This document is a maintenance checklist for PT. SINAR SOSRO's CILAR machine from November 2018. It outlines the weekly, monthly, and yearly maintenance tasks to be completed for the machine, including inspecting and lubricating sensors, chains, belts, pneumatic components, gears, and more. The checklist tracks the maintenance work done and is signed off by the shift leader and supervisor.

Uploaded by

edlistianto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
93 views1 page

Cilar Checklist: Maintenance Job Desk

This document is a maintenance checklist for PT. SINAR SOSRO's CILAR machine from November 2018. It outlines the weekly, monthly, and yearly maintenance tasks to be completed for the machine, including inspecting and lubricating sensors, chains, belts, pneumatic components, gears, and more. The checklist tracks the maintenance work done and is signed off by the shift leader and supervisor.

Uploaded by

edlistianto
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Nomor Form : 009/PM/CSD

Revisi : 00

PT. SINAR SOSRO


CILAR CHECKLIST
KPB MOJOKERTO
MONTH : November 2018
AREA : Line 4
MACHINE : VARIOPACK - KR96737
Maintenance Type : Weekly
Maintenance Job Desk
NO DATE WEEK SHF/FOR P.E. Sensors and Central chain Toothed belts of the PIC VER
Motor Conveyor
Reflectors 215 lubrication system pre-folding unit 217

1 / 2 / 3
1 44 C / I / L / A / R C / I / L / A / R C / I / L / A / R C / I / L / A / R
A / B / C

1 / 2 / 3
2 45 C / I / L / A / R C / I / L / A / R C / I / L / A / R C / I / L / A / R
A / B / C

1 / 2 / 3
3 46 C / I / L / A / R C / I / L / A / R C / I / L / A / R C / I / L / A / R
A / B / C

1 / 2 / 3
4 47 C / I / L / A / R C / I / L / A / R C / I / L / A / R C / I / L / A / R
A / B / C

1 / 2 / 3
5 48 C / I / L / A / R C / I / L / A / R C / I / L / A / R C / I / L / A / R
A / B / C

Maintenance Type : Monthly


Maintenance Job Desk
Drain off the
NO DATE WEEK SHF/FOR Pneumatic condensation water PIC VER
Drive Chains 223 Gluing Unit 224
components 219 in the water
separator 221

C / I / L / A / R C / I / L / A / R C / I / L / A / R C / I / L / A / R

The lubricators The drive brake of the The bump rubber of


1 / 2 / 3
1 48 (variant – machine The gears 227 asynchronous servo the antitorsion
A / B / C
with lubricators) 225 motors 228 supports. 229

C / I / L / A / R C / I / L / A / R C / I / L / A / R C / I / L / A / R

Maintenance Type : Yearly


Maintenance Job Desk
NO DATE WEEK SHF/FOR Replace the filters of Replace the toothed Have a general Have a general PIC VER
the water separators belts of the pre- inspection on inspection on
230 folding unit 232 Mechanical Unit Electrical Unit

C / I / L / A / R C / I / L / A / R C / I / L / A / R C / I / L / A / R

1 / 2 / 3
1 Main Drive Servo Drivers PLC Unit Automation PC / HMI
A / B / C

C / I / L / A / R C / I / L / A / R C / I / L / A / R C / I / L / A / R

OPTION :

C : CHECK I : INSPECTION L : LUBRICATION A : ADJUSTMENT R : REPLACEMENT

Note : Prepared by, Approved by,

_____________ _____________
Shift Leader Supervisor

PIC : DI : DULADI BI : BUDI PM : PARMAN