Lean Assignment 4
Lean Assignment 4
You are the CI manager and you have been asked by the CEO to improve the lead time for the Tail Gate production line.
(1) Develop a Current State Value Stream Map base on the information below:
More information:
Inventory between process
Process Cycle time (minutes) Change Over time (CO) Rework Rate Up time
TG 150 TG 250
Stamping 0.7 3 hours 0% 90%
Forming 246 120 10 10 hours 0% 85%
Heat Stress 126 97 13 4 hours 0% 40%
Grinding 98 60 13 0.3 hour 0% 90%
Assembly casing 221 122 17 2 hours 25% 100%
Assembly detail 27 14 12 0.2 hours 30% 100%
Shipping 190 76
Solution:
Production Control
DAILY PLAN
5 Days 4.06 Days 2.47 Days 1.75Days 3.7 Days 0.45 Days 2.95 Days
(2) Answer the eight questions of Future State Value Stream Map and develop a Future State Value
Stream Map
(5) At what single point (the pacemaker) in the Value Stream is processing/production triggered?
(7) How is production volume leveled at the pacemaker? (i.e. Pitch: what increment of work will be
released and taken away at the pacemaker process?)
(8) What process improvements are necessary for the Future State to become a reality? (e.g. uptime,
changeover, training)
Solution:
Production Control
Monthly
5 Days 4.06 Days 2.47 Days 1.75Days 3.7 Days 0.45 Days 2.95 Days
3)
17 12
13 13
10
0.7
5 Days 4.06 Days 2.47 Days 1.75Days 3.7 Days 0.45 Days 2.95 Days
5 Days 4.06 Days 2.47 Days 1.75Days 3.7 Days 0.45 Days 2.95 Days
17 12
13 13
10
0.7
5)
3 3 3
12
13
10
10
10
0.7 1
5 Days 4.06 Days 2.47 Days 1.75Days 3.7 Days 0.45 Days 2.95 Days
Production Control
10 day forecast
Daily Shipping
Plan
Production Control
10 day forecast
Daily Shipping
Plan
1
Production Control
10 day forecast
Daily Shipping
Plan
1
1
Forming, Heat Stress, Grinding and
STAMPING Assembly Casing and Assembly Detail
Daily Shipping
Plan
1
BATCH
Production Control
10 day forecast
Daily Shipping
Plan
BATCH 1
XOXO
XOXO 1
1
Forming, Heat Stress, Grinding and 1
STAMPING Assembly Casing and Assembly Detail
Production Control
10 day forecast
Daily Shipping
Plan
BATCH 1
XOXO
XOXO 1
1
Forming, Heat Stress, Grinding and 1
STAMPING Assembly Casing and Assembly Detail
5 days
2 Days 4.06 Days 2.95 Days 65.7 mins
0.7 mins 65 mins