BIM & DIGITAL CONSTRUCTION

Hadjar Seti Adji

BIM EXPERIENCE SHARING


BIM (Building Information Modeling) is an intelligent 3D model-based process that gives architecture, engineering,
and construction (AEC) professionals the insight and tools to more efficiently plan, design, construct, and manage
buildings and infrastructure.
Level Of Development (LOD) BIM
Detailed information that we can obtain from construction stages
Dimension of Digital Construction (BIM)
Information obtained from BIM based on the functions

3D 4D 5D 6D 7D
3D Building data & Work Breakdown
Project Schedule & Phasing Energy analysis Building Life Cycles
Information Structures
Just in Time schedule Green Building Element BIM as built data
Project Scope Conceptual Cost Planning
Installation schedule Green Building certification BIM cost operation&
Prefabrication Quantity Take off Tracking Maintenance
Structural Detailing Payment Approval
Trade Verification Green Building Point BIM Digital lease planning
Object Specification Last Planner schedule tracking.
Value Engineering
Field layout & civil data Critical Point
Prebarication

PRE DESIGN SCHEMATIC DESIGN DESIGN DEVELOPMENT CONSTRUCTION DOCUMENT CONSTRUCTION STAGE AS BUILT
Construction Time
Sequencing
3D image Critical path
Scope
Detailing

Quantity
Price
BIM 5D
BIM LIBRARY
Benefit of BIM : Design & Shopdrawing Coordination BIM 3D

Proyek NewPort Makassar

Proyek Jembatan Kendari


Scheduling & Sequencing Simulation
(4D BIM) BIM 4D

Proyek Stadium Jayapura Proyek Gedung BI Gorontalo

Jalan Tol Pandaan Malang


BIM 5D – PROGRESS MONITORING

Structure
Documentation

Quantification Estimating

Architecture

MULTIDISCIPLINE BIM MODEL


4D Sequencing Scheduling

MEP

Civil
Clash Detection / Coordination
Visualization ERP/SCM/O & M
Installed
BIM 5D
Progress / Project
Monitoring

Not Installed

Nipah Mall Makassar Project


BIM 5D – ERP DATA SUPPORTING

Structure
Documentation

Quantification Estimating

Architecture

MULTIDISCIPLINE BIM MODEL


4D Sequencing Scheduling

MEP

Civil
Clash Detection / Coordination
Visualization ERP/SCM/O & M
BIM 5D – ERP DATA SUPPORTING
BIM DATA - ERP SYSTEM

Check Sales
(SD)

Kinerja -
Project Systems SCM Finance
Dashboard (BI &
(PS) (MM) (FI-CO)
BPC)

Check

HR
(HCM)
BIM 6D
BNI 46 Pejompongan Building – Green Building Design & Build

Energy analysis Computational Flow Diagram


Green Building Element
Green Building Certification Tracking
BIM 6D
BNI 46 Pejompongan Building – Green Building Design & Build

GBCI, 27 SEPTEMBER 2017

GOLD DESIGN RECOGNITION


VISUALIZATION DESIGN COMMUNICATION
IDENTIFICATIO
N

Bring your Digital World/Virtual to Real World


Bring your Real World to Digital World/Virtual
DESIGN COMMUNICATION
VISUALIZATION
IDENTIFICATION

Bring your Real World to Digital World/Virtual


DSM (Digital Surface Model)
DTM (Digital Terrain Model)
DEM (Digital Elevation Model)

3D Photogrammetry Modeling
Ciamis Dam Project
Point Cloud
DEM
(Digital Elevation Model) A set of data points similar as
a cloud and has coordinate
A digital model of an area or and elevation information
region that has coordinate
position information and
elevation of that point

Contour Lines
Garis kontur yang digunakan untuk pemetaan didapatkan dari ekstraksi
DEM
Similar with CT Scan in medical field, the method
uses electrical wave (electromagnetic) which is
injected to the body part to identify the
composition

The benefit of this method for construction field is


Geoelectrical method is one of geophysical subsurface survey to determine the stratification of soil layer
method to identify the type of soil layers by utilizing electrical
current which is injected into the soil to measure the resistivity
value of each type

Higher resistivity value means higher rock


hardness value
To support BIM implementation through 3D
modeling of soil layer stratification

To complement the boring log data that is


effective to be used in large area

To ease the identification of rock and soil


excavation volume

To ease identification of areas


prone/vulnerable to landslide
Bring your Digital World to Real Works
BIM & DIGITAL CONSTRUCTION
• Construction Work would be
more effective & efficient in Time,
Cost & Quality due to Better on
....
1. Understanding
2. Design Quality
3. Coordination
• We would enter the New Era of Construction Business Process

Welcome to the New World


Tomorrow is Today