100% found this document useful (1 vote)
1K views1 page

Pag Asa Request Leter

A project engineer from LLMG Construction and Trading Inc. wrote a letter to the Weather Services Chief of Northern Luzon at PAGASA requesting a copy of the daily rainfall report from January 2018 to November 2018 for the area of Sallapadan, Abra. This rainfall data is needed as an attachment for a time extension request for their project to construct an evacuation center in Sallapadan, Abra due to delays from rain. The engineer expressed gratitude for the chief's assistance in providing the rainfall report.

Uploaded by

vicente
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views1 page

Pag Asa Request Leter

A project engineer from LLMG Construction and Trading Inc. wrote a letter to the Weather Services Chief of Northern Luzon at PAGASA requesting a copy of the daily rainfall report from January 2018 to November 2018 for the area of Sallapadan, Abra. This rainfall data is needed as an attachment for a time extension request for their project to construct an evacuation center in Sallapadan, Abra due to delays from rain. The engineer expressed gratitude for the chief's assistance in providing the rainfall report.

Uploaded by

vicente
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Date: November 26, 2018

To : FREDOLINA D. BALDONADO, M. Sc
Weather Services Chief-Northern Luzon
Philippine Atmospheric, Geophysical and
Astronomical Services Administration

Subject : Letter Request

Dear Ma’am,

In behalf of LLMG Construction and Trading Inc. I, Elyner Gayao, Project


Engineer, Humbly Requesting your good office for a copy of daily rainfall
report in Sallapadan Abra from January 2018 to November 2018. This is to
serve as an attachment document for our time extension request for the
project of Construction of Evacuation Center at Sallapadan, Abra.

Thank you very much

Respectfully Yours,

Elyner Gayao
Project Engineer