DMIC Design-Work Shop
DMIC Design-Work Shop
20.000 m
w w w w
w
UP
10.000
w D w w w
3.500
3.500
Floor Slab
Load kg/M2
SlabThickness = 0.150 m 375.000
Floor finish = 0.040 m 92.000
Live Load = 300.000 kg/m2 300.000
Total = 767.000
5.000 m
At = 3.674 cm2/m
BEAM
15.000 cm
25.00
45.000 cm
Column
As no wind / seismic considered hence this much allowance is O.K. for preliminary Design.
Foundation
Considering permissiblle Bearing Capacity of soil = = 12.000
At = 16.403
Provide 16 mm rod @ 120 c/c
m clear
m clear
0.600
1.500
kg/M2
cm
cm
cm
kg
kg/m
kg
13312.500 kg
kg
kg
kg
T/M2
kg
kg
t/M2
kg/m2
kgm/m
cm
< 30 cm
cm2/m
Estimation of Administrative Building
1) Earthwork in excavation =
( normal soil )
Footing =
Plinth Beam =
( neglecting junctions ) =
Lintels =
Column =
( neglecting junctions ) =
Slab( side ) =
slab( bottom ) =
Beam =
Total =
9) 25 mm Mosaic Skirting =
57.600 cum
166.080 cum
45.938 sq m
8.980 cum
8.250
5.313
4.275
60.000 cum
16.500
103.318 cum
14.400
44.000 sqm
36.000 sqm
132.000 sqm
9.000 sqm
200.000 sqm
84.000 sqm
519.400 sqm
200.000 sqm
200.000 sqm
400.000 sqm
19.200 sqm
99.855 cum
105.000 sqm
448.000 sqm
456.000 sqm
400.000 sqm
504.000 sqm
456.000 sqm
22 nos
1 no
16.221 ton
Design of Work shop
(Unit 22)
A
20.00
W W W W
Rolling Shutter (3m
Toilet
10.00
wide)
W
W W W W
5.00 m
0.60 m
GL
1.50 m
Section A-A
Column
Load of Truss and wind load will be much less in comparison to the earlier loads in two
buildings coming from roof and Floor hence same section and steel ( 4-16 Ø ) will suffice.
6) Shuttering
Footing =
Plinth Beam =
( neglecting junctions )
Lintels =
Column =
( neglecting junctions )
Beam =
Total =
148.224 cum
28.830 sq m
5.564 cum
5.100 cum
3.000
2.156
6.000 cum
21.821 cum
200.000 sqm
10.080
32.000 sqm
12.000 sqm
81.600 sqm
30.000 sqm
165.680 sqm
300.000 sqm
300.000 sqm
200.000 sqm
18.000 sqm
101.540 cum
105.000 sqm
400.000 sqm
336.000 sqm
400.000 sqm
360.000 sqm
336.000 sqm
9.000 nos
1.000 no
3.426 ton