Material Traceability Record: Report No Rev. Date Shift (Day) (Night) Sheet

This material traceability record documents the materials used for a structural project including the drawing number, item descriptions, quantities, material specifications, heat and serial numbers, and certificate and GRIR numbers. It was prepared by the QC officer and reviewed and approved by the QC coordinator, contractor, company, and third party.

Uploaded by

Alfian Imaduddin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
4K views1 page

Material Traceability Record: Report No Rev. Date Shift (Day) (Night) Sheet

This material traceability record documents the materials used for a structural project including the drawing number, item descriptions, quantities, material specifications, heat and serial numbers, and certificate and GRIR numbers. It was prepared by the QC officer and reviewed and approved by the QC coordinator, contractor, company, and third party.

Uploaded by

Alfian Imaduddin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

REPORT NO

REV.
DATE
MATERIAL TRACEABILITY RECORD SHIFT [DAY]
1 OF 1

[NIGHT]
SHEET
JOB NO. : PROJECT NAME :
CLIENT : LOCATION :
PART NAME : DISCIPLINE : STRUCTURAL
DRAWING NO. :
DRAWING SHEET REV MARK ITEM DESCRIPTION LENGTH QTY MATERIAL HEAT SERIAL CERTIFICATE GRIR REMARKS
NO. NO NO. (Material) (mm) (req'd) SPEC. NO. NO. NO. NO.

Prepared by, Reviewed / Approved by, Reviewed / Approved by, Reviewed / Approved by, Reviewed / Approved by,

CONTRACTOR COMPANY THIRD PARTY


QC Officer QC. Coordinator ……………………………….. ……………………………….. ………………………………..
Form : BCWP-FAB-013_02