DMIC Design-Work Shop

1) This is the design of an administrative building and workshop with dimensions of 20m x 10m. 2) The building will have a RCC foundation, columns, beams, slabs, and shuttering. Material requirements are estimated for concrete, reinforcement steel, plaster and other finishes. 3) Design calculations are shown for the slab, beam, column and foundation to check for loading capacity, steel reinforcement requirements, and soil bearing capacity. Reinforcement and material specifications are provided.

Uploaded by

Maitrayee Aditya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
178 views15 pages

DMIC Design-Work Shop

1) This is the design of an administrative building and workshop with dimensions of 20m x 10m. 2) The building will have a RCC foundation, columns, beams, slabs, and shuttering. Material requirements are estimated for concrete, reinforcement steel, plaster and other finishes. 3) Design calculations are shown for the slab, beam, column and foundation to check for loading capacity, steel reinforcement requirements, and soil bearing capacity. Reinforcement and material specifications are provided.

Uploaded by

Maitrayee Aditya
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 15

Design of Administrative Building

(Unit No. 19)

20.000 m

w w w w
w
UP
10.000

w D w w w

3.500

3.500

Footing 1.6X1.6X0.2m Avg. thick


M25conc = 2500.000 kg/m3 Floor finish = 2300.000 kg/m3

Floor Slab
Load kg/M2
SlabThickness = 0.150 m 375.000
Floor finish = 0.040 m 92.000
Live Load = 300.000 kg/m2 300.000
Total = 767.000

5.000 m

5.000 m Ly/Lx = 1.000

Maxm - ve moment at continuous edge = 901.225 kgm/m


σsteel = 2300.000 kg/cm2
σ cb = 83.000 kg/cm2 Clear cover,
m= 11.245 Slab= 3.000
k = mc/(t+mc)= 0.289 Beam= 3.000
j= 0.904 Column= 4.000
R= 10.827
d= 9.124 cm
D= 12.924 < than 15 cm o.k.

At = 3.674 cm2/m

Provide 12 mm Ø 30.727 cm c/c


Provide 12 mm Ø 200mm c/c both way top and bottom

BEAM
15.000 cm
25.00
45.000 cm

Load coming from the slab = 9587.500


Self load = 257.500
Considering partition wal of 0.075 m,
Wt of wall = 2437.500
Considering some fixity,
M = 6656.250 kgm/m Total load over beam =
n = 11.951 < than 15 cm hence NA lies within Flange
At = 10.603 cm2
Provided 16 mmØ = 6.000 nos
Shear force = 6656.250
τ = 6.462 kg/cm2
100*As/(b*d) = 1.171
Permissible shear stress 4.2 kg/cm2

Vertical stirrups = 10 mm, 4 legged At = 3.140 cm2


Reidual shear Vs = 2435.250
Spacing = 104.389 mm Provide, 100 mm c/c

Column

Load over central column from beam = 26625.000


Self wt. 250X250 = 546.875
Total load = 27171.875
Let the Section of Column be 250 X 250 mm
Providing 1% steel Asc = 6.250 cm2
16 mm 4 nos
P= 70363.320 O.K.

As no wind / seismic considered hence this much allowance is O.K. for preliminary Design.

Binders, Provide 8 mmØ 150 c/c

Foundation
Considering permissiblle Bearing Capacity of soil = = 12.000

Load on Footing = 27171.875


Self Weight: 1.6m X 1.6 m X 0.20 ( AV)
Wt = 1280.000 kg

Total wt below footing = 28451.875


Stress on soil = 11114.014
= 11.110
O.K.

Upward reaction = = 10314.014


Moment = 8251.211
d = 16.956
D = 22.756

At = 16.403
Provide 16 mm rod @ 120 c/c
m clear

m clear

0.600
1.500

kg/M2

cm
cm
cm

kg
kg/m

kg

13312.500 kg

kg
kg
kg
T/M2

kg

kg

t/M2

kg/m2
kgm/m
cm
< 30 cm

cm2/m
Estimation of Administrative Building

1) Earthwork in excavation =
( normal soil )

2) E/W in filling with compaction =

3) Mat Conc ( M15 ) ( 75mm thk) =

4) RCC Work ( M25)


( only conc. Volume )
Footing =
Column =
Tie Beam at Plinth level =
Lintel =
( gr. & 1st)

Slab (1st floor+ 2nd floor ) =


( inclu stair opening )
Beams 25X30 (below slab) =
( for both floors )
Total =
5) Shuttering

Footing =
Plinth Beam =
( neglecting junctions ) =
Lintels =
Column =
( neglecting junctions ) =
Slab( side ) =
slab( bottom ) =
Beam =
Total =

6) BFS ( 75 mm ) on Gr. Floor =

7) M15 conc ( 75mm ) =


8) Mosaic in Floor
Gr. Floor and 1st Floor =

9) 25 mm Mosaic Skirting =

10) 250mm CBW ( 1:6 cement &sand ) =

11) 75mm CBW partition wall LS =

12) 12mm thk (1:5 ) cement sand


(inside plaster) =
13) 18mm outside plaster (1;5) =
14) 6mm ceiling plaster (1:4) =
15) Inside painting =
( 20% extra for partitionwall columns etc)
16) )utside Painting =
17) Steel Windows (1.8X1.2M) =
18) Rolling shutter 2 X 2.1 m =
19) Supplying Tor Steel ( Fe 500 ) and bending & Binding
2% of RCC conc volume =
n of Administrative Building

57.600 cum

166.080 cum

45.938 sq m

8.980 cum
8.250
5.313
4.275

60.000 cum

16.500

103.318 cum

14.400
44.000 sqm

36.000 sqm
132.000 sqm

9.000 sqm
200.000 sqm
84.000 sqm
519.400 sqm

200.000 sqm

200.000 sqm

400.000 sqm

19.200 sqm

99.855 cum

105.000 sqm

448.000 sqm
456.000 sqm
400.000 sqm
504.000 sqm

456.000 sqm
22 nos
1 no

16.221 ton
Design of Work shop
(Unit 22)
A
20.00

W W W W
Rolling Shutter (3m

Toilet

10.00
wide)

W
W W W W

5.00 m

0.60 m
GL

1.50 m

Section A-A

Column
Load of Truss and wind load will be much less in comparison to the earlier loads in two
buildings coming from roof and Floor hence same section and steel ( 4-16 Ø ) will suffice.

Foundation same as MCC Bldg.


Estimation of Workshop
1) Earth work in excavation =
( normal soil )

2) E/W in filling with compaction =

3) Mat Conc ( M15 ) ( 75mm thk) =

4) RCC Work ( M25)


( only conc. Volume )
Footing =
Column =
Tie Beam at Plinth level =
Lintel =
Top Beam below Truss level =
Total RCC =

5) Roof Truss to cover =

6) Shuttering

Footing =
Plinth Beam =
( neglecting junctions )
Lintels =
Column =
( neglecting junctions )

Beam =
Total =

7) BFS ( 75 mm ) on Gr. Floor =

7) M15 conc ( 75mm ) =


8) IPS Flooring (25mm) =

9) 25 mm Skirting ( M20) 25mm thk =

10) 250mm CBW ( 1:6 cement &sand ) =

11) 75mm CBW partition wall LS =

12) 12mm thk (1:5 ) cement sand


(inside plaster) =
13) 18mm outside plaster (1;5) =
14) 6mm ceiling plaster (1:4) =
15) Inside painting =
( 20% extra for partitionwall columns etc)
16) outside Painting =
17) Steel Windows (1.8X1.2M) =
18) Rolling shutter 2 X 2.1 m =
19) Supplying Tor Steel ( Fe 500 ) and bending & Binding
2% of RCC conc volume =
35.280 cum

148.224 cum

28.830 sq m

5.564 cum
5.100 cum
3.000
2.156
6.000 cum
21.821 cum

200.000 sqm

10.080
32.000 sqm

12.000 sqm
81.600 sqm

30.000 sqm
165.680 sqm

300.000 sqm

300.000 sqm
200.000 sqm

18.000 sqm

101.540 cum

105.000 sqm

400.000 sqm
336.000 sqm
400.000 sqm
360.000 sqm

336.000 sqm
9.000 nos
1.000 no

3.426 ton