In 2013 Landustrie celebrated its 100th anniversary.

The foundations were laid around 1913, when the company


was active in the agricultural sector and the evolving phases
of polder drainage. As early as 1916, electrically driven
pumping stations were installed with Archimedes screw
pumps alongside countless wind driven pumping stations.
Screw pump design progressed rapidly and in addition
to the polder drainage pumps, a range was developed to
handle sewage. By the 1950s these advances contributed
to wastewater purification units being used widely and
efficiently.

Today Landustrie is a state of the art manfacturing and


engineering company, combining traditional proven
products and techniques, with high-tech innovations.

LANDY HYDROPOWER SCREWS

Flowing water is a relentless, never ending source of power


for pure, clean renewable energy. All you need to benefit
from this natural resource is a LANDY hydropower screw
system.

Landustrie designs, builds and installs highly efficient,


cost effective and environmentally beneficial hydropower
turbine system solutions which are specifically designed for
relatively low head, high flow river courses.

An environmental friendly solution can only be called a


sustainable solution if it is economically viable. Landustrie
helps you achieve a truly sustainable project by combining
years of hydropower engineering experience with
professional project guidance throughout the process.
With Landustrie experts providing all roles from initial site
investigation, through engineering/design to manufacturing
and installation, your costs are kept low; therefore, ensuring
your project is truly an environmentally and financially
sustainable solution.

Steinsau, Erstein, France


Selection, manufacturing and R&D

SELECTION MANUFACTURING

The LANDY designed and manufactured hydropower screw


systems operate more efficiently and cost effectively than
any other turbine technology. Where a potential hydropower
site has either a higher head or a higher flow, or both,
multiple hydropower screws can be developed in series
(stepped from one hydropower screw to another) or in
parallel (hydropower screws next to each other).

Once dimensioned with our own software, Landustrie


engineers utilize finite element analysis (FEA) software which
calculates all the forces on the hydropower system and civil
structures to ensure a robust and reliable hydropower plant.
Additionally, all required hydropower screw drawings and
calculations will be provided to you by Landustrie.

In-house production facilities


Our engineers will implement your sites specific and unique
characteristics into your design. Some of these site specific
variables which can be accommodated through ingenuity
and flexible engineering, include:

Sites with variable flow


To ensure the absolute highest quality product, we
Sites with variable upper and/or lower water levels manufacture all of our own hydropower screws in our purpose
built factory in Sneek, Holland, which is equipped to build
Inflow and outflow structures screws from 250 to 5000 mm in diameter and lengths up to
25 meters. In fact, the largest operating hydropower screws
Unusual foundation restrictions in the world were built right here in Sneek by Landustrie.

HEAD : 1 - 10 m In our 15,000 m2 state of the art manufacturing facility, we


FLOW : 0.2 - 15 m 3 /s have all of the latest technology to build the most durable
and best performing hydropower screws currently available.
From metal forming and welding to corrosion protective
coatings and painting, through to final assembly, each
step of the manufacturing process is under our roof and
importantly, under our quality control programs.

In our facility for instance, we x-ray and/or perform ultrasonic


tests in critical areas to further ensure your hydropower screw
will be a robust and reliable system for decades to come.

Landustrie has earned and operates under ISO 9001-2008


and SCC.

Working range hydropower screw


How it works

APPLICATIONS

The checklist needed for a hydropower screw is limited:

Is there flow and is there head?

The most straight forward projects will answer yes on both


questions. However, less obvious situations might be well
suitable for a LANDY hydropower screw. Think about:

A complete new site, where a head can be created in the


river or canal.
Chapel Haddlesey, North Yorkshire, England
At an existing dam or weir, the LANDY hydropower screw
can simply be added.
OPERATION
A dysfunctional hydropower plant is also suitable to be
The principle of the LANDY hydropower screw dates back replaced by the LANDY hydropower screw.
to 300 B.C., when Archimedes invented the screw pump.
In the last decade Landustrie altered the design, making Outlets of sewage treatment or hydropower plants.
the screw pump suitable for hydropower: the LANDY
hydropower screw. Existing hydropower plant’s overspill or fish by-wash

By placing the screw inclined in the flow direction of a river,


the water stream is directed into the screw. When water
enters the screw, the combination of potential and kinetic
energy of the water forces the screw to rotate. The higher the
potential or kinetic energy, hence a higher head or flow, the
higher the output power.

The relatively slow rotational motion of the screw is transferred


via a gearbox to the generator. Here the rotational energy is 1. Screw body
converted into electrical power, ready to use or to sell to the 2. Gearbox
grid. 3. Brake
4. Generator
5. Trash screen
6. Sluice gate
7. Control panel
8. Trough

Watch our video

Widdington, North Yorkshire, England


LANDUSTRIE

SUSTAINABLE ENERGY, SAVING CO2 LOW CIVIL COSTS

Utilizing a freely available source of energy and not producing Different from standard turbines, the civil works for the
any emissions or requiring fossil fuel, is the principle of LANDY hydropower screw are fairly easy: an existing or new
sustainable energy generation: this characterizes exactly, weir, an inlet and a place to hold the trough of the screw.
the hydropower screw. Compared to a standard turbine, there is no need for a
complicated turbine house design, penstock, forebay or
Every kWh generated by the use of the LANDY hydropower sand trap. Less civil works also results in less construction
screw, can save up to 0.542 kg of CO2 emissions. time.

HIGH EFFICIENCY

The LANDY hydropower screw maintains its high efficiency,


even if the available flow decreases to 20% of the design
flow. In cases of higher flows, or a fluctuating head, the
hydropower screw performs better than any other standard
turbine type and is the turbine to use in virtually any low
head site!

FISH FRIENDLY QUIET

Improving the local eco-system is one of the advantages of Installing machinery like the LANDY hydropower screw into
the LANDY hydropower screw. The water quality downstream a new environment, should never result in detrimental sound
and the quality of life for fish are increased. Landustrie has levels.
been involved in multiple studies to test how the screw
affects passing fish, showing no harm at all. To enhance Careful design, based on the river flow and level, is one of
the fish friendliness even more, resilient fish bumpers can the solutions to eliminate or reduce noise levels. Many years
be installed on the leading edges of the turbines blades. of experience in our labaratory has resulted in the quietest
In addition to designing a safe, fish-friendly turbine that running hydropower screw in the world. Additionally, covers
enables downstream migration through the turbine, the over the screw and a proper powerhouse design can be
LANDY hydropower screw is often combined with a fish applied, ensuring no significant impact on the surrounding
pass, to stimulate upstream migration. sound levels.

Craigpot weir, Scotland


Advantages

SHORT PAYBACK PERIOD

As for any investment, the payback period for a hydropower


project is one of the decisive factors for proceeding. A
short installation time, high efficiency and 24/7 electricity
generation turns the LANDY hydropower screw into an
economically feasible investment.
Besides the parameters of the location, the head and
flow, the tariff at which the electricity can be sold is key to
the payback calculation. If you are unaware of your local
feedback tariff, please contact Landustrie and we can assist
you. Pennlergare, Wales

General rule of thumb calculations FLOOD-PROOF


Electrical power output: When installing a system into a river, one should always
H (m) x Q (m3/s) x g (m/s2) x η (%) = P (kW)
design by keeping the extreme values in mind, like a
Annual energy production Q100 level. It could be the case that this level will flood
P (kW) x 8760 (hours) = kWh/year the generator room. Instead of building up high above this
level, Landustrie can also make a compact and flood-proof
Annual revenues:
price/kWh x kWh/year = revenue /year design. For instance with a wall mounted bearing and a
watertight door.

DURABLE & TROUBLE FREE

The LANDY hydropower screw operates at a relatively low


rotational speed of 20-50 rpm, resulting in very low levels
of wear and tear on the mechanical components, ensuring
decades of trouble free operation. The turbine is able to
cope with large debris, resulting in a system that operates
trouble free and with a low level of maintenance.
Before and after flooding at Goldsborough, UK
LANDUSTRIE

OPERATION MODE CONTROL PANEL

Constant speed The Landustrie control panel is the heart of the system,
When the available flow, the upper water level and the head, enabling your LANDY hydropower screw to be a part of an
are fairly constant troughout the year, the constant speed integrated, efficient power generation system.
system is the most efficient way of operation.
Landustrie manufactures the most sophisticated control
Variable speed panels and software operating systems for hydropower
In case the water levels and flow do vary significantly, a screws, in the world. In order to operate safely and
variable speed system could provide the best overall power efficiently in all conditions possible, the control package
generation. An extra advantage is the capability of regulating is manufactured in-house at our Sneek facility to ensure a
the upper water level, by regulating the speed of the screw. perfect match for your custom designed hydropower screw
REMOTE CONTROL for your sites characteristics.
The control panel provides fully automatic operation of your
hydropower system, regardless of which operating mode
option is selected. By using water level sensors upstream
and downstream, monitoring all important parameters
of the system, such as gearbox oil and generator phase
temperatures, screw and generator RPM, your LANDY
system is guaranteed to operate efficiently and safely at all
times it is running.

ADJUSTABLE

One of the results of the in-house R&D is the adjustable angle


of the LANDY hydropower screw. The highest effciency is
reached when both the lower and upper end of the screw are
halfway in the water. In case of a significant fluctuation of the
water levels, this can become an issue. By using a hydraulic
REMOTE CONTROL system, the angle of the screw can be automatically and
continuously adjusted to the most optimal position, thereby
Full remote control and monitoring of your LANDY hydropower
increasing annual power output significantly.
system on your PC or smart phone, from anywhere in the
world, is a low cost option that most customers choose.

WATER-IN-OIL DETECTION

As the lower bearing is placed under water, inspection is a


difficult task to perform. Landustrie invented the water-in-oil
detection alarm for early warning of potential maintenance
problems. This alarm system gives a signal when a certain
amount of water, or other conducting medium, enters
the lower bearing and has polluted the oil in the bearing
housing. All LANDY ECO lower bearings can be fitted with
the water-in-oil detection.
Options

TYPE OF TROUGH

Steel trough suitable for grouting Semi-compact trough Compact trough


The trough is fastened at the structure The trough is fully self-supporting, but the This trough is fully self-supporting, inclu-
and then casted with concrete. generator and gearbox will be directly at- ding the generator and gearbox. At both
The generator and gearbox are attached tached to a concrete foundation. ends there will be a small foundation
to a concrete foundation. where the trough will be attached.
+ Lower unit costs + Lower unit costs + Easy plug-and-play installation
- Higher civil costs o Average unit costs + Limited civil costs
- Longer installation period o Average installation costs - Higher unit costs

UPPER BEARING LANDY HYDROPOWER SCREW PUMP

The standard upper bearing, is a LANDY foot-mounted In some situations where a combination pump storage/
bearing. This specially designed Landustrie bearing, is hydropower generation system is possible, we are able
mounted on a foot at the inside of the drive unit room, leaving to provide a LANDY Hydropower screw pump; all in one
the tube of the screw rotating in the wall. If a watertight drive machine!
unit room is not required, a LANDY foot-mounted bearing is
the bearing to choose.The LANDY wall-mounted bearing
is a unique bearing fully designed, tested and patented by
Landustrie. The bearing is mounted to the wall with special
anchors, instead of to the floor. Using a special seal on the
outside and an extra concrete closure on the inside, the
drive unit room can be made completely gas- and airtight. Hydropower screw pump for
An extra advantage is that the forces on the civil construction waterway Wilhelminakanaal,
will be absorbed over a larger area, reducing stress on the Tilburg (The Netherlands)
civil structure.

wall-mounted bearing foot-mounted bearing


LANDUSTRIE

EXPERIENCE

When starting a hydropower project, a reliable and Combining the strength and qualities of Landustrie with
experienced turbine manufacturer is what you must have to local partners, projects have been realized in such diver-
achieve a successful result. Landustrie is that manufacturing se locations as uninhabitable mountain areas and British
partner! Queens garden at Windsor Castle. Varying from one small
turbine generating electricity for a household to large scale
Landustrie is involved in the hydropower sector in more than projects with six screws and anything in between.
70 countries worldwide. And backed by over a century of
experience and currently more than 50.000 MWh generated All this experience is put in force, in order to create your
yearly by the globally installed LANDY hydropower screws. unique hydropower project!

Totnes, Devon, England

Warburg, Germany Windsor Castle, London, England Donside, Aberdeen, Scotland


Experience, installation and maintenance

Heudreville,France Ballyness, Northern Ireland La Chapelle, France

INSTALLATION MAINTENANCE & AFTER SALES

The Landustrie teams are renowned for the quality of Both preventive and if required, corrective maintenance for
work in the field. Under any condition, the installation and the installation, can be provided by Landustrie. Furthermore,
maintenance teams are able to deliver high quality and fast replacement parts are easily available and can be quickly
solutions. On-site tuning to your specific site characteristics dispatched to your site for quick maintenance, ensuring the
is one of the skills of the team. all important system up-time is achieved.

The LANDY hydropower screws can always be installed by The knowledge of the manufacturing process and decades
our specialized installation team. Another option is the use of of experience operating and maintaining hydropower
a Landustrie supervisor, who will ensure proper installation turbines, makes Landustrie the clear choice to provide full
of the screw, together with a local team. after sales support for any hydropower screw.

Mühlbach, Süd Tirol, Italy


MORE THAN HYDROPOWER SCREWS

Landustrie produces a wide range of equipment for wastewater


treatment which includes:

Archimedes screw pumps


Pumps
Surface aerators
Aeration rotors
Landox flow boosters
Screen cleaners
Clarifiers and sludge thickeners
After sales service that is second to none

front cover photo Marc Zoutendijk


versie eng / november 2017

Landustrie Sneek BV
P.O. Box 199 | NL-8600 AD SNEEK
The Netherlands
Tel. +31 515 48 68 88 | Fax +31 515 41 23 98
E-mail [email protected] | Website www.landustrie.nl
Office address Pieter Zeemanstraat 6, Sneek

You might also like