Pump Head Calculation
Pump Head Calculation
Pump Head Calculation
Pump Selection
Hence, two pumps with one duty and one duty-assist
are selected.
Each Sump Pump capacity 1 L/s
Head Calculation
Pump Selection
Hence, two pumps with one duty and one duty-assist
are selected.
Each Sump Pump capacity 1 L/s
Head Calculation
Pump Selection
Hence, two pumps with one duty and one standby are
selected, FP-01(Electric) and FP-02 (Diesel Driven)
Each Fire pump capacity 47.25 L/s
Head Calculation
Pump Selection
Hence, two pumps with one duty and one stand-by are
selected.
Each Transfer pump capacity 5.58 L/s
Head Calculation
Area WC BIDET Wash Basin Kitchen Sink Dish Washer Water Tub Shower Bib Tap
Cold Cold Cold Hot Cold Hot Cold Hot Cold Hot Cold Hot Cold
Loading units per Application
Considered 2 2 2 2 3 3 3 3 10 10 3 3 10
PENTHOUSE FLOOR
PH1 3 2 3 3 1 1 1 1 2 2 1 1
PH2 5 4 5 5 1 1 1 1 3 3 1 1
PH3 5 4 5 5 1 1 1 1 3 3 1 1
Garbage Room 1
Window Cleaning Bib tap 6
21st FLOOR
Apartment B-1 3 2 3 3 1 1 1 1 2 2 1 1
Apartment B-2 3 2 3 3 1 1 1 1 2 2 1 1
Apartment E-1 4 3 4 4 1 1 1 1 3 3 1 1
Apartment E-2 4 3 4 4 1 1 1 1 3 3 1 1
Apartment F-1 4 3 4 4 1 1 1 1 3 3 1 1
Apartment F-2 4 3 4 4 1 1 1 1 3 3 1 1
Garbage Room 1
Window Cleaning Bib tap
20th FLOOR
Apartment B-1 3 2 3 3 1 1 1 1 2 2 1 1
Apartment B-2 3 2 3 3 1 1 1 1 2 2 1 1
Apartment E-1 4 3 4 4 1 1 1 1 3 3 1 1
Apartment E-2 4 3 4 4 1 1 1 1 3 3 1 1
Apartment F-1 4 3 4 4 1 1 1 1 3 3 1 1
Apartment F-2 4 3 4 4 1 1 1 1 3 3 1 1
Garbage Room 1
Window Cleaning Bib tap
19th FLOOR
Apartment B-1 3 2 3 3 1 1 1 1 2 2 1 1
Apartment B-2 3 2 3 3 1 1 1 1 2 2 1 1
Apartment E-1 4 3 4 4 1 1 1 1 3 3 1 1
Apartment E-2 4 3 4 4 1 1 1 1 3 3 1 1
Apartment F-1 4 3 4 4 1 1 1 1 3 3 1 1
Apartment F-2 4 3 4 4 1 1 1 1 3 3 1 1
Garbage Room 1
Window Cleaning Bib tap
18th FLOOR
Apartment B-1 3 2 3 3 1 1 1 1 2 2 1 1
Apartment B-2 3 2 3 3 1 1 1 1 2 2 1 1
Apartment E-1 4 3 4 4 1 1 1 1 3 3 1 1
Apartment E-2 4 3 4 4 1 1 1 1 3 3 1 1
Apartment F-1 4 3 4 4 1 1 1 1 3 3 1 1
Apartment F-2 4 3 4 4 1 1 1 1 3 3 1 1
Garbage Room 1
Window Cleaning Bib tap
17th FLOOR
Apartment B-1 3 2 3 3 1 1 1 1 2 2 1 1
Apartment B-2 3 2 3 3 1 1 1 1 2 2 1 1
Apartment E-1 4 3 4 4 1 1 1 1 3 3 1 1
Apartment E-2 4 3 4 4 1 1 1 1 3 3 1 1
Apartment F-1 4 3 4 4 1 1 1 1 3 3 1 1
Apartment F-2 4 3 4 4 1 1 1 1 3 3 1 1
Garbage Room 1
Swimming Pool 4 4 4 4 4 6
PROJECT: 2B+G+22 RESIDENTIAL & COMMERCIAL BUILDING, DUBAI
LOADING UNITS FOR BOOSTER PUMP FLOW CALCULATION- CWBP-01,02
Area WC BIDET Wash Basin Kitchen Sink Dish Washer Water Tub Shower Bib Tap
Cold Cold Cold Hot Cold Hot Cold Hot Cold Hot Cold Hot Cold
Loading units per Application
Considered 2 2 2 2 3 3 3 3 10 10 3 3 10
Jockey Pump
Head Calculation