0% found this document useful (0 votes)
51 views

Detail Technical Spec

The document provides detailed specifications for civil works including excavation, concrete, reinforcement, shuttering, bitumen painting, and brickwork. Excavation will be done according to soil and safety regulations. Concrete of various grades will be used for foundations, columns, beams, etc. Reinforcement will be cold twisted deformed steel bars or thermomechanically treated steel. Formwork will be made of steel plates and maximum reuse will be three times. Under structures will be painted with bitumen paint. Brickwork will be 230mm thick conforming to specifications.

Uploaded by

ovikbasu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
51 views

Detail Technical Spec

The document provides detailed specifications for civil works including excavation, concrete, reinforcement, shuttering, bitumen painting, and brickwork. Excavation will be done according to soil and safety regulations. Concrete of various grades will be used for foundations, columns, beams, etc. Reinforcement will be cold twisted deformed steel bars or thermomechanically treated steel. Formwork will be made of steel plates and maximum reuse will be three times. Under structures will be painted with bitumen paint. Brickwork will be 230mm thick conforming to specifications.

Uploaded by

ovikbasu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

c

DETAILED TECHNICAL SPECIFICATION FOR CIVIL WORK.


c
cc c
 c cc ccc c c  c c  cc c
 cc ccc c cc cc  c c  c c c cc c
  c  c 
 c    c  c  c 
c c  c c   c 
cc
cc
c c ccc c c c    c
c
 c c

 cc c
 cc c  c  c
ccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccccc ccccccccccccccccccccccccccccccccccccccccccccccccccccc
.0c Earth Work :


 c c  c
 c  c c c   c c  c c  c  !c
  c  c  c 
c 
 c  c c  c c  c c c
  c  c c    c "c  c  c  c

 c c
 c c


c c
c cc c  c   cc   c  c
c c  c#  c 
 cc    c"c c  c
  c
  c  c   c 
c c  c 
 c  c c
 c $ c   c

  c   c c c   c c
 cc  c c cc
 c
  cc c c
c
c ccc
c
%%ccc#  c 
 c ccc c c c c cc ccc c
cccccccccc c  c
 c$
c  ccc c cccc ccccccc c
cccccccccc cc   c c cc  c c  c 
 cc c  cccc
ccccccccccc 
ccc   c   c
c
%& c | c
  c c    c 
c   c c  c  c  c  c

 c c c  c c %'(c c  c   

 c   c
  c  c c c c  c
c
%) c *  c 
 c cc c  cc c
c  cc  c
c%c+,c  cc
c
Ñc Concrete :

&%c  c
 c

  c --!c  c c  c ./0c c  c  c c  c c
   cc
 c c cc  c  c1  c   c
 cc 
c
c   c    c  c c
c
&& c --c c  1  c 
 c c  c  c  c  " c c  c
./0c c  c  c  c c  c 2(c "c &(c c c  c
  c c
cc c c
 c  c
c
&) c 3 
c
 c

  c c  c ,&(",&'!c  c &(c c  c c
 c   c c  c  c c c  c 
c   c c     c

 c cc cc c3--ccc c   c
c
&2 c -  c c  c  c  c  c
 c 2)c  c c  c
c  
c c
 c
  c c *&45 %565c -  c c  c
 c c c cc
 c  c
c
&' c |c
 c7c  c  cc
cc*)6)%58(c9  c  c
c cc c  c c c
 c  cc cc c

c c
c
c D. P. C :

)% c c c  c 2(c c 


c  c
 c

  %%')!c c  c %(c c c 7c
c  c  c
 c    c  c  c  c  c

  c  c c  c ccc  c c
c
‰c Reinforcement :

‰ c 3 
c 3"9!c c c  c  c
 c   c  c -#!c c
 c 

c   c ,!c c  c *%864 %56'c  c  c  c
 c  cc c
ccc
2& c 3"9c c  c  c c  c c  c 
 c  c   c c  c   c


  c
c c
2) c - cc3"9cc c cc  cc
 c cc
c %2! c
c
22 c .  c  cc c  c%4c* :c c  c   c
c
2' c # cc cc%&cc c8'ccc;c8'(cc
"
 c
cc
ÿc Shuttering :
'% c *   c c c
c c *2'4&(((c  c c   c  c
 c c  "  c ." c ,  c  c c " c
   cc c)  !c   c
cc
 c itumen Painting : |c    c *
  c  
 c    c
1  c    c 
c c

c  c c c  c c   c  c &c

c c    c    *  c c 1  !c c  c &(c "c )(c c  c
  c c

  c 


7c rickwork :

8% c  c 
c c  c c &'(c c 
c
 c c *&&%& 
%55%c  c 
c c  c c
c '(%)c
 c c *%(88 %55&c
.
cc c c  c  c c cc

c  c c
 c c  < c  c
   c  c c  c 'c $"1c , !c  c

 c ccc
ccc c%4c
c
Îc Plastering :

6% c |c  ccc c


 c cc c*%54% %58&c
c /  !cc %'cc
c c
 c cc%4c% c  c
 c 'c c 
c  c  c  c
  c
 c c )c c '=c c  c  
  c


 c
c  !ccccc %'cc
c cc%4c
-  ccccccccccccccc %(cc
c cc%2c
c
6& c | c   c c c c  c
  c c   c c 8c c
   !c
c
·c Flooring :
c
c
5% c 9cc  c ccc  c c**c  c2(c c 
cc ,%'c

  c

c c   %,"%,!c  c &c c 
c    c  c  c
 c9c  c c cc

c7c
 
c c
c
·.Ñc Acid proof tiling work :

|
c  c  c ccc c  c c
cc
 c c
c
5)% c itumen Primer :

 c    c   c
c c  c  c c   c
  c  c c


  c  c "c c c  
c c  c  c c  c
   c 
c c  c  c  c   
c
  c   c
  c
 c c *%'6c  c c  c  c 
c c  c *5'%(c
 !c  cc c c cc  c
c
5)& c itumastic impervious liner :
c
/c c c  c
c
  cc c cc c*5'%(c c


c  c c 
c c  c &c  c    c c &'c -c
%(("'!c c  c %c  c   c 
 c c  c %'c c  c

 
 cc c ccc c   cc>c-  c
c
5))Tiles :c
c
*  
c c 
c   c   c c  < c &)(c c %%2c c 2(c 
c
c c  c c  c
c c c cc c

 c c*264(c

ccc
c
c
c
c
5)2c edding & Jointing :c
c
9c  c 7c ?  c c   c 4c c 
!c c  c *26)&c c @c c

  cc
 c c  c c cc c 
  c
c c c
c
c
0cDoor & Windows :

%(% c 
c   c c  c  1  c c c  c c  c c
c c  c  cc   c c #c cc cc  c  c
 c  cc cc c c|c cc c c  ccc
  c
c c  c    c  cc c  cc c
 cc c2(c c 
c c c%&'ccc8'c c  cc
 c&(cc
c c c c  cc c
c
%(& c |c  cc cc c c c< cc c*c  c|c
< c c  c  c c 4c c 
c   c c  c  c  c  c
  ccc
c
 c    c   c "c    c   c  1  c  c c  c c
 c  c c ,*c  c   c c  c  c  c 
c |  c  c
c cc"c
ccc c  c
c
cRoof, chajjas and their water proofing and ventilation :

!c c%(c  c   c c  c   c c  c c c


  c c  c
cc
c
!c  c     c c )&c  c
  c  c   c c  c

 c c  c ?
c   c *  c  c  1  c    c
  cc c c cc   c
c
!c -??c c  1  c  < c  c  c c  c c c c  c
 cc c  c cc c  ccc c c  c
 c  c
c
!c -c "A-c c  c  c   c c  c  c c c   c
   c  1  c  c  c  c   c c  c  c c c  c
 cc cc c? cc c?  c c
c c
 cc
c  c   c   c  c 
c c   c   c  c  c c
 c c c  c
c
c
c
c
ÑcPaintings
c
!c * c*
  c c 
 cc c
 cc c c
 c c  c
&c
c c  c  c < 
c
 c   c    c c & c
c c
* 
c  cc 1  cc c   c c c  c   c
c* 
c  ccc c
c
c
!c |c c c   c c  c   c c
c c
 c  c c  c
 c 
cc cc
cc  c c cc  c 
c c

 c
c
!c 3 c c< 
c
 c  c c c c c
 cc ccc c
 c c c
c
c
cFoundation bolts & inserts :

|c  c   c c    c c  c  c c


c c
*%)4)c B !c
c
‰cDrains :

!c *c c   c c c c < c"c3


 c
 c
c  c , c c  c  c &((c c c c  c   c  c  c
c
 c%'cc
c %4!cc"c c c c cc

   c
!c # c c c cc c c c c c c c
  c ,'!c

  c
!c 
c  c  c  c c

 c c c  cc  c  cc
 c  c
!c c  c
 c 
c   c   c "c c c c  c c  c
 c
!c , c  c c c

 ccc   c c"c c  c  c
c
ÿcPathway / Gantry :

c"c:c  c c c



  c
c
!c 9c  c  c  c c  c   c  c  c

 c c c "c
c )(c ,c    !c  c C  c  c  c  c  c   c c  c
 c c c c c  cc2'c, c
c
!c / c  c

 c c   c  c  c %'(c c 
 c c  c
 c   c  c %((c c 
c 3--c  c  c  c |c 6(c c 
c
 c c3--c c  c cc cc"ccc c c
 c  ccc   cc c  c
c
!c |c c "c c  c  c   c c  c    c |c c
c  c

 c  c c c .,c   c  c 3--c c  c c c  c
 c  c 
 c "c   c c  c 
   c c c c c  c
  c c c
c
!c $
c 3--c "c C  c   c c  c

 c    c   c c c

 cc  c
 c c c cc c  c c c
c
c cc
 cWater Supply :

!c  c c  c   c  c c  c cc  c   c  c


 c  c  c   c c  c  1   c c  c  c  c  c
 c c   c  c   c   c c  c  c   c
 1   cc cc c c c c c   cc c
  c  c  c
  c c  c 1   c c cc
 c ccc c c  c  c c c  c* c  cc
  c c 1   cc  ccc c
  c c
  c

 cc c c cc
c c  c  c c
  c c c c  cc c  c  c c c  cc


 cc cc c
c
c
7cOther Technical requirements :

*  c
 
c   c c c    c
c
*  c
 
c    c  c c  c  c c

 c c  c
  cc c  c 1  c  c c  c#   cc c  c

  c c  c   c  cc c
 c  c

  c
 c c  1  c  < c c 1
c  c 
c 
  c c c "c
 
c  c c 
  c |c   c c  c  c  c
 c  c

c  c 
c c  c  c

 c c  c
  cc
c
ÎcAnti-Termite Treatment :

  c c |    c   c |!c c   c  c 


c
  c |c   c c  c   c  c  c c  c 

 c  c
c c c c  cc*4)%)c !c c c  cc
 c  cc cc   c c c?cc|c c   c
c c 
 c
c
·cLevels of buildings and plinth protection :
 c   c  c   c   c  c    c )((c c  c   c
  c   c c
 c c c  c  c "c   c 
 c c
  c  c  c   c   c  c  c   c c c
 c  c
 c   c c  c   c c  c  c  c   c c  c

  c  c
 c c 
c cc c  c c c
 cc   c8'(c
c c   c  c   c c  c  c |c 
c  c  c
  c  c  c  c  c   c c c  c    c


 c c ccc c c%' c
c
Ñ0c Finishes in Technology / Production uilding :
 c   c 
ccc c
 cc c 
c 
c c
 c  c   c  
c c c  c
 c  c
 c  c  c
 c c  c    c c  c c  c  c c

c  c

 
c c c c c   c c c  c
 c c c c  c
  ccc  c c

  c|c  c cc  c


c  c    c %'(c c  c   c c
   c c
    c
c
ÑcConsumption of water & power :

 c  c  c 

c  c  c   c c ?
c   c c c
  c c c c  c
c
ÑÑcGeneral condition of the contract :
!c >c      c      c c  c   c c c  c
   c c  c  c  c  c
 cc !c c   c c  c
 c   c c  c  c   c  c  c *c , c   c
  c   c c c  c  c c  c  c   c c c
  c 
 c  c   c
  c 
c   c    c c
 c   c c c  c  c c  c 
 c  c   c  c
  c  c c    c  c c  c   c  c   c   c
   c  c   c c c    c
  c  c  c
 c
 c   c c   c   c c c  c   c 
c c

  ccc c cc
cc c  c c

  c
 c c  1  c  c c   c c  c  c c  c    c
  c c 
c  c c 
 c c   c c c   c

  
c  c  c


c 
c c  
c c 
c
 c c
c c  c   c  c    c  c   c c c  c   c c  c
  cc c 
   c c c  c   cc c cc c
c 
c  c   c  c  c  c 
   c c  c   c c
   c
c
!c  c   c c

 c   c  c  c  
 c c  c c
 c   c
 c c   c c *c 

 c c c   c
 c "c  c "c  c  c c  c   c c  c  c c  c
?
c    c c  c c  c     c c 1  c c
 c  c c c    cc c c
c
!c |c

 c  c 
 c
 c7c c cc c c
c cc    c
c
!c -
c c 3   c c|  c|
c%58(!c
 c 
 c  
c c  1  c c c  c c  c
 c c  c c  c  c -
c c  c   c c  c


c  c 3   c  c |  !c |
c %58(c  c 3  c  c
  c  c $c    c c 
 c  
c
c   c c 
 c
 cc  ccB
 c  ccB
 c/
 c
cc
!c ,   c c ccB  c
*
  c c    c  c c c 
 c c  c  c   c  c
 c 
 c  
c c  c c  c  c   c    c  c
   c  c  c c   c c  c 
  c  
  c c
 c
cc:<  c$ 
 ccc c c   ccc c
c  c c  c 
  c c    c  c  c    c  c
 c 
  c    c c  c  c  c    c  c   c c
:<  cc  ccc
c   c
  c c   cc
c
 !c $  c  c    c c  c  c c |   c  c

 c  
c c c  c c  c   c c  c :c c  c
 c :c 
 c >c
  c |
c %5&)c 9
c |
c
%526c  c c  c |
c %5)4c | 
c |
c %54%c  c   c
 c  !cccc

cc

You might also like