1-11-B 1. Tools and Equipment: Deadline Anchor Maintenance
1-11-B 1. Tools and Equipment: Deadline Anchor Maintenance
1-11-B 1. Tools and Equipment: Deadline Anchor Maintenance
3. PROCEDURES
3.1 FOR SENSATOR ADJUSTMENT
1. REMOVE ANCHOR GUARDS IF APPLICABLE.
5. CHECK GAP, PUMP MORE IF NECESSARY AND BLEED OFF ANY OVER
PRESSURE AT THE LINE ANCHOR CHECK VALVE.
6. REFIT PROTECTION NUT.
_______________________________________________________________
PPC Manual Sept 95 Rev/1 Page 1
1-11-B
DEADLINE ANCHOR MAINTENANCE
A) WITH TOP DRIVE HUNG, PUMP UP UNTIL SLIGHT WEIGHT INDICATED
THENBLEED OFF TO ZERO. WHEN PICKING UP ENSURE WEIGHT INDICATOR
READS 27 K DaN.
2. CHECK WEAR IN SENSATOR PINS, AND THAT SPLIT PINS ARE IN PLACE.
_______________________________________________________________
PPC Manual Sept 95 Rev/1 Page 2