HINDUSTANCOPPER LIMITED
(A Government of India Enterprise)
„Tamra Bhawan‟
1, Ashutosh Chowdhury Avenue
KOLKATA 700019
NOTICE INVITING TENDER
Hindustan Copper Limited (HCL), a Public Sector Undertaking under the administrative
control of the Ministry of Mines, was incorporated on 9th November 1967. It is the only
vertically integrated copper producing company in India with presence in mining,
beneficiation, and smelting, refining and downstream saleable products. HCL holds all the
operating mining leases of copper in India.
HCL invites e-Tenders under two bid systems from reputed and experienced contractors
for NX/PQ/HQ/NQ size surface diamond drilling in 32 nos. of boreholes totaling 24648 m
of Diamond drilling, related geological activities and Geological Report Preparation work
in Kolihan Copper Mine lease of Khetri Copper Complex, Kolihan, Jhunjhunu, Rajasthan
over a period of 16 months (excluding 45 days of mobilization period). The interested
contractors are requested to note the following:
1. Under two bid system, the first bid (the “Techno Commercial Bid") of the process
involves qualification of interested parties in accordance with the provisions of the
pre-qualification criteria (PQC) stipulated in the tender and the second bid is the
“Price Bid”. The offers are to be submitted on line at URL
https://eps.buyjunction.in of M/s. Mjunction Services Limited, Kolkata, who
are our service provider for Enterprise Procurement System. The documents
pertaining to “Techno Commercial Bid" (only Part I Bid) is to be submitted in
sealed packet at address mentioned in Tender. The price bid at above e procurement
portal will be opened only of those bidders who qualify techno commercially.
Please refer clause no. 2.6 for detailed procedure for submission of offers.
2. The Tender document can be purchased from the office of the Executive Director
(Commercial), HCL, Kolkata as per clause 1.13 on any working day on payment of
Rs 5,000/- (Rupees Five Thousand only) inclusive of 12% GST through non
refundable demand draft/banker‟s cheque in favor of “Hindustan Copper Limited”,
payable at Kolkata. The bidders purchasing the document from HCL shall submit
Page 2 of 160
along with the Part-I bid of the tender, the original receipt for payment of 5,000/-
(Rupees Five Thousand only) inclusive of 12% GST to HCL towards the cost of
the tender document. Tender document can also be downloaded from the HCL
website (http://www.hindstancopper.com). Bidders who download the tender
document from the HCL website must submit a tender document fee of the same
amount (Rs 5000/-) inclusive of 12% GST in the form of a non-refundable demand
draft/banker‟s cheque drawn on any schedule commercial bank payable at Kolkata
along with their Part-I bid of the tender. The tenders not accompanied by the tender
document fee as specified above shall be considered as non-responsive and
summarily rejected.
3. Addresses for Communication:
a. Interested bidders may obtain further information from:
Executive Director (Materials and Contracts)
Hindustan Copper Limited
„Tamra Bhawan‟
1, Ashutosh Chowdhury Avenue
Kolkata – 700 019
Email [email protected]
Tel: +91 33 22900397
Mobile: +91 94330 01147
b. The e bids (including the Part – II Price Bid) have to submitted in the e
tendering portal and the documents pertaining to Part – I (Techno Commercial
Bid) of the tender must be submitted on or before as per schedule mentioned in
clause 1.13 at the above mentioned address or dropped in the tender box
located on the 3rd floor of „Tamra Bhawan‟.
The Tenders shall be opened as per schedule mentioned in clause 1.13.
However, in the eventuality of the day of opening of the tenders becomes a
non-working day due to a force majeure event, the date of opening of the
tenders will shift to the next working day at the same time.
c. All communications, including the tenders should have the following
information super scribed at the top of the packet in bold letters:
“TENDER No: HCL/M&C/KOLIHAN/DRILLING/2018/01 Dated 07/12/2018
Tender document for Diamond drilling, related geological activities and Geological
Report Preparation work in Kolihan copper mine lease of Khetri Copper Complex,
Kolihan Nagar, Jhunjhunu, Rajasthan”
Page 3 of 160
The name and address of the bidders should be clearly mentioned at the left
side of the packet.
d. Official website for notices:
All notice related to this tender including Clarifications / Amendments /
Corrigendum to the tender document shall be available on HCL website
http://www.hindustancopper.com under the heading “Tenders”.
(D K Mahajan)
Executive Director (Materials and Contracts)
For Hindustan Copper Limited
Page 4 of 160
DISCLAIMER
Page 6 of 160
CONTENTS
This tender comprises the disclaimer set-forth hereinabove, the contents as listed below in
Section I, contract document in Section II.
Section I: Tender Invitation
Sl Clause No Particulars Page No
1 1 Introduction 9
2 1.2 Brief Description of Kolihan Mine 9-16
3 1.3 Scope of Work 16-24
4 1.4 Special Conditions of Contract 24-26
5 1.5 Pre-Qualification 26-28
6 1.6-1.11 Documents for Bidding 29-33
7 1.12 Brief description of Bidding Process 33-34
8 1.13 Schedule of Bidding Process 34-35
9 2.1-2.3 General 35-37
10 2.4-2.12 Preparation and Submission of Bid 37-43
11 2.13 Bid Security 43-45
12 3.1 Evaluation of Bids 46
13 3.2 Selection of Bidders 46-47
14 4 Fraud and Corrupt Practices 48-49
15 5 Pre-Bid Conference 50
16 6 Miscellaneous 50-51
APPENDICES
Sl Appendix No Particulars Page No
1 Contract 92-93
2 1 Definitions and Interpretation 94-103
3 2 Contract 104
4 3 Conditions Precedent 105-106
5 4 Work Site 107-108
6 5 Engineer-In-Charge 109
7 6 Contractor‟s Obligations 110-122
8 7 HCL‟s Obligations 123
9 8 Contract Price 124-126
10 8 Liquidated Damage 127-129
11 9 Force Majeure 130
12 10 Material Breach and Suspension 131
13 11 Events of Default and Termination 132-134
14 12 Divestment of Rights and Interests 135-136
15 13 Mode of Payment by HCL 137
16 14 Dispute Resolution 138-139
17 15 Miscellaneous 140-143
Schedules
Sl Schedule No Particulars Page No
Page 8 of 160
HINDUSTAN COPPER LIMITED
(A GOVT OF INDIA ENTERPRISE)
TENDER DOCUMENT
SECTION I –TENDER INVITATION
1. INTRODUCTION
1.1 HCL, a public sector undertaking under the administrative control of the Ministry
of Mines, Govt. of India, was incorporated on November 09, 1967. It is the only
vertically integrated copper producing company in India with presence in mining,
beneficiation, smelting, refining and downstream saleable products.
HCL desires to engage a reputed drilling agency for drilling of about 24648 m in
Kolihan Copper Mine lease area as per the exploration plan prepared by HCL along
with related geological activities e.g. core logging, preparation of log sheets in hard
as well as soft copies, preparation of geological cross sections, lode plans, other
required technical drawings in soft and hard copies, core preservation with due
housekeeping of the preservation site, samples‟ preparation, samples‟ analysis
through NABL accredited or equivalent labortory and geological modeling,
resource estimation as per UNFC guidelines and furnishing of corresponding JORC
categories of reserves / resources and preparation of Geological Report.
1.2 BRIEF DESCRIPTION OF KOLIHAN COPPER MINE, KCC:
To match with the predicted rapid increase in copper demand in India over the
coming years and to reduce the expenditure on foreign exchange on account of
import, HCL has an ambitious expansion drive to enhance Copper ore production
to approximately 20.0 MT / annum in the coming years. The future strategy
includes expansion of existing mines, and re-opening of closed mines.
As a part of that initiative HCL has planned for conducting exploration in its
Kolihan Mining Lease to prove depth wise and strike-wise extendibility of the ore
body beyond current level of mining.
Page 9 of 160
1.2.1 Location and Connectivity:
The lease hold area is lying in Khetri Taluka, covering Khetri village, in Jhunjhunu
District of the Rajasthan State. The area is part of Survey of India Toposheet no. 44
P/16 (scale 1:50,000) with Latitude N 28°00'42.21067" - 28°01'24.17493" and
Longitude - E 75°45'59.21234" - 75°46'44.27510"(total area 163.23 Hect.)
Page 11 of 160
Trees
Butea monosperma
Shrub
Pedalium murex
Grass
Cenchrus setigerus
Sacchanim spontaneum
It is evident from the survey that, plant like Acasia nilotica (Babul),
Caligonum polygonoides (Dhok), Prosopis cineraria, Commiphora wightii
(Gugal), Rhus mysorensis (Dangra), are dominant and these plants cover about
70 - 80 % flora vegetations of that area. They are followed by Zizyphus
numbularia (Ber), Zizyphus jujuba, Capparis decidua, Leptadenia pyrotechia,
Page 12 of 160
Calotropis procera. These vegetations cover about 10 to 15% flora of the Khetri
tehsil. Some grasses viz. Lasirus sindicus, cenchrus cilliaris and Saccharum
spontaneum are most common grasses of the area.
The study area has a dry climate with hot summer. The winter season starts from
the middle of November and continues till the beginning of March. The summer
season follows winters and extends up to the end of June. The diurnal variation in
temperature is very high indicating typical desert and arid climate. The rainy season
extends normally from July to October.
The area experiences varied rainfall conditions throughout the year. The annual
rainfall varies from 560 mm to 477 mm with 34 rainy days in a year. Highest
rainfall recorded in the area is 1252 mm (in 1977) and lowest rainfall recorded is as
low as 89 mm (in 1905). The data are based on studies carried out by Central Arid
Zone Research Institute, Jodhpur, Rajasthan and other published information over
the internet.
Geology:
Regional Geology of the area
The rocks of this area belong to Delhi System of Proterozoic age. The major rock
formations of the region consist of metamorphosed arenaceous and argillaceous
sediments with intercalated lenticular calcarious bands of comparatively smaller
thickness and lesser continuity in strike and depth. They belong to the Alwar and
Page 13 of 160
Ajabgarh Groups of Delhi Super Group. The generalized succession of the belt
according to M.K. Roychowdhury and S.P. Dasgupta is represented below.
AJABGARH
GROUP
~~~~~~~~~~~~~~~~~Gradational contact~~~~~~~~~~~~~~~~~~
P ALWAR
R GROUP
: Phyllite
Page 14 of 160
The older formation (Alwar Series) predominantly comprises arenaceous rocks with
relatively minor intercalated phyllite formations. While the younger formation
(Ajabgarh Series) mostly consists of argillaceous rocks such as andalusite bearing
schists, phylites, biotite muscovite schists, chlorite schists etc. interbeded with
massive quartzites and marbles as subordinate members. The contact between the
two formations is gradational. The sediments show current bedding, ripple marks
and graded bedding. The regional strike varies from NNE-SSW to NE-SW with
steep dip around 65 towards NW. The rocks of Delhi system have been intruded
by an earlier generation of basic rocks consisting of dolerite metamorphosed to
epidermises and amphibolites; followed by acid intrusions of granites, pegmatite
and quartz veins which are succeeded by younger basic dykes.
3. Garnet-chlorite-quartzite/schist+ amphibole+biotite,
Page 15 of 160
--------------- Gradational Contact --------------------------
1. Feldspathic quartzite
Page 16 of 160
SL. N0. Item of Work Unit Quantity
NX/PQ/HQ/NQ size surface diamond drilling in 32
nos. of bore holes along with construction of bore
A hole collar pillar, collar & deviation survey, bore Mts 24648
hole / core logging, sample preparation etc.
B Laboratory Studies
1 Chemical Analysis
i) Primary & Check samples for Copper Nos 2470
ii) Composite Samples
Samples from NABL Labs for 8 radical (Cu, Au, Ag,
Nos 45
Mo, Ni, Co, Pb, Zn )
iiI) Fire Assay for Gold & Silver Nos 32
2 Physical Analysis
i) a) XRD Studies on composite Nos 2
ii) b) ICP-MS studies Nos 0
iii) Preparation of thin section Nos 32
iv) Petrographic Studies Nos 32
v) Preparation of polished section Nos 32
vi) Mineragraphic Studies Nos 32
vii) Specific Gravity determination Nos 10
viii) Bulk Density Nos 16
ix) Spectrographic Studies Nos 2
Exploration Report
1) The reserve / resource estimation in compliance with UNFC classification and
corresponding JORC classification categories to be furnished.
C 3) Submission of report and drawings shall be in soft copy along with 6 sets of
hard copies.
4) In addition to the above hard copies 01 number of hard copy of the drawings
to be supplied in form of spirally bind booklet, duly protected with hard cover
on front and back. The drawings may include the geological cross sections at
1:250; 1:1000, lode plans at 1:250; 1:1000, Longitudinal Vertical Section
/Vertical Longitudinal Section at 1:250; 1:1000 etc.
Page 17 of 160
5) Core obtained from bore hole shall be systematically numbered/ indexed, arrow
marked and arranged in the core boxes brought by the contractor. Core boxes
should be Strong high impact UV stabilized polypropylene made having double
handles both sides with suitable comportments (width & depth) for keeping NX
size core. Bottom of the core box should be strong enough to carry core when it
is fully loaded. Core Boxes must be designed in such a way that it should slide
one on the other having locking / un-locking system when it is finally
positioned. Top of the most core box should be provided with suitable cover.
6) The boxes will be serially numbered and all the details of the borehole should be
indicated on the cover of the box and carried to the sampling station and stacked
at an earmarked place.
7) In case of disturbances in sequencing the core arrangements, the bore hole shall
have to be re-drilled at contractors own cost.
8) Detailed core / hole logging, (including the lithological details, structural
features, e.g. joints, veins, foliations, mineralization pattern, visual estimation of
copper content and other associated minerals in percentage etc. for entire length
of all the holes and determination of Rock Quality Designations (RQD) for
entire length of all holes. The contractor will arrange for the geological logging
of the core in the format provided by the engineer-in-charge or his
representative. The contractor will ensure that logger (Geologist) will be
deployed and would posses post graduate degree in Geology from a recognized
institute and has at least three year experience of working in Surface Exploration
work and proficient in general computer work i.e use of MicroSoft Excel,
MicroSoft Word, Auto Cad Drawing software etc. The primary/ onsite
geological logging work will have to be neat and clean with visible best possible
hand writing and the final logging sheets to be generated in the soft copy as per
the format supplied by the engineer-in-charge. The entire logging work will have
to be the satisfaction of the engineer-in-charge and contractor will have to obtain
approval at the end of the logging
9) Core samples will be taken from 3.00 m above and 3.00 m below of the
mineralized zone. Whereas, in the mineralized portion, the samples length will
depend upon the intensity, nature and pattern of mineralization. However; in any
case the length of samples in mineralized zone shall not exceed more than
1.00m.
10) The commencement and closure of borehole shall be with the approval and in
the presence of Engineer-in-charge of HCL or his representative. The depth of
Page 18 of 160
completed borehole will be measured in the presence of Engineer-in-charge or
his representative and a document in form of JMC will be generated.
11) Measurement of bore-hole deviation by multi-shot bore-hole camera for entire
length of the each bore hole to be carried out in the presence of Engineer-in-
charge or his representative. The soft / hard copy of the deviation survey results
will be supplied with due attestation. Maximum on an average 20 deviation per
100 meters of hole length from collar of the hole either upward or downward is
allowed but maximum deviation in the entire hole length should not be more
than 100 from the collar inclination of the hole.
12) In case deviation is more due to poor ground / strata condition/ technicality with
the bore hole length, or any other field situation engineer-in-charge will have
discretion to judge the same and decide whether any concession could be
considered for higher deviation.
13) The Core Boxes required for preservation of the core will be arranged by the
contractor.
14) The core will be preserved in the core boxes. The core, as well as the core boxes
will be duly numbered and marked, as specified above and / or as advice by the
engineer-in-charge.
15) The premises for preservation of core is to be provided by HCL, however the
premises is to be maintained for keeping of cores, ambiance cleanliness by the
contractor, during the tenure of the contract.
16) The entire core obtained from the drilling and after duly marked and splitted will
be photographed and video graphed using High Definition Camera to make the
hole wise/ box wise/ length wise digital record of the core. The same should be
supplied to HCL in compatible soft Copy format so as to fulfill the purpose of
Digital Core Library.
17) Sample preparation as per the sample length will be marked during the detailed
core logging.
18) Chemical analysis shall be carried out at reputed recognized laboratory (NABL
accredited) which will be cross checked randomly by the company (HCL) if
Engineer-in-charge desires so.
19) Composite samples – Number of Composite samples may vary depending on
mineralized zone intersection shall be analyzed for Cu, Au, Ag, Mo, Ni, Co, Pb,
and Zn.
20) Physical, Petrological, Mineragraphic, Spectroscopic and XRD studies of core
samples.
21) The specific gravity determination would be systematically done to determine
average specific gravity of ore.
22) The exploration will be in accordance to UNFC codes.
Page 19 of 160
23) Prepare geological cross section of all the sections drilled and projected cross
section at 25 m interval for in between the drilled section on 1:1000 & 1:250
scale.
24) Prepare composite lode plans from “0” mRL level to (-) 300 mRL at every 15
mtrs vertical intervals at different cut off and pay limits.
25) The bidder should have NABL accredited lab or should be associated with
NABL accredited lab to carry out chemical, petrological, Mineralogical etc.
analysis.
26) The bidder shall have / appoint highly experienced team of Geologists and
Mining Software Engineers. Team of Geologists should have at least one
Geologist having minimum 20 years of working experience in non-ferrous metal
mines / surface exploration and among Software Engineers at least one Software
Engineer should be highly proficient in working on ore body modeling, reserve
estimation, mine design and planning software and in past associated with
Datamine Studio. The person would be capable enough to cater the needs
stipulated by HCL regarding ore and waste modeling, preparing plan & section
and calculating ore reserves at different parameters through Datamine Studio
Finally, the team of Geologists & Software Engineers should be able to prepare
comprehensive Geological Report.
27) The reserve / resource estimation in compliance with UNFC classification has to
done and a table indicating corresponding JORC classification categories to be
furnished.
28) Preparation and submission of detailed exploration report with further
recommendations. The recording and presentation of the geological activities
and report will be in the internationally accepted format and in accordance to the
UNFC codes.
29) Submission of report and drawings shall be in soft copy along with 6 sets of hard
copies.
30) In addition to the above hard copies 01 number of hard copy of the drawings to
be supplied in form of spirally bind booklet, duly protected with hard cover on
front and back. The drawings may include the geological cross sections at 1:250;
1:1000, lode plans at 1:250 ; 1:1000, Longitudinal Vertical Section /Vertical
Longitudinal Section at 1:250 ; 1:1000 etc.
1.3.1.1 Schedule of quantities for Drilling at Kolihan Copper Mine:
Page 20 of 160
The total quantity of drilling and number of bore holes may vary +20% (twenty)
only.
Page 21 of 160
11) The contractor will keep a progress register to log all the daily ongoing activities
and update it daily at the end of the day and which shall be available for
inspection by the Engineer-in-charge.
12) The contractor will provide a list of technical staff mentioning the details of
experience and qualification.
13) The contractor would appoint a person as SPOC (Single Point of
Communication), furnishing in writing the name, designation and all time
working cellular number of the person. The appointed SPOC for the project
would at least be at Managerial level or higher in responsibility handling profile.
The SPOC appointed by the contractor would be the face from contractor side to
hear, communicate resolve, comply all matters / directions/ issues raised by
HCL.
14) All other related jobs that may be required and not limited to the above
mentioned.
Deliverables:
1) Final borehole Collar and bore hole deviation survey details of all the bore
holes, along with final borehole locations marked in surface plan,
geological map, and geological sections (with mineralized zones marked as
identified during logging along with lithology and structural features).
2) Daily Progress Report with drilling progress & Monthly Progress Report
with drilling progress, updated borehole location on surface plan, and
updated geological sections, core photographs.
3) Copy of log register (to be handed over on completion of each borehole);
Original Log registers of all the bore holes.
4) Detail bore hole logs with sample details.
5) Sample list with report on sampling method, QA/QC adopted with
photographs.
6) Collar and bore hole deviation survey details of all the bore holes.
7) Cores arranged in core boxes, along with half splitted core of mineralized
zone properly kept in core boxes with detail written on it.
8) All documents, records, information generated and collected during the
contract period in the process of execution of the contract will be
exclusively the property of HCL and are to be handed over in Hard and soft
format to HCL at the time of completion of awarded work.
Page 22 of 160
Detailed exploration report submitted as
1.4.1 The successful bidder shall ensure safe working of man & machinery and
HCL/KCC shall in no way be held responsible for any damage/loss/accident etc of
any type and/or reason.
1.4.2 The successful bidder will be liable for any damage caused to the HCL‟s
equipment/property etc. due to negligence of his employees.
1.4.3 The successful bidder shall not be entitled to any additional cost on account of
shifting of equipment from one place to another place.
1.4.4 The successful bidder shall ensure reliability/availability of minimum 4 nos of
drilling equipment for working during the contract period to achieve the target
quantity. In case of any break down of the equipment, the same should be intimated
to the Engineer-in-Charge or his representative immediately and also immediate
action is to be taken to rectify/replace the equipment to achieve the monthly target.
1.4.5 The successful bidder should employ only skilled and authorized manpower for
operation and maintenance of the equipment
1.4.6 For carrying out work on Sundays/holidays, the successful bidder will approach the
Engineer-in-Charge or his representatives at least two days in advance and obtain
permission in writing.
1.4.7 HCL/KCC shall not be liable for or in respect of any damage or compensation
payable at law in respect of/ inconsequence of any accident or injury to any
workmen or other persons in employment under contract during the execution of
this work.
Page 24 of 160
1.4.8 In case the Contractor fail to execute the contract or part thereof as per the agreed
terms and conditions, HCL reserve the right to arrange execution of work through
alternate sources or departmentally at Contractor‟s risk and cost.
1.4.9 No part of the contract nor any share of interest therein shall in any manner be
transferred, assigned or sublet by the agency directly or indirectly to any person,
firm or corporation whosoever without the prior approval of the HCL/KCC.
1.4.10 Secrecy: The Contractor shall at all times keep confidential all technical
information relating directly or indirectly to the work, either disclosed to the
Contractor by and/ or on behalf of the Company or acquired by the Contractor
during the course of performance of the Contract. The Contractor shall not disclose
such information to any third party without the company‟s prior written approval.
Any contravention of the provision of this clause will tantamount to breach of the
Contract.
1.4.11 Progress Report: The Contractor shall submit daily progress report detailing the
progress of execution of work to the Engineer-in-Charge. The form and manner of
such report shall be as prescribed by the Engineer-in-Charge.
1.4.12 Labour Relation: Any action taken by the contractor in relation to handling its
employees shall not adversely affect the existing labour relations of HCL /KCC.
1.4.13 Cleaning-up: During the progress of the work, the Contractor shall keep the
premises occupied by him in a neat and tidy condition and free from any unsightly
accumulation of rubbish. On the completion of any portion of the work, the
Contractor shall promptly remove all his equipment, temporary structures and
surplus construction material not to be used at or near the same location during
later stages of the work. Upon completion of the work and before the final payment
is made, the Contractor shall at his own cost, satisfactorily dispose of or remove
material from the vicinity of the work and from all other lands made available to
him by the Company: all construction plants, buildings, rubbish, unused material
and other equipment and material belonging to him and used under his direction
during the work and shall leave the premises in neat and tidy condition. In the event
of his failure to do so, the same may be removed and disposed of by the Company
at the Contractor‟s cost.
1.4.14 Use of Contract documents: All documents, drawings and specifications, provided
by the Company to the Contractor, shall be the property of the Company and they
shall not be used on work other than covered by the contract and shall be returned
to the Company on completion of the work or termination of the Contract.
1.4.15 Supervision of the work by the contractor and the Contractor‟s agent and his
supervising staff at the work site: The contractor shall have the sole and exclusive
responsibility for supervision of the work and all workmen engaged therein.
1.4.16 The contractor shall name and depute a qualified person having sufficient
experience in carrying out work of similar nature, which the equipment, material, if
Page 25 of 160
any shall be issued and instructions for work is given. The contractor shall also
provide to the satisfaction of Engineer-in-charge sufficient and statutory qualified
staff for supervision and execution of the work.
1.4.17 The contractor shall keep at all time on the work site while the work is in progress,
a properly qualified and competent Project Manager, duly authorised and
empowered to act for him and to receive on his behalf all such notices and
communications as the company and/or the Engineer-in-charge may wish to issue
from time to time. From the moment the Project Manager so appointed takes
charge of the work, such notices and communications shall operate as if the
contractor himself had received them and all act done by Project Manager shall be
“quit facit per alium perse”, which means “he who does through another does by
himself”. The Act of Project Manager is the act of the contractor, as binding as if
done by the contractor himself, notwithstanding absence of formal authority or
definite instructions from the contractor to the said Project Manager or any
purported restrictions or powers or limitations of authority imposed by the
contractor. It shall be open to the company to enforce replacement of the Project
Manager and/or any other employees of the contractor in the event that the
Engineer-in-Charge deems the Project Manager or any other employee to be
incompetent or otherwise
1.5 PRE-QUALIFICATION
1.5.1 Scope of Bid/Offer: HCL wishes to select experienced and capable bidder for
NX/PQ/HQ/NQ size surface diamond drilling, related geological activities and
Geological Report Preparation work in Kolihan Copper Mine lease of Khetri
Copper Complex, Kolihan, Jhunjhunu, Rajasthan.
1.5.2 Integrity Pact: Bidders shall execute an Integrity Pact Agreement with HCL in the
format annexed as Appendix - VA as a pre-qualification to the submission of their
bids in accordance with the tender. The duly executed Integrity Pact in original on
non-judicial stamp paper of appropriate value (Rs. 50/-) shall have to be submitted
to HCL along with Techno-commercial bid.
1.5.3 Eligibility of Bidders: The bidder should have to fulfill the following qualification
criterion:
ii. The Bidder (in case of consortium, members of consortium) shall have
positive net worth as per their latest audited financial statement for the
year ending 31st March 2018. Relevant documentary evidence in the
form of a certificate from a chartered accountant, along with audited
annual accounts shall be furnished together with the bid A Bidder (in
case of consortium, members of consortium) not having positive net
worth as per their latest audited financial statement is ineligible to
participate in the tender. Further, the Net Worth on 31.03.2018 should
not have eroded by more than 30% in the last 3 years ending
31.03.2018. The net worth shall be positive for the last one financial
year which shall be calculated based on the subscribed paid up share
capital plus Share Premium Plus Free Reserve Plus unallocated
Balance/ Surplus amount of profit and loss account, less (a) expenses
not written off, (b) Accumulated losses in Profit and Loss account, if
not reduced from reserves and surplus. The Revaluation Resrves,
capital reserves and amount of intangible assets like goodwill etc. will
not be taken into account while calculating the net worth.
1.5.3.2 Technical Eligibility: The prospective bidder should fulfill the following
technical eligibility criteria executed in any year during last seven years ending
on 31.03.2018:
Page 27 of 160
1.5.3.2.1 The Bidder should have executed Surface Diamond Core Drilling and
Geological Report Preparation up to a minimum length of 500 m in a
single hole either inclined or vertical.
1.5.3.2.2 The Bidder should have successfully completed / executed similar works
either of the following:
Three similar completed / executed works, either each costing not less
than basic value of Rs. 9.60 Crores or each not less than, 7,600 meters
of surface diamond drilling and geological report preparation.
OR
Two similar completed/ executed works, either each costing not less
than basic value of Rs. 12.00 Crores or each not less than 9,500 meters
of surface diamond drilling and geological report preparation.
OR
One similar completed / executed work, either costing not less than
basic value of Rs. 19.20 Crores or not less 15,200 meters of surface
diamond drilling and geological report preparation.
Similar work with respect to this tender means the work of exploratory
diamond core drilling of NX/PQ/HQ/NQ size from surface, related
geological activities and Geological Report Preparation work.
Page 28 of 160
1.6 The bidders shall enclose the following in their offer as per the forms prescribed in
this tender:
a. Certificate(s) from the statutory auditors of the bidder as per Appendix VI,
specifying the turnover of the bidder as per the audited annual accounts of the
consecutive preceding three financial years ending on 31.03.2018, and also
specifying that the methodology adopted for calculating such Turnover
conforms to the provisions of tender.
b. Certificate(s) from Company or client of the bidder, based on the client
certificate and as per Appendix VII to be submitted, to showcase relevant
experience of drilling in the specified period, to fulfill the technical eligibility.
c. The bidders should submit a Power of Attorney in non-judicial stamp
paper, strictly as per Appendix IV, duly notarized, authorizing the signatory
of this tender to commit the bidder.
d. Documentary evidence confirming ownership of minimum 4 nos hydraulic
Drill Rigs and readiness to commence the work within mobilization period of
1.5 months (45 days).
e. The successful bidder shall give an undertaking to employ a set of drilling
crews including drill operator in each shift and at each machine who are fully
conversant with the job of diamond drilling and have at least two years of
experience.
1.6.1 Individual bidders / Consortium are eligible to participate in tender. The definition
of consortium is as given in Article 1, i.e. Definitions and Interpretation chapter of
NIT of Section II. In case of a Foreign Listed Company, bidding as a Consortium
Lead Member, it must have an Indian Company, registered under the Company‟s
Act, as one of the Consortium Members.
Page 29 of 160
1.6.2 Any entity (consortium or individual members of consortium in case of
consortium) which has been barred by H C L and the bar subsists as on the date
of the tender by HCL, would not be eligible to submit an offer. The bidder should
submit an Affidavit declaring that no such bar has been implied by HCL.
1.6.4 The following conditions shall be adhered to while submitting the Tender:
(a) Bidders should attach clearly marked and referenced continuation sheets
in the event that the space provided in the prescribed forms is insufficient.
Alternatively, bidders may format the prescribed forms making due
provisions for incorporation of the requested information;
(b) Information supplied by a Bidder;
(c) In responding to the tender submissions, Bidders should demonstrate their
capabilities in accordance with Clause 3.1 below.
Page 30 of 160
Attorney, as per Appendix IV B, duly signed by both members of
the Consortium.
(d) The Bid should include a brief description of the roles and
responsibilities of individual members, particularly with reference to
their financial and technical obligations;
(e) An individual Bidder cannot at the same time be a member of a
Consortium applying for pre-qualification. Further, a member of a
particular Applicant Consortium cannot be a member of any other
Applicant Consortium applying for pre-qualification;
(f) Members of the Consortium shall enter into a binding Joint Bidding
Agreement, substantially in the format specified at Appendix IV C
(the “Joint Bidding Agreement” or “JBA”), for the purpose of
submitting the Bid and execute the Project in case they have been
selected as the successful Bidder. The JBA, to be submitted along
with the Part-I Bid, shall, inter alia:
i. convey the intent to enter into the Agreement and subsequently
perform all the obligations of the selected Bidder, in case the
Project is awarded to the Consortium;
ii. clearly outline the proposed roles and responsibilities, if any, of
each member;
iii. include a statement to the effect that all members of the
Consortium shall be liable jointly and severally for all
obligations of the selected Bidder in relation to the Project;
iv. commit that its Members would fulfill the eligibility conditions
as laid down in Clause 1.5.3; and
(g) Except as provided under this NIT and the Bidding Documents,
there shall not be any amendment to the JBA.
(h) The permissible amendments to the JBA under the NIT and bidding
documents shall be only with prior written consent of HCL.
Page 31 of 160
(j) The leader shall be authorised to incur liabilities and receive
instructions and payment for and on behalf of any & all members of
the consortium.
1.6.6 The following conditions shall be adhered to while submitting the Bid:
(a) The Bidder should attach clearly marked and referenced
continuation sheets in the event that the space provided in the
prescribed forms is insufficient. Alternatively, Bidders may format
the prescribed forms making due provisions for incorporation of the
requested information;
Page 32 of 160
(b) In case the Bidder is a Consortium, each member should
substantially satisfy the pre-qualification requirements to the extent
specified herein.
1.9 The statements and explanations contained in this tender are intended to provide a
better understanding to the bidders about the subject matter of this tender and should
not be construed or interpreted as limiting in any way or manner the scope of services
and obligations of the Contactor set forth in the Contract.
1.10 Any omissions, conflicts or contradictions in the bidding documents including this
tender are to be noted, interpreted and applied appropriately to give effect to this
intent, and no claims on that account shall be entertained by HCL.
1.11 HCL shall receive bids pursuant to this tender in accordance with the terms set forth
hereunder and other documents that may be provided by HCL pursuant to this tender,
including any modification, alteration, amendment or clarification that may be issued
by HCL from time to time (collectively the "Bidding Documents"), and all bids shall
be prepared and submitted in accordance with the terms of the bidding documents
within the due date of submission.
1.12.3 The bidder is required to deposit, along with its bid, a bid security as per Clause
2.14. The bid shall be summarily rejected if it is not accompanied by the Bid
Security.
1.12.4 Site visit: The bidder may visit the site if required. In that case bidders to submit a
certificate confirming to have visited the site, duly countersigned by HCL/KCC‟s
Unit Head or his representative in the prescribed format as Appendix IX C.
1.12.5 Any query or request for additional information concerning this tender shall be
submitted by e-mail to the officer designated at clause 2.5.4.
Page 34 of 160
5. Due date of bid submission 21.01.2019 Up to 14:30 Hrs.
6. Opening of Part-I bid 21.01.2019 At 15:00 Hrs.
7. Opening of Price Bid To be intimated to the qualified bidders
8. Issue of LOI / WO To the successful bidder
2 INSTRUCTIONS TO BIDDERS
a. GENERAL
2.1 Site visit and verification of information:
2.1.1 Bidders may visit the work site and ascertain for themselves the site conditions,
location, surroundings, climate, availability of power, water and other utilities for
construction, access to site, handling and storage of materials, weather data,
applicable laws and regulations, and any other matter considered relevant by them
before submission of bid.
2.1.2 For this purpose, bidders shall communicate to HCL via notice/ e-mail indicating
their intention to visit the site along with the intended date of visit and the details of
their visiting representatives at least 3 (three) days before their intended visit.
HCL shall communicate its response to the interested bidders who are planning to
visit the work site at the earliest approving the date of visit or may specify another
date as it may consider suitable.
2.1.3 It shall be deemed that by submitting a bid, the bidder has complete understanding
of the work and only after that the bidder has :
a) Made a complete and careful examination of the bidding documents;
b) Received all relevant information requested from HCL;
c) Satisfied itself about all matters, things and information
d) Acknowledged and agreed that inadequacy, lack of completeness or
incorrectness of information provided in the bidding documents or
ignorance of any of the matters shall not be a basis for any claim for
compensation, damages, extension of time for performance of its obligations,
loss of profits etc. by the bidders from HCL, or a ground for termination
of the Contract;
e) Acknowledged that it does not have a Conflict of Interest; and
f) Agreed to be bound by the undertakings provided by it under and in terms
hereof.
Page 35 of 160
2.1.4 HCL shall not be liable for any omission, mistake or error on the part of the bidder
in respect of any of the above or on account of any matter or thing arising out of or
concerning or relating to tender, or the bidding process, including any error or
mistake therein or in any information or data given by HCL.
2.1.5 Verification and Disqualification
2.1.6 HCL reserves the right to verify all statements, information and documents
submitted by the bidder in response to the tender or the other bidding documents
and the bidder shall, when so required by HCL, make available all such
information, evidence and documents as may be necessary for such verification.
Any such verification or lack of such verification by HCL shall not relieve the
bidder of its obligations or liabilities hereunder nor will it affect any rights of HCL
there under.
2.1.7 HCL reserves the right to reject any bid and appropriate the bid security if:
a. at any time, a material misrepresentation is made or uncovered, or
b. the bidder does not provide, within the time specified by HCL, the
supplemental information sought by HCL for evaluation of the Bid.
c. No deviations shall be mentioned in the price bid or any part of the tender
document, otherwise the offer will be summarily rejected.
Such misrepresentation/improper response shall lead to the disqualification of the
bidder.
In case it is found during the evaluation or at any time before signing of the
Contract or after its execution and during the period of subsistence thereof, that one
or more of the pre-qualification conditions have not been met by the bidder or the
bidder has made material misrepresentation or has given any materially incorrect or
false information, the bidder shall be disqualified forthwith if LOI has not been
issued to such bidder, and if the selected bidder has already been issued the LOI or
the selected bidder has entered into the Contract, as the case may be, the same shall,
notwithstanding anything to the contrary contained therein or in this tender, be
liable to be terminated, by a communication in writing by HCL to the selected
bidder, without HCL being liable in any manner whatsoever to the selected bidder.
In such an event, HCL shall forfeit, invoke and appropriate the Bid Security, or the
Performance Security and/or the payments made by the selected bidder as per the
Contract, as the case may be, as damages, without prejudice to any other right or
remedy that may be available to HCL under the bidding documents and/or the
Contract, or otherwise.
2.1.8 The Contract to be executed by successful bidder as given in section II as part of
Page 36 of 160
the Bidding documents shall be deemed to be part of this tender.
2.2 Clarifications
2.2.1 HCL shall endeavour to respond to the questions raised or clarifications sought by
the bidders. However, HCL reserves the right not to respond to any question or
provide any clarification, and nothing in this clause shall be taken or read as
compelling or requiring HCL to respond to any question or to provide any
clarification.
2.2.2 HCL may, if deemed necessary by HCL, issue interpretations and clarifications to
all bidders. All clarifications and interpretations issued by HCL shall be deemed
to be part of the bidding documents. Verbal clarifications and information given
by HCL or its employees or representatives shall not in any way or manner be
binding on HCL.
2.3 Amendment of Tender
2.3.1 Before bid due date, HCL may, for any reason, whether at its own initiative or in
response to clarifications requested by a bidder, modify the tender by the issuance
of addendum.
2.3.2 Any addendum thus issued will be intimated to the bidders by uploading on HCL
website only.
2.3.3 In order to afford the bidders a reasonable time for taking an addendum into
account, or for any other reason, HCL may, extend the bid due date.
b. PREPARATION AND SUBMISSION OF BIDS
2.4 On line offers are invited through Enterprise Procurement System (EPS) of M/s.
Mjunction Services Limited (MJ), who is the service provider to HCL, under two-
part bid system. All vendors are requested to contact M/s. Mjunction Services
Limited, Kolkata at the following address for registration and obtaining user id and
password to access and quote for the tender enquiry on line.
The offers are to be submitted on line at URL https://eps.buyjunction in of M/s.
Mjunction Services Limited, Kolkata, who are our service provider for Enterprise
Procurement System.
Registration Procedure:
Page 37 of 160
4. Click on INTERESTED Button on behalf of respective organization. It would be HCL
in your case.
5. Fill up the Form, click on the next button fill your preferred procurement category and
click on submit button.
6. Download the pdf Form and take a printout of the same on your Organizational
Letterhead.
7. Duly Sign & Stamp on each page of the form
8. Attach One (1) Photocopy of your Organization PAN Card
9. Scan and email the same to [email protected] or Fax us at - 033
66106345.
10. Courier the hard copy to the below mentioned address
11. MJ New Office Address:
Godrej Waterside
Tower-I, 3rd floor, Plot No. 5,
Block-DP, Sector-V, Salt Lake City, Kolkata – 700091
NB: You do not require registering again for different tender enquiries of HCL.
Registration on the website is free of cost.
MJ Contact Person:
Important 1: For Registration related issues, all bidders are requested to contact M/s.
Mjunction services limited, Kolkata, for free registration and obtaining User ID and
Password. Please feel free to call at 033 66106426 (9.30 AM to 5.30 PM) or mail us at
[email protected] for any assistance.
Important 2: For Bidding related issues, please call Mjunction on their Toll Free Helpline
at 1800-419-20001 (9.30 AM to 5.30 PM). You can also use their Customer Complaint
Handling Portal and log in your suggestions and complaints, if any, through this portal.
You need to click on “ Query “ or “Complaint”, which is available in the home page .Your
issues will be resolved through the CCHP portal itself.
For any further details on the tender, the interested parties may contact HCL office at
(033)2283-2228.
NOTE:
1. All entries in the quotation should be entered at on-line submission form without any
ambiguity and can be corrected by the vendor till the date and time of closing. The last
modified quotation will be taken into consideration only.
2. Quotation cannot be accessed on-line after the DUE DATE.
3. Any order resulting from this enquiry shall be governed by the following terms and
conditions in addition to those mentioned in order.
4. PRICE: Price Bid shall be submitted through Enterprise Procurement System through
Internet. Price bid of Techno-commercially acceptable bidders ONLY as assessed by
HCL shall only be evaluated. The schedule and details of e-procurement event shall be
communicated by HCL/Service Provider (Mjunction Services Ltd.) to the techno-
commercially accepted bidders.
During the online Enterprise Procurement System, Price to be submitted in the Price
Bid format On-line. Rating of L1 bidder shall be done on lowest quoted rate basis.
The interested parties should go through Terms and Conditions of the tender before
submitting their offer on-line.
The bidders should carry out mock submission of e-bid at Mjunction and screen
shot of the same should be submitted in Techno Commercial bid documents.
5. The bidder shall fill vendor registration form in HCL‟s website
www.hindustancopper.com and indicate the vendor code in Appendix II
6. The bidders who strictly fulfill the Pre-qualification criteria should only submit their
offer on-line on EPS mode in two parts. The Part-I shall consist of "Qualification &
Techno Commercial Bid" and Part-II shall be “Price Bid”. The bidders, in proof of their
fulfillment of Pre-qualification criteria, have to furnish the required documents off-line.
The relevant documents along with the required EMD and a copy of tender document
duly signed and stamped on each page in acceptance of all terms and conditions and
relevant Annexures as mentioned in the Appendices, duly filled shall have to be sent in
a sealed packet to Executive Director (Materials and Contracts), Hindustan Copper
Limited, “Tamra Bhawan”, 1, Ashutosh Choudhury Avenue, Kolkata – 700 019, super
scribing tender enquiry no. The bidders must ensure that the above details and EMD are
received by HCL before the due date of opening of bids on EPS.
Page 39 of 160
- Use of On-Line Enterprise Procurement System for price bid.
- Vendors can access the evaluation statement on-line after the bid evaluation is over.
- Price evaluation will be on lowest quoted rate basis.
- Once the Enterprise procurement is closed, bidders shall not be allowed to revise
their price and/or withdraw their offer for any reason whatsoever.
The bid shall be typed or written in indelible ink and signed by the authorized
signatory of the bidder who shall also sign each page. The bid shall be submitted in
hard bound form. In case of printed and published documents, only the cover shall
be initialed. All the alterations, omissions, additions or any other amendments
made to the bid shall be initialed by the person(s) signing the bid.
2.5 Sealing and Marking of Techno Commercial Bid (Part-I)
2.5.1 The bidder shall submit the following documents of Techno Commercial Bid
(Part-I) bid in a packet bearing the TENDER no.
“HCL/M&C/KOLIHAN/DRILLING/2018/01 Dated 07.12.2018” :
i. Covering letter in the format specified under the schedule as Appendix-I
ii. Details of the bidder in the format prescribed at Appendix-II
iii. The Bid Security in the format prescribed at Appendix-III, and marked as
„Bid Security‟ on the packet.
iv. Power of Attorney for signing of bid in the prescribed format (Appendix-
IV A).
v. Power of Attorney for Lead Member of Consortium in the prescribed
format (Appendix-IV B)
vi. Joint Bidding Agreement in the prescribed format (Appendix-IV C)
vii. Integrity Pact Agreement (Appendix–V&VA)
Page 40 of 160
viii. Proof of eligibility criteria in the format prescribed at Appendix-VI & VII
ix. Minimum no of details of equipment including make and year of make in
the format prescribed at Appendix-VIII
x. Statement of Legal Capacity of the bidder in the format prescribed at
Appendix-IX A
xi. Proposed Site Organization in the format prescribed at Appendix-IX B
xii. Certificate of Site visit in the format prescribed at Appendix-IX C (if
visited)
xiii. Screen shot of mock submission of e-bid at Mjunction at Appendix-IX D.
xiv. A copy of the tender document with each page initialed by the person
signing the bid in pursuance of the power of attorney.
a. Part II (Price Bid) consisting of the quotation of prices shall only be done in
the e tendering Portal only and no packet consisting hard copy of the Price
Bid may be sent to HCL office.
2.5.2 The documents accompanying the bid, shall be placed in hard binding and the
pages shall be numbered serially. Each page thereof shall be initialized by the
authorized signatory.
2.5.3 The packet shall clearly bear the following identification:
“TENDER DOCUMENT FOR DIAMOND DRILLING, SAMPLING AND
RELATED GEOLOGICAL ACTIVITIES AND GEOLOGICAL REPOPORT
PREPARATION WORK IN KOLIHAN COPPER MINE LEASE OF KHETRI
COPPER COMPLEX, KOLIHAN, JHUNJHUNU, RAJASTHAN”
and shall clearly indicate the name and address of the bidder. In addition, the bid
due date should be indicated on the right hand top corner of the packet.
2.5.4 The packet shall be addressed to:
ATTN. OF: Executive Director (Materials and Contracts)
ADDRESS: Hindustan Copper Limited
„Tamra Bhawan‟
1, Ashutosh Chowdhury Avenue
Kolkata – 700 019
Email: [email protected]
2.5.5 If the packet is not sealed and marked as mentioned above, HCL shall not assume
any responsibility for the misplacement or premature opening of the bid submitted
and consequent losses, if any, suffered by the bidder.
2.5.6 Bids submitted by fax, telex, telegram or e-mail shall not be entertained and shall
be rejected.
Page 41 of 160
2.6 Bid Due Date and Time
2.6.1 Due date and time of submission of Bid Documents is as per clause 1.13 in the e
tendering portal and at the address mentioned above and in the manner and form as
detailed in this TENDER.
2.7 HCL may, in its sole discretion, extend the bid due date by issuing an addendum.
2.8 Late Bids
Bids received by HCL after the Bid Due Date shall not be eligible for
consideration and shall be summarily rejected.
2.9 Modifications/Substitution/Withdrawal of Bids
2.9.1 Except where expressly permitted by these instructions, the bidder shall not make
or cause to be made any alteration, erasure or obliteration to the text of the
documents prepared by HCL and submitted by the bidder with or as part of his bid.
2.9.2 No bid shall be modified, substituted or withdrawn by the bidder on its submission
on the bid due date.
2.9.3 Withdrawal of a bid during the interval between the deadline for submission of bids
and expiration of the period of bid validity specified in the bid shall result in the
forfeiture of Bid Security.
2.10 Rejection of Bids
2.10.1 Notwithstanding anything contained in the tender, HCL reserves the right to reject
any bid and to annul the bidding process and reject all the bids at any time without
any liability or any obligation for such rejection or annulment. In the event that
HCL rejects all the bids or annuls the bidding process, it may, in its discretion
invite all eligible bidders to submit fresh bids hereunder.
2.10.2 HCL reserves the right not to proceed with the bidding process at any time, without
notice or liability, and to reject any bid without assigning any reasons.
2.11 Confidentiality: Information relating to the examination, clarification,
recommendation and evaluation of the Bidders shall not be disclosed to any person
who is not officially concerned with the process or is not a retained professional
advisor advising HCL in relation to or matters arising out of, or concerning the
bidding process. HCL will treat all information, submitted as part of the bid, in
confidence and will require all those who have access to such material to treat the
same in confidence. HCL may not divulge any such information unless it is
directed to do so by any statutory entity that has the power under law to require its
disclosure or is to enforce or assert any right or privilege of the statutory entity
and/or HCL or as may be required by law or in connection with any legal process.
Page 42 of 160
2.12 Correspondence with the Bidder: Save and except as provided in this tender,
HCL shall not entertain any correspondence with any Bidder in relation to
acceptance or rejection of any Bid.
c. BID SECURITY
2.13 Bid Security
2.13.1 The Bidder shall have to furnish Rs 32.0 lakh (Rs. Thirty Two Lakhs) only as part
of its bid, a Bid Security in the form of a Demand Draft/Pay Order/Banker‟s
Cheque or a bank guarantee issued by any scheduled commercial bank, drawn in
favour of Hindustan Copper Limited and payable at Kolkata, in the format at
Appendix III (in case of “Bank Guarantee”) and having a validity period of not
less than 180 (one hundred and eighty) days from the Bid Due Date, inclusive of a
claim period 60 (sixty) days, and which may be extended for a maximum period of
another 30 (thirty) days, if required by HCL or transfer EMD amount Rs 32 lakh to
HINDUSTAN COPPER LIMITED bank account by NEFT/RTGS. However, in in
case of transfer by NEFT/RTGS, copy of the RTGS slip / UTR no along with date
to be enclosed. The Bank account details are as mentioned below:
Name of account: HINDUSTAN COPPER LIMITED
Cash Credit A/C no: 10373629348
Name of Bank: State Bank of India
Corporate Accounts
Group Branch, Kolkata, India
Address of Bank: 34, Jawaharlal Nehru Road
Reliance House
Kolkata – 700 071, India
IFSC No: SBIN0009998
2.13.2 HCL shall not be liable to pay any interest on the Bid Security so made and the
same shall be interest free.
2.13.3 Any bid not accompanied by the Bid Security shall be summarily rejected by HCL
as non- responsive subject to exemptions, if any, indicated in the tender documents.
2.13.4 HCL shall be entitled to forfeit, invoke and appropriate the Bid Security as
damages inter alia in any of the events specified below. The bidder, by submitting
its bid pursuant to this tender, shall be deemed to have acknowledged and
confirmed that HCL will suffer loss and damage on account of withdrawal of its
Page 43 of 160
bid or for any other default by the bidder during the Bid validity period as specified
in this tender. No relaxation of any kind on Bid Security shall be given to any
bidder.
2.13.5 Under the following conditions, the Bid Security shall be forfeited, invoked as
damages without prejudice to any other right or remedy that may be available to
HCL under the bidding documents and/or under the Contract, or otherwise,:
(a) If a bidder engages in a corrupt practice, fraudulent practice, coercive
practice, undesirable practice.
(b) If a bidder withdraws its bid during the period of validity of bids as specified
in this tender and as extended on instructions of HCL;
(c) In the case of selected bidder, if it fails within the specified time limit -
(i) to sign and return the duplicate copy of the LoI; and/or
(ii) To do all such acts as are required under this tender or before signing of
the Contract ; and/or
(iii)To furnish the Performance Security within the period prescribed there
for.
2.13.6 The following are exempted from submission of Bid Security:
The EMD provided by the Bidders along with the Bids should be returned to the
unsuccessful Bidders within 30 days from the date of opening of price Bid /
placement of purchase order / signing of the job contract, whichever is earlier. In
case of selected Bidder, Bid security will be retained till Performance Security as
per Contract is submitted, subject to extension of the validity as per the
requirement. In the event of the Bid of any party is rejected during the course of
Techno-Commercial scrutiny and evaluation, the EMD should be returned to such
Bidder immediately within seven days from the date of rejection of their offer.
In the price bid, the bidder shall include all elements of cost strictly as per the scope
of work specified in technical specification. The price shall be item wise in
accordance with and as stated in the specification. The bidder will be responsible
for complete execution of the job as specified in the scope of work. The rate quoted
should be valid for 180 days, which may be extended by 30 days by the bidder, if
required by HCL.
Page 44 of 160
The bidder shall give the detail price schedule taking into consideration of all the
element of work and services as covered under the scope of work. Quoted Price
should be in figure.
The Contract Price is in accordance with commercial terms & conditions,
stipulations, specifications, requirements and other conditions of the Contract for
the estimated quantities of work and firm unit rates as given in Schedule of items.
Total Quoted Price of bidder shall include basic price, all taxes & duties, levies,
freight,Insurance etc. as applicable on base date but excluding GST.
Bidders shall quote for the entire scope on a “single responsibility” basis such that
the total bid price covers all the Contractor‟s obligations mentioned in or to be
reasonably inferred from the tender documents in respect of the engineering,
procurement, erection, testing, commissioning, construction, Insurance, mine
development, ore production and execution of all the facilities in relation to the
Project as defined in technical specification. This includes all requirements under
the Contractor‟s responsibilities for testing, pre- commissioning and
commissioning of the equipment, insurance, training of Purchaser‟s personnel,
commissioning spares, initial fill and Lubricants, special tools and tackles, where
so required by the tender documents, the acquisition of all permits, approvals and
licenses, etc. up to commissioning and such other items and services as may be
specified in the tender documents.
Items against which no price is entered by the bidder will not be paid for by the
Employer when executed and shall be deemed to be covered by the prices for other
items. The bidder will execute/supply such item(s) without claiming any extra
amount.
Bidder are required to quote the price for the commercial and technical obligations
outlined in the bidding documents. Deviations shall not be allowed for this
package.
Bidder must clearly mention their Income Tax Permanent Account Number (PAN)
and Bank Account Number in the offer. Supplies & Services quoted in Indian
Rupee shall be quoted on “HCL, KCC Site” basis. Base Date of the Contract Price
shall be the date of opening of Part I (Techno Commercial Bid) of the tender.
Page 45 of 160
3 EVALUATION OF BIDS
3.1 Opening and Evaluation of Bids
3.1.1 HCL shall open the Techno Commercial Bid (Part – I) on e tendering portal and
hard copy documents of Part I received by post at HCL, as per schedule given in
clause 1.13 in the presence of the bidders who choose to attend. However, in the
eventuality that the day of opening of the bids becomes a non-working day due to a
force majeure event, the date of opening of the bids will shift to the next working
day at the same time.
Part II of the bid (“Price Bid”) shall be opened in the e tendering portal for those
bidders who qualify techno-commercially as per qualifying criteria of the tender.
The date and time of opening of Price Bid (Part – II) B shall be communicated in
due course of time.
3.1.2 To facilitate evaluation of bids, HCL may, in its sole discretion, seek clarifications
in writing from any / all Bidder(s) regarding its Bid.
3.2 Selection of Bidder
3.2.1 The bidder whose bid is adjudged as responsive and quoting the lowest Contract
Price evaluated on the basis of quantities in Schedule of Quantity and rate, for
implementation of the Work shall be declared as the selected bidder (the “Selected
Bidder”).
3.2.2 Bids will be invited for the Project on the basis of the lowest total lump sum fee
(“Contract Price”) required by a Bidder for executing the Project. Bidders shall be
required to quote in the Price Bid the Contract Price that shall be charged by them
for the execution of the Project. The Contract Price amount shall constitute the sole
criteria for evaluation of Bids. The Project shall be awarded to the Bidder quoting
the lowest Contract Price. In this tender document, the term “Lowest Bidder” shall
mean the Bidder seeking the lowest Contract Price. Bidder shall quote for total/all
items of price schedule. Bidder to quote in the “Price Schedule” in Indian Rupees
only.
Evaluation shall be done on Total Quoted price of Price Schedule which includes
Basic price, all taxes & duties, levies, freight, Insurance etc. but excluding GST.
Price for Open items shall not be considered for Evaluation of Price bids.
3.2.3 After selection, a Letter of Intent (the “LoI”) shall be issued, in duplicate, by HCL
to the selected bidder and the selected bidder shall, within 7 (seven) days of the
receipt of the LoI, sign and return the duplicate copy of the LoI in
acknowledgement thereof. In the event the duplicate copy of the LoI duly signed
Page 46 of 160
by the selected bidder is not received within the stipulated time, HCL may, unless it
consents to extension of time for submission thereof, appropriate/invoke the Bid
Security of such bidder as damages on account of failure of the selected bidder to
acknowledge the LoI. No correspondence will be entertained by HCL from the
unsuccessful bidders.
3.2.4 After acknowledgement of the LoI as aforesaid by the selected bidder, it shall cause
the selected bidder to execute the Contract within the period of ten (10) days. The
Selected Bidder shall not be entitled to seek any deviation, modification or
amendment in the Contract.
3.2.5 Upon “Letter of Intent” being signed and returned by the successful Bidder, HCL
will discharge/return bid security to other unsuccessful bidders.
3.2.6 The selected bidder shall, for the due and proper performance and fulfillment of its
obligations during the contract period of the Work, provide an irrevocable and
unconditional bank guarantee from any scheduled commercial bank in India, in
favour of HCL, for a sum equivalent to 10% of the total contract amount in the
form set-forth in the Contract (the “Security Deposit”) at schedule VII. Security
Deposit in any other format is not acceptable. Payment shall not be released if SD
has not been deposited in totality. The Security Deposit shall remain valid for a
period of 24 months from the date of issue of LoI and will be renewed
subsequently as per Article 6 of NIT. The selected bidder shall further extend the
validity of its Performance Security Deposit, if so required by HCL.
The said Security Deposit shall be provided by the selected bidder within 30
(thirty) days of the date of issue of LoI. In the event, the selected bidder fails to
provide the said Performance Security within the time period stipulated herein,
HCL may forfeit the Bid Security submitted by the selected bidder along with their
bid.
Page 47 of 160
4 FRAUD AND CORRUPT PRACTICES
4.1 The Bidders and their respective officers, employees, agents and advisers shall observe
the highest standard of ethics during the Bidding Process and subsequent to the issue of
the LOI and during the subsistence of the Contract. Notwithstanding anything to the
contrary contained herein, or in the LOI or the Contract, HCL shall reject a Bid,
withdraw the LOI, or terminate the Contract, as the case may be, without being liable
in any manner whatsoever to the Bidder or Selected Bidder, as the case may be, if it
determines that the Bidder or Selected Bidder, as the case may be, has, directly or
indirectly or through an agent, engaged in corrupt practice, fraudulent practice,
coercive practice, undesirable practice or restrictive practice in the Bidding Process. In
such an event, HCL shall forfeit and appropriate the Bid Security or Performance
Security, as the case may be, as damages, without prejudice to any other right or
remedy that may be available to HCL under the Bidding Documents and/or the
Contract, or otherwise.
4.2 Without prejudice to the rights of HCL under clause 4.1 hereinabove and the rights
and remedies which HCL may have under the LOI or the Contract, if a Bidder or
Selected Bidder, as the case may be, is found by HCL to have directly or indirectly or
through an agent, engaged or indulged in any corrupt practice, fraudulent practice,
coercive practice, undesirable practice or restrictive practice during the Bidding
Process, or after the issue of the LOI or the execution of the Contract, such Bidder or
Selected Bidder shall not be eligible to participate in any tender or request for proposal
issued by HCL during a period of 2 (two) years from the date such Bidder or Selected
Bidder, as the case may be, is found by HCL to have directly or indirectly or through
an agent, engaged or indulged in any corrupt practice, fraudulent practice, coercive
practice, undesirable practice or restrictive practices, as the case may be.
4.3 For the purposes of this clause 4, the following terms shall have the meaning
hereinafter respectively assigned to them:
(a) “corrupt practice” means (i) the offering, giving, receiving, or
soliciting, directly or indirectly, of anything of value to influence the
actions of any person connected with the Bidding Process (for
avoidance of doubt, offering of employment to or employing or
engaging in any manner whatsoever, directly or indirectly, any official
of HCL who is or has been associated in any manner, directly or
indirectly with the Bidding Process or the LOI or has dealt with matters
concerning the Contract, before or after the execution thereof, at any
time prior to the expiry of one year from the date such official resigns or
retires from or otherwise ceases to be in the service of HCL, shall be
Page 48 of 160
deemed to constitute influencing the actions of a person connected with
the Bidding Process); or (ii) engaging in any manner whatsoever,
whether during the Bidding Process or after the issue of the LOI or after
the execution of the Contract, as the case may be, any person in respect
of any matter relating to the Project or the LOI or the Contract, who at
any time has been or is a legal, financial or technical adviser of HCL in
relation to any matter concerning the Project;
(b) “fraudulent practice” means a misrepresentation or omission of facts or
suppression of facts or disclosure of incomplete facts, in order to
influence the Bidding Process ;
(c) “coercive practice” means impairing or harming, or threatening to
impair or harm, directly or indirectly, any person or property to
influence any person‟s participation or action in the Bidding Process;
(d) “undesirable practice” means (i) establishing contact with any person
connected with or employed or engaged by HCL with the objective of
canvassing, lobbying or in any manner influencing or attempting to
influence the Bidding Process; or (ii) having a Conflict of Interest; and
(e) “restrictive practice” means forming a cartel or arriving at any
understanding or arrangement among the Bidders with the objective of
restricting or manipulating a full and fair competition in the Bidding
Process.
Page 49 of 160
5 PRE-BID CONFERENCE
5.1 Pre-Bid conference of the Bidders shall be convened at a designated date, time and place. A
maximum of two representatives of each Bidder shall be allowed to participate.
5.2 During the course of the pre-bid conference, the Bidders will be free to seek clarifications and make
suggestions for consideration of HCL. HCL shall endeavour to provide clarifications and such
further information as it may, in its sole discretion, consider appropriate for facilitating a fair,
transparent and competitive Bidding Process.
5.3 The Bidders are requested to submit any question/query by email to reach HCL as per 1.13 Schedule
of Bidding Process. Bidders desirous of obtaining clarifications on clauses of the tender enquiry
(Technical as well as Commercial) are requested to send their questions/queries for clarifications at
least 5 days prior to date of pre-bid conference and also ensure their participation in the per bid
conference. The purpose of the pre-bid conference will be to clarify the issues raised by the bidders.
However, HCL shall not be obliged to respond any queries which it receives after above deadline.
Any modifications of the tender document which may become necessary as a result of Pre-bid
conference shall be made exclusively through the issue of Addendum/Corrigendum, if any, and will
be uploaded on websites of www.hindustancopper.com and it shall become part of the bidding
documents. However, in case any query remains un-replied, it shall be construed that in respect of
those queries, the respective stipulation of the tender document shall continue to apply and/or no new
stipulations made w.r.t. those queries.
5.4 Non-attendance at the pre-bid conference will not be a cause for disqualification of a Bidder.
6.0 MISCELLANEOUS
6.1 The Bidding Process shall be governed by and construed in accordance with the laws of India
and the courts at Khetri, Jhunjhun, Rajasthan shall have exclusive jurisdiction over all disputes
arising under, pursuant to and/ or in connection with the Bidding Process.
6.2 HCL, in its sole discretion and without incurring any obligation or liability, reserves the right, at
any time, to;
(a) suspend and/or cancel the Bidding Process and/or amend and/or supplement the Bidding
Process or modify the dates or other terms and conditions relating thereto;
(b) consult with any Bidder in order to receive clarification or further information;
(c) retain any information and/ or evidence submitted to HCL by, on behalf of, and/ or in relation
to any Bidder; and/ or
(d) independently verify, disqualify, reject and/ or accept any and all submissions or other i
nformation and/ or evidence submitted by or on behalf of any Bidder.
6.3 It shall be deemed that by submitting the Bid, the Bidder agrees and releases HCL, its employees,
agents and advisers, irrevocably, unconditionally, fully and finally from any and all liability for
claims, losses, damages, costs, expenses or liabilities in any way related to or arising from the
exercise of any rights and/ or performance of any obligations hereunder, pursuant hereto and/ or
Page 50 of 160
in connection herewith and waives any and all rights and/ or claims it may have in this respect,
whether actual or contingent, whether present or future.
Page 51 of 160
APPENDIX - I
Covering Letter
(To be placed in Part I of the Bid)
Date:
Sub: Bid Tender document for diamond drilling, sampling and related geological activities and
Geological Report Preparation work in Kolihan copper mine lease of Khetri copper
complex, Kolihan, Jhunjhunu, Rajasthan
Dear Sir,
With reference to your tender no. ……………. dated xx.xx.2018, I/We, having examined the Bidding
Documents and understood their contents, hereby submit my/our Bid for the aforesaid Work in
prescribed format. The Bid is unconditional and unqualified.
1. I/We acknowledge that HCL will be relying on the information provided in the Bid and the
documents accompanying the Bid for selection of the Selected Bidder for the aforesaid Work, and
we certify that all information provided therein is true and correct and nothing has been omitted
which renders such information misleading and all documents accompanying the Bid are true copies
of their respective originals.
2. This statement is made for the express purpose of qualifying as a Selected Bidder for the
implementation of the aforesaid Work.
3. I/ We shall make available to HCL any additional information it may find necessary or require to
supplement or authenticate the Bid.
4. I/ We acknowledge the right of HCL to reject our Bid without assigning any reason or otherwise and
hereby waive, to the fullest extent permitted by applicable law, our right to challenge the same on
any account whatsoever.
5. I/ We declare that:
(a) I/ We have examined and have no reservations to the Bidding Documents, including any
addendum issued by HCL; and
(b) I/ We do not have any Conflict of Interest and
(c) I/We have not directly or indirectly or through an agent engaged or indulged in any corrupt
practice, fraudulent practice, coercive practice, undesirable practice or restrictive practice, in
Page 52 of 160
respect of any tender or request for proposal issued by or any agreement entered into with
HCL or any other public sector enterprise or any government, Central or State; and
(d) I/ We hereby certify that we have taken steps to ensure that no person acting for us or on our
behalf has engaged or will engage in any corrupt practice, fraudulent practice, coercive
practice, undesirable practice or restrictive practice.
(e) the undertakings given by me/us along with the offer in response to the Tender for the Work
were true and correct as on the date of making the Tender and are also true and correct as on
the Bid Due Date and I/we shall continue to abide by them.
6. I/ We understand that you may cancel/annul the Bidding Process at any time and that you are neither
bound to accept any Bid that you may receive nor to invite the Bidders to Bid for the Work, without
incurring any liability to the Bidders.
7. I/ We certify that in regard to matters other than security and integrity of the country, have not been
convicted or indicted by a court of law and no adverse orders have been passed by a regulatory
authority which could cast a doubt on our ability to undertake the Work or which relates to a grave
offence that outrages the moral sense of the community.
8. I/ We further certify that in regard to matters relating to security and integrity of the country, we have
not been charge-sheeted by any agency of the government or convicted by a court of law for any
offence committed by us or by any of our Associates.
9. I/ We further certify that no investigation by a regulatory authority is pending either against
us or against our Associates or against our CEO or any of our Directors/ managers/ employees.
10. I/ We undertake that in case due to any change in facts or circumstances during the Bidding Process
the provisions of disqualification in terms of the guidelines referred to above are attracted, we shall
intimate HCL of the same immediately.
11. We further agree and acknowledge that the aforesaid obligations shall be in addition to the
obligations contained in the Contract.
12. I/We hereby irrevocably waive any right or remedy which we may have at any stage at law or
howsoever otherwise arising to challenge or question any decision taken by HCL in connection with
the selection of the Bidder, or in connection with the Bidding Process itself, in respect of the above
mentioned Work and the terms and implementation thereof.
13. In the event of my/our being declared as the Selected Bidder, I/We agree to enter into a Contract in
accordance that has been provided to me/us prior to the Bid Due Date. We agree not to seek any
changes in the aforesaid Contract and agree to abide by the same.
14. I/We have studied all the Bidding Documents carefully and have also surveyed the Work site. We
understand that except to the extent as expressly set forth in the tender and/or Contract, we shall have
no claim, right or title arising out of any documents or information provided to us by HCL or in
Page 53 of 160
respect of any matter arising out of or concerning or relating to the Bidding Process including the
award of the Contract.
15. The Contract Price has been quoted by me/us after taking into consideration all the terms and
conditions stated in the tender, Contract, our own estimates of costs and after a careful assessment of
the site and all the conditions that may affect the work cost and implementation of the Work.
16. I/We offer a bid security of Rs 32.0 Lakh only to HCL in accordance with the tender.
17. The Bid security in the form of a Demand Draft/Pay Order/Banker‟s Cheque/Bank Guarantee (strike
out whichever is not applicable) is attached.
18. In the event of I/We being declared as Selected Bidder, I/We hereby undertake and agree to provide
an irrevocable and unconditional bank guarantee as Performance Security Deposit in favour of HCL
within 30 (thirty) days of the issue of LoI as per the tender.
19. I/ We agree and understand that the Bid is subject to the provisions of the Bidding Documents. In no
case, I/we shall have any claim or right of whatsoever nature if the Work is not awarded to me/us or
our Bid is not opened or rejected.
20. I/We agree to keep this offer valid for 180 (one hundred and eighty) days from the Bid Due Date
specified in the tender and may be extended by another 30 (thirty) days, if required by HCL.
21. I/ We hereby submit our Bid for undertaking the aforesaid work in accordance with the Bidding
Documents and the Contract. The prices of each item aggregating to the Contract Price are quoted by
me/us as provided in the schedule annexed hereto. The said Contract Price shall be payable over the
construction period and as set out in Contract. The RA bills can be payable only after receipt of
security deposit.
22. I/We hereby confirm that no change has been made in any of the formats attached with tender.
23. I/We agree and undertake to abide by all the terms and conditions of the tender and confirm that
there is no deviation in the terms and conditions.
In witness whereof, I/we submit this Bid under and in accordance with the terms of the tender.
Yours faithfully,
Date:
(Signature of the Authorized signatory)
Place:
(Name and designation of the of the Authorized signatory)
Name and seal of Bidder
Page 54 of 160
APPENDIX - II
DETAILS OF BIDDER
(In case of Consortium, details of the Lead Member & other Members of the Consortium to be
given in separate sheets)
1. IN CASE OF INDIVIDUAL:
1.1 Name
1.2 Registration details, if any
1.3 Date of commencement of business
1.4 Permanent Account Number (PAN)
1.5 TIN
1.6 GST registration number
1.7 Copies of Balance sheet
1.8 HCL‟s vendor registration code
2. IN CASE OF PARTNERSHIP:
2.1 Name of Partners
2.2 Whether the Partnership is registered or not.
2.3 Date of establishment of firm
2.4 Permanent Account Number (PAN)
2.5 TIN
2.6 GST registration number
2.7 Copies of Balance sheet
2.8 HCL‟s vendor registration code
Page 55 of 160
APPENDIX – III
Page 56 of 160
tribunal/relating thereto, our liability under this present being absolute and unequivocal.
The payment so made by us under this guarantee shall be a valid discharge of our liability for
payment hereunder and the Bidder shall have no claim against us on making such payment.
3. We,______________________(indicate the name of the bank) further agree that the guarantee
herein contained shall be irrevocable and remain in full force and effect for a period of 180 (One
Hundred and Eighty) days from the Bid Due Date inclusive of a claim period of 60 (Sixty) days or as
extended for a maximum period of another 30 (Thirty) days as required by HCL and shall continue to
be enforceable till all the dues of HCL under or by virtue of the said Bidding Documents have been
fully paid and its claims satisfied or discharged or the___________________________
(office/Department) certifies that the terms and conditions of the said Bidding Documents have been
fully and properly carried out by the said Bidder and accordingly discharges this guarantee. Unless a
demand or claim under this guarantee is made on us in writing on or before the
_______________________ (indicate the date of validity) we shall be discharged from all liability
under this guarantee thereafter.
4. We, ___________________________further agree with HCL that HCL shall have the fullest
liberty without our consent and without affecting in any manner our obligations hereunder to vary
any of the terms & conditions of the said Bidding Documents or to extend the validity period of this
guarantee or to postpone for any time or from time to time any of the powers exercisable by HCL
against the said Bidder and to forebear or enforce any of the terms and conditions relating to the said
Bidding Documents and we shall not be relieved from our liability by reason of any such variation or
extension being granted to the said Bidder or for any forbearance, act or commission on the part of
HCL or any indulgence by HCL to the said Bidder or by any such matter or thing whatsoever which
under the law relating to sureties would, but for this provision, have effect of so relieving us.
5. This guarantee will not be discharged due to the change in the constitution or winding up of the
Bidder or the Bank or any absorption, merger or amalgamation of the Bidder or the Bank with any
other person.
6. It shall not be necessary for HCL to proceed against the said Bidder before proceeding against
the Bank and the guarantee herein contained shall be enforceable against the Bank, notwithstanding
any other security which HCL may have obtained from the said Bidder or any other person and
which shall, at the time when proceedings are taken against the Bank hereunder, be outstanding or
unrealized.
7. We, ___________________ (indicate the name of the Bank) lastly undertake not to revoke this
guarantee during its currency except with the previous consent of HCL in writing.
Dated the ____________Day of ______
For _______________
(Indicate the name of bank)
Page 57 of 160
APPENDIX – IV A
Power of Attorney for signing of Bid
(To be placed in Part I of the Bid)
Know all men by these presents, We, ___________________ (name of the company and address
of the registered office) do hereby irrevocably constitute, nominate, appoint and authorize Mr. /
Ms__________ , son/daughter/wife of____________ and presently residing at ________, who is
holding the position of ________________], as our true and lawful attorney (hereinafter referred to
as the “Attorney”) to do in our name and on our behalf, all such acts, deeds and things as are necessary
or required in connection with or incidental to submission of our Bid for the “ [insert name of the work]”
proposed by the Hindustan Copper Limited (“HCL”) including but not limited to signing and submission
of all Tenders, Bids and other documents and writings, participation in Bidders' and other conferences
and providing information / responses to HCL, representing us in all matters before HCL, signing and
execution of all contracts including the Contract and undertakings consequent to acceptance of our Bid,
and generally dealing with HCL in all matters in connection with or relating to or arising out of our Bid
for the said Work and/or upon award thereof to us and/or till the execution of the Contract with HCL.
AND we hereby agree to ratify and confirm and do hereby ratify and confirm all acts, deeds and things
lawfully done or caused to be done by our said Attorney pursuant to and in exercise of the powers
conferred by this power of attorney and that all acts, deeds and things done by our said Attorney in
exercise of the powers hereby conferred shall and shall always be deemed to have been done by us.
IN WITNESS WHEREOF WE, ________________, THE ABOVE NAMED PRINCIPAL
HAVE EXECUTED THIS POWER OF ATTORNEY ON THIS _____DAY OF ______, 2018.
For _______________
(Signature)
(Name, Title and Address)
Witnesses:
1.
2.
Accepted [Notarized]
(Signature) (Name, Title and Address of the Attorney)
Notes:
• The mode of execution of the power of attorney should be in accordance with the procedure, if any, laid
down by the applicable law and the charter documents of the executants (s) and when it is so required,
the name should be under common seal affixed in accordance with the required procedure.
Page 58 of 160
• Also, wherever required, the Bidder should submit for verification the extract of the charter documents
and documents such as a resolution/power of attorney in favour of the person executing this
power of attorney for the delegation of power hereunder on behalf of the Bidder.
Page 59 of 160
APPENDIX – IV B
Power of Attorney for Lead Member of Consortium
(To be placed in Part I of the Bid)
Whereas the Hindustan Copper Limited (“HCL”) has invited Bids from bidders Tender document for for
diamond drilling, sampling and related geological activities and Geological Report Preparation
work in Kolihan copper mine lease of Khetri copper complex, Kolihan, Jhunjhunu, Rajasthan.
Whereas, ____________, and____________ (collectively the “Consortium”) being members of the
Consortium are interested in bidding for the Project in accordance with the terms and conditions of the
NIT and other connected documents in respect of the work, and
Whereas, it is necessary for the members of the Consortium to designate one of them as the Lead
Member with all necessary power and authority to do for and on behalf of the Consortium, all acts,
deeds and things as may be necessary in connection with the Consortium‟s Bid for the entire
work and its execution.
We, M/s----------------------,having our registered office at _______and M/s. ______, having our
registered office at ____________, [the respective names and addresses of the registered office]
(hereinafter collectively referred to as the “Principals”) do hereby irrevocably designate, nominate,
constitute, appoint and authorise M/s ________, having its registered office at _________, being one of
the members of the Consortium, as the Lead Member and true and lawful attorney of the Consortium
(hereinafter referred to as the “Attorney”) and hereby irrevocably authorise the Attorney (with power to
sub-delegate) to conduct all business for and on behalf of the Consortium and any one of us during the
Bidding Process and, in the event the Consortium is awarded the Contract, during the execution of the
entire work, and in this regard, to do on our behalf and on behalf of the Consortium, all or any of such
acts, deeds or things as are necessary or required or incidental to the submission of its Bid for the entire
work, including but not limited to signing and submission of all applications, Bids and other documents
and writings, participation in Bidders‟ and other conferences, respond to queries, submit information/
documents, sign and execute contracts and undertakings consequent to acceptance of the Bid of the
Consortium and generally to represent the Consortium in all its dealings with HCL, and/ or any other
government agency or any person, in all matters in connection with or relating to or arising out of the
Consortium‟s Bid for the entire work and/ or upon award thereof till the Contract is entered into
with HCL.
AND we hereby agree to ratify and confirm and do hereby ratify and confirm all acts, deeds and
things lawfully done or caused to be done by our said Attorney pursuant to and in exercise of the powers
conferred by this power of attorney and that all acts, deeds and things done by our said Attorney in
Page 60 of 160
exercise of the powers hereby conferred shall and shall always be deemed to have been done by us/
Consortium.
For ________
For ________
Witnesses:
1.
2.
(Executants)
Notes:
1) The mode of execution of the power of attorney should be in accordance with the procedure, if
any, laid down by the applicable law and the charter documents of the executant(s) and when it is
so required, the same should be under common seal affixed in accordance with the required
procedure.
2) Also, wherever required, the Consortium members should submit for verification the extract of
the charter documents and documents such as a resolution/ power of attorney in favour of the
person executing this power of attorney for the delegation of power hereunder on behalf of the
Consortium members.
Page 61 of 160
APPENDIX – IV C
Joint Bidding Agreement
(To be placed in Part I of the Bid)
This Joint Bidding Agreement (the “AGREEMENT”) made at ______ on this __ day of _____, 201-
AMONGST
{___________ Limited, a company incorporated under the companies Act, 2013} and having its
registered office at ________ (herein after referred to as “First Part”, which expression shall unless
repugnant to the context include its successors and permitted assigns)
AND
{___________ Limited, a company incorporated under the companies Act, 2013} and having its
registered office at ________ (herein after referred to as “Second Part”, which expression shall unless
repugnant to the context include its successors and permitted assigns)
The above mentioned parties of the FIRST and SECOND PART are collectively referred to as the
“Parties” and each is individually referred to as a “Party”.
WHEREAS:
A. Hindustan Copper Limited (HCL), invites applications by its NIT for short-listing of bidders
Tender document for for diamond drilling, sampling and related geological activities and
Geological Report Preparation work in Kolihan copper mine lease of Khetri copper
complex, Kolihan, Jhunjhunu, Rajasthan (hereinafter referred to as the “work”)
B. The Parties are interested in jointly bidding for the work as members of a Consortium and in
accordance with the terms and conditions of the NIT, and
C. It is necessary condition under the NIT that the members of the Consortium shall enter into a
Joint Bidding Agreement and furnish a copy thereof with the Application.
Page 62 of 160
In this Agreement, the capitalised term shall, unless the context otherwise requires, have the meaning
ascribed thereto under the RFQ.
2. Consortium
a) The Parties do hereby irrevocably constitute a consortium (the “Consortium”) for the purpose of
jointly participating in the Bidding Process for the Project
b) The Parties hereby undertake to participate in the Bidding Process only through this Consortium
and not individually and/ or through any other Consortium constituted for this Project, either
directly or indirectly or through any of their Constituents.
3. Covenants
The Parties hereby undertake that in the event the Consortium is declared the selected Bidder and
awarded the Work, it shall enter into a Agreement with HCL and for performing all its obligations as
the developer in terms of the Agreement for the work.
4. Roles of the Parties
The Parties hereby undertake to perform the roles and responsibilities as described below:
a. Party of the First Part shall be the Lead member of the Consortium and shall have the power of
attorney from all Parties for conducting all business for and on behalf of the Consortium during
the Bidding Process and under the Agreement when all the obligations under the agreement shall
become effective. The role of First Part shall (in the event that it is a technical member)
be________________, or (in the event that it is a financial member) be ____________________
.
b. Party of the Second Part shall be the Financial / Technical Member {delete as appropriate, based
on who is being nominated as the Lead Member} and the role of Second Part shall
be________________.
5. Joint and Several Liability
The Parties do hereby undertake to be jointly and severally responsible for all obligations and
liabilities relating to the work and in accordance with the terms of the NIT and the Agreement.
6. Representation of the Parties
Each Party represents to the other Parties as of the date of this Agreement that:
a) Such Party is duly organized, validly existing and in good standing under the laws of its
incorporation and has all requisite power and authority to enter into this Agreement;
b) The execution, delivery and performance by such Party of this Agreement has been authorised by
all necessary and appropriate corporate or governmental action and a copy of the extract of the
charter documents and board resolution/ power of attorney in favour of the person executing this
Agreement for the delegation of power and authority to execute this Agreement on behalf of the
Consortium member is annexed to this Agreement, and will not, to the best of this knowledge
i. require any consent or approval not already obtained;
ii. violate any Applicable Law presently in effect and having applicability to it;
iii. violate any clearance, permit, concession, grant, license or other governmental authorisation,
approval, judgment, order or decree or any mortgage agreement, indenture or any other
Page 63 of 160
instrument to which such Party is a party or by which such Party or any of its properties or
assets are bound or that is otherwise applicable to such Party; or
iv. create or impose any liens, mortgages, pledges, claims, security, interests, charges or
Encumbrances or obligations to create a lien, charge, pledge, security interest, encumbrances
or mortgage in or on the property of such Party, except for encumbrances that would not,
individually or in the aggregate, have a material adverse effect on the financial condition or
prospects or businesses of such Party so as to prevent such Party from fulfilling its
obligations under this Agreement;
v. this Agreement is the legal and binding obligation of such Party, enforceable in accordance
with its terms against it; and
vi. there is no litigation pending, or to the best of such Party‟s knowledge, threatened to which it
or any of its Affiliates is a party that presently affects or which would have a material
adverse effect on the financial condition or prospects or business of such Party in the
fulfillment of its obligations under this Agreement
7. Termination
In case the work is awarded to the Consortium, this Agreement shall be effective from the date
hereof and shall continue in full force and effect till the execution of the Completion of the work as
specified under the Agreement. However, in case the Consortium is either not pre-qualified for the
work or does not get selected for award of the work, the Agreement will stand terminated in case the
Applicant is not pre-qualified or upon return of the Bid Security by HCL to the Bidder, as the case
may be.
8. Miscellaneous
a) This Joint Bidding Agreement shall be governed by laws of India.
b) The Parties acknowledge and accept that this Agreement shall not be amended by the Parties without
the prior written consent of HCL.
IN WITNESS WHEREOF THE PARTIES ABOVE NAMED HAVE EXECUTED AND DELIVERED
THIS AGREEMENT AS OF THE DATE FIRST ABOVE WRITTEN.
Note:
The mode of execution of the Joint Bidding Agreement should be in accordance with the procedure,
if any laid down by the applicable law and the charter documents of the executants(s) and when it is
so required, the same should be under common seal affixed in accordance with the required
procedure.
Page 65 of 160
APPENDIX – V
Page 66 of 160
APPENDIX - VA
INTEGRITY PACT AGREEMENT
Between
Hindustan Copper Limited (HCL) hereinafter referred to as “the Principal”
and
..…………………………hereinafter referred to as “The Bidder”
Preamble
The Principal intends to award, under laid down organizational procedures, Contract/s of “[insert name of the
work]”. The Principal values full compliance with all relevant laws of the land, rules, regulations, economic use of
resources and of fairness/transparency in its relations with its Bidder(s).
In order to achieve these goals, the Principal has appointed Sri M.K.Deshmukh and Sri Narendra Kothari
an Independent External Monitors (IEMs), who will monitor the tender Process and the execution of the
Contract for compliance with the principles mentioned above.
Section I – Commitments of the Principal
(1) The Principal commits itself to take all measures necessary to prevent corruption and to observe the following
principles:-
a. No employee of the Principal, personally or through family members, will in connection with the
bidding , or the execution of a contract, demand, take a promise for or accept, for self or third person,
any material or immaterial benefit which the person is not legally entitled to.
b. The Principal will, during the Bidding Process treat all Bidder(s) with equity and reason. The Principal
will in particular, before and during the Bidding Process, provide to all Bidder(s) the same information
and will not provide to any Bidder(s) confidential/additional information through which the Bidder(s)
could obtain an advantage in relation to the Bidding Process or the Contract execution.
c. The Principal will exclude from the process all known prejudiced persons.
(2) If the Principal obtains information on the conduct of any of its employees which is a criminal offence under
the Indian Penal Code / Prevention of Corruption Act, or if there be a substantive suspicion in this regard,
the Principal will inform the Chief Vigilance Officer and in addition can initiate disciplinary actions.
Section 2 – Commitments of the Bidder(s)
(1) The Bidder(s) commits himself to take all measures necessary to prevent corruption. He commits himself to
observe the following principles during his participation in the Bidding Process and during the Contract
execution.
The Bidder(s) will not, directly or through any other person or company, offer, promise or give to any of the
Principal‟s employees involved in the Bidding Process or the execution of the Contract
Page 67 of 160
a. or to any third person any material or other benefit which he/she is not legally entitled to, in order to
obtain in exchange any advantage of any kind whatsoever during the Bidding Process or during the
execution of the Contract.
b. The Bidder(s) will not enter with other Bidders into any undisclosed agreement or understanding,
whether formal or informal. This applies in particular to prices, specifications, certifications, subsidiary
contracts, submission or non-submission of Bids or any other actions to restrict competitiveness or to
introduce cartelization in the Bidding Process.
c. The Bidder(s) will not commit any offence under the Indian Penal Code / Prevention of Corruption Act;
further the Bidder(s) will not use improperly, for purposes of competition or personal gain, or pass on to
others, any information or document provided by the Principal as part of the business relationship,
regarding plans, technical proposals and business details, including information contained or transmitted
electronically.
d. The Bidder(s) will, when presenting his Bid, disclose any and all payments he has made, is committed to
or intends to make to agents, brokers or any other intermediaries in connection with the award of the
Contract.
(2) The Bidder(s) will not instigate third persons to commit offences outlined above or be an accessory to
such offences.
Section 3 – Disqualification from Bidding Process and exclusion from future contracts
If the Bidder(s), before award or during execution has committed a transgression through a violation of
Section 2, above or in any other form such as to put his reliability or credibility in question, the Principal is
entitled to disqualify the Bidder(s) from the Bidding Process or take action as per the procedure mentioned
in the “Guidelines on Banning of Business Dealings”.
Section 4 – Compensation for damages
a. If the Principal has disqualified the Bidder(s) from the Bidding Process prior to the award according
to Section 3, the Principal is entitled to demand and recover the damages equivalent to Bid Security.
b. If the Principal has terminated the Contract according to Section 3, or if the Principal is entitled to
terminate the Contract according to Section 3, the Principal shall be entitled to demand and recover
from the Bidder, liquidated damages/penalties of the Contract value or the amount equivalent to
Performance Security.
Section 5 – Previous transgression
a. The Bidder declares that no previous transgressions occurred in the last 3 (three) years with any other
company in any country conforming to the anti corruption approach or with any other public sector
enterprise in India that could justify his exclusion from the Bidding Process.
b. If the Bidder makes incorrect statement on this subject, he can be disqualified from the Bidding
Process or action can be taken against them as per the procedure mentioned in “Guidelines on
Banning of Business Dealings”.
Page 68 of 160
Section 6 - Equal treatment of all Bidders
a. The Bidder(s) undertake(s) to demand from all subcontractors a commitment in conformity with this
Integrity Pact Agreement, and to submit it to the Principal before execution of the Contract.
b. The Principal will enter into agreements with identical conditions as this one with all Bidders,
c. The Principal will disqualify from the Bidding Process all Bidders who do not sign this Integrity Pact
Agreement or violate its provisions.
Section 7 – Criminal charges against violating Bidder(s)
If the Principal obtains knowledge of conduct of a Bidder or of an employee or a representative or an
Associate of a Bidder which constitutes corruption, or if the Principal has substantive suspicion in this
regard, the Principal will inform the Chief Vigilance Officer of the same.
Section 8 - Independent External Monitor/Monitors
a. The Principal has appointed competent and credible Independent External Monitor (“IEM”) for this
Integrity Pact Agreement. The task of the IEM is to review independently and objectively, whether
and to what extent the parties comply with the obligations under this agreement.
b. The IEM is not subject to instructions by the parties/ their representatives and performs its functions
neutrally and independently. It reports to the Chairman- cum-Managing Director of HCL.
c.The Bidder(s) accepts that the IEM has the right of access without restriction to all Work documentation
of the Principal .The Bidder will also grant the IEM, upon its request and demonstration of a valid
interest, unrestricted and unconditional access to his Work documentation. The same is applicable to
Subcontractors. The IEM is under a contractual obligation to treat the information and documents of
the Bidder(s) with confidentiality.
d. The Principal will provide to the IEM sufficient information about all meetings among the parties
related to the Work provided that such meetings could have an impact on the contractual relations
between the Principal and the Bidders. The parties offer to the IEM the option to participate in such
meetings.
e. As soon as the IEM notices, or believes, that there is a violation of this Integrity Pact Agreement, it
will so inform the management of the Principal and request the management to discontinue or take
corrective action, or to take other relevant action. The IEM can, in this regard, submit non-binding
recommendations. Beyond this, the IEM has no right to demand from the parties that they act in a
specific manner, refrain from action or tolerate action.
f.The IEM will submit a written report to the Chairman-cum-Managing Director of HCL within 8 to 10
weeks from the date of reference or intimation to him by the Principal and, should the occasion arise,
submit proposals for correcting problematic situations.
g. The IEM shall be entitled to compensation on the same terms as being extended to/provided to
Independent Directors of HCL.
Page 69 of 160
h. If the IEM has reported to the Chairman-cum-Managing Director of HCL, a substantiated suspicion of
an offence under relevant Indian Penal Code/PC Act, and the Chairman-cum-Managing Director of
HCL has not, within reasonable time taken visible action to proceed against such offence or reported it
to the Chief Vigilance Officer, the IEM may also transmit this information directly to the Central
Vigilance Commissioner.
Section 9 - Pact Duration
This Integrity Pact Agreement begins when both parties have legally signed it. It expires for the
Selected Bidder 12 (twelve) months after the last payment under the Contract, and for all other Bidders 6
(six) months after the Contract has been awarded.
If any claim is made/lodged during this time, the same shall be binding and continue to be valid despite
the lapse of this Integrity Pact Agreement as specified above, unless it is discharged/determined by
Chairman-cum-Managing Director of HCL.
Section 10 - Other provisions
a. This agreement is subject to Indian laws. Place of performance and jurisdiction is the registered office
of the Principal, i.e. Kolkata.
b. Changes and supplements as well as termination notices need to be made in writing. Side agreements
have not been made.
c. Should one or several provisions of this agreement turn out to be invalid, the remainder of this
agreement remains valid. In this case, the parties will strive to come to an agreement as to their
original intentions.
____________________________ _____________________________
(For & On behalf of the Principal) (For & On behalf of the Bidder)
(Office Seal) (Office Seal)
Witness 1: ________________________________
(Name & Address) ________________________________
________________________________
________________________________
Witness 2: ________________________________
(Name & Address) ________________________________
________________________________
________________________________
Page 70 of 160
Annex - A
1.0 There shall be compulsory registration of agents for all Global (Open) Tender and
Limited Tender. An agent who is not registered with HCL Plants/Units shall apply
for registration in the prescribed Application –Form.
1.1 Registered agents will file an authenticated Photostat copy duly attested by a Notary
Public/Original certificate of the principal confirming the agency agreement and
giving the status being enjoyed by the agent and the
commission/remuneration/salary/ retainer ship being paid by the principal to the
agent before the placement of order by HCL Plants/Units.
1.2 Wherever the Indian representatives have communicated on behalf of their
principals and the foreign parties have stated that they are not paying any
commission to the Indian agents, and the Indian representative is working on the
basis of salary or as retainer, a written declaration to this effect should be submitted
by the party (i.e. Principal) before finalizing the order
2.1.1 The name and address of the agents/representatives in India, if any and the
extent of authorization and authority given to commit the Principals. In case
the agent/representative be a foreign Company, it shall be confirmed whether
it is real substantial Company and details of the same shall be furnished.
2.1.2 The amount of commission/remuneration included in the quoted price(s) for
such agents/representatives in India.
2.1.3 Confirmation of the Bidder that the commission/ remuneration if any, payable
to his agents/representatives in India, may be paid by HCL in Indian Rupees
only.
2.2 Bidders of Indian Nationality shall furnish the following details in their offers:
2.2.1 The name and address of the foreign principals indicating their nationality as
well as their status, i.e, whether manufacturer or agents of manufacturer
holding the Letter of Authority of the Principal specifically authorizing the
agent to make an offer in India in response to tender either directly or through
the agents/representatives.
2.2.2 The amount of commission/remuneration included in the price (s) quoted by
the Bidder for himself.
Page 71 of 160
2.2.3 Confirmation of the foreign principals of the Bidder that the
commission/remuneration, if any, reserved for the Bidder in the quoted price
(s), may be paid by HCL in India in equivalent Indian Rupees on satisfactory
completion of the Project or supplies of Stores and Spares in case of
operation items .
2.3 In either case, in the event of contract materializing, the terms of payment will
provide for payment of the commission /remuneration, if any payable to the
agents/representatives in India in Indian Rupees on expiry of 90 days after the
discharge of the obligations under the contract.
2.4 Failure to furnish correct and detailed information as called for in paragraph-2.0
above will render the concerned tender liable to rejection or in the event of a
contract materializing, the same liable to termination by HCL. Besides this there
would be a penalty of banning business dealings with HCL or damage or payment of
a named sum.
*******
Page 72 of 160
Annex. B
CONTENTS
S.No. Description
1. Introduction
2. Scope
3. Definitions
Contractors etc.
9. Show-cause Notice
Page 73 of 160
1. Introduction
1.1 Hindustan Copper Limited (HCL), being a Public Sector Enterprise and ‘State’,
within the meaning of Article 12 of Constitution of India, has to ensure preservation
of rights enshrined in Chapter III of the Constitution. HCL has also to safeguard its
commercial interests. HCL deals with Agencies, who have a very high degree of
integrity, commitments and sincerity towards the work undertaken. It is not in the
interest of HCL to deal with Agencies who commit deception, fraud or other
misconduct in the execution of contracts awarded / orders issued to them. In order to
ensure compliance with the constitutional mandate, it is incumbent on HCL to
observe principles of natural justice before banning the business dealings with any
Agency.
1.2 Since banning of business dealings involves civil consequences for an Agency
concerned, it is incumbent that adequate opportunity of hearing is provided and the
explanation, if tendered, is considered before passing any order in this regard
keeping in view the facts and circumstances of the case.
2. Scope
2.1 The General Conditions of Contract (GCC) of HCL generally provide that HCL
reserves its rights to remove from list of approved suppliers / contractors or to ban
business dealings if any Agency has been found to have committed misconduct and
also to suspend business dealings pending investigation. If such provision does not
exist in any GCC, the same may be incorporated.
2.2 Similarly, in case of sale of material there is a clause to deal with the Agencies /
customers / buyers, who indulge in lifting of material in unauthorized manner. If
such a stipulation does not exist in any Sale Order, the same may be incorporated.
2.3 However, absence of such a clause does not in any way restrict the right of Company
(HCL) to take action / decision under these guidelines in appropriate cases.
2.4 The procedure of (i) Removal of Agency from the List of approved suppliers /
contractors; (ii) Suspension and (iii) Banning of Business Dealing with Agencies,
has been laid down in these guidelines.
2.5 These guidelines apply to all the Plants / Units and subsidiaries of HCL.
2.6 It is clarified that these guidelines do not deal with the decision of the Management
not to entertain any particular Agency due to its poor / inadequate performance or
for any other reason.
2.7 The banning shall be with prospective effect, i.e., future business dealings.
Page 74 of 160
3. Definitions
‘Party / Contractor / Supplier / Purchaser / Customer/Bidder/Bidder’ shall mean and include a public
limited company or a private limited company, a firm whether registered or not, an individual, a
cooperative society or an association or a group of persons engaged in any commerce, trade, industry, etc.
‘Party / Contractor / Supplier / Purchaser /Customer/ Bidder / Bidder’ in the context of these guidelines
isindicated as ‘Agency’.
‘Inter-connected Agency’ shall mean two or more companies having anyof the following features:
If one is a subsidiary of the other.
If the Director(s), Partner(s), Manager(s) or Representative(s) are common;
If management is common;
If one owns or controls the other in any manner;
For banning of business dealings with Foreign Suppliers of imported coal/coke, HCL Directors‟ Committee
(SDC) shall be the „Competent Authority‟. The Appeal against the Order passed by SDC, shall lie with
Chairman, as First Appellate Authority.
In case the foreign supplier is not satisfied by the decision of the First Appellate Authority, it may approach
HCL Board as Second Appellate Authority.
Page 75 of 160
Chairman, HCL shall have overall power to take suo-moto action on any information available or
received by him and pass such order(s) as he may think appropriate, including modifying the order(s)
passed by any authority under these guidelines.
0 ‘Investigating Department’ shall mean any Department or Unit investigating into the conduct of the
Agency and shall include the Vigilance Department, Central Bureau of Investigation, the State Police
or any other department set up by the Central or State Government having powers to investigate.
Action for banning / suspension business dealings with any Agency should be initiated by
the department having business dealings with them after noticing the irregularities or
misconduct on their part. Besides the concerned department, Vigilance Department of each
Plant / Unit /Corporate Vigilance may also be competent to initiate such action.
5.1 If the conduct of any Agency dealing with HCL is under investigation by any
department (except Foreign Suppliers of imported coal/coke), the Competent
Authority may consider whether the allegations under investigation are of a serious
nature and whether pending investigation, it would be advisable to continue business
dealing with the Agency. If the Competent Authority, after consideration of the
matter including the recommendation of the Investigating Department, if any,
decides that it would not be in the interest to continue business dealings pending
investigation, it may suspend business dealings with the Agency. The order to this
effect may indicate a brief of the charges under investigation. If it is decided that
inter-connected Agencies would also come within the ambit of the order of
suspension, the same should be specifically stated in the order. The order of
suspension would operate for a period not more than six months and may be
communicated to the Agency as also to the Investigating Department. The
Investigating Department may ensure that their investigation is completed and whole
process of final order is over within such period.
5.2 The order of suspension shall be communicated to all Departmental Heads within
the Plants / Units. During the period of suspension, no business dealing may be held
with the Agency.
5.3 As far as possible, the existing contract(s) with the Agency may continue unless the
Competent Authority, having regard to the circumstances of the case, decides
otherwise.
Page 76 of 160
5.4 If the gravity of the misconduct under investigation is very serious and it would not
be in the interest of HCL, as a whole, to deal with such an Agency pending
investigation, the Competent Authority may send his recommendation to Chief
Vigilance Officer (CVO), HCL Corporate Office alongwith the material available. If
Corporate Office considers that depending upon the gravity of the misconduct, it
would not be desirable for all the Plants / Units and Subsidiaries of HCL to have any
dealings with the Agency concerned, an order suspending business dealings may be
issued to all the Plants / Units by the Competent Authority of the Corporate Office,
copy of which may be endorsed to the Agency concerned. Such an order would
operate for a period of six months from the date of issue.
5.6 If the Agency concerned asks for detailed reasons of suspension, the Agency may be
informed that its conduct is under investigation. It is not necessary to enter into
correspondence or argument with the Agency at this stage.
5.7 It is not necessary to give any show-cause notice or personal hearing to the Agency
before issuing the order of suspension. However, if investigations are not complete
in six months time, the Competent Authority may extend the period of suspension by
another three months, during which period the investigations must be completed.
6.2 If the Director / Owner of the Agency, proprietor or partner of the firm, is convicted
by a Court of Law for offences involving moral turpitude in relation to its business
dealings with the Government or any other public sector enterprises or HCL, during
the last five years;
6.3 If there is strong justification for believing that the Directors, Proprietors, Partners,
owner of the Agency have been guilty of malpractices such as bribery, corruption,
fraud, substitution of tenders, interpolations, etc;
6.4 If the Agency continuously refuses to return / refund the dues of HCL without
showing adequate reason and this is not due to any reasonable dispute which would
attract proceedings in arbitration or Court of Law;
6.5 If the Agency employs a public servant dismissed / removed or employs a person
convicted for an offence involving corruption or abetment of such offence;
6.6 If business dealings with the Agency have been banned by the Govt. or any other
public sector enterprise;
6.8 If the Agency uses intimidation / threatening or brings undue outside pressure on the
Company (HCL) or its official in acceptance / performances of the job under the
contract;
Page 77 of 160
6.9 If the Agency indulges in repeated and / or deliberate use of delay tactics in
complying with contractual stipulations;
6.11 Based on the findings of the investigation report of CBI / Police against the Agency
for malafide / unlawful acts or improper conduct on his part in matters relating to the
Company (HCL) or even otherwise;
6.14 If the Agency misuses the premises or facilities of the Company (HCL), forcefully
occupies, tampers or damages the Company‟s properties including land, water
resources, forests / trees, etc.
(Note: The examples given above are only illustrative and not exhaustive. The
Competent Authority may decide to ban business dealing for any good and
sufficient reason).
7.1 Normally, a decision to ban business dealings with any Agency should apply
throughout the Company including Subsidiaries. However, the Competent Authority
of the Plant / Unit except Corporate Office can impose such ban unit-wise only if in
the particular case banning of business dealings by respective Plant / Unit will serve
the purpose and achieve its objective and banning throughout the Company is not
required in view of the local conditions and impact of the misconduct / default to
beyond the Plant / Unit. Any ban imposed by Corporate Office shall be applicable
across all Plants / Units of the Company including Subsidiaries.
7.2 For Company-wide banning, the proposal should be sent by the Plant / Unit to the
CVO through the Head of the Plant / Unit setting out the facts of the case and the
justification of the action proposed alongwith all the relevant papers and documents
except for banning of business dealings with Foreign Suppliers of imported
coal/coke.
The Corporate Vigilance shall process the proposal of the Plant / Unit for a prima-
facie view in the matter by the Competent Authority nominated for Company-wide
banning.
The CVO shall get feedback about that agency from all other Plants / Units. Based
on this feedback, a prima-facie decision for banning / or otherwise shall be taken by
the Competent Authority.
If the prima-facie decision for Company-wide banning has been taken, the Corporate
Vigilance shall issue a show-cause notice to the agency conveying why it should not
be banned throughout HCL.
Page 78 of 160
After considering the reply of the Agency and other circumstances and facts of the case,
a final decision for Company-wide banning shall be taken by the Competent Authority.
7.3 There will be a Standing Committee in each Plant / Unit to be appointed by Unit Head
for processing the cases of “Banning of Business Dealings” except for banning of
business dealings with foreign suppliers of coal/coke. However, for procurement of
items / award of contracts, to meet the requirement of Corporate Office only, the
committee shall be consisting of General Manager / Dy. General Manager each from
Operations, Finance, Law & M&C. Member from M&C shall be the convener of the
committee. The functions of the committee shall, inter-alia include:
0 To study the report of the Investigating Agency and decide if a prima-facie case for
Company-wide / Local unit wise banning exists, if not, send back the case to the
Competent Authority.
1 To recommend for issue of show-cause notice to the Agency by the concerned
department.
2 To examine the reply to show-cause notice and call the Agency for personal hearing, if
required.
3 To submit final recommendation to the Competent Authority for banning or otherwise.
7.4 If the Competent Authority is prima-facie of view that action for banning business
dealings with the Agency is called for, a show-cause notice may be issued to the
Agency as per paragraph 9.1 and an enquiry held accordingly.
8.3 Past performance of the Agency may be taken into account while processing for
approval of the Competent Authority for awarding the contract.
9. Show-cause Notice
9.1 In case where the Competent Authority decides that action against an Agency is
called for, a show-cause notice has to be issued to the Agency. Statement containing
the imputation of misconduct or mis-behaviour may be appended to the show-cause
notice and the Agency should be asked to submit within 15 days a written statement
in its defence.
9.2 If the Agency requests for inspection of any relevant document in possession of
HCL, necessary facility for inspection of documents may be provided.
9.3 The Competent Authority may consider and pass an appropriate speaking order:
Page 79 of 160
2 For exonerating the Agency if the charges are not established;
3 For removing the Agency from the list of approved Suppliers / Contactors,
etc.
4 For banning the business dealing with the Agency.
9.4 If it decides to ban business dealings, the period for which the ban would be
operative may be mentioned. The order may also mention that the ban would extend
to the interconnected Agencies of the Agency.
10.2 Appellate Authority would consider the appeal and pass appropriate order which
shall be communicated to the Agency as well as the Competent Authority.
12. Circulation of the names of Agencies with whom Business Dealings have been banned
12.1 Depending upon the gravity of misconduct established, the Competent Authority of
the Corporate Office may circulate the names of Agency with whom business
dealings have been banned, to the Government Departments, other Public Sector
Enterprises, etc. for such action as they deem appropriate.
12.3 If business dealings with any Agency has been banned by the Central or State
Government or any other Public Sector Enterprise, HCL may, without any further
enquiry or investigation, issue an order banning business dealing with the Agency
and its inter-connected Agencies.
12.4 Based on the above, Plants / Units may formulate their own procedure for
implementation of the Guidelines and same be made a part of the tender
documents.
Page 80 of 160
APPENDIX – VI
Year
S. No. Head
2015-16 2016-17 2017-18
1. Net Sales (Rs.)
Page 81 of 160
APPENDIX – VII
(To be placed in Part I of the Bid)
2. Officer- in-Charge :
3. Certificate:
We declare that all information stated in the table above is correct and complete in all respect. Any error or
omission in mentioning the information shall entitle HCL, at its sole discretion, to reject our Tender.
Dated this _____ day of ___________ 2018
Page 83 of 160
APPENDIX – IX A
Date:
To
Dear Sir,
We hereby confirm that we satisfy the terms and conditions laid out in the Tender document.
We have agreed that ______________ (insert individual‟s name) will act as our representative and has
been duly authorized to submit the Tender. Further, the authorized signatory is vested with requisites
power to furnish such letter and authenticate the same.
Thanking you,
Yours faithfully,
Page 84 of 160
APPENDIX – IX B
HINDUSTAN COPPER LIMITED
CORPORATE OFFICE
KOLKATA
Name of work: Bid Tender document for diamond drilling, sampling and related geological
activities and Geological Report Preparation work in Kolihan copper mine
lease of Khetri copper complex, Kolihan, Jhunjhunu, Rajasthan
The bidder is to indicate herewith proposed site organization to be set up for execution of the work
which should include qualified Engineers & Mine foremen for supervision of the work as per statute. It
is understood that this will be augmented from time to time depending on the requirements for timely
completion of work as indicated by Engineer –in Charge.
Bio-data of Site-in-Charge and key personnel including the statutory Foremen/Mate etc.
Page 85 of 160
APPENDIX – IX C
HINDUSTAN COPPER LIMITED
CORPORATE OFFICE
KOLKATA
Name of work: Bid Tender document for for diamond drilling, sampling and related
geological activities and Geological Report Preparation work in Kolihan
copper mine lease of Khetri copper complex, Kolihan, Jhunjhunu, Rajasthan
This is to certify that the authorised representatives of M/s……… have visited the site on / from
………………… to understand the work for the purpose participating the above tendering process.
Page 86 of 160
APPENDIX – IX D
HINDUSTAN COPPER LIMITED
CORPORATE OFFICE
KOLKATA
Name of work: Tender document for for diamond drilling, sampling and related geological
activities and Geological Report Preparation work in Kolihan copper mine
lease of Khetri copper complex, Kolihan, Jhunjhunu, Rajasthan
Page 87 of 160
APPENDIX - X
** The above rate will be exclusive of Goods and Services Tax (GST). Applicable GST shall be
payable by the successful bidder as per clause 8.10 a) and 8.10 b).
Quoted rates should be in figures. Standing of L-1 bidder shall be decided based on overall L-1 value
of work as per scope of work.
Page 88 of 160
APPENDIX - XI
CHECKLIST
Complied with
Requirement
(Yes / No)
Document bound
All the pages numbered serially
Each page of the book initialled in indelible ink by the authorised signatory
All corrections/interlineations initialled in indelible ink by the authorised signatory
ENVELOP - 1
Submitted
Sl. No. Document / enclosure for submission (Yes / No / Not
Applicable)
1 Tender fees of Rs. 5000/- /- (Rupees Five Thousand Only) inclusive of
GST @12% in form of Demand draft/ Banker’s cheque in favour of “
Hindustan Copper Limited ” payable at Kolkata.
ENVELOP - 2
Submitted
Sl. No. Document / enclosure for submission (Yes / No / Not
Applicable)
1 Bid Security of Rs. 32,00,000/- (Rupees Thirty Two Lacs Only) in the
form of Demand Draft/Pay Order/Banker’s Cheque or a Bank
Guarantee in the Format at Appendix III, as per Clause 2.13 of NIT.
ENVELOP – 3
Document
Page
Submitted Total
Sl. Nos
Document / enclosure for submission (Yes / No / No of
No. (_ to
Not Pages
__)
Applicable)
1 Covering Letter as prescribed in Appendix I
i. Signed by authorized signatory
ii. On the letterhead of the Applicant/ Lead member of Consortium
2 Details of Applicant as prescribed in Appendix II
i. Signed by authorized signatory
ii. Information attached for Applicant/ each member of Consortium
iii. Attached copy of Memorandum of Association & Article of
Association
3 a) Power of Attorney for signing of Bid executed on non-judicial stamp
paper of appropriate value and duly notarised as prescribed in Appendix
IV A;
b) Power of Attorney for Applicant/ each member of Consortium;
Page 89 of 160
Extracts of the charter documents such as board or shareholders’
resolution/ power of attorney in favour of the person executing the Power
of Attorney
4 a) Power of Attorney for appointing Lead Member of Consortium executed
on non-judicial stamp paper of appropriate value and duly notarised as
prescribed in Appendix IV B;
b) Extracts of the charter documents such as board or shareholders’
resolution/ power of attorney in favour of the person executing the
Power of Attorney
5 Joint Bidding Agreement between members of Consortium executed on
non-judicial stamp paper of appropriate value and duly notarised as
prescribed in Appendix IV C.
6 Integrity Pact Agreement as prescribed in Appendix–V&VA
7 Information for Financial qualification – Turnover as prescribed in Appendix
VI and Net Worth positive as per Clause 1.5.3 (1) (ii) of NIT
i. Signed by Authorized Signatory
ii. Signed and sealed by Statutory Auditor of Applicant/ each member
of Consortium
iii. Attached copies of Audited Annual Reports for 3 (three) preceding
consecutive audited financial years ending 31.3.18 (or 31.12.17 for
foreign company) for Applicant/ each member of Consortium
8 Information for Technical qualification as prescribed in Appendix VII
i. Signed by Authorized Signatory
ii. Copies of all relevant documents/evidences in support of their
technical eligibility including Certified copy of proof of production
from the employer and copy of the Work Order
9 Details of Minimum number of equipment including make, year of make,
bucket capacity, capacity of equipment etc in the format prescribed at
Appendix-VIII
i. Signed by Authorized Signatory
ii. Delivery schedule in case equipment is to be purchased
iii. Catalogue of equipment proposed to be deployed for this work.
10 Statement of legal capacity as prescribed in Appendix IX A
i. Signed by Authorized Signatory
ii. On the letterhead of the Applicant
11 Proposed Site Organization as prescribed in Appendix-IX B
i. Signed by Authorized Signatory
ii. Bio-data of Site-in-Charge and key personnel
12 Certificate of Site visit in the format as prescribed in Appendix-IX C
i. Signed by Authorized Signatory
ii. Counter signed by Unit Head or his representative
13 Screen shot of Mock test of submission of Bid in MJunction as prescribed in
Appendix-IX D Signed by Authorized signatory
14 Affidavit declaring that no bar has been implied or subsists as on date of the
Page 90 of 160
tender, by HCL on the bidder, as per Clause 1.6.2 of NIT.
15 Affidavit declaring that the bidder has neither failed to perform on any
contract related to HCL, as evidenced by an arbitral or judicial authority, a
judicial pronouncement or arbitration award against the bidder and no
arbitration case is filed against them in this respect, as per Clause 1.6.3 of
NIT.
16 A copy of the tender document with each page initialed by the person
signing the bid in pursuance of the power of attorney, as a token of
acceptance.
Submitted
Sl.
Declaration regarding submission of Price Bid in MJunction only (Yes / No / Not
No.
Applicable)
1 Price Bid has been submitted in MJunction e tendering portal only and no
Price is mentioned in Techno Commercial hard copy documents submitted
at HCL or Techno Commercial Bid submitted in MJunction.
Date:
Place:
Company Seal of the Applicant/ (Signature of the Authorised Signatory)
Page 91 of 160
SECTION II
CONTRACT
BETWEEN
HINDUSTAN COPPER LIMITED
AND
[Please Insert the name of the Contractor]
(CONTRACTOR)
FOR
[Please insert the name of the work]
Contract Tender document for for diamond drilling, sampling and related geological activities and
Geological Report Preparation work in Kolihan copper mine lease of Khetri copper complex,
Kolihan, Jhunjhunu, Rajasthan for a period of 16 (sixteen) months from………….. to
………………(excluding mobilization period of 45 days) is entered into on this the [●] day of [●] 2018
at [●] (hereinafter referred to as the “Contract”)
BETWEEN:
HINDUSTAN COPPER LIMITED, a company incorporated under the Indian Companies Act 2013
(hereinafter referred to either as the "Employer or HCL” which expression shall include its successors
and permitted assigns) having its registered office at 1, Ashutosh Chowdhury Avenue, Kolkata – 700019
India of the FIRST PART;
AND
[Please Insert the Name of the Contractor], a company incorporated under the provisions of the Indian
Companies Act, 2013, having its registered office at [Please Insert the Address of the Contractor] or, in
case of a Consortium, [please insert the details of the consortium members], who have, vide a power of
attorney, duly authorized [Please Insert the Name of the Contractor], a company incorporated under the
provisions of the Indian Companies Act, 2013, having its registered office at [Please Insert the Address
of the Contractor], to execute this Contract for and on their behalf collectively, hereinafter referred to as
the "Selected Bidder or Contractor" (which expression shall unless repugnant to the subject or the
context include its successors and permitted assigns) of the OTHER PART.
WHEREAS:
(A) HCL is a public sector undertaking under the administrative control of the Ministry of Mines.
(B) For undertaking the Work (as defined hereinafter), the Employer has conducted a competitive
bidding process for inviting tenders from eligible parties. HCL, after evaluating the tender
Page 92 of 160
submitted by the parties, selected [Please Insert the details of the Selected Bidder] or Consortium
comprising [Please insert the details of the consortium members] (“Contractor”) and issued a
Letter of Intent (“LoI”) for the Work which was duly accepted by the Selected Bidder.
(C) The Contractor has represented that it has the experience, expertise, capability and know-how to
ensure that the Works are executed and completed in accordance with the terms of the Contract
in a safe and environmentally responsible manner and that the Works will be capable of seamless
integration with Related Works and be carried out on, under and over the Work Site (as defined
hereinafter).
(D) Relying upon the representations in Recital C, the Employer appoints the Contractor for
execution of the Work, and the Contractor agrees to carry out and complete the Works and
remedy any defects therein, on the terms and conditions of the Contract.
(E) The Contractor acknowledges that the Employer has entered into or will enter into other contracts
with other contractors and/or parties for elements of the Work (as defined hereinafter) (and not
comprised in the Works) and that the Employer will have Related Works performed and that it is
of paramount importance that the Works are fully and completely co-ordinated with the Related
Works in view of their concurrent and sequential nature.
(F) This Contract has been executed and delivered in accordance with the laws of India.
(G) The terms and conditions of this Contract have been fully negotiated between the Employer and
the Contractor as parties of competent capacity and equal standing.
NOW THEREFORE in reliance of the mutual covenants and agreements, HCL is desirous of regulating
its relationship with the Contractor in accordance with and subject to the terms hereof and in the manner
set forth herein.
Page 93 of 160
ARTICLE - 1
DEFINITIONS AND INTERPRETATION
1.1 Definitions
In this Contract or any documents either issued or that may be issued in connection with this Contract,
the following words and expressions shall, unless repugnant to the context or meaning thereof, have the
meaning hereinafter respectively assigned to them:
"Applicable Laws" means all laws in force and effect as of the date hereof and which may be
promulgated or brought into force and effect hereinafter in India including any revisions, amendments or
re-enactments including without limitation, the Mines Act, 1952, The Mines Rules, 1955, Mines and
Minerals (Development and Regulations) Act, the Metalliferous Mines Regulations, 1961, Minimum
Wages Act, and Workmen Compensation Act, PF Act including any rules, regulations and notifications
made there under and judgments, decrees, injunctions, writs, orders and notifications issued by any court
of record or any appropriate authorities, as may be in force and effect during the subsistence of the
Contract.
“Applicable Permits” means any clearance, permit, authorization, consent, license, lease, ruling,
exemption, filing, agreements, or approval, required to be obtained and maintained by the Employer
and/or the Contractor from time to time, in order to implement the Work and/or to design and execute
the Works in accordance with this Contract.
“Appointed Date” means the date of issue of Letter of Intent (LoI).
“Approved” shall mean approved in writing including subsequent written confirmation of previous
verbal approval.
“Bidder” means Bidding Company or Bidding Consortium, as defined below.
Bidding Company: If the bid is made by a single corporate entity.
Bidding Consortium: If the bid is made jointly by corporate entities with suitable consortium
agreement amongst them.
“Bid Security” shall mean the bid security as furnished by the Contractor in response to the tender in
the format attached at Appendix III.
"Business Day" means a day other than a Sunday or a public holiday on which scheduled commercial
banks are open for business in Rajasthan, India.
“Change in Law” means (i) any enactment or issuance of any new Applicable Law; (ii) any change in
the interpretation or Tender of an existing Applicable Law by any Government Agency having direct
authority for such interpretation or Tender; (iii) any amendment, alteration or modification of an existing
Applicable Law by any Government Agency having direct authority for the enactment, enforcement or
interpretation, thereof; or (iv) the repeal and re-enactment of any existing Applicable Law.
Page 94 of 160
“Commencement Date” shall mean the date falling on the expiry of the mobilisation period of 1.5
months (45 days) from the date of issue of LoI.
“Company” means Hindustan Copper Limited (HCL) having its registered office at 1, Ashutosh
Choudhury Avenue, Kolkata 700 019, West Bengal, including its successor and assignees or its
representatives. Company shall also mean the owner wherever the context so requires.
“Completion” means the completion of the entire scope of Work herein specified to the required
standards accordance with this Contract to the satisfaction of the Engineer-in-Charge, and the terms
"Complete""Completed""Completion" and "Completing" shall be construed accordingly.
“Completion Certificate” means the certificate to be issued by the Engineer-in-Charge in accordance
with provision of Article 6.4 certifying Completion of the awarded Work
"Confidential Information" means the Contract and everything contained therein, all documentation,
data, particulars of the Works and technical and/ or commercial information made by (or on behalf of)
the Employer or obtained directly or indirectly from the Employer or the Employer's Representative by
the Contractor or which is generated by the Contractor or any information or data that the Contractor
receives or has access to as a result of the Contract, other than information which is generally available
in the public domain other than by any unauthorized actions or fault of the Contractor; or which is in the
possession of the Contractor with a right to disclose.
“Consortium” means the consortium consisting of members only as mentioned below. The consortium
consists of (i) ______________________ and (ii) ______________________ formed/ acting pursuant to
the joint bidding agreement dated __________.
“Contract” means the agreement to be entered into between HCL and the successful bidder, as recorded
in the Contract Form signed by the parties, including all annexure thereto and all documents
incorporated by reference therein.
“Contract Agreement” means the written agreement, which the contractor shall enter into the company,
pursuant to the acceptance of the Tender.
"Contractor's Documents" means those documents to be prepared by the Contractor under the
Contract including without limitation, such data, Drawings, designs, design information, descriptions,
calculations, schedules, specifications, plans, samples, patterns, models, mock-ups, computer software
drawings, inspection and test plans, manuals, programmes, erection and test data and all other
information and documents including all eye readable or computer/other machine readable data relating
to the design (to the extent required under the Contract) for execution of the Works or otherwise for the
performance of the Contract.
“Contract Period” means the period of Contract 16 (Sixteen) months or completion of the contractual
quantity, whichever is earlier, excluding 45 days of mobilization period.
Page 95 of 160
“Contract Price” shall have the meaning ascribed in the applicable clauses in the tender.
“Contract Payment Due Date” means credit period of 30 days from the receipt of the bill by Engineer
in-charge within 7 days as receipt of bill from contractor for the month of completion of the job, after
deduction of LD, if any.
“Contract Payment Period” means the period within which, payment is to be made by HCL to the
Contractor for the actual work done by the Contractor during the month for which payment is sought.
“Contractual Quantity” means the quantity for which contract has been entered into.
“Contract value” means total value of the contract on date of agreement and not of date of bidding.
“Day” means the twenty four hours period ending at 24.00 midnight (Indian Standard Time).
“DGMS” means Directorate General of Mines Safety, Government of India.
“Dispute” shall have the meaning ascribed thereto in applicable clauses in the tender.
“Drawings” shall include maps, plans, sections, and tracings or prints thereof with any modifications
approved in writing by the Engineer-in-charge and such other drawings as may, from time to time, be
furnished or approved in writing by the Engineer-in-charge during the currency of the contract.
“Emergency” means a condition or situation that is likely to endanger the Mine safety as per Good
Industry Practice on or about the Work Site/Work Facilities including safety of users thereof or which
poses an immediate threat of material damage to any of the Work Site/Work Facilities.
“Emergency Works” shall mean and include all such works necessary to be undertaken to prevent the
occurrence/ happening/ further deterioration/ damage/ disaster/ accident/ incident anticipated by the
Engineer-in-Charge that could seriously affect the safety of persons/production of Mine or part thereof.
“Encumbrance” means any encumbrance such as mortgage, charge, pledge, lien, hypothecation,
security interest, assignment, privilege or priority of any kind having the effect of security or other such
obligations and shall include without limitation any designation of loss payees or beneficiaries or any
similar arrangement under any insurance policy pertaining to the Work, physical encumbrances and
encroachments on the Work Site/Work Facilities.
“Engineer-in-Charge/HCL‟s Representative” shall mean such officer or officers having such rights
and obligations set out in Schedule I, to be designated, deputed or authorized, by HCL for the purpose of
this Contract and shall include Engineer-in-Charge‟s authorized representatives.
“Event of Default” shall have the meaning ascribed thereto in applicable clauses in the tender.
“Final Certificate” in relation to a work means the certificate issued by Engineer-in-Charge after the
period of liability is over.
“Force Majeure Event” shall have the meaning ascribed thereto in Article 9.
Page 96 of 160
“Force Majeure Period” means, as determined by the Engineer-in-Charge, the period commencing
from the date of occurrence of a Force Majeure Event and ending on (i) the date on which the Affected
Party acting in accordance with the Good Industry Practice, resumes or should have resumed such of its
obligations the performance of which was excused as per terms mentioned elsewhere in the tender or (ii)
the Termination Date, as applicable.
“Good Industry Practice” means those practices, methods, techniques, standards, skills, diligence and
prudence which are generally and reasonably expected of and accepted internationally from a reasonably
skilled and experienced operator engaged in the same type of undertaking as envisaged under this
Contract and acting generally in accordance with the provisions of all Applicable laws, and would mean
good engineering and mining practices in the design, engineering, expansion, construction and work
management and which would be expected to result in the performance of its obligations by the
Contractor and in the operation and maintenance of the Mining Facilities, in accordance with this
Contract, Applicable Laws, Applicable Permits, reliability, safety, environment protection, economy and
efficiency. For avoidance of doubt, it is clarified that in the event of a conflict between any Good
Industry Practice and any requirement and/or standard prescribed by the DGMS, the latter shall prevail
and the Contractor shall have to oblige with the provisions of the latter.
"Gol" means the Government of India and includes any agency, authority (including any regulatory
authority) department, inspectorate, ministry or statutory person (whether autonomous or not) under the
control and direction of the Government of India.
"GoR" means the Government of Rajasthan and any agency, authority (including any regulatory
authority) department, inspectorate, ministry or statutory person (whether autonomous or not) (including
any successor there for) under the control and direction of the Government of Rajasthan.
“Government Agency” means GoI, GoR, HCL or any state government or governmental department,
commission, board, body, bureau, agency, authority, instrumentality, court or other judicial or
administrative body, central, state, or local, having jurisdiction over the Contractor, the Work Site/ Work
Facilities or any portion thereof, or the performance of all or any of the services or obligations of the
Contractor under or pursuant to this Contract.
“HCL” means Hindustan Copper Limited.
"HCL‟s Requirements" means the document or documents identified as such and included in the
Contract and any modifications thereof or addition thereto as may from time to time be issued by (or on
behalf of) the Engineer-in-Charge in accordance with the Contract.
“Joint Measurement Certificate” shall have the meaning as mentioned in the NIT.
“Lead Member” The Lead Member, in case of a Bidding Consortium, is a member company that is
responsible for execution, accountable, commission of the contract on behalf of consortium. The Lead
member of the consortium must have minimum 75% of the Turnover specified in Eligibility Criteria at
clause no 1.5.3.1. HCL will have all dialogue with the Lead member only during the currency of the
contract, as and when required.
Page 97 of 160
“Material Adverse Effect” means material adverse effect on (a) the ability of the Contractor to exercise
any of its rights or perform/discharge any of its duties/obligations under and in accordance with the
provisions of this Contract and/or (b) the legality, validity, binding nature or enforceability of this
Contract.
“Material Breach” means a breach by either Party of any of its obligations under this Contract which
has or is likely to have a Material Adverse Effect on the Work and which such Party shall have failed to
cure.
“Mine” means Kolihani Copper Mine at Jhunjhunu District, Rajasthan, India.
“Mine Manager” means a person authorized in writing by Owner under Section 17 of Mines Act, 1952
to be in-charge of the Mine who is responsible for the overall management, control, supervision and
direction of the Mine.
“Mobilization Period” means the period of 1.5 months (45 days) from the date of issue of Letter of
Intent, during which, the Contractor is required to mobilize his resources and commence the Works at
the Site.
“Modification / Alteration Order” means an order given in writing by the Engineer-in-Charge to effect
additions to or deletion from and alterations in the work.
“Month” means a period beginning at 00-00 hours (Indian Standard Time) on the first day of a given
English calendar month and ending at 00-00 hours (Indian Standard Time) on the first day of the next
succeeding English calendar month.
“Owner” means the Director (Mining) of HCL.
“Parties” means the parties to this Contract collectively and
“Party" means either of the Parties to this Contract individually.
“Period of Liability” in relation to a Work means a period of six (6) months from the date of
Completion, during which the Contractor stands responsible for rectifying all defects that may appear in
the Work.
“Person” means (unless otherwise specified or required by the context), any individual, company,
corporation, partnership, joint venture, trust, unincorporated organization, government or Government
Agency or any other legal entity.
“Preliminary Notice” means the notice of intended Termination by the Party entitled to terminate this
Contract to the other Party setting out, inter alia, the underlying Event of Default.
“Project Manager” means any person appointed and authorized by the Contractor, who will take
decision at Work Site independently and on behalf of the Contractor during the implementation of the
Contract.
Page 98 of 160
"Related Works" means works other than the Works, performed or undertaken by the Employer or
other contractors or suppliers of the Employer or any contractor employed in connection with the Work
and/or services related thereto or by public or private utilities or by any Government Agency or other
authorities or by any relevant authority, either prior to, concurrently or sequentially with the Works at,
on, over or adjacent to the Work Site in connection with or related to the Work and which may be
connected to, associated with, ancillary to or otherwise related to or relevant to the Works.
“Representative” means either the HCL‟s representative or the Contractors representative.
“Retention money” means the money which is hold by HCL for successful performance of the contract.
"RQD" Rock Quality Designation, means a modified core recovery parameter in which all sound rock
compresses with 1000mm
“Rs” or “Rupees” refers to the lawful currency of the Republic of India
“Security Deposit” means the deposit for security of performance of its obligations during the Contract
Period to be provided by the Contractor in accordance relevant applicable clause/clauses mentioned in
the tender.
“Shift” means the eight hours period consisting three shifts in a day of 24 hours (Indian Standard Time).
"Site" shall mean the lands and other places on, under, in or through which the permanent works are to
be carried out and any other lands or places provided by HCL for the purpose of the contract.
"Specifications" shall mean all directions, various technical specification, provisions and requirements
attached to the contract, which pertain to the method and manner of performing the work or works to the
quantities and qualities of the work or works and the materials to be furnished under the contract.
“Successful Bidder” means the bidder / consortium of bidders who has been awarded the work.
“Supervision” means and shall include the successive control and directions given by the Contractor in
relation to contract work, during the execution of the work and services.
“Tax” means and includes all taxes, fees, cesses, levies that may be payable by the Contractor under any
Applicable Law.
Tax shall not include any penalty, interest or other penal sum levied on or payable by the Contractor on
account of non-payment, short payment or delayed payment of Tax or on account of any other default.
“Technical Assistance” means the provision by the Bidder for technical supervision and assistance for
maintenance, operation etc. of the Equipment after the commissioning and up to the Contract Period.
"Temporary Works" shall mean every work which is of a temporary nature, and which the Contractor
shall remove, or at the option of HCL, hand over to HCL, upon such temporary works having fulfilled
the reason for which they were required by the Contractor.
“Tender” means collectively the tender issued to bidders including any supplements/amendments
thereto and other documents, drawings, specifications, agreed variations, if any.
Page 99 of 160
“Termination” means early termination of this Contract pursuant to Termination Notice or otherwise in
accordance with the provisions of this Contract but shall not, unless the context otherwise requires,
include the expiry of this Contract due to efflux of time in the normal course.
“Termination Date” means the date specified in the Termination Notice as the date on which
Termination occurs.
“Termination Notice” means the notice of Termination by either Party to the other Party, in accordance
with the applicable provisions of this Contract
“Tests” means the tests to be carried out by Contractor to ascertain the safety and reliability of the
Works carried out by the Contractor for the Work.
“Tonnes” or “tonne” or abbreviations “te” or “Te” or “T” or “t” or “MT” used in Tender in suffix of a
quantity means a metric tonne of 1000 (One thousand) kilograms.
“Work” means engineering, procurement, construction and designing of the Works and all Related
Works in relation to the Work, in accordance with the provisions of this Contract.
“Work Agreements” means collectively this Contract and any other material contract entered into or
may hereafter be entered into by the Contractor in connection with the Work.
“Work/ Works/ Job” shall mean all or any portion of the entire activities to be performed in relation to
the Work of hauling of rock in accordance with the scope of the work, whether supplemented or not by
HCL or the Engineer-in-Charge during the progress of execution of the activities by the Contractor by
explanatory instructions.
“Work Site / Site” means Kolihan Copper Mine at Jhunjhunu , Rajasthan, India where the Work is to be
implemented by the Contractor in accordance with the Work Requirements or provision of any
Temporary Work or for any other purpose for execution of Work.
“Year” year shall mean 12 months, normally financial year starting on the 1st of April of each calendar
year and closing on the 31st March of the subsequent Calendar year.
1.2 Interpretation
In this Contract, unless the context otherwise requires,
a) any reference to a statutory provision shall include such provision as is from time to time modified
or re-enacted or consolidated so far as such modification or re-enactment or consolidation applies or
is capable of applying to any transactions entered into hereunder;
b) references to Applicable Law shall include the laws, acts, ordinances, rules, regulations,
notifications, guidelines or byelaws which have the force of law in any State or Union Territory
forming part of the Union of India;
CONTRACT
2.1 Grant of Contract
Subject to and in accordance with the terms and conditions set forth in this Contract, HCL hereby
grants and authorizes the Contractor to investigate, study, design, engineer, procure, finance and
carry out office/camp construction and any other work related to the awarded work in accordance
with the provisions of the Contract and Good Industry Practices and to exercise and/or enjoy the
rights, powers, benefits, privileges, authorizations and entitlements as set forth in this Contract.
2.2 Contract Period
Duration of contract is One Year and four Months (16) months from the date of issue of LoI /
Work Order whichever is earlier, excluding one and half (1.5) months for mobilization. The
Contract Period may be extended further as stipulated under Article 8.5 and hereunder,
provided that the period of any such extension shall be decided by HCL in its sole and absolute
discretion.
ii. HCL has chosen State Bank of India to act advising/beneficiary bank of HCL. The bank issuing
the guarantee should choose this bank to send confirmation through SFMS.
iii. The details of beneficiary (i.e. HCL) for issue of bank guarantee through SFMS platform is as
furnished below.
iv. The Successful bidder is required to take note of it that above particulars are to be incorporated
by the issuing bank properly while issuing the Bank Guarantee under SFMS mode to avoid any
future problem in accepting the BGs.
v. The Guarantor (BG issuing bank) shall send information about issuance of this Guarantee
through SFMS gateway to the State Bank of India, CAG Branch Kolkata (IFSC-
SBIN0009998), to aid in the process of confirmation of Bank Guarantee.
vi. The BG should also have a clause that “The BG shall be operable including encashment at
issuing bank‟s any local branch in Kolkata”.
vii. The Original Bank Guarantee issued by the outstation bank shall be sent by the Issuing Bank to
the Hindustan Copper Limited at Kolkata by Speed Post /Registered Post (AD).
HCL‟s OBLIGATIONS
In addition to and not in derogation or substitution of any of its other obligations under this Contract,
HCL shall have the following obligations:
7.1 Specific obligations
HCL shall:
a) Appoint/nominate the Engineer-in-Charge in accordance with Article 5.1 above.
b) Instruct Engineer-in-Charge for carrying out all the obligations and exercise all the rights set
out in Schedule I.
c) Ensure that Engineer-in-Charge reviews and finalizes the Plan, Drawings and other
documents within a reasonably time and in any case within the respective time specified
elsewhere in this Contract.
d) Provide to Contractor in accordance with the Plan, supply of specific items set out in
Schedule IV upon exercise of the Contractor‟s option to obtain these utilities from HCL.
e) Make payment of Contract Price in accordance with the provisions of this Contract.
f) Grant in a timely manner, all such approvals, permissions and authorizations which the
Contractor may require or is obliged to seek from HCL in connection with implementation of
the Work and the performance of its obligations, under this Contract.
g) Take all steps and make all applicable applications, filings, returns and reports for a license
holder of a mine in accordance with the Applicable Laws to ensure compliance, expansion,
operations and maintenance of the Work/Work Facilities.
7.2 General obligations
HCL shall:
a) grant or where appropriate provide necessary assistance to the Contractor in securing all
Applicable Permits;
b) ensure peaceful use of the Work Site by the Contractor under and in accordance with the
provisions of this Contract without any hindrance from HCL or any Governmental Agency or
persons claiming through or under it/them;
c) pay Dead Rent / Royalty, payment to District Mineral Fund (DMF), National Mineral
Exploration Trust (NMET) & surface rent and also get the forest land diverted for mining &
its related activities & pay NPV accordingly.
d) Observe and comply with all its obligations set forth in this Contract.
Page 123 of 160
ARTICLE - 8
CONTRACT PRICE
8.1 Contract Price
Subject to the provisions of this Contract and in consideration of undertaking to perform and
discharge its obligations in accordance with the terms, conditions and covenants set forth in this
Contract, HCL agrees and undertakes to make to the Contractor, the following payments
(“Contract Price”) as per the provisions of this Article:
a) Payment for work done
Payment for actual work done shall be for Scheduled Items and shall be at the rates against each
respective item set out under Schedule V hereafter achieved and certified by Engineer-in-Charge
during any Contract Payment Period.
Actual work done in case of bore hole drilling means completion of individual bore hole in all
respect including construction of bore hole collar pillar, collar & deviation survey, bore hole /
core logging, sample preparation, chemical analysis etc.
The rates for payment set out in Schedule V shall be based on the mechanism set out under
Schedule VI hereafter.
8.2 Payment Mechanism
8.2.1 The contract price relating to each month shall be payable for actual work done by the
contractor for the month through e-payment only as per format given in Schedule VIII
(“contract payment period”). Contractor shall submit the bill for the actual work done
during a contract payment period to the engineer-in-charge on contract payment due date.
The bill shall be based on the Joint Measurement Certificate. Joint measurements of work
completed during a month and cumulative shall be made on last day of each month and the
results of such joint measurements should be recorded and jointly signed in a bound book.
Engineer-in-Charge shall certify the quantities and arrange for the payment of Contractor‟s bill
after allowing adjustments for the supplies rendered HCL and for other deductions.
Payment of the work done shall be made by credit period of 30 days from the receipt of the
bill for the month of completion of the job, after applicable deduction, if any. However no claim
shall be entertained for any delay in payment. The R.A. bills should be submitted to the
Engineer-in-Charge within three weeks of completion of work.
HCL shall release 95% of billed amount (each RA Bill) & balance 05% payment shall be
released on submission of final Geological Report.
The Contractor will submit proof of depositing of provident fund of the previous month with the
bills.
8.2.2 Joint measurement: Successful Bidder shall submit the bill for the work done during the
previous months in accordance with the joint measurement to the Engineer-in-charge in the
first week of every month. The results of such joint measurements should be recorded and
jointly signed in a bound book. Engineer-in-charge shall certify the quantities and arrange
for the payment of Successful Bidder‟s bill after allowing adjustments for the supplies and
services rendered by the company and for other deductions.
All measurements shall be in metric system. All the work in progress will be measured by the
representative of the Engineer-in-charge and the Successful Bidder‟s authorized agent
progressively. For the purpose of taking joint measurement the Successful Bidder‟s
representative shall be bound to be present whenever required by the Engineer-in-charge. If,
however, he absents for any reason whatsoever the measurements will be taken by Engineer-in-
charge or his representative and this will be deemed to be correct and binding on the Successful
Bidder.
8.3 Withholding of payments to Contractor and HCL‟s lien on money due to the Contractor
Payments may at any time be withheld or reduced if, in the opinion of HCL, the Contractor is not
diligently and efficiently endeavoring to comply with the terms of the Contract or if the
Contractor should fail to pay wages to his labour or for material.
HCL shall have a lien on all amount that may become due and payable to the Contractor under
this Contract or transaction of any nature whatsoever between HCL and the Contractor and the
Performance Security furnished by the Contractor under the Contract or any sum that may
become due and payable to the Contractor till the Contractor pays and clears the claim
immediately on demand.
8.4 Final Payment and Release
On Completion the Engineer-in-Charge will issue a Completion Certificate to the Contractor on
the application of the Contractor after satisfying himself (Engineer in charge) that the work has
been completed in accordance with the contract documents and verifying from the following
completion documents:
(a) All surplus materials, rubbish, equipment etc are cleaned off the site completely.
Page 125 of 160
(b) The work has been measured,
(c) All temporary works, labour and staff colonies/camp constructed are removed.
(d) Performance Security, if any remaining after set-off by HCL of any amounts owed by the
Contractor to HCL, and which amounts not having been paid by the Contractor to HCL,
Material appropriation statement for the material, if issued by HCL for the Work and list of
surplus material returned to HCL‟s stores duly supported by necessary documents. If the
contractor fail to comply with the requirements of this clause on or before the date fixed for the
completion of the work, the Engineer-in-Charge may at the expenses of the contractor remove
such surplus materials and rubbish and dispose off the same as he thinks fit. The contractor shall
forthwith pay the amount of all expenses so incurred and shall have no claim in respect of any
such surplus materials as aforesaid except for any sum actually realized by the sale thereof.
The Contractor, after obtaining the completion certificate, is eligible to present the final bill for
the work executed by him under the terms of contract.
After the issue of Completion Certificate by the Engineer-in-Charge as aforesaid and on the
particulars contained therein and after getting the final bill for the work executed by the
contractor, HCL shall determine the total value of the Work done by the Contractor and after
adjusting all sums paid to him already or due to HCL, and such further sums as HCL may require
to reserve or retain under the terms of the Contract, release eighty percent (80%) of the final
payment due to the Contractor subject to undertaking given by the contractor. The remaining
twenty percent (20%) of the outstanding final payment shall be paid by the HCL within seven (7)
days after the expiry of the Period of Liability, provided that no set-offs are required to be made
by HCL, during the Period of Liability, for remedying any work done by the Contractor under the
Contract. Such final payment shall be made only when the Contractor furnishes to HCL an
undertaking to the effect that Contractor has no further claim of whatever nature or description
against HCL.
The Contractor should file no claim after final payment and HCL will not be liable to pay any
money to the Contractor except as specifically provided for in the Contract. Acceptance by the
Contractor of the final payment as aforesaid shall release HCL from all acts of omission and
commission by HCL or by the Engineer-in-Charge.
8.5 Variation in Schedule Items
The Itemized quantities indicated in Schedule V are indicative and at this stage it is envisaged
that variation may be within +20% of the Contract and the duration of the contract may be
extended based on the variation on pro rata basis target during the period of the contract.
Also, HCL shall reconcile measurement of work done at the end of each financial year, and
excess amount of LD, if found deducted from the bills of the successful bidder on quarterly basis
during the financial year, shall be refunded to the successful bidder on achievement of 100% of
the annual target.
Liquidated damages for delay in start of work beyond mobilization period of 1.5 months(45 days)
from the date of issue of LoI or Work order whichever is earlier @ 20% of total monthly rate of
the shortfall shall be levied on Successful Bidder. The Successful Bidder can start the work
during mobilization period and claim their bills for payment. There will be no target in the
mobilization period. The achievement of mobilization period will not be carried over to the
achievement of first year or subsequent years.
The liquidated damage will be maximum of 10% of the total awarded value (excluding Service
Tax).
However, if there is shortfall in the achievement due to such circumstances, which are under the
control of HCL/KCC, liquidated damages will not be applicable & in that case, proportionate
reduction in the quarterly target will be allowed.
Non-achievement of targets will, however, not attract any liquidated damages in case the same is
established due to force majeure conditions as stipulated under the contract.
Page 127 of 160
HCL shall have the right to adjust the Liquidated Damage which HCL may become entitled to
from any amount payable by HCL to the contractor under the contract and in case no payment is
due from HCL to the contractor, the contractor shall promptly and without demur or protest
arrange remittance to HCL on demand.
If the delay in completion of execution of job is attributable to HCL, or due to a Force
Majeure event, then Competent Authority may consider waiving of LD, provided the
occurrence of the event is informed by notice to HCL, immediately thereof.
8.7 Penalty for poor Core Recovery
Core recovery will be calculated bore hole wise.
% Core Recovery = {(Total core recovered (m) for the entire length of bore hole) / (Total length of
the bore hole)}x 100
If core recovery is below 90% then the penalty will be imposed proportionately.
The amount of penalty = [{(Total length of the bore hole x 0.90) – Core recovered of the same
drilling in meters} / 0.90] x rate of per meter of drilling.
In case core recovery is poor due to poor ground / strata conditions, engineer-in-charge will have
discretion to judge the same and decide whether any concession is given for poor core recovery.
The dispute may be referred to an arbitral tribunal, consisting of an Arbitrator nominated by both
parties each and one arbitrator appointed by both the above arbitrators. The Arbitrator will be
appointed within 30 days of reference to arbitration. The Arbitrator will be nominated by the
Chairman-cum-Managing Director of Hindustan Copper Limited (HCL), who, according to the
2015 Act, will not stand in conflict of interest with any to the organizations. A declaration to the
effect shall be submitted by the Arbitrator, to guarantee impartially in the proceedings.
The duration of proceedings and the fee structure will be governed by the 2015 Act. The venue of
the arbitration shall be Kolkata only. The award of the arbitrator shall be final and binding on the
parties. Any dispute, which arises at any point of time out of arbitration, shall have the jurisdiction
of the court of Kolkata, West Bengal.
Subject to the above, the provision of Arbitration and Conciliation Act, 1996 and the rules there
under and the statutory modifications thereof shall govern such arbitration proceedings and shall
be deemed to apply and be incorporated in this contract.
ln the event of any dispute or difference relating to the interpretation and application of the
provisions of commercial contract(s) between Central Public sector Enterprises (CPSEs)/Port
Trusts inter se and also between CPSEs and Government Departments/Organizations (excluding
disputes concerning Railways, Income -Tax, Customs & Excise Departments), such dispute or
difference shall be taken up by either party for resolution through AMRCD as mentioned in DPE
OM No.4 (1)/2013-DPE ( GM )/FTS- 1835 DATED 22-05-2018.
Name: Name:
Designation: Designation:
Seal: Seal:
In the presence of: In the presence of:
1) 1)
1. The Engineer-in-charge/Mines Manager or his representative which includes HCL‟s Surveyor and
his staff, will have full power and authority to inspect the work at any time wherever work is in
progress either on the site or at the Successful Bidder‟s premises/ workshop wherever situated,
premises/ workshops of any person, firm or corporation where work in connection with the
Contract may be in hand or where material are being or are to be supplied and the Successful
Bidder shall afford or procure for the Engineer-in-charge or his representative every facility and
assistance to carry out such inspection. The Successful Bidder shall at all time during the usual
working hours and at all other times at which reasonable notice of the intention of the Engineer-in-
charge or his representative to visit the works shall have been given to the Successful Bidder, either
himself be present to receive orders and instructions or have a responsible officer duly accredited
in written be present for the purpose.
2. No material shall be dispatched from the Successful Bidder‟s stores before obtaining the approval
in writing of the Engineer-in-charge. The Successful Bidder is to provide at all times during the
progress of work and the maintenance period proper means of access with ladder, gangways, etc.
and the necessary attendance to move and adopt as directed for inspection or measurement of the
work by the Engineer-in-charge.
Party will abide by laws with the provisions of the Payment of Wages Act, 1936, Minimum
Wages Act, 1948, Contract Labour (Regulation & Abolition) Act, 1970 etc. and also provisions
of any other law as may be applicable from time to time. Wages of any kind i.e. Salary, Over
Time, Bonus, and Advance or on any other account whatever shall be paid, through bank account
only. Cash payment will not be allowed in any circumstance whatever the reason there may be.
Page 148 of 160
SCHEDULE - III
CONDITION FOR ENVIRONMENT, HEALTH & SAFETY MANAGEMENT
1. Environment, Health and Safety Management
During the entire Contract Period, the Contractor shall observe and abide by the general
guidelines and specific guidelines on environment, health and safety applicable to mining works
in accordance with Applicable Laws and Good Industry Practices.
2. Environment
2.1 During the entire Contract Period, the Contractor‟s men and equipment shall conform to the
provisions of all directions and orders issued by HCL in respect of environment protection.
2.2 The Contractor shall abide by and perform all Works in accordance with all applicable
environmental laws, regulations and permits in force.
2.3 If after the execution of this Contract, any change in the Work or additional work is required due
to new environmental laws and regulations not previously applicable to the Work, the Contractor
and HCL shall agree upon the changes required and Additional Cost, if any. An addendum to the
Contract will be executed incorporating the required changes and additional price, if any.
3. Safety
3.1 The Contractor shall, at all times, exercise all reasonable precautions for the safety of its
personnel and employees/workers in the performance of its obligations under the Contract and
shall comply with all lawful instructions of HCL and/or DGMS or other authority relating to
safety in general and in particular to the safety of the Mine and its operations and safety of all
persons engaged in the Mine and shall abide by all applicable provisions of the safety laws drawn
up by the DGMS, GOR or GOI or municipalities and other authorities in India and shall provide
all facilities and gadgets required for the purpose. Any compensation to be paid to the
workers/employees or others on any account including failure to observe safety laws shall be the
responsibility of the Contractor. In case of non-compliance by the successful bidder, the same
may be provided by HCL at the successful bidder‟s cost
3.2 The contractor shall be responsible for implementation of safety rules as per good industry
practices and applicable laws and directions of DGMS.
3.3 Special precautions should be taken while deploying workers in the mine. Before employing any
labour to the mine proper vocational training should be imparted and all rules and regulations in
that regard should be strictly followed and shall ensure that:
3.3.1 No person/vehicle shall be deployed at any place other than authorized place.
3.3.2 All workers should obey lawful instructions of mine management.
b) Regarding statutory supervision, the Successful Bidder and HCL management shall frame out
a policy to comply with the provisions of MMR1961. However, for execution, supervision
and control of the Contract, Successful Bidder shall deploy statutory qualified supervisors
and officials experienced in the field of Metal Mining in all the three shifts of operation.
c) The Successful Bidder shall name and depute a qualified person having sufficient experience
in carrying out work of similar nature, which the instructions for work are given.
d) The Successful Bidder shall keep at all time on the work site while the work is in progress, a
properly qualified and competent Project Manager, duly authorized and empowered to act for
him and to receive on his behalf all such notices and communications as the company and/or
the Engineer-in-charge may wish to issue from time to time. From the moment the Project
Manager so appointed takes charge of the work, such notices and communications shall
operate as if the Successful Bidder himself had received them and all act done by Project
Manager shall be “quit facit per aliumperse”, which means “he who does through another
does by himself”. The act of Project Manager is the act of the Successful Bidder, as binding
as if done by the Successful Bidder himself, notwithstanding absence of formal authority or
definite instructions from the Successful Bidder to the said Project Manager or any purported
restrictions or powers or limitations of authority imposed by the Successful Bidder. It shall be
open to the company to enforce replacement of the Project Manager and/or any other
employees of the Successful Bidder in the event that the Engineer-in-charge/ Mine Manager
deems the Project Manager or any other employee to be incompetent or otherwise
unacceptable at any time. The Project Manager shall arrange for receipt of material, supplies
and equipment as per terms and conditions of the Contract.
1. Residential Accommodation: Residential accommodation in the HCL Colony can be given to the
Contractor on chargeable basis, subject to availability.
a. Deposit a refundable, interest free security deposit amounting to Rs. One Lakh.
Also,
a) To bear a maintenance fee charged @ 10% of Monthly Rent
b) To pay electricity charges and water charges as per actuals
ii) Escalation on All India Wholesale Price Index = Awarded Rate in Rs per Unit *(M2-M1)*0.20
M1
Where:
M1 = All India Wholesale Price Index as published by the RBI Bulletin (New Series) (Base 2011-12
=100) of all commodities as on the month of Tender submission.
M2 = All India Wholesale Price Index as published by the RBI Bulletin (New Series) (Base 2011-12
=100) of all commodities as on the quarter under review.
F1 = Average Index number for Wholesale Price for group fuel and power as published by the RBI
Bulletin (New Series) (Base 2011-12 =100) of all commodities as on the month of Tender
submission.
F2 = Average Index number for Wholesale Price for group fuel and power as published by the RBI
Bulletin (New Series) (Base 2011-12 =100) of all commodities as on the quarter under review.
I hereby declare that the particulars given above are correct and complete. If any transaction is delayed
or not effected for reasons of incomplete or incorrect information, I shall not hold Hindustan Copper
Limited responsible. I also undertake to advise any change in the particulars of my account to facilitate
updation of records for purpose of credit of amount through RBI EFT/Internet/RTGS.
Place:
Date: Signature of the Party/Authorized Signatory
Certified that the particulars furnished above are correct as per our records.
Bank‟s Stamp:
Date: (Signature of the Authorized Official from the Banks)