Onshore Operation Daily Maintenance Report: H2S Support Engineer

Cascade Air Lines provides air transportation services. This document is a daily maintenance report from Cascade Air Lines for their offshore rig operation. It details the required daily safety checks performed on the rig including inspecting breathing air systems, gas monitoring equipment, and self-contained breathing apparatuses. It also notes that the rig was taken down for the day and the self-contained breathing apparatuses were properly stored.

Uploaded by

shahzad sultan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
77 views1 page

Onshore Operation Daily Maintenance Report: H2S Support Engineer

Cascade Air Lines provides air transportation services. This document is a daily maintenance report from Cascade Air Lines for their offshore rig operation. It details the required daily safety checks performed on the rig including inspecting breathing air systems, gas monitoring equipment, and self-contained breathing apparatuses. It also notes that the rig was taken down for the day and the self-contained breathing apparatuses were properly stored.

Uploaded by

shahzad sultan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

CASCADE Air Lines

DATE VERIFIED
ONSHORE OPERATION DAILY MAINTENANCE REPORT
Company man Name Hizbullah
RIG NAME SLR-215

EEBA
SABA

SCBA
LOCATION Maino 28 WELL No.: 1
USL H2S Support Engineer Shahzad Sultan STATIONS
DATE 30-Oct-18

Status
Monkey Board
DAILY REQUIREMENTS Rig Floor Rig down
Dog house Rig down
Carried out regular inspection for all mesh guard devices overall around of RIG's H2S Office Rig down
Regulary monitoring and inspect all Breathing Air supply - all HP & LP gauges, lines, manifolds, regulators, fittings, cascade racks for leaks and appropriate pressure readings. Shale shakers Rig down
To Check fixed gas monitoring system for all stations . Muster station A Rig down
To inspect & maintain all SCBAs & SABAs. Muster Station B Rig down
Conducting, H2S awarness training as mandatory requirements for new commer, Visitor Orientations & H2S Refresh Trainings as required - and recorded accordingly Mud logging unit Rig down
Actively monitoring the RIG operation Medic Rig down
#REF! Company man office Rig down
Rig manager office Rig down
Cementing unit dowel Rig down
Mud pits Rig down
ACTIVITIES FOR 24 HOURS : DAY & Night shahzad sultan Pump room Rig down
Sack area Rig down
* Rig down completed today. * Training Room Rig down
* Put all scba in container and properly stored * Choke manifold Rig down
* SABA, EEBA and H2S detectors were removed from locations and put back. * Client HSE Rig down
* Collected all Gas detectors and multi detectors. * Rig HSE Rig down
* Informed company man about the status of rig down and also to the office * Step oil tool Rig down
* Enviromental office Rig down
* Material man office Rig down
* Mud engineer Rig down
security Rig down
Geologist Rig down
Rig ware house Rig down
PMS office Rig down
Radio Room Rig down
Mud logger Rig down
US unit Rig down
Engine area Rig down
Well head area Rig down
Welding Work Shop Rig down
night company man Rig down
Rig down

MONTHLY REPORTS & SUBMISSION Fire, Abandon & H2S Drill


Last H2S drill was conducted on 24 october 2018
Mesh Guard calibration was done on 24 october 2018 & next due on 24 nov.
Gas alert micro 5 & single gas clip bump tested on 24 oct. 2018 & next due on 24 nov.2018.

TOTAL : 0 0 0 0

QUARTERLY ACCOMMODATIONS*
Cabin # Occupy N0. Cabin # Occup.N0. Cabin # Occup.N0

TOOLS & EQUIPMENT ONBOARD DETECTION SYSTEM Fixed sensors, ITX & GAS badges sensor calibration
NO. ITEMS QTY SERIAL NO. Station QTY TYPE LAST DATE NEXT DATE
Wire Brush 1 Main Deck 1 H2S 24-Oct-18 24-Nov-18
Bug Blowers - 30 inches in size 2 Rig Floor 1 H2S 24-Oct-18 24-Nov-18
Bull Hornes 1 Shale Shakers 1 H2S 24-Oct-18 24-Nov-18
Windsock w/Poles - Windsocks & Poles 2 Mud Pits 1 H2S 24-Oct-18 24-Nov-18
Intrinsically safe Torches - Flash Lights Well Head 1 H2S 24-Oct-18 24-Nov-18
Screw drivers 1 Choke Manifold 1 H2S 24-Oct-18 24-Nov-18
Rescue Stretcher
Oxygen Resuscitator
Air analysis Kit 1
Air analysis Test tubes 1
Digital Anometer 1
Allen Key Set 1
Cutter 1 Single Gas Clip 12 H2S 10-Oct-18 24-Nov-18
Pliers 1 Multi Gas Detector 3 H2S,LEL,CO,O2 10-Oct-18 24-Nov-18
Crescent Wrench 1 Rae Pump 2 Multi Tubes Nill Nill
Tool Bag 1
Printer 1
Voice amplifiers 3

PENDING ISSUES ACTION TAKEN

* POB in Chambers:
POB Total onboard = 137 Max. allowable POB =

BA on board & operational ( SCBA 2216psi & SABA 4500psi )


DAILY OPERATIONS SUMMARY MISCELLANEOUS / OTHER Cascade racks 3 ( With 6 cylinders)
Cascade Air Lines 23

Day Shift Rescue Team : Night Shift Rescue Team :


Crane C
Team # 1: Rig Manager, Roustabouts Team # 2: Doctor, Electrician, Mechanic
Rig : cement plug, wait on cement.

Shahzad Sultan
H2S Support Engineer