Trapezoidal Canal Design
Trapezoidal Canal Design
Trapezoidal Canal Design
Designed By
Checked By
Reference Documents
REF CALCULATIONS RESULTS
Channel Sizing
Manning's equation
Q = A x (1/n) x R2/3 x S1/2
A = (B+dwN)x dw
dw = Depth of water in canal
R = A/P
P = Wetted perimeter
P = B+ [ 2xdwx 1 + ]
R = (B+dwxN)x dw
B+ [ 2x dwx 1 + ]
therefore;
dw = nxQ
(B+ dwN) x R2/3 x S1/2
by doing iterations,
assume, dw,1 = 1.3 m
dw,2 = 1.29890 m
dw,3 = 1.29981 m
dw,4 = 1.29906 m
dw,5 = 1.29968 m
dw,6 = 1.29916 m
dw,7 = 1.29959 m
dw,8 = 1.29924 m
dw,9 = 1.29953 m
dw,10 = 1.29929 m
dw,11 = 1.29949 m
dw,12 = 1.29932 m
dw,13 = 1.29946 m
dw,14 = 1.29935 m
dw,15 = 1.29944 m
dw,16 = 1.29936 m
dw,17 = 1.29943 m
dw,18 = 1.29937 m
dw,19 = 1.29942 m
dw,20 = 1.29938 m
dw,21 = 1.29941 m
Rev No.
Designed By
Checked By
Reference Documents
REF CALCULATIONS RESULTS
dw,22 = 1.29939 m
dw,23 = 1.29941 m
dw,24 = 1.29939 m
dw,25 = 1.29940 m
dw,26 = 1.29939 m
dw,27 = 1.29940 m
dw,28 = 1.29939 m
dw,29 = 1.29940 m
dw,30 = 1.29939 m
Take dw = 1.300 m
depth of channel = 1.600 m
Top width of channel = 1.6+ ( 2 x1.3x0.7)
Top width of channel = 3.800 m
considering free board of 0.3 m
Required depth of Canal
d = 1.3+0.3
d = 1.600 m
hence, selected depth of canal , d= 1.6 m d=1.6m
2/3 1/2
v = (1/n) x R x S
R = (B+dwxN)x dw
B+ [ 2x dwx 1 + ]
substituting values of B, dw & N ,
R = 0.68 m