Responding to Government of India’s mission to provide “POWER FOR ALL”, the Navayuga Group has ventured
into power generation in a big way by building an installed capacity of about 6,000 mw. The portfolio includes
both thermal power as well as hydroelectric power generation projects

PROJECTS WITH DESCRIPTION

PROJECT DESCRIPTION

Polavaram Hydro Electric Power Plant (12*80 mw) Design, Engineering, Manufacturing and Testing of
Vertical full Kaplan Turbine generators 80 mw each.
All civil works of Power House, Pressure Tunnels,
approach channel, intake pools, intake structure
and all Hydro Mechanical works of Polavaram
Hydro Electric Power Project on EPC basis.

Farakka Super Thermal Power Project, Stage – III All under ground civil works including piling and
(1X500 mw) foundations for Boiler, ESP, TG, fans, BFPs, mills,
mill & bunker buildings, main power house and
other equipment / structures in TG / boiler area.

NTPC Barh STPP (3X660 mw) The broad scope of work under this package shall
include Civil, Structural and Architectural works
related to Main Plant Building i.e., T. G.

Barh STPP, Stage – II (2X660 mw), Barh The broad scope of work under this package shall
includes all Civil works including piling and
foundations for Boiler, ESP, TG, Fans, BFPjs, Mills,
Mill & Bunker Buildings, Main Power House, Piling
for bottom ash hopper and FAE Tower,
Transformer Yard.

2x500 mw Koderma TPS,DVC,Koderma, Dist- Complete BTG & BOP civil works incuding Individual
Koderma, Jharkhand, India Access roads.

SDSTPS, Stage – II, Unit No 3 Krishnapatnam in Pilling, civil & structural works for BOP and BTG
Nellore District, AP areas.

http://www.necltd.com/sectors-power.html 1/2
11/11/2018 Navayuga Engineering Company Ltd. | Sectors

PROJECT DESCRIPTION

DSTPP, Stage – II, 2X800, Krishnapatnam, Nellore Piling and BTG works.
District

Teesta Stage – III HEP 1200 mw (6X200 mw) Civil works for the construction of 1000 mm thick
cut o wall for concrete faced Rock ll Dam, cavern
of size 17 m X 23 m of 640 m length for desilting
chambers and tunnels of di erent shapes of dia,
upto 11 m of total length 6.7 km for various units of
Teesta-III at a remote location in North Sikkim, a
logistics and extreme weather challenge.

© 2018 Navayuga Engineering Company Limited. e-Brochure (img/brochure/NECL-Brochure.pdf)

Disclosures (disclosures.html)

Pedigree (http://www.navayuga.com/)

CSR (csr.html)

Group Companies (group-companies.html)

http://www.necltd.com/sectors-power.html 2/2

You might also like