Well Control Pre-Kick Sheet (Surface BOP Stack) : Capacities and Volumes

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

Rev 5: 28_09_07 Page 1 of 4

UK UNITS
© Aberdeen Drilling Schools WELL CONTROL PRE-KICK SHEET
( Surface BOP Stack )
All Rights Reserved

Name : Date : Level :

Measured Depth : ft. True Vertical Depth (TVD) : ft.

Measured Casing Shoe Depth : ft. Casing Shoe TVD : ft.

CAPACITIES AND VOLUMES

DRILL STRING DATA O.D. (in) I.D. (in) Wt. (lb/ft) CAPACITY x LENGTH = VOLUME
(bbl/ft) (ft) (bbl)

DRILL PIPE

HWDP

DRILL COLLARS

DRILL COLLARS
Total Length Total Drill string

CHECK THAT TOTAL LENGTH = MEASURED DEPTH


ft (bbls)

ANNULUS DATA CAPACITY x LENGTH = VOLUME


(bbl/ft) (ft) (bbl)

DRILL PIPE IN CASING


Bit to Shoe Volume
DRILL PIPE IN OPEN HOLE

DRILL COLLARS IN OPEN HOLE =


(bbls)
DRILL COLLARS IN OPEN HOLE

Total Length Total Annulus


CHECK THAT TOTAL LENGTH
= MEASURED DEPTH
ft (bbls)

TOTAL DRILLSTRING TOTAL ANNULUS TOTAL


(SURFACE TO BIT) (BIT TO SURFACE) SYSTEM VOLUME

+ =
(bbls) (bbls) (bbls)

P.T.O.
Rev 5: 28_09_07 Page 2 of 4
UK UNITS
© Aberdeen Drilling Schools
All Rights Reserved
Read and record SLOW CIRCULATION RATE.
Pump Output
bbls/stk

ANNULAR
S.C.R. PUMP No.1 PUMP No. 2

20 spm psi
psi
PIPE
RAM
30 spm psi
psi

BLIND 40 spm
RAM psi psi
KILL CHOKE
LINE LINE

PIPE
RAM
Drill String Data
Drill String Volume Pump Output
(bbls) (bbl/stk) Surface to Bit Strokes
÷ =
Slow Circulating
Surface to Bit Strokes Rate (spm) Surface to Bit Time
÷ = min

Open Hole Data


Bit to Shoe Volume Pump Output
ft MD
CASING (bbls) (bbl/stk) Bit to Shoe Strokes

ft TVD ÷ =
Slow Circulating
Bit to Shoe Strokes Rate (spm) Bit to Shoe Time

÷ = min

ft MD
WELL
ft TVD
Annulus Data
Bit to Surface Volume Pump Output
(bbls) (bbl/stk) Bit to Surface Strokes
÷ =
Slow Circulating
Bit to Surface Strokes Rate (spm) Bit to Surface Time
÷ = min
Rev 5: 28_09_07 Page 3 of 4
UK UNITS
© Aberdeen Drilling Schools WELL CONTROL KICK SHEET
( Surface BOP Stack )
All Rights Reserved

Name:

Read and Record SIDPP, SICP and PIT GAIN.

S.I.D.P.P. PIT GAIN S.I.C.P.

psi psi
bbls

Day : Date : Time :

Max. Mud Wt.


Surface Leak off
Leak Off Test Casing T.V.D. Test Mud Weight Maximum Mud Weight

psi
÷ ft
÷ 0.052 + ppg = ppg
Formation
Breakdown Gradient Maximum Mud Weight
OR psi/ft ÷ 0.052 = ppg
M.A.A.S.P.
Maximum Maximum Allowable

[        ]x
Mud Weight Drilling Mud Weight Casing T.V.D. Annulus Surface Pressure

- ppg ppg
0.052 x ft = psi

NEW M.A.A.S.P.
Maximum New Maximum Allowable

[       ]x
Mud Weight Kill Mud Weight Casing T.V.D. Annulus Surface Pressure

- ppg ppg 0.052 x ft = psi

M.A.C.P. Maximum Allowable


Casing Yield Safety Factor Casing Pressure

psi
x 0.80 = psi
Kill Mud

S.I.D.P.P. T.V.D. from RKB Current Mud Weight Kill Mud

psi ÷ ft
÷ 0.052 + ppg = ppg

P.T.O.
Rev 5: 28_09_07 Page 4 of 4
UK UNITS
© Aberdeen Drilling Schools
All Rights Reserved

Pressure Step Down Chart


Strokes to bit D.P. psi
1) Calculate I.C.P.
0 ICP ∆P x 100
2) Calculate F.C.P.
psi /
100 stks
3) Calculate Stepdown

4) In the left hand column record strokes


in 100 Stroke intervals, until final
circulating pressure is reached.

5) Record I.C.P. in top right column, and


deduct pressure ∆P until F.C.P. is reached.

6) Calculate complete circulation, in strokes


and time.

I.C.P.
Initial Circulating
SCR psi SIDPP psi Pressure

+ = psi

FC.P.
Drilling Mud Final Circulating
SCR psi Kill Mud ppg Weight ppg Pressure

x ÷ = psi

∆P
Surface to Pressure
( ICP - FCP ) psi Bit Strokes Stepdown

÷ = psi/stk

Complete Circulation
Surface to Bit to Total Strokes
Bit Strokes Surface strokes to Kill Well

+ =
Bit to Total Time
Surface to Bit Time Surface Time to Kill Well

+ = min

You might also like