Location :
Task Description:
Team composition : DATE: / /
Sump entry for Scale removing and welding inside vessel
Whom or
Description Hazard Risk Residual Action
Step what might Controls Action
of task description rating risk party
hazard
Isolation step should Followed isolation
Mechanical Faultily Contractor
1 C3P be done by authorized C0P procedures ( competency
isolation isolation crew
and competent staff and tags system )
/spading
Process isolation
Hydrocarbon Sure and verification
Tags putted
Opening man Effect, Hot Contractor isolation procedures
2
way Weather crew
C3P were followed , Gas C1P PPE preparing
Effect test and PPE using Toll box talk
Safety supervision
Unsafe man
entry ,unsafe Bonding air remover,
24 hour continue
Air air Contractor
3
ventilation remover crew
C4P ventilation, Earthing, C1P Equipment check
and supervision Safety Supervision
,static
electric
Task Description:
Team composition : DATE: / /
Sump entry for Scale removing & welding inside vessel
Whom or
Description Hazard Risk Residual Action
Step what might Controls Action
of task description rating risk party
hazard
Preheat the
6 Contractor PPE, Water Drinking
painting Hot Effected C2P C0P Supervision
crew and Group change
Fire happen
Apply confined space
in process Fire Truck Standby,
and Hot work Procedures
area , Hot, Contractor Machine earthing
7 Welding C5P,A C1P and requirement
unsafe crew PPE Using
PTW
welding Explosion proof tools
Experience workers
Machine