204 Malayan Law Journal [2015] 4 MLJ

Au Kean Hoe v Persatuan Penduduk D’villa Equestrian A

FEDERAL COURT (PUTRAJAYA) — CIVIL APPEAL NO 02(f )-50–08


OF 2013(B)
ZULKEFLI CJ (MALAYA), ABDULL HAMID EMBONG, AHMAD B
MAAROP, ZAINUN ALI, RAMLY ALI FCJJ
19 MARCH 2015

Tort — Nuisance — Obstruction to public road — Resident in housing estate C


sued residents’ association for nuisance caused by presence of guard house and boom
gates on access road into estate — Resident contended structures were ‘obstruction’
under s 46(1)(a) of the Street, Drainage and Building Act 1974 (‘SDBA’) and
illegal and should be demolished — Whether the fact that local authority approved
erection of said structures meant they were not an obstruction under the SDBA D
— Whether operation of a security gate system in residential area was not per se an
actionable obstruction — Whether resident’s complaint in reality not that he was
obstructed or denied access to his residence but that he was inconvenienced
— Whether inconvenience in circumstances of case could not amount to actionable
nuisance E

The appellant and his wife owned a house in the D’Villa Equestrian housing
estate. When they bought the property there were already two boom gates and
a guard house in operation on the road which served as the sole entrance to and
exit from the housing estate. The respondent was the residents’ association F
(‘RA’) of the housing estate and it decided that those residents who did not pay
the monthly fee for security and maintenance charges would have to open the
boom gates themselves without the assistance of the security guard on duty.
The appellant, who stopped paying the security and maintenance charges after
having previously done so, objected to the respondent’s decision and sued the G
respondent in the High Court for, inter alia, nuisance in creating an
obstruction on a public road. Besides an injunction, the appellant sought an
order that the boom gates and guard house be demolished. The respondent
counterclaimed, inter alia, for arrears of maintenance and security charges
owing by the appellant and an injunction to restrain him from harassing the H
committee members of the respondent and the security guards at the guard
house. The High Court dismissed the appellant’s claim and partly allowed the
counterclaim ruling that it was not unreasonable for the respondent to impose
the condition that residents who did not pay for the security charges had to
open the boom gates themselves without the assistance of the security guards I
especially when that condition was agreed to by all the residents in the housing
estate, except the appellant. The High Court also held that while the appellant
might have been inconvenienced by having to open the gate himself he had not
been obstructed ie prevented or hindered from entering his residence; neither
Au Kean Hoe v Persatuan Penduduk D’villa Equestrian
[2015] 4 MLJ (Zulkefli CJ (Malaya)) 205

A did the presence of the boom gates and the guard house interfere with the
comfort or convenience of living in the housing estate. The Court of Appeal
(‘COA’) dismissed the appellant’s appeal and affirmed the High Court’s
decision. This led to the instant appeal where one of the questions of law posed
to the Federal Court was whether the erection of a guard house and boom gate
B across a public road in a residential area was an obstruction within the meaning
of s 46(1)(a) of the Street, Drainage and Building Act 1974 (‘SDBA’).

Held, dismissing the appeal with costs:

C (1) The guard house and boom gates were not an obstruction under
s 46(1)(a) of the SDBA. The Majlis Bandaraya Petaling Jaya (‘MBPJ’), as
the relevant local authority, was fully empowered to approve their
construction and they were duly authorised structures not only under the
SDBA but also under the Town and Country Planning Act 1976
D (‘TCPA’) and the Local Government Act 1976 (‘LGA’) (see paras
21–22).
(2) The MBPJ was the rightful authority to approve the erection of the guard
house and the boom gates under the SDBA. The developer of the housing
estate, as the predecessor to the respondent, had obtained MBPJ’s
E approval for the construction of the guard house when the lay-out plan,
which included provision for the building of a guard house, was approved
in 2002. In 2012, there was a second approval from MBPJ with regard to
the guard house and accompanying boom gates. Approval of the lay-out
plan was required under the TCPA before development could take place
F while under the LGA the local authority was empowered to do all things
necessary for or conducive to public safety, health and convenience.
Guarded communities were schemes implemented to improve public
safety and security in defined residential areas (see paras 16–20).

G (3) The assumption that operating a security gate system in a residential area
was an actionable obstruction in law was clearly wrong. It was only so if
one was denied access to a public place. A regulated access to a defined
area was not an obstruction in law especially if it was for security
purposes. It was not a barricade that was placed across a public road
H denying access altogether to all who wished to enter (see para 23).
(4) The appellant’s complaint was not that he or his family was prohibited
from access at all or that the boom gates were a barricade against him and
his family. His real complaint was not of obstruction but that he was
inconvenienced because he had to engage in self-service to lift the gate. At
I common law, actionable obstruction or actionable private nuisance was
not available for inconvenience. It was a matter of degree at all times and
the conduct had to be unreasonable in the circumstances of the case for it
to be actionable. The underlying rule was the recognition that individuals
lived within a community and it was always the balancing of the
206 Malayan Law Journal [2015] 4 MLJ

individual’s inconvenience against the community’s interest that was of A


paramount concern. Both the courts below had correctly concluded that
the appellant’s inconvenience by the presence of the guard house and
boom gates was not an actionable nuisance (see paras 24–27).

[Bahasa Malaysia summary B


Perayu dan isterinya memiliki sebuah rumah di kawasan perumahan D’Villa
Equestrian. Apabila mereka membeli hartanah itu telah wujud dua palang
pintu parkir dan rumah pengawal yang beroperasi di jalan yang merupakan
satu-satunya jalan keluar masuk kawasan perumahan itu. Responden
C
merupakan persatuan penduduk (‘PP’) kawasan perumahan itu dan ia telah
memutuskan bahawa penduduk-penduduk yang tidak membayar fi
keselamatan dan caj penyelenggaraan bulanan perlu membuka palang pintu
parkir sendiri tanpa bantuan pengawal keselamatan yang bertugas. Perayu,
yang sebelum ini membayar caj keselamatan dan penyelenggaraan sudah D
berhenti pembayaran, telah membantah keputusan responden dan menyaman
responden di Mahkamah Tinggi untuk, antara lain, kacau ganggu kerana
menyebabkan halangan pada jalan awam. Selain injunksi, perayu memohon
perintah agar palang pintu parkir dan pondok pengawal itu diruntuhkan.
Responden telah menuntut balas, antara lain, untuk tunggakan caj E
penyelenggaraan dan keselamatan yang terhutang oleh perayu dan satu
injunksi untuk menghalangnya daripada mengganggu ahli-ahli responden dan
pengawal-pengawal keselamatan di pondok pengawal. Mahkamah Tinggi
telah menolak tuntutan perayu dan membenarkan sebahagian daripada
tuntutan balas yang memutuskan bahawa ia bukan tidak munasabah untuk F
responden mengenakan syarat agar penduduk-penduduk yang tidak
membayar caj keselamatan perlu membuka palang pintu parkir sendiri tanpa
bantuan pengawal keselamatan terutamanya jika syarat itu telah dipersetujui
oleh semua penduduk-penduduk dalam kawasan perumahan itu, kecuali
perayu. Mahkamah Tinggi juga memutuskan bahawa walaupun perayu G
mungkin mengalami kesulitan kerana perlu membuka pagar itu sendiri dia
tidak disekat iaitu dicegah atau dihalang daripada memasuki tempat
tinggalnya; kewujudan palang pintu parkir dan pondok pengawal itu juga
tidak mengganggu keselesaan dan kesenangan perayu mendiami dalam
kawasan perumahan itu. Mahkamah Rayuan (‘MR’) telah menolak rayuan H
perayu dan mengesahkan keputusan Mahkamah Tinggi. Ini telah membawa
kepada rayuan ini di mana salah satu persoalan undang-undang yang
dikemukakan kepada Mahkamah Persekutuan adalah sama ada pondok
pengawal dan palang pintu parkir yang dibina melintang jalan awam dalam
kawasan perumahan adalah satu halangan dalam maksud s 46(1) Akta Jalan, I
Parit dan Bangunan 1974 (‘AJPB’).

Diputuskan, menolak rayuan dengan kos:


(1) Pondok pengawal dan palang pintu parkir itu bukan halangan di bawah
Au Kean Hoe v Persatuan Penduduk D’villa Equestrian
[2015] 4 MLJ (Zulkefli CJ (Malaya)) 207

A s 46(1)(a) AJPB. Majlis Bandaraya Petaling Jaya (‘MBPJ’), sebagai pihak


berkuasa tempatan yang relevan, diberikan kuasa penuh untuk
meluluskan pembinaannya dan ia adalah struktur-struktur yang
dibenarkan bukan sahaja di bawah AJPB tetapi juga di bawah Akta
Perancangan Bandar dan Wilayah 1976 (‘APBW’) dan Akta Kerajaan
B Tempatan 1976 (‘AKT’) (lihat perenggan 21–22).
(2) MBPJ adalah pihak berkuasa yang sah untuk meluluskan pembinaan
pondok pengawal dan palang pintu parkir di bawah AJPB. Pemaju
kawasan perumahan itu, sebagai pendulum kepada responden, telah
C memperoleh kelulusan MBPJ untuk pembinaan pondok pengawal
apabila pelan susun atur, yang termasuk peruntukan untuk membina
pondok pengawal, telah diluluskan dalam tahun 2002. Pada 2012,
terdapat kelulusan kedua daripada MBPJ berkaitan pondok pengawal itu
dan disertai palang pintu parkir itu. Kelulusan pelan susun atur itu
D dikehendaki di bawah APBW sebelum pembinaan boleh dimulakan
manakala di bawah AKT pihak berkuasa tempatan diberi kuasa untuk
melakukan semua perkara yang perlu untuk atau sesuai untuk
keselamatan, kesihatan dan kemudahan awam. Komuniti berpagar
adalah skim yang dilaksanakan untuk memperbaiki keselamatan awam
E dan keselamatan dalam kawasan perumahan yang ditafsirkan (lihat
perenggan 16–20).
(3) Andaian bahawa melaksanakan sistem berpagar keselamatan dalam
kawasan perumahan adalah halangan yang boleh diambil tindakan dari
F segi undang-undang jelas salah. Ia hanya begitu jika seseorang itu tidak
dibenarkan masuk ke kawasan awam. Akses yang dikawal untuk kawasan
yang ditafsirkan bukan suatu halangan dari segi undang-undang
terutamanya jika ia adalah untuk tujuan keselamatan. Ia bukan
penghalang yang diletakkan melintang jalan awam yang tidak
G membenarkan sama sekali sesiapa yang ingin masuk (lihat perenggan
23).
(4) Aduan perayu bukan kerana dia atau keluarganya dilarang daripada
memasuki secara langsung atau palang pintu parkir itu penghalang
kepadanya dan keluarganya. Aduan sebenarnya bukan tentang halangan
H itu tetapi bahawa dia mengalami kesulitan kerana dia sendiri perlu
mengangkat pagar itu. Dalam common law, halangan yang boleh diambil
tindakan atau kacau ganggu persendirian yang boleh diambil tindakan
tidak tersedia untuk kesulitan. Ia merupakan suatu perkara berhubung
tahap pada setiap masa dan perbuatan itu hendaklah tidak munasabah
I dalam keadaan kes itu agar ia boleh diambil tindakan. Rukun yang
tersirat adalah pengiktirafan bahawa individu-individu yang tinggal
dalam suatu komuniti dan ia sentiasa adalah mengimbangi kesulitan
individu dengan kepentingan komuniti yang merupakan keprihatinan
utama. Kedua-dua mahkamah bawahan betul dalam memutuskan
208 Malayan Law Journal [2015] 4 MLJ

bahawa kesulitan perayu dengan kehadiran pondok pengawal dan palang A


pintu parkir bukan kacau ganggu yang boleh diambil tindakan (lihat
perenggan 24–27).]

Notes
For cases on nuisance in general, see 12(2) Mallal’s Digest (4th Ed, 2013 B
Reissue) paras 1944–2010.

Cases referred to
George Philip & Ors v Subbammal & Ors AIR 1957 Tra-Co 281, HC (refd)
Lingk Christchurch Corpn [1912] 3 KB 595, CA (refd) C
Teoh Soon Kok t/a T S K Suppliers v Yang Dipertua Majlis Daerah Kuala Muda
[1998] MLJU 223; [1998] 5 CLJ 790, HC (refd)
Trevett & Anor v Lee & Anor [1955] 1 WLR 113, CA (refd)
UDA Holdings Bhd v Koperasi Pasaraya (M) Bhd and other appeals [2009] 1
MLJ 737; [2009] 1 CLJ 329, FC (refd) D

Legislation referred to
Local Government Act 1976 s 101(v)
Road Transport Act 1987 ss 70, 71
Societies Act 1966 E
Street, Drainage and Building Act 1974 ss 46, 46(1)(a), 70(3)
Town and Country Planning Act 1976 ss 2, 3, 5, 18, 19, 21A(1)(f ),
21B(c)
Malik Imtiaz Sarwar (Eric Tan, Chan Wei June and Sohan Yong with him) (Ong F
Kok Bin & Co) for the appellant.
Cyrus Das (Atma Singh Veriah and DR John with him) (Atma Singh Veriah & Co)
for the respondent.

Zulkefli CJ (Malaya) (delivering judgment of the court): G

INTRODUCTION

[1] This is an appeal by the appellant against the decision of the Court of
Appeal in dismissing the appellant’s appeal against the decision of the High H
Court at Shah Alam. The High Court had dismissed the appellant’s claim
against the respondent for nuisance and obstruction as well as for injunction
and allowing the respondent’s counterclaim for damages to the boom gates and
for the order restraining the appellant from harassing the committee members
of the respondent and the security guards. I

[2] Dissatisfied with the decision of the Court of Appeal, the appellant
sought and obtained leave from this court to appeal against the said decision on
the following two questions of law:
Au Kean Hoe v Persatuan Penduduk D’villa Equestrian
[2015] 4 MLJ (Zulkefli CJ (Malaya)) 209

A (a) whether the erecting of a guard house and a boom gate across a public
road in a residential area amounts to an obstruction within the meaning
of s 46(1)(a) of the Street, Drainage and Building Act 1974 (‘SDBA’);
and
B (b) whether a local government is empowered to authorise or otherwise
approve an obstruction within the meaning of s 46(1)(a) of the SDBA.

BACKGROUND FACTS

C [3] The relevant backgrounds of the case may be summarised as follows:


(a) the appellant and his wife are the purchasers and co-owner of a house No
7, Jalan Kenyalang 11/5E, D’Villa Equestrian, Kota Damansara, 47810
Petaling Jaya (‘the housing estate’). They purchased the house from the
first buyer on 23 November 2006 and moved in on January 2007;
D
(b) the housing estate was developed by Sunway Damansara Sdn Bhd (‘the
developer’). There is only one entrance and exit road to the housing
estate, that is Jalan 11/15. The developer had constructed two boom gates
and a guard house on Jalan 11/15 of the housing estate. The developer
E was responsible for the security and maintenance including the two
boom gates and the guard house of the housing estate until December
2007;
(c) when the appellant and his wife purchased the house in the housing
estate, the two boom gates and the guard house were already in place and
F functioning;
(d) the respondent is the Residents’ Association (‘RA’) of the housing estate.
It is registered under the Societies Act 1966. The appellant was a member
of the RA and was the treasurer from May 2009–March 2010. He took
G no objection to the boom gates during this period;
(e) beginning from January 2008, the residents of the housing estate were
required to pay RM250 per month to the respondent as security and
maintenance charges. This amount was later reduced to RM200 per
month sometime in August 2009. At a meeting held on 21 July 2007, the
H residents of the housing estate had unanimously agreed that those who do
not pay for the security and maintenance charges will not enjoy the
facilities provided by the guards at the gate or the security facilities;
(f) the appellant ceased to be a member of the RA sometime in August 2010
I and had since then stopped paying the maintenance and security charges;
(g) on 25 October 2011 the respondent issued a circular signed by the
chairman, the treasurer and the secretary of the RA notifying the
residents that those who have not paid the security and maintenance
charges will have to do a self-service entrance to the housing estate; that
210 Malayan Law Journal [2015] 4 MLJ

is to say that they will have to open the boom gates themselves without A
the assistance of the security guard on duty;
(h) dissatisfied with the above circular the appellant lodged a police report
dated 30 October 2011. The appellant also lodged an online complaint
dated 31 October 2011 through the local authority, Majlis Bandaraya B
Petaling Jaya (‘MBPJ’) website;
(i) the appellant discovered that the respondent’s application to MBPJ for
setting up of the alleged obstructions (the boom gates and the guard
house) was made retrospectively. MBPJ had approved the alleged
obstruction in a meeting on or about 22 December 2011 and this was C
confirmed by way of a letter dated 11 January 2012;
(j) of the 114 residents, 113 have agreed to the guarded community scheme
by the RA. Only the appellant has objected but only insofar that he
should not be inconvenienced by the scheme; D
(k) the appellant commenced the action against the respondent on the
grounds of, inter alia, nuisance and that the alleged obstructions were
illegal structures that amounted to obstructions in law. Additionally the
appellant sought an order that the alleged obstructions be demolished. E
The respondent counterclaimed for arrears of security and maintenance
charges and also for an injunction restraining the appellant from
harassing the respondent and the security guards at the guard house.

FINDINGS OF THE HIGH COURT F

[4] The learned High Court judge dismissed the appellant’s claim and
allowed the respondent’s counterclaim in part, by issuing an injunction
restraining the appellant from harassing the respondent and the security
guards. The learned High Court judge, inter alia, held that: G
I find that there is nothing unreasonable to direct the guards not to assist the
residents who have not paid the security charges especially when all residents (except
the plaintiff ) had agreed to adhere to the notice of self-service entrance and had paid
for the fees upon receipt of the notice.
H
Neither is there a real interference with the comfort or convenience of living
according to the standards of the average man by having the guard house and the
boom gates at D’Villa Equestrian. By having to get down from his car and operate
the button at the guard house to lift the boom gate himself, the plaintiff had
certainly been inconvenienced but as the plaintiff admitted, he has not at any time I
been obstructed i.e. being prevented or hindered from entering his residence. Being
inconvenienced and being obstructed are entirely two different circumstances and
scenarios.
Au Kean Hoe v Persatuan Penduduk D’villa Equestrian
[2015] 4 MLJ (Zulkefli CJ (Malaya)) 211

A FINDINGS OF THE COURT OF APPEAL

[5] The Court of Appeal on appeal by the appellant against the decision of
the High Court affirmed the decision of the High Court and, inter alia, held as
follows:
B
The plaintiff also contended that the boom gates and the guard house is a nuisance
because it is an obstruction in a public place and therefore are in contravention of
s 46(1)(a) of the Street, Drainage and Building Act 1974. That section makes it an
offence for any person who erects or maintains obstruction in any public place.
C However on the facts and in the circumstances of this case, we are unable to agree
with the contention by the plaintiff. The learned judge in her judgment had found
that though the plaintiff had certainly been inconvenienced by the presence of the
guard house and the boom gates, the plaintiff has not at any time been obstructed
ie being prevented or hindered from entering or leaving his residence. The learned
judge went further to say that being inconvenienced and being obstructed are
D entirely two different circumstances and scenarios. We agree with this view by the
learned judge.
Furthermore, the obstruction complained by the plaintiff in this case is not of the
same class or category as the obstruction caused by the closure of the public road
leading to the main entrance of the supermarket in UDA Holdings Bhd’s case.
E
SUBMISSION OF THE APPELLANT

[6] On the first question raised for the determination of this court learned
F counsel for the appellant submitted that both the High Court and the Court of
Appeal failed to consider the application and implication of s 46(1)(a) of the
SDBA. This is despite the fact that the alleged obstructions are situated on a
public road and were built without the prior approval of MBPJ. In any event,
the appellant contended that the respondent did not operate the alleged
G obstructions in the manner allowed or approved by MBPJ. Section 46(1)(a) of
the SDBA provides as follows:
46 Obstruction
(1) Any person who —
H (a) builds, erects, sets up or maintains or permits to be built, erected or set up
or maintained any wall, fence, rail, post or any accumulation of any
substance, or other obstruction, in any public place;
shall be guilty of causing an obstruction and may be arrested without warrant by any
officer or employee of the local authority authorized in writing in that behalf by the
I local authority and taken before a Magistrate’s Court and shall be liable on
conviction to a fine not exceeding five hundred ringgit, and in the case of a second
or subsequent conviction to a fine not exceeding one thousand ringgit.

[7] As regards application of s 46(1)(a) of the SDBA and obstruction


212 Malayan Law Journal [2015] 4 MLJ

situated on a public road, learned counsel for the appellant referred to us a A


number of case authorities and amongst them is the High Court decision of
Teoh Soon Kok t/a T S K Suppliers v Yang Dipertua Majlis Daerah Kuala Muda
[1998] MLJU 223; [1998] 5 CLJ 790 wherein Hishamudin Mohd Yunus J (as
he then was) held as follows:
B
Learned counsel for the appellant had argued that there was no obstruction to road
users since the road in question was not a through road but lead to a dead end. The
evidence of both sides in the present case was not clear as to on which part of the
road were the goods deposited. It was merely said in evidence that the items were
found deposited on the road. However, even assuming that they were deposited at
C
the dead end part of the road, still, to my mind, that tantamount to obstructing the
usage of the road. Members of the public are entitled to the maximum utilisation of
the road.

[8] It was submitted for the appellant that the word ‘boom gate’ should D
rightfully fall within the term ‘post’ as provided for under s 46(1)(a) of the
SDBA. The boom gate is in nature an obstruction placed on the public road by
the respondent to impede the appellant’s use of the said road. With regard to
the facts of the case it was the contention of the appellant that in answer to the
first question in the instant case, a guard house and a boom gate across a public E
road in a residential area amounted to an obstruction for the following reasons:
(a) the appellant, his family and guests, together with all non-paying
residents must get down from their vehicle and open the boom gate by
themselves; and
F
(b) the respondent in imposing the operation of the boom gate against the
appellant was in breach of the MBPJ guidelines and the MBPJ letter of
approval dated 22 December 2011 which are namely as follows:
(i) the residents who are not participants of the scheme should not be
obstructed at all from entering their residence at any time; and G

(ii) there is a security guard controlling the boom gate twenty four
hours a day. The boom gate is only operational from 12am–6pm
when in reality was being operated twenty four hours a day.
H
[9] It was also the appellant’s submission that the existence of the boom gate
remained as an issue to be decided as the boom gate had not been included in
the MBPJ approved plans of the guard house. Hence it was the appellant’s
contention that the respondent’s operation of the boom gate in compelling the
appellant to open the boom gate for himself and his visitors was clearly an I
obstruction pursuant to s 46(1)(a) of the SDBA. Therefore it was submitted
that the first question is to be answered in the affirmative.

[10] On the second question posed in this appeal learned counsel for the
Au Kean Hoe v Persatuan Penduduk D’villa Equestrian
[2015] 4 MLJ (Zulkefli CJ (Malaya)) 213

A appellant submitted that s 46 of the SDBA on the face of it does not provide for
the authorisation and/or approval of an obstruction. Section 46 deals with
existence of an obstruction in any public place and the repercussions faced
should one be guilty of causing an obstruction. It is apparent from the reading
of s 46(1)(a) of the SDBA that the power conferred to a local authority is only
B to remove obstructions.

[11] Similarly it was contended for the appellant that s 46(1)(a) of the SDBA
only empowers the local authority to arrest any person who builds, erects or
maintains an obstruction. It is evident that the local authority has no duty to
C
authorise or otherwise approve an obstruction within the definition of the said
section.

[12] Further, it was also submitted that the respondent’s action of setting up
D the alleged obstruction in accordance with its own regulations is ultimately an
attempt at regulating motor vehicles and traffic on public roads which it has no
power or authority to do so. Such regulation is only permitted under the Road
Transport Act 1987 (see ss 70 and 71).

E SUBMISSION OF THE RESPONDENT

[13] Learned counsel for the respondent submitted in reply at the outset that
the illegality issue was not the subject of the complaint of the appellant but was
being deployed by him as a threat to obtain the assurance that the operation of
F the boom gate should not inconvenience him although he was not a paying
resident. Accordingly, the Court of Appeal noted in its judgment that with
regard to the illegality of the boom gates it is a non-issue in the appeal. The
Court of Appeal further noted that only the issue of nuisance by the use of the
boom gates remained to be decided. In the circumstances it was contended for
G the respondent that the illegality issue is not a live issue before this court. The
illegality issue has become academic as it has ceased to be the real complaint to
the appellant. This court was therefore invited by the respondent to decline to
answer the question on illegality.

H DECISION

[14] Notwithstanding the contention of the respondent that the Court of


Appeal had made a finding that with regard to the illegality of the boom gate,
it is a non-issue in the appeal, we take the view that the two questions posed in
I this appeal which relate to the illegality issue of the boom gate shall nevertheless
be dealt with.

[15] The appellant relies on s 46(1)(a) of the SDBA to contend that the
boom gates are illegal as they constitute an obstruction over a public road. With
214 Malayan Law Journal [2015] 4 MLJ

respect, we do not agree with such a contention. On the scope of application of A


s 46(1)(a) of the SDBA, it has been held by the Federal Court in UDA Holdings
Bhd v Koperasi Pasaraya (M) Bhd and other appeals [2009] 1 MLJ 737; [2009]
1 CLJ 329 that s 46(1)(a) of the SDBA has no application where the local
authority has given approval for the so-called obstruction complained of.
Section 46(1)(a) of the SDBA must be read with s 46(3) of the SDBA that B
empowers the local authority to remove an obstruction. Abdul Aziz
Mohamad FCJ on this point held, inter alia, as follows:
The erection of the building was with the approval of DBKL. As far as concerns s 46,
the case is no different from that of a person who obtained a TOL in respect of some C
other State land in Kuala Lumpur and built on it a temporary shop with the
approval of DBKL. It is ludicrous to suggest that he thereby built or erected an
obstruction in a public place and committed an offence under para (a) of sub-s (1)
of s 46 and that DBKL, who approved the construction of the building, had a duty
under sub-s (3)(a) to remove it. The situation is simply not of the kind intended by
D
s 46.

[16] We are of the view the principal issue to be decided in this case is
whether the guard house and the boom gates were constructed with the
approval of the relevant local authority, namely, the MBPJ. In this regard it is E
noted in 2002 there was the approval of the lay-out plan submitted by the
developer to the MBPJ that included provision for the building of a guard
house.

[17] The lay-out plan for development is a requirement under the Town and F
Country Planning Act 1976 (‘the TCPA’). Under s 5 of the TCPA the local
authority is the relevant planning authority for any local area. Under ss 18 and
19 of the TCPA no development may take place in a local area without
planning approval. By s 21A(1)(f ) of the TCPA a development proposal must
contain a lay-out plan. By s 21B(c) of the TCPA the lay-out plan must contain G
particulars of any building to be built. The definition of ‘building’ in s 2 of the
TCPA is wide and includes ‘any house, shed or hut’. We are of the view the
developer as the predecessor to the respondent had thus obtained approval
from the MBPJ for the construction of the guard house by the approval of the
layout plan. H

[18] It is also to be noted that the construction of a guard house is invariably


accompanied with the construction of a gate. In any event in the year 2012
there was a second approval from the MBPJ, after the gated and guarded
community concept became popular. The approval was specific with regard to I
a guard house and accompanying boom gates. Initially the MBPJ’s approval
was for the boom gates to be down only from midnight to 6am. However, by
a letter dated 30 January 2012 from the officer in charge of the police district
(OCPD) for Kota Damansara had directed the respondent to keep the boom
Au Kean Hoe v Persatuan Penduduk D’villa Equestrian
[2015] 4 MLJ (Zulkefli CJ (Malaya)) 215

A gate functional throughout the day to improve the security in the area.

[19] We are of the view there could be no dispute over the authority of the
MBPJ to issue the Guidelines for Guarded Communities and give approval in
accordance therewith. The MBPJ guidelines were issued in May 2011 by the
B Jabatan Perancang Bandar. Under the SDBA the local authority has full
supervisory authority over all ‘buildings’ both at the pre-construction and
post-construction stage. Like under the TCPA, the term ‘building’ is defined
widely under the SDBA to include ‘any house, hut, shed … gate’ (see s 3). By
s 70(3) of the SDBA the local authority is the approving authority for the
C
erection of any building. It follows that the MBPJ is the rightful authority for
the approval of the guard house and the boom gates as ‘buildings’ under the
SDBA.

D [20] In the context of the present case useful reference can be made to
another statute, the Local Government Act 1976 (‘LGA’) which contained
provision empowering the local authority to do all things necessary for or
conducive to the public safety, health and convenience (see s 101(v)). In this
regard it cannot be disputed that guarded communities are schemes
E implemented to improve public safety and security in defined residential areas.

[21] It is our judgment that the guard house and boom gates are duly
authorised structures under the relevant statues namely the TCPA, the SDBA
and the LGA and cannot therefore in law be an obstruction under s 46(1)(a) of
F the SDBA as posed by the first question in this appeal.

[22] On the approval issue posed in the second question in this appeal as to
whether a local authority is empowered to approve an obstruction under
s 46(1)(a) of the SDBA, the answer to this argument in our view must be made
G by way of reference to the statutory provisions referred to in the preceding
paragraphs. It is our finding that these provisions make it clear that the MBPJ,
as the relevant local authority is fully empowered to approve the construction
of ‘buildings’ which may be in the nature of a guard house with boom gates.

H [23] We shall now deal with the issue of nuisance. It is noted that the two
questions posed in this appeal are premised on the assumption that operating
a security gate system in a residential area is an actionable obstruction in law. In
our view this is clearly wrong. A regulated access to a defined area is not an
obstruction in law especially if it is for security purposes. It is so only if one is
I denied access to a public place. It is not a barricade that is placed across a public
road that denies access altogether to all who wish to enter. The MBPJ
guidelines, on which the January 2012 approval was given, addresses this issue.
The guidelines in relation to a guarded community deal with the rights of those
residents who opt not to participate in the security scheme. It says in para 2(f )
216 Malayan Law Journal [2015] 4 MLJ

of the guidelines as follows: A


Penghuni yang tidak menyertai skim ini tidak boleh dihalang sama sekali memasuki
kediaman mereka pada bila-bila masa.

[24] It is noted in the present case that the appellant does not complain that B
he or his family are prohibited from access at all or that the boom gates are a
barricade against him or his family. His complaint is that he is inconvenienced
because he has to engage in self-service to lift the gate. In short, the appellant’s
complaint in reality is a complaint of inconvenience and not of obstruction.
C
[25] At common law, both actionable obstruction or actionable private
nuisance is not available for inconvenience. The decided cases have shown that
it is a matter of degree at all times and the conduct has to be unreasonable
conduct in the circumstances of the case for it to be actionable. In Trevett &
Anor v Lee & Anor [1955] 1 WLR 113. Lord Evershed observed that the D
question whether a householder is or is not obstructing the highway so as to
give rise to cause of action is to be judged by balancing on standards of
reasonableness, the claims and conduct of the householder on the one side and
the members of the public on the other. Lord Evershed adopted the rule
E
propounded by Romer J in " procphrase="v">Lingk[e920b6] Christchurch
Corpn [1912] 3 KB 595 as follows:
The law relating to the user of highways is in truth the law of give and take. Those
who use them must in doing so have reasonable regard to the convenience and
comfort of others, and must not themselves expect a degree of convenience and F
comfort only obtainable by disregarding that of other people. They must expect to
be obstructed occasionally. It is the price they pay for the privilege of obstructing
others.

[26] We are of the view the underlying rule is a recognition that individuals G
live within a community and it is always the balancing of the individuals’
inconvenience against the communities’ interest that is of paramount concern.
On this point in George Philip & Ors v Subbammal & Ors AIR 1957 Tra-Co
281, the High Court in India observed as follows:
H
Every little discomfort or inconvenience cannot be brought on to the category of
actionable nuisance. Consistent with the circumstances under which a person is
living, he may have to put up with a certain amount of inevitable annoyance or
inconvenience. But if such inconvenience or annoyance exceeds all reasonable
limits, then the same would amount to actionable nuisance. The question as to what
would be a reasonable limit in a given case will have to be determined on a I
consideration as to whether there has been a material interference with the ordinary
comfort and convenience of life under normal circumstances.

[27] It is our judgment that both the High Court and the Court of Appeal
Au Kean Hoe v Persatuan Penduduk D’villa Equestrian
[2015] 4 MLJ (Zulkefli CJ (Malaya)) 217

A had correctly concluded that the appellant’s inconvenience was not an


actionable nuisance by the presence of the guard house and the boom gates.

CONCLUSION

B [28] For the reasons abovestated on the facts and circumstances of the
present case, the first question posed in this appeal is answered in the negative.
As to the second question posed we do not find it necessary to answer it as it is
too general and not based on specific factual circumstances. The appeal is
therefore dismissed with costs.
C
Appeal dismissed with costs.

Reported by Ashok Kumar