2.5 Equipment Owning and Operation Cost Estimator Sheet

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

________________ GENERAL CONTRACTOR

የክፍያ የምስክር ወረቀት ቅጽ


Interim Payment Certificate Format

No.

Contract
Main amount
Contract with
Project VAT
Sub Contractor Price Adj.
Type of Work:- Variation Orders
Total Sum

Previous Payments Amount ( BIRR )

S / No Amount Deduction Amount ( BIRR )


1 Previous Payment -
2 Retention 5% -
3 Advance Rep.
4
Total Deduction - -

VAT 15%
Total -
0.00
Net sum

We Certify the payment of Birr:

Prepared Certified Authorized

Date Date Date


GENERAL CONTRACTOR

ምስክር ወረቀት ቅጽ
ent Certificate Format