1. The document summarizes the results of gamma ray radiography tests performed on various pipes and joints of a power plant turbine system between November 14-22, 2018. 2. A total of 69 films were taken of 21 different pipe lines with diameters ranging from 1 1/2 inches to 12 inches. 3. The tests found indications such as porosity, cracking, and stringer inclusions in some of the joints tested, though the majority of the tests resulted in acceptable condition classifications.

Uploaded by

kucing_batam
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
37 views

Summary RT MultiSystem

1. The document summarizes the results of gamma ray radiography tests performed on various pipes and joints of a power plant turbine system between November 14-22, 2018. 2. A total of 69 films were taken of 21 different pipe lines with diameters ranging from 1 1/2 inches to 12 inches. 3. The tests found indications such as porosity, cracking, and stringer inclusions in some of the joints tested, though the majority of the tests resulted in acceptable condition classifications.

Uploaded by

kucing_batam
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Summary Radiography (Gamma Ray)

PT. BILL EMAS SARNO Powerplant Project (Turbine) - PT. Multi System Production (P. Bulan)

Thk Report
Line No Identification/ Description Joint No DIA ø Loc Test Date R1 R2 RSC Status FILM D7 FILM D7 Remark
(mm) No
4"x10" 4"X15"
1 CEP ( 1,2 ) suction from surface condenser 1 6" 7.11 0-7 14-0 19-Nov-18 18 √ ACC 2
1 CEP ( 1,2 ) suction from surface condenser 3 6" 7.11 0-7 7-14 14-0 19-Nov-18 18 √ ACC 3 Por 7-14; Por 14-0
2 CEP (1,2 ) discharge to Ejector inlet 1 4" 6.02 0-5 5-10 10-0 19-Nov-18 18 √ ACC 3 Por; Por; Por
2 CEP (1,2 ) discharge to Ejector inlet 2 3" 5.49 8-0 19-Nov-18 18 √ ACC 1
3 GVC outlet to LP heater 1 3" 5.49 8-0 16-Nov-18 17 √ ACC 1
3 GVC outlet to LP heater 2 3" 5.49 8-0 16-Nov-18 17 √ ACC 1
3 GVC outlet to LP heater 3 3" 5.49 0-4 4-8 16-Nov-18 17 √ ACC 2
3 GVC outlet to LP heater 4 3" 5.49 0-4 4-8 8-0 16-Nov-18 17 √ ACC 3
3 GVC outlet to LP heater 5 3" 5.49 4-8 8-0 16-Nov-18 17 √ ACC 2
3 GVC outlet to LP heater 6 4" 6.02 0-5 5-10 19-Nov-18 18 √ ACC 2 Por 0-5
4 Re-circulation line from LCV to surface condenser 3 2" 3.91 AB 19-Nov-18 18 √ ACC 2
5 Air evacuation line (condenser to vacuum pump) 1 4" 6.02 0-5 5-10 10-0 19-Nov-18 19 √ ACC 3
5 Air evacuation line (condenser to vacuum pump) 2 6" 7.11 0-7 14-0 19-Nov-18 19 √ ACC 2 Por 0-7
13 Oil filter outlet to Turbine Skid 1 2" 2.65 AB 22-Nov-18 22 √ ACC 2
14 Alternator inlet 1 1 1/2" 3.68 ABC 22-Nov-18 22 √ ACC 3
15 Alternator oil outlet 1 3" 5.49 0-4 4-8 22-Nov-18 22 √ ACC 2 Por 0-4; Por 4-8
19 Turbine bleed to LP heater inlet 1 3" 5.49 0-4 4-8 8-0 15-Nov-18 17 √ ACC 3 Por 4-8
19 Turbine bleed to LP heater inlet 2 4" 6.02 5-10 15-Nov-18 17 √ ACC 1
19 Turbine bleed to LP heater inlet 3 4" 6.02 0-5 10-0 15-Nov-18 17 √ ACC 2
19 Turbine bleed to LP heater inlet 4 4" 6.02 0-5 5-10 15-Nov-18 17 √ ACC 2 RC 0-5
19 Turbine bleed to LP heater inlet 5 2" 3.91 AB 15-Nov-18 17 √ ACC 2
19 Turbine bleed to LP heater inlet 6 4" 6.02 0-5 10-0 21-Nov-18 20 √ ACC 2
19 Turbine bleed to LP heater inlet 7 4" 6.02 0-5 5-10 10-0 21-Nov-18 20 √ ACC 3
19 Turbine bleed to LP heater inlet 8 4" 6.02 0-5 15-Nov-18 17 √ ACC 1
19 Turbine bleed to LP heater inlet 9 4" 6.02 0-5 10-0 15-Nov-18 17 √ ACC 2
19 Turbine bleed to LP heater inlet 10 4" 6.02 0-5 5-10 10-0 15-Nov-18 18 √ ACC 3 Profile 5-10; Profile 10-0
19 Turbine bleed to LP heater inlet 11 4" 6.02 0-5 10-0 21-Nov-18 20 √ ACC 2
19 Turbine bleed to LP heater inlet 12 4" 6.02 0-5 15-Nov-18 18 √ ACC 1
20 Dump steam line 1 12" 10.31 0-25 25-50 50-75 21-Nov-18 20 √ ACC 3 CP 0-25; Por 25-50; Por 50-75
20 Dump steam line 1 12" 10.31 75-0 21-Nov-18 20 √ ACC 1
20 Dump steam line 2 12" 10.31 25-50 75-0 14-Nov-18 15 √ ACC 2
20 Dump steam line 3 12" 10.31 25-50 21-Nov-18 20 √ ACC 1 SI+Por 25-50
20 Dump steam line 5 12" 10.31 0-25 25-50 50-75 14-Nov-18 15 √ ACC 3
20 Dump steam line 6 12" 10.31 50-75 75-0 14-Nov-18 15 √ ACC 2
20 Dump steam line 7 12" 10.31 0-25 25-50 50-75 75-0 14-Nov-18 15 √ ACC 4
20 Dump steam line 8 12" 10.31 0-25 25-50 75-0 14-Nov-18 15 √ ACC 3
20 Dump steam line 9 12" 10.31 0-25 25-50 50-75 75-0 21-Nov-18 21 √ ACC 4
20 Dump steam line 10 12" 10.31 25-50 14-Nov-18 16 √ ACC 1
20 Dump steam line 13 6" 7.11 14-0 14-Nov-18 16 √ ACC 1
21 Warm up vent line 1 4" 6.02 0-5 5-10 22-Nov-18 22 √ ACC 2
21 Warm up vent line 2 4" 6.02 0-5 5-10 10-0 22-Nov-18 22 √ ACC 3
21 Warm up vent line 3 4" 6.02 0-5 22-Nov-18 22 √ ACC 1 SI 0-5
21 Warm up vent line 4 2" 3.91 AB 22-Nov-18 23 √ ACC 2
21 Warm up vent line 5 2" 3.91 AB 22-Nov-18 23 √ ACC 2