two bases. For the first basis, the pump-in rate is 522.6 m3/hr and pump-out rate is 48.7 m3/hr. The total pressure requirement is 9451.7 Nm3/hr and total vacuum requirement is 1925.5 Nm3/hr. For the revised basis, the pump-in rate is 450 m3/hr and pump-out rate is 127.76 m3/hr. The total pressure requirement is 9304.4 Nm3/hr and total vacuum requirement is 2000.0 Nm3/hr. Both bases require a 10 or 12 inch valve with similar pressure and
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
55 views1 page
First Basis Vaccum Requirements Pressure Requirements
This document contains information about pump rates and pressure requirements for two bases. For the first basis, the pump-in rate is 522.6 m3/hr and pump-out rate is 48.7 m3/hr. The total pressure requirement is 9451.7 Nm3/hr and total vacuum requirement is 1925.5 Nm3/hr. For the revised basis, the pump-in rate is 450 m3/hr and pump-out rate is 127.76 m3/hr. The total pressure requirement is 9304.4 Nm3/hr and total vacuum requirement is 2000.0 Nm3/hr. Both bases require a 10 or 12 inch valve with similar pressure and