Siemer Technologies: Pages: 1 of 2

This document provides a pre-commissioning test report for current transformers used in a 6.6kV switchgear panel for a wagon loading system. It details the results of insulation resistance measurements, secondary winding resistance checks, primary injection testing at various current levels, and a polarity check, and finds the current transformers to be healthy.

Uploaded by

siva
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views2 pages

Siemer Technologies: Pages: 1 of 2

This document provides a pre-commissioning test report for current transformers used in a 6.6kV switchgear panel for a wagon loading system. It details the results of insulation resistance measurements, secondary winding resistance checks, primary injection testing at various current levels, and a polarity check, and finds the current transformers to be healthy.

Uploaded by

siva
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

SIEMER Pages: 1 of 2

PRE-COMISSIONING TEST REPORT


TECHNOLOGIES

Client : KRISHNAPANTHAM PORT COMPANY LTD.


Project : 6.6 KV SWITCH GEAR PANEL FOR WAGON LOADING SYSTEM
Location : SS-3
Feeder Detail : PANEL 02 – MR000 CONVEYOR CRD-1 (1) 700 KW
Equipment Details : CURRENT TRANSFORMER
Make : PARGATI ELECTRICALS PVT. LTD.
Sr. No.
R-11/153910 : CORE RATIO CLASS VA
Y-11/153858 : Core-1 150/1A 5P20 15
B-11/153979 : Core-2 150/1A 0.5 15

I. Insulation Resistance Measurement : ( Values in G )


Primary- Earth and Primary to Secondary tested with 2.5kV.
Secondary -Earth and Between Secondary tested with 500V.

R-Ph Y-Ph B-Ph


Primary - Earth 16.9 GΩ 12.0 GΩ 15.0 GΩ
Secondary 1/2- Earth 5.5/4.0 GΩ 6.0/6.5 GΩ 5.6/4.4 GΩ
Primary – Secondary 1/2 38.6/26.1 GΩ 34.0/16.8 GΩ 28.0/17.3 GΩ
Between Secondary 2.3 GΩ 6.65 GΩ 18.9 GΩ

II. CT SECONDARY WINDING RESISTANCE CHECK:

Terminal No. PHASE


R-CT Y-CT B-CT
1S1 – 1S2 6.8 Ω 6.8 Ω 6.7 Ω
2S1 – 2S2 2.1 Ω 2.1 Ω 2.3 Ω

________________________________________________________________________________________

Tested By : Vamish Umar Witnessed by Witnessed by:

SIEMER Technologies VSE Ltd KPPCL

Date :
SIEMER Pages: 2 of 2
PRE-COMISSIONING TEST REPORT
TECHNOLOGIES

III. Primary Injection Test :

Primary Current Amp Secondary Current Amp

Phase % Amp Core 1 Core 2

25 37.5 A 0.24 A 0.23 A

R- ph 50 75.0 A 0.49 A 0.49 A

100 150 A 0.98 A 0.99 A

25 37.5 A 0.23 A 0.24 A

Y-Ph 50 75.0 A 0.48 A 0.49 A

100 150 A 0.97 A 0.99 A

25 37.5 A 0.23 A 0.23 A

B-Ph 50 75.0 A 0.48 A 0.49 A

100 150 A 0.99 A 0.98 A

IV. Polarity Check :


Test set up with P1 +ve P2 -ve

S1 CLOCKWISE +ve kick with respect to S2

Result Core 1 Core 2

R-Ph OK OK

Y-Ph OK OK

B-Ph OK OK

CT found healthy : YES

________________________________________________________________________________________

Tested By : Vamish Umar Witnessed by Witnessed by:

SIEMER Technologies VSE Ltd KPPCL

Date :