VIBROFLOTATION COMPACTION CONSTRUCTION
6 Capacity test ES-132.003-301-06-004 / not less than 160 kPa Every 5000 Lab Assistant QA/QC H H Test report
AASHTO T-222-78 m2 Engineer
Employer´s Requirements From 0 to -20m
7 Standard Penetration Test C.4.9.2 (depth): Every 5000 Lab Assistant QA/QC H H Test report
(SPT) ES-132.003-301-06-004 / 0 to 22 SPT N Value m2 Engineer
ASTM D1586
Note :
1) Strictly adhere with HSE plan for safe work enviroment.
2) Materials wich are not icluided in this ITP and need arises to use at site and same shall be added in ITP in later stage.
3) All items in wich cement is used shall be cured for minimun seven days.