PERHITUNGAN LUASAN

A = 4.00 x 3.00 = 12.000 m2


B = 4.50 x 4.00 = 18.000 m2
C = 3.00 x 3.00 = 9.000 m2
D = 3.00 x 3.00 = 9.000 m2
E = 3.00 x 5.00 = 15.000 m2
F = 4.00 x 1.00 = 4.000 m3
G = 1.00 x 1.50 = 1.500 m3
H = 2.00 x 1.50 = 3.000 m2
I = 2.00 x 1.50 = 3.000 m2
J = 2.00 x 4.00 = 4.000 m2
LUAS BANGUNAN 78.500 m2
Luas Total Bangunan :
= A+B+C+D+E+F+G+H+I+J
= 78.500 m2

Luas Bangunan :
a. Bangunan Induk = A+B+C+D+E+F+G+H+I
= 74.500 m2
b. Bangunan Teras :
= J
= 4.000 m2
Total 78.500 m2
PANJANG BANGUNAN

ED_K@K@#1
RAB 2007
PERHITUNGAN VOLUME

NO. SKETSA GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.

I PEKERJAAN PERSIAPAN : 1. Pembersihan Lahan


L (m) B (m) A = (L+4) x (B+4)

9.50 12.00
= 216.000 m2

B
2. Pemasangan Bowplank + Vitzet
L (m) B (m) K = 2 x (( L + 2 ) + ( B + 2 ))

9.50 12.00
= 51.000 m
L
3. Penyediaan Air Kerja - LS

II PEKERJAAN TANAH DAN URUGAN 1. Galian Tanah Pondasi

b (m) h (m) L (m) V = (bxh)xL

1.00 0.90 69.50


H H = 62.550 m3

B b (m) h (m) L (m) V = (bxh)xL


B
1.05 0.60 7.00
= 4.410 m3
Volume Total Galian Tanah Pondasi 66.960 m3

2. Urugan Tanah Kembali


Vol Gal (m3) 1
V = x VG
4
66.960
= 16.740 VOLUME m3

3. Urugan Pasir Di Bawah Pondasi

b (m) h (m) L (m) V = (bxh)xL

B. Induk 1.00 0.10 69.50


H = 6.950 m3

B. Teras 1.05 0.10 7.00


B B = 0.735 m3

Volume Total Urugan Pasir Di Bawah Pondasi 7.685 m3

ED_K@K@#1
RAB 2007
NO. SKETSA GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.

4. Urugan Pasir Peninggi Lantai

L T V = [ A - (L x b )] x h

B. Induk 74.500 0.200


= 14.900 m3

B. Teras 4.000 0.200


= 0.800

m3
Volume Total Urugan pasir peninggi lantai 15.700 m3

III PEKERJAAN PASANGAN DAN PLESTERAN 1. Pasangan Aanstamping Batu Karang/ Kali

b (m) h (m) L (m) V = (bxh)xL

B. Induk 1.00 0.20 69.50


= 13.900 m3
H
B. Teras 1.05 0.20 7.00
= 1.470 m3
B
Volume Total Pasangan Aanstamping Batu Karang/ Kali 15.370 m3
a Bangunan Induk
2. Pasangan Pondasi Batu Karang/ Kali

a+b
V = xh xL
h h a (m) b (m) h (m) L (m) 2

0.30 0.80 0.90 69.50


= 34.403 m3
b Bangunan Teras
a (m) b (m) h (m) L (m)
V = a+b xh xL

0.30 0.30 0.64 7.00 = 2.688

Tangga
a (m) b (m) h (m) L (m) m3

0.27 0.27 0.64 7.00 = 2.3968


Volume Total Pasangan Pondasi Batu Karang/ Kali 39.487 m3

3. Pasangan Tembok Trasraam

P (m) L (m) LT = P*L

12.50 1.25
= 15.625 m2
NO. SKETSA GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.

ED_K@K@#1
RAB 2007
P (m) L (m) LT = P*L

69.50 0.30
= 20.850 m2

Luas Total Pasangan Tembok Trasraam = 36.475 m2

4. Pasangan Tembok Biasa (1 pc : 6 psr)

Kusen PJ 1 ( 2 Unit ) :
L1 = 2* [ 2,67 X 1,02 ] + [ 2,67 X 1,68 ]
= 10.5186 m2
Kusen P 1 ( 4Unit ) :
L2 = 4 [ 2,67 x 1,02 ]
= 10.894 m2
Kusen P 2 ( 2 Unit ) :
L3 = 2 [ 2,67 x 0,92 ]
= 4.913 m2
Kusen J 1 ( 4 Unit ):
L5 = 4 [ 1.53 x 1,6 ]
= 9.792 m2
Kusen BV1 ( 3 Unit ):
L6 = 3 [ 0,70 x 1,15 ]
= 2.415 m2
maka, Luas Kusen (Ak) = L1 + L2 + L3 + L4 + L5 + L6
= 38.532 m2
Luas Tanpa Kusen (ATK) = 339.900 38.532
= 301.368 m2
= 36.475
TOTAL PAS TEMBOK = 337.843 VOLUME 337.843 m2
NO. SKETSA GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.
PAS

h(m) b (m) n L = (1/2 x b xh)

2.25 10.000 2.000


= 22.500

Luas Total Pasangan Tembok Biasa 360.343 m2

5. Plesteran Tembok Trasraam (1 pc : 3 psr)

P (m) T (m) N (m) A = (P xT)x2

12.50 1.25 2.00


= 31.250 m2
Luas Total Plesteran Tembok Trasraam 31.250 m2

6. Plesteran Tembok Biasa (1 pc : 6 psr)

ED_K@K@#1
RAB 2007
P (m) T (m) N (m) A = (P xT)x2

8.50 2.25 2.00


= 38.250

P (m) T (m) N (m) A = (P xT)x2


h4 h3

m2
80.75 2.00 2.00

h1h2
= 323.000
Luas Total Plesteran Tembok Biasa + Gewel 361.250 m2

7. Plesteran Pondasi Tepi Luar (1 pc : 4 psr)

b (m) h (m) A = (b+h)xL

B. Induk 36.000 0.300


= 10.800 m2
b (m) h (m)
Teras
= 2.250 m2
7.500 0.300

b
h

Luas Total Plesteran Pondasi Tepi Luar 13.050 m2


Luas Total Plesteran Tembok dan plesteran pondasi 374.300 m2
NO. SKETSA GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN SAT.
8. Acian Tembok bangunan dan pondasi tepi

Apl (m2) AAC = APl

374.300
= 374.300 m2

IV PEKERJAAN BETON
1. Cor Beton Sloof (1 pc : 2 psr : 3 Krl)

b (m) h (m) p (m) V = (bxh)xp


h h
B. Induk 0.15 0.20 69.50
= 2.085 m3

B. Teras 0.15 0.20 7.00


b b = 0.210 m3
Berat Besi = 184.56 kg/m3

Volume Total Cor Beton Sloof 2.295 m3

2. Cor Beton Kolom Praktis (1 pc : 3 Psr : 5 Krl)

ED_K@K@#1
RAB 2007
a (m) a' (m) L (m) n (jumlah) V = [( a x a' ) x L ] x n

0.15 0.20 3.50 22


= 2.310 m3
Berat Besi = 159.70 kg/m3

3. Cor Beton Kolom Teras (1 pc : 3 psr : 5 Krl)

a (m) a' (m) h (m) n (jumlah) V = [( a x a' ) x h ] x n

0.20 0.20 3.50 2


= 0.280 m3

4. Cor Beton Ringbalk (1 pc : 3 psr : 5 Krl)

b (m) h (m) L (m) V = (bxh)xL

B. Induk 0.15 0.20 69.50


= 2.085

B. Teras 0.15 0.20 7.00


= 0.210

Gewel 0.15 0.20 20.18


= 0.605
Volume Total Cor Beton Ringbalk 2.900 m3

5. Cor Beton Meja Dapur (1 pc : 2 Psr : 3 Krl)


P L T
v = 0.105
0.70 3.00 0.05

Volume Total Cor Meja Dapur 0.105 m3


NO. SKETSA GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.

V PEKERJAAN KAYU DAN KACA


1. Mengerjakan Kusen Kosen Kayu Kelas I (5/11)

b (m) h (m) L (m) n (unit) V = [( b x h ) x L ] x n

PJ 1 0.05 0.11 18.55 2


= 0.204

P1 0.05 0.11 7.68 4


Pj - 1 = 2 UNI T
= 0.169

P2 0.05 0.11 5.14 2


= 0.057

J1 0.05 0.11 7.45 4


= 0.164

BV1 0.05 0.11 3.98 3


= 0.066

Volume Total Kayu Kosen Klas I 0.659 m3

2. Pasangan Daun Pintu Panil Kayu

ED_K@K@#1
RAB 2007
b (m) h (m) n (unit) A = (bxh)xn

0.800 2.000 6
= 9.600 m2

3. Pasangan Daun Pintu Double Teacwood Lapis Alluminium

b (m) h (m) n (unit) A = (bxh)xn

0.700 2.000 2
= 2.800 m2
NO. SKETSA GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.

4. Pasangan Daun Jendela Kaca 3 mm dan Ventilasi

b (m) h (m) n (lubang) A = (bxh)xn

Ventilasi P 1.10 0.30 8


= 2.640 m2

Ventilasi J 1.00 0.30 15


= 4.500 m2

Jendela 1.00 1.50 15


= 22.500 m2

b (m) h (m) n (lubang) A = (bxh)xn

Ventilasi P 0.50 0.30 2


= 0.300 m2
Luas Total Pasangan Daun Jendela Kaca & Ventilasi 29.940 m2
5. Pasangan Kaca Polos (Silang)

Type b (m) L (m) n (buah) A = (bxL)xn


P2 0.5 0.55 8 = 2.200 m2
BV1 0.5 0.26 8 = 1.040 m2

Luas Total Pasangan Kaca Polos (Silang) 3.240 m2


NO. SKETSA GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.

7. Pasangan Kayu Kap dan Gording


a. Pasangan Kuda - Kuda I

b (m) h (m) L (m) n (Jlh) V = [( b x h ) x L ] x n

Tiang Nok 0.08 0.12 2.30 2


= 0.044 m3

Kaki Kuda2 0.08 0.12 5.60 4


= 0.215 m3

Blk. Tarik 0.08 0.12 7.40 2


= 0.142 m3

Penyokong 0.08 0.12 1.50 4

ED_K@K@#1
RAB 2007
0.08 0.12 1.50 4
= 0.058 m3

Pengapit 0.04 0.12 3.00 4


= 0.058 m3

Blk. Kunci 0.08 0.12 0.80 6


= 0.046 m3
= 0.563
b. Pasangan II

b (m) h (m) L (m) n (Jlh) V = [( b x h ) x L ] x n

Tiang Nok 0.08 0.12 1.40 1


= 0.013 m3

Kaki Kuda2 0.08 0.12 2.90 2


= 0.056 m3

Blk. Tarik 0.08 0.12 2.50 1


= 0.024 m3

Penyokong 0.08 0.12 2.00 2


= 0.038 m3

Pengapit 0.04 0.12 1.50 2


= 0.014 m3

Blk. Kunci 0.08 0.12 1.00 1


= 0.010 m3
0.156
NO. SKETSA GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.

e. Jurai Dalam (6/12)


b (m) h (m) L (m) V = [( b x h ) x L ]
0.06 0.12 8.20 1 = 0.059

f. Jurai Luar (6/12)


b (m) h (m) L (m) V = [( b x h ) x L ]
0.06 0.12 17.90 1 = 0.129
m3

g. Balok Bubungan (6/12)

b (m) h (m) L (m) V = (bxh)xL

0.06 0.12 11.10


= 0.080 m3

h. Gording (6/12)

b (m) h (m) L (m) V = (bxh)xL

0.06 0.12 335.00


= 2.412 m3
NO. SKETSA GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.

i. Ikatan Angin (4/12)

ED_K@K@#1
RAB 2007
b (m) h (m) L (m) n (Jlh) V = [( b x h ) x L ] x n

0.04 0.10 25.00 0


= 0.100 m3
Volume Total Kuda2 8 / 12 cm 0.718
Volume Total Kuda2 6 / 12 cm 2.492
Volume Total Kuda2 4 / 10 cm 0.100 m3
TOTAL KESELURUHAN KAP + GORDING 3.310
8. Pasangan Listplank Papan

L (m) n (buah) L' = Lxn

53.30 2
= 106.600 m1

VI PASANGAN ATAP DAN PLAFOND


1. Pasangan Atap Seng Gelombang BJLS 0.30

Daerah b1 (m) b2 (m)

A 16.00 6.00 0.00


= 96.000 m2

B 16.50 6.00 0.00


= 99.000 m2

C 7.00 5.60 0.00


= 39.200 m2

D 8.00 5.60 10.00


= 34.800 m2

E 6.50 5.60 4.00


= 32.400 m2

F 5.00 5.60 6.00


= 22.000 m2

NO. SKETSA GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.


Luas Total Pasangan Atap Seng Gelombang BJLS 0.30 323.400 m2

2. Pasangan Bubungan Seng Licin BJLS 0.30

L (m) n (unit) L' = Lxn

Bubungan 11.10 1
= 11.100 m1

Jurai 26.10 1
= 26.100 m1
Panjang Total Bubungan Seng Licin BJLS 0.30 37.200 m1

3. Pasangan Plafond Tripleks dan rangka

ED_K@K@#1
RAB 2007
luas bangunan
= 78.500 m2

4. Pasangan List Plafond Profil

L (m) n (buah) L' = Lxn

B. Induk 76.50 2
= 153.000 m1
Panjang Total List Plafond Profil 153.000 m1
NO. SKETSA GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.

VII PEKERJAAN LANTAI


1. Pasangan Tegel Keramik 30/30

Ruang tamu A = 4.00 x 3.00 = 12.000 m2


Ruang keluarga B = 4.50 x 4.00 = 18.000 m2
Kamar tidur utama C = 3.00 x 3.00 = 9.000 m2
Kamar tidur anak D = 3.00 x 3.00 = 9.000 m2
Dapur E = 3.00 x 5.00 = 15.000 m2
Lorong 1 F = 4.00 x 1.00 = 4.000 m2
Lorong 2 G = 1.50 x 1.00 = 1.500 m3
teras depan J = 2.00 x 4.00 = 4.000 m2
= 72.500 m2 m2

2. Pasangan Tegel Lantai (KM/ WC) 20/20

kamar mandi / wc 1 H = 2.00 x 1.50 = 3.000 m2


kamar mandi / wc 2 I = 2.00 x 1.50 = 3.000 m2
= 6.000 m2 m2

3. Pasangan Tegel dinding (KM/ WC) 20/ 25

wc 1
P x L J m2
a 3.00 1.50 1.00 = 4.500 m2
a1 2.20 1.50 1.00 = 3.300
b 1.50 1.50 1.00 = 2.250

wc 2
P x L J 0.00 m2
a 2.00 1.50 1.00 = 3.000
a1 0.70 1.50 1.00 = 1.050
b 1.50 1.50 1.00 = 2.250

Luas Total Pasangan Tegel Porselin 16.350 m2


NO. SKETSA GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.

VIII PEKERJAAN INSTALASI LISTRIK DAN AIR 1 Pasangan Titik Lampu = 11 Titik

ED_K@K@#1
RAB 2007
2 Pasangan Lampu TL 40 Watt = 2 Buah
3 Pasangan lampu pijar 24 watt = 6 Buah
4 Pasangan Lampu Pijar 18 Watt = 4 Buah
5 Pasangan Lampu Pijar 8 Watt = 2
5 Pasangan Saklar Tunggal = 2 Buah
6 Pasangan SaklarGanda = 5 Buah
7 Pasangan Stop Kontak = 6 Buah
8 Pasangan Sekring Cast = 1 Buah
9 Pasangan Arde Pembumian = 1 Buah
10 Pasangan Meteran = 1 Buah

IX PEKERJAAN FINISHING 1. Cat Tembok

AAC (m2) A = AAC

374.300
= 374.300 m2

2. Cat Plafond

APl (m2) A = APl

78.500
= 78.500 m2
NO. SKETSA GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.

3. Cat Kayu

Type L P n (Jlh) A = AM - [(L x h) x n]

PJ1 0.36 17.70 2


= 12.744 m2

P1 0.36 4.90 4
= 7.056 m2

P2 0.36 4.90 2
= 3.528 m2

J1 0.36 7.60 4
= 10.944 m2

BV1 0.36 3.00 2


= 2.160 m2
Luas Total Cat Kayu Untuk Kosen 36.432 m2

P L T J

53.300 0.2 0.02 2


= 0.426 m2
Luas Total Cat Kayu (Kosen & Listplank) 36.858 m2
NO. SKETSA GAMBAR URAIAN PEKERJAAN DAN PERHITUNGAN VOLUME SAT.
4. Cat Seng

As (m2) A = As

ED_K@K@#1
RAB 2007
323.400
= 323.400 m2

5. Teac oil

ADP (m2) A = ADP x 2

9.600
= 19.200 m2

X PEKERJAAN PENGGANTUNG DAN PENGUNCI 1 Pasangan Kunci Dua Kali Putar = 6 Buah
3 Pasangan Grendel Pintu = 2 Buah
3 Pasangan Grendel jendela = 8 Buah
4 Pasangan Engsel Pintu = 9 Zet
4 Pasangan Engsel Jendela + Buven = 30 Zet
5 Pasangan Kait Angin = 28 Zet
6 Pasangan Anker Doc = 60 Buah
7 Pasangan Mur, Baut = 117 Buah
8 Pasangan Beugel U = 3 Buah
9 Pasangan Beugel U Bulat = 6 Buah

XI PEKERJAAN LAIN - LAIN 1. Pasangan Saluran Keliling Bangunan (Buis Beton U 30 cm)

A B K = [ 2 (A + B) - 2 (C + D)] + 3

18.5 23.5
= 87.000 m1

2. Pembersihan Kembali = 1 LS

PEKERJAAN SANITAIR 1 Pasangan Wastafel = 1 Buah


2 Pasangan Bak Air Porselin = 2 Buah
3 Pasangan Closed Jongkok = 2 Buah
4 Pasangan Septic Tank dan Peresapan = 2 Buah

ED_K@K@#1
RAB 2007
REKAPITULASI VOLUME

NO. URAIAN PEKERJAAN VOLUME SATUAN


I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan 216.000 m2
2 Pemasangan Bowplank + Vitset 51.000 m1
3 Penyediaan Air Kerja 1 LS

II PEKERJAAN TANAH DAN URUGAN


1 Galian Tanah Pondasi 66.960 m3
2 Urugan Tanah Kembali 16.740 m3
3 Urugan Pasir di Bawah Pondasi 7.685 m3
4 urugan pasir dibawah lantai 15.700 m3
III PEKERJAAN PASANGAN DAN PLESTERAN
1 Pekerjaan Pasangan batu kosong 15.370 m3
2 Pasangan Pondasi Batu Kali (1 pc : 5 psr) 39.487 m3
3 Pasangan Tembok Trasraam (1 pc : 3 psr) 36.475 m2
4 Pasangan Tembok Biasa (1 pc : 5 psr) 337.843 m2
5 Plesteran Tembok Trasraam (1 pc : 3 psr) 31.250 m2
6 Plesteran Tembok Biasa (1 pc : 5 psr) 361.250 m2
7 Plesteran Pondasi Tepi Luar (1 pc : 4 psr) 13.050 m2
8 Acian Tembok 374.300 m2

IV PEKERJAAN BETON
1 Cor Beton Sloof (1pc : 2psr : 3krl) 2.295 m3
2 Cor Beton Kolom Praktis (1pc : 2psr : 3krl) 2.310 m3
3 Cor Beton Kolom Teras (1pc : 2psr : 3krl) 0.280 m3
4 Cor Beton Ringbalk (1pc : 2psr : 3krl) 2.900 m3
6 Cor Meja Beton (1pc : 2psr : 3krl) 0.105 m3

V PEKERJAAN KAYU DAN KACA


1 Pasangan Kayu Kusen Klas I 0.659 m3
2 Pasangan Daun Pintu Panil Kayu 9.600 m2
3 Pas. Daun Pintu Double Teacwood lapis Alluminium 2.800 m2
4 Pas. Daun Jendela Kaca dan Ventilasi 29.940 m2
5 Pas. Kaca Polos (Kaca Silang) 3.240 m2
6 Pas. Kayu Kap dan Gording 3.310 m3
7 Pasangan Lisplank Papan 106.600 mI
VI PASANGAN ATAP DAN PLAFOND
1 Pas. Atap Seng BJLS 0.30 mm 323.400 m2
2 Pas. Atap Bubungan Seng Licin 0.30 mm 37.200 m1
3 Pas. Plafond Tripleks 3 mm & Rangka 78.500 m2
4 Pas. List Penutup Plafond (Berprofil) 153.000 m1

VII PEKERJAAN LANTAI


1 Pasangan Keramik 30 /30 72.500 m2
2 Pasangan Lantai Keramik wc / km 20 / 20 6.000 m2
3 Pasangan Dinding Keramik 20 / 25 16.350 m2
VIII PEKERJAAN INSTALASI LISTRIK DAN AIR
1 Pasangan Titik Lampu 11 Titik
2 Pasangan Lampu TL 40 Watt 2 Buah
3 Pasangan Lampu Pijar 24 Watt 6 Buah
4 Pasangan Lampu Pijar 18 Watt 4 Buah
5 Pasangan Lampu Pijar 8 Watt 2 Buah
5 Pasangan Saklar Tunggal 2 Buah
6 Pasangan Saklar Ganda 5 Buah
7 Pasangan Stop Kontak 6 Buah
8 Pasangan Sekring Cast 1 Buah
9 Pasangan Arde Pembumian 1 Buah
10 Pasangan meteran 1 Buah
11 Pasangan Wastafel 1 Buah
12 Pasangan Bak Air Porselin 2 Buah
13 Pasangan Closed Jongkok Porselin 2 Buah
14 Pasangan Septic Tank dan Peresapan 2 Buah
15 Pasangan Instalasi Air Bersih 1 LS
16 Pasangan Instalasi Air Kotor 1 LS
17 Pasangan Floor Drain 2 Buah
18 Pasangan Kran Air 3 Buah

IX PEKERJAAN FINISHING
1 Cat Tembok 374.300 m2
2 Cat Plafond 78.500 m2
3 Cat Kayu 36.858 m2
4 Cat Seng 323.400 m2
5 Teak Oil 19.200 m2

X PEKERJAAN PENGGANTUNG DAN PENGUNCI


1 Pasangan Kunci Tanam 2 kali putar 6 Buah
2 Pasangan Grendel pintu 2 Buah
3 pasang grendel jendela 8 Buah
4 Pasangan Engsel pintu 9 Zet
5 Pasang Engsel jendela 30 Zet
6 Pasangan Kait Angin 28 Zet
7 Pasangan Anker Doc 60 Buah
8 Pasangan Mur, Baut 117 Buah
9 Pasangan Beughel U 3 Buah
10 Pasangan Beugel U bulat 6 Buah
XI PEKERJAAN LAIN - LAIN
1 Pasangan Saluran Keliling Bangunan (Buis Beton U 30 cm) 87.000 m1
2 Pembersihan Kembali 1.00 LS
DAFTAR ANALISA HARGA SATUAN

1). 1 m1 Pengukuran & Pemasangan Bowplank

a. Bahan
Kayu 5/7 0.012 M3 x Rp. 1,650,000.00 = Rp. 19,800.00
Paku biasa 0.020 Kg x Rp. 16,900.00 = Rp. 338.00
Kayu papan 3/20 0.007 M3 x Rp. 1,000,000.00 = Rp. 7,000.00
Sub Jumlah (1) = Rp. 27,138.00

b. Tenaga
Pekerja 0.100 Oh x Rp. 30,000.00 = Rp. 3,000.00
Tukang kayu 0.100 Oh x Rp. 40,000.00 = Rp. 4,000.00
Kepala tukang 0.010 Oh x Rp. 50,000.00 = Rp. 500.00
Mandor 0.005 Oh x Rp. 50,000.00 = Rp. 250.00
Sub Jumlah (2) = Rp. 7,500.00

Jumlah (1) + (2) = Rp. 34,638.00

2). 1 m3 Galian Tanah Cadas

Tenaga
Pekerja 1.250 Oh x Rp. 30,000.00 = Rp. 37,500.00
Mandor 0.062 Oh x Rp. 50,000.00 = Rp. 3,100.00

Jumlah = Rp. 40,600.00

3). 1 m3 Urugan Tanah

Tenaga
Pekerja 0.192 Oh x Rp. 30,000.00 = Rp. 5,760.000
Mandor 0.019 Oh x Rp. (50,000.00) = Rp. (950.000)

Jumlah = Rp. 4,810.000

4). 1 m3 Urugan Pasir

a Bahan
Pasir urug 1.200 M3 x Rp. 83,300.00 = Rp. 99,960.00
Sub Jumlah (1) = Rp. 99,960.00

b Tenaga
Pekerja 0.300 Oh x Rp. 30,000.00 = Rp. 30,000.30
Mandor 0.010 Oh x Rp. 50,000.00 = Rp. 50,000.01
Sub Jumlah (2) = Rp. 80,000.31
Jumlah (1) + (2) = Rp. 179,960.31

5). 1 m3 Pasangan Pondasi Batu Kosong

a Bahan
Batu Karang 1.200 M3 x Rp. 117,200.00 = Rp. 140,640.00
Pasir urug 0.300 M3 x Rp. 83,300.00 = Rp. 24,990.00
Sub Jumlah (1) = Rp. 165,630.00

b Tenaga
Pekerja 0.780 Oh x Rp. 30,000.00 = Rp. 23,400.00
Tukang batu 0.390 Oh x Rp. 40,000.00 = Rp. 15,600.00
Kepala tukang 0.039 Oh x Rp. 50,000.00 = Rp. 1,950.00
Mandor 0.039 Oh x Rp. 50,000.00 = Rp. 1,950.00
Sub Jumlah (2) = Rp. 42,900.00
Jumlah (1) + (2) = Rp. 208,530.00

ED_K@K@#1
RAB 2007
6). 1 m3 Pasangan Pondasi Batu Karang (1 Pc : 5 Ps)

a Bahan
Batu Karang 1.100 M3 x Rp. 117,200.00 = Rp. 128,920.00
Semen portland 136.000 Kg x Rp. 1,100.00 = Rp. 149,600.00
Pasir pasang 0.544 M3 x Rp. 117,700.00 = Rp. 64,028.80
Sub Jumlah (1) = Rp. 342,548.80

b Tenaga
Pekerja 1.500 Oh x Rp. 30,000.00 = Rp. 45,000.00
Tukang batu 0.600 Oh x Rp. 40,000.00 = Rp. 24,000.00
Kepala tukang 0.060 Oh x Rp. 50,000.00 = Rp. 3,000.00
Mandor 0.075 Oh x Rp. 50,000.00 = Rp. 3,750.00
Sub Jumlah (2) = Rp. 75,750.00
Jumlah (1) + (2) = Rp. 418,298.80

7). 1 m2 Pasangan bata merah tebal 1/2 bata (Tembok Trasraam), 1 Pc : 3 Ps

a Bahan
Bata merah 5 x 11 x 22 cm 70.000 Bh x Rp. 1,300.00 = Rp. 91,000.00
Semen portland 14.370 Kg x Rp. 1,100.00 = Rp. 15,807.00
Pasir pasang 0.040 M3 x Rp. 117,700.00 = Rp. 4,708.00
Sub Jumlah (1) = Rp. 111,515.00

b Tenaga
Pekerja 0.320 Oh x Rp. 30,000.00 = Rp. 9,600.00
Tukang batu 0.100 Oh x Rp. 40,000.00 = Rp. 4,000.00
Kepala tukang 0.010 Oh x Rp. 50,000.00 = Rp. 500.00
Mandor 0.015 Oh x Rp. 50,000.00 = Rp. 750.00
Sub Jumlah (2) = Rp. 14,850.00
Jumlah (1) + (2) = Rp. 126,365.00

8). 1 m2 Pasangan bata merah tebal 1/2 bata (Tembok Biasa), 1 Pc : 5 Ps

a Bahan
Bata merah 5 x 11 x 22 cm 70.000 Bh x Rp. 1,300.00 = Rp. 91,000.00
Semen portland 9.680 Kg x Rp. 1,100.00 = Rp. 10,648.00
Pasir pasang 0.045 M3 x Rp. 117,700.00 = Rp. 5,296.50
Sub Jumlah (1) = Rp. 106,944.50

b Tenaga
Pekerja 0.320 Oh x Rp. 30,000.00 = Rp. 9,600.000
Tukang batu 0.100 Oh x Rp. 40,000.00 = Rp. 4,000.000
Kepala tukang 0.010 Oh x Rp. 50,000.00 = Rp. 500.000
Mandor 0.015 Oh x Rp. 50,000.00 = Rp. 750.000
Sub Jumlah (2) = Rp. 14,850.000
Jumlah (1) + (2) = Rp. 121,794.50

9). 1 m2 Plesteran Tembok Trasraam 1 Pc : 3 Ps, tebal 15 mm

a Bahan
Semen portland 6.480 Kg x Rp. 1,100.00 = Rp. 7,128.00
Pasir pasang 0.019 M3 x Rp. 117,700.00 = Rp. 2,236.30
Sub Jumlah (1) = Rp. 9,364.30

b Tenaga
Pekerja 0.200 Oh x Rp. 30,000.00 = Rp. 6,000.000
Tukang batu 0.150 Oh x Rp. 40,000.00 = Rp. 6,000.000
Kepala tukang 0.015 Oh x Rp. 50,000.00 = Rp. 750.000
Mandor 0.010 Oh x Rp. 50,000.00 = Rp. 500.000
Sub Jumlah (2) = Rp. 13,250.000
Jumlah (1) + (2) = Rp. 22,614.300

ED_K@K@#1
RAB 2007
10). 1 m2 Plesteran Tembok Biasa 1 Pc : 5 Ps, tebal 15 mm
a Bahan
Semen portland 4.320 Kg x Rp. 1,100.00 = Rp. 4,752.00
Pasir pasang 0.022 M3 x Rp. 117,700.00 = Rp. 2,589.40
Sub Jumlah (1) = Rp. 7,341.40

b Tenaga
Pekerja 0.200 Oh x Rp. 30,000.00 = Rp. 6,000.00
Tukang batu 0.150 Oh x Rp. 40,000.00 = Rp. 6,000.00
Kepala tukang 0.015 Oh x Rp. 50,000.00 = Rp. 750.00
Mandor 0.010 Oh x Rp. 50,000.00 = Rp. 500.00
Sub Jumlah (2) = Rp. 13,250.00
Jumlah (1) + (2) = Rp. 20,591.40

11). 1 m2 Plesteran Pondasi Tepi Luar 1 Pc : 4 Ps, tebal 15 mm

a Bahan
Semen portland 5.200 Kg x Rp. 1,100.00 = Rp. 5,720.00
Pasir pasang 0.020 M3 x Rp. 117,700.00 = Rp. 2,354.00
Sub Jumlah (1) = Rp. 8,074.00

b Tenaga
Pekerja 0.200 Oh x Rp. 30,000.00 = Rp. 6,000.00
Tukang batu 0.150 Oh x Rp. 40,000.00 = Rp. 6,000.00
Kepala tukang 0.015 Oh x Rp. 50,000.00 = Rp. 750.00
Mandor 0.010 Oh x Rp. 50,000.00 = Rp. 500.00
Sub Jumlah (2) = Rp. 13,250.00
Jumlah (1) + (2) = Rp. 21,324.00

12). 1 m2 Acian Tembok 1Kp : 1Sm : 1Ps

a Bahan
Semen merah 0.009 Kg x Rp. 4,800.00 = Rp. 43.20
Kapur padam 0.009 M3 x Rp. 200,000.00 = Rp. 1,800.00
Pasir pasang 0.009 M3 x Rp. 117,700.00 = Rp. 1,059.30
Sub Jumlah (1) = Rp. 2,902.50

b Tenaga
Pekerja 0.200 Oh x Rp. 30,000.00 = Rp. 6,000.00
Tukang batu 0.150 Oh x Rp. 40,000.00 = Rp. 6,000.00
Kepala tukang 0.015 Oh x Rp. 50,000.00 = Rp. 750.00
Mandor 0.010 Oh x Rp. 50,000.00 = Rp. 500.00
Sub Jumlah (2) = Rp. 13,250.00
Jumlah (1) + (2) = Rp. 16,152.50

13). 1m3 Membuat sloof dan Ring Balk beton bertulang 15/20 (184,56 kg besi + bekesting)

a Bahan
Kayu terentang 0.270 M3 x Rp. 1,000,000.00 = Rp. 270,000.00
Paku biasa 2"-5" 2.000 Kg x Rp. 16,900.00 = Rp. 33,800.00
Minyak bekesting 0.600 lt x Rp. 6,800.00 = Rp. 4,080.00
Besi beton polos (Ø 12) 118.118 Kg x Rp. 8,300.00 = Rp. 980,382.72
Besi beton polos (Ø 6) 66.442 Kg x Rp. 8,300.00 = Rp. 551,465.28
Kawat beton 2.768 Kg x Rp. 22,400.00 = Rp. 62,012.16
Semen portland 323.000 Kg x Rp. 1,100.00 = Rp. 355,300.00
Pasir beton 0.520 M3 x Rp. 117,700.00 = Rp. 61,204.00
Koral beton 0.780 M3 x Rp. 211,100.00 = Rp. 164,658.00
Sub Jumlah (1) = Rp. 2,482,902.16

b Tenaga
Pekerja 5.852 Oh x Rp. 30,000.00 = Rp. 175,560.00
Tukang batu 0.350 Oh x Rp. 40,000.00 = Rp. 14,000.00
Tukang kayu 1.560 Oh x Rp. 40,000.00 = Rp. 62,400.00
Tukang besi 1.292 Oh x Rp. 40,000.00 = Rp. 51,676.80
Kepala tukang 0.331 Oh x Rp. 50,000.00 = Rp. 16,550.00
Mandor 0.170 Oh x Rp. 50,000.00 = Rp. 8,500.00
Sub Jumlah (2) = Rp. 328,686.80
Jumlah (1) + (2) = Rp. 2,811,588.96

ED_K@K@#1
RAB 2007
14). 1m3 Membuat kolom beton bertulang 15/20 (184,56 kg besi + bekesting)

a Bahan
Kayu terentang 0.400 M3 x Rp. 1,000,000.00 = Rp. 400,000.00
Paku biasa 2"-5" 4.000 Kg x Rp. 16,900.00 = Rp. 67,600.00
Minyak bekesting 2.000 lt x Rp. 6,800.00 = Rp. 13,600.00
Besi beton polos (Ø 12) 118.118 Kg x Rp. 8,300.00 = Rp. 980,382.72
Besi beton polos (Ø 6) 66.442 Kg x Rp. 8,300.00 = Rp. 551,465.28
Kawat beton 2.768 Kg x Rp. 22,400.00 = Rp. 62,012.16
Semen portland 323.000 Kg x Rp. 1,100.00 = Rp. 355,300.00
Pasir beton 0.520 M3 x Rp. 117,700.00 = Rp. 61,204.00
Koral beton 0.780 M3 x Rp. 211,100.00 = Rp. 164,658.00
Kayu borneo balok 0.150 M3 x Rp. 3,000,000.00 = Rp. 450,000.00
Tripleks 2.8 mm 3.500 lbr x Rp. 65,000.00 = Rp. 227,500.00
Dolken Ø 8cm/4m 20.000 btg x Rp. 5,500.00 = Rp. 110,000.00
Sub Jumlah (1) = Rp. 3,443,722.16

b Tenaga
Pekerja 6.492 Oh x Rp. 30,000.00 = Rp. 194,760.00
Tukang batu 0.350 Oh x Rp. 40,000.00 = Rp. 14,000.00
Tukang kayu 3.300 Oh x Rp. 40,000.00 = Rp. 132,000.00
Tukang besi 1.292 Oh x Rp. 40,000.00 = Rp. 51,676.80
Kepala tukang 0.570 Oh x Rp. 50,000.00 = Rp. 28,500.00
Mandor 0.250 Oh x Rp. 50,000.00 = Rp. 12,500.00
Sub Jumlah (2) = Rp. 433,436.80
Jumlah (1) + (2) = Rp. 3,877,158.96

ED_K@K@#1
RAB 2007
2) 1m3 Membuat kolom praktis 15/15 (159,7 kg besi + bekesting)

a Bahan
Kayu terentang 0.400 M3 x Rp. 1,000,000.00 = Rp. 400,000.00
Paku biasa 2"-5" 4.000 Kg x Rp. 16,900.00 = Rp. 67,600.00
Minyak bekesting 2.000 lt x Rp. 6,800.00 = Rp. 13,600.00
Besi beton polos (Ø 8) 78.253 Kg x Rp. 8,300.00 = Rp. 649,499.90
Besi beton polos (Ø 6) 81.447 Kg x Rp. 8,300.00 = Rp. 676,010.10
Kawat beton 2.396 Kg x Rp. 22,400.00 = Rp. 53,659.20
Semen portland 323.000 Kg x Rp. 1,100.00 = Rp. 355,300.00
Pasir beton 0.520 M3 x Rp. 117,700.00 = Rp. 61,204.00
Koral beton 0.780 M3 x Rp. 211,100.00 = Rp. 164,658.00
Kayu borneo balok 0.150 M3 x Rp. 3,000,000.00 = Rp. 450,000.00
Tripleks 2.8 mm 3.500 lbr x Rp. 65,000.00 = Rp. 227,500.00
Dolken Ø 8cm/4m 20.000 btg x Rp. 5,500.00 = Rp. 110,000.00
Sub Jumlah (1) = Rp. 3,229,031.20

b Tenaga
Pekerja 6.318 Oh x Rp. 30,000.00 = Rp. 189,540.00
Tukang batu 0.350 Oh x Rp. 40,000.00 = Rp. 14,000.00
Tukang kayu 3.300 Oh x Rp. 40,000.00 = Rp. 132,000.00
Tukang besi 1.118 Oh x Rp. 40,000.00 = Rp. 44,716.00
Kepala tukang 0.570 Oh x Rp. 50,000.00 = Rp. 28,500.00
Mandor 0.250 Oh x Rp. 50,000.00 = Rp. 12,500.00
Sub Jumlah (2) = Rp. 421,256.00
Jumlah (1) + (2) = Rp. 3,650,287.20

15). 1m3 Membuat Cor Beton Meja Dapur

a Bahan
Kayu terentang 0.250 M3 x Rp. 1,000,000.00 = Rp. 250,000.00
Paku biasa 2"-5" 3.000 Kg x Rp. 16,900.00 = Rp. 50,700.00
Minyak bekesting 1.200 lt x Rp. 6,800.00 = Rp. 8,160.00
Besi beton polos (Ø 8) 200.000 Kg x Rp. 8,300.00 = Rp. 1,660,000.00
Kawat beton 3.000 Kg x Rp. 8,300.00 = Rp. 24,900.00
Semen portland 323.000 Kg x Rp. 1,100.00 = Rp. 355,300.00
Pasir beton 0.520 M3 x Rp. 117,700.00 = Rp. 61,204.00
Koral beton 0.780 M3 x Rp. 211,100.00 = Rp. 164,658.00
Kayu borneo balok 0.105 M3 x Rp. 3,000,000.00 = Rp. 315,000.00
Tripleks 2.8 mm 2.500 lbr x Rp. 65,000.00 = Rp. 162,500.00
Dolken Ø 8cm/4m 14.000 btg x Rp. 5,500.00 = Rp. 77,000.00
Sub Jumlah (1) = Rp. 3,129,422.00

b Tenaga
Pekerja 5.600 Oh x Rp. 30,000.00 = Rp. 168,000.00
Tukang batu 0.350 Oh x Rp. 40,000.00 = Rp. 14,000.00
Tukang kayu 2.300 Oh x Rp. 40,000.00 = Rp. 92,000.00
Tukang besi 1.400 Oh x Rp. 40,000.00 = Rp. 56,000.00
Kepala tukang 0.405 Oh x Rp. 50,000.00 = Rp. 20,250.00
Mandor 0.202 Oh x Rp. 50,000.00 = Rp. 10,100.00
Sub Jumlah (2) = Rp. 360,350.00
Jumlah (1) + (2) = Rp. 3,489,772.00

ED_K@K@#1
RAB 2007
16). 1m3 Membuat beton tumbuk 1Pc : 3Psr : 5Kr

a Bahan
Semen portland 218.000 Kg x Rp. 1,100.00 = Rp. 239,800.00
Pasir beton 0.520 M3 x Rp. 117,700.00 = Rp. 61,204.00
Koral beton 0.870 M3 x Rp. 211,100.00 = Rp. 183,657.00
Sub Jumlah (1) 484,661.00
b Tenaga
Pekerja 1.650 Oh x Rp. 30,000.00 = Rp. 49,500.00
Tukang batu 0.250 Oh x Rp. 40,000.00 = Rp. 10,000.00
Kepala tukang 0.025 Oh x Rp. 50,000.00 = Rp. 1,250.00
Mandor 0.080 Oh x Rp. 50,000.00 = Rp. 4,000.00
Sub Jumlah (2) = Rp. 64,750.00
Jumlah (1) + (2) = Rp. 549,411.00

17). 1 m3 Pasang kusen pintu dan jendela kayu jati (kelas I)

a Bahan
Kayu jati, balok 1.1000 M3 x Rp. 4,000,000.00 = Rp. 4,400,000.00
Sub Jumlah (1) = Rp. 4,400,000.00

b Tenaga
Pekerja 6.000 Oh x Rp. 30,000.00 = Rp. 180,000.00
Tukang kayu 20.000 Oh x Rp. 40,000.00 = Rp. 800,000.00
Kepala tukang 2.000 Oh x Rp. 50,000.00 = Rp. 100,000.00
Mandor 0.300 Oh x Rp. 50,000.00 = Rp. 15,000.00
Sub Jumlah (2) = Rp. 1,095,000.00
Jumlah (1) + (2) = Rp. 5,495,000.00

18). 1 m2 Pasang pintu panel kayu jati

a Bahan
Kayu jati, papan 0.0400 M3 x Rp. 4,500,000.00 = Rp. 180,000.00
Sub Jumlah (1) = Rp. 180,000.00

b Tenaga
Pekerja 1.000 Oh x Rp. 30,000.00 = Rp. 30,000.00
Tukang kayu 2.500 Oh x Rp. 40,000.00 = Rp. 100,000.00
Kepala tukang 0.250 Oh x Rp. 50,000.00 = Rp. 12,500.00
Mandor 0.050 Oh x Rp. 50,000.00 = Rp. 2,500.00
Sub Jumlah (2) = Rp. 145,000.00
Jumlah (1) + (2) = Rp. 325,000.00

ED_K@K@#1
RAB 2007
20). 1 m2 Pasang pintu teakwood lapis seng rangkap kayu kamper

a Bahan
Kayu kamper, papan 0.0196 M3 x Rp. 4,500,000.00 = Rp. 88,200.00
Paku biasa 1/2" - 1" 0.3000 Kg x Rp. 12,500.00 = Rp. 3,750.00
Lem kayu 0.3000 Lt x Rp. 33,400.00 = Rp. 10,020.00
Teakwood 4" x 8" x 4 mm 0.3472 Lbr x Rp. 66,900.00 = Rp. 23,227.68
Seng plat BJLS 0.20 mm 1.0000 Lbr x Rp. 41,600.00 = Rp. 41,600.00
Sub Jumlah (1) = Rp. 166,797.68

b Tenaga
Pekerja 0.600 Oh x Rp. 30,000.00 = Rp. 18,000.00
Tukang kayu 2.000 Oh x Rp. 40,000.00 = Rp. 80,000.00
Kepala tukang 0.200 Oh x Rp. 50,000.00 = Rp. 10,000.00
Mandor 0.030 Oh x Rp. 50,000.00 = Rp. 1,500.00
Sub Jumlah (2) = Rp. 109,500.00
Jumlah (1) + (2) = Rp. 276,297.68

21). 1 m2 Pasang daun jendela kaca 3 mm

1). 1m2 Pasang jendela kaca kayu jati

a Bahan
Kayu jati, papan 0.0350 M3 x Rp. 4,500,000.00 = Rp. 157,500.00
Sub Jumlah (1a) = Rp. 157,500.00

b Tenaga
Pekerja 0.800 Oh x Rp. 30,000.00 = Rp. 24,000.00
Tukang kayu 2.000 Oh x Rp. 40,000.00 = Rp. 80,000.00
Kepala tukang 0.200 Oh x Rp. 50,000.00 = Rp. 10,000.00
Mandor 0.040 Oh x Rp. 50,000.00 = Rp. 2,000.00
Sub Jumlah (1b) = Rp. 116,000.00
Jumlah (1) = Rp. 273,500.00

2). 1m2 Pasang kaca, tebal 3 mm

a Bahan
Kaca 1.1000 M2 x Rp. 140,500.00 = Rp. 154,550.00
Sub Jumlah (2a) = Rp. 154,550.00

b Tenaga
Pekerja 0.015 Oh x Rp. 30,000.00 = Rp. 450.00
Tukang kayu 0.150 Oh x Rp. 40,000.00 = Rp. 6,000.00
Kepala tukang 0.015 Oh x Rp. 50,000.00 = Rp. 750.00
Mandor 0.00075 Oh x Rp. 50,000.00 = Rp. 37.50
Sub Jumlah (2b) = Rp. 7,237.50
Jumlah (2) = Rp. 161,787.50
Jumlah (1) + (2) = Rp. 435,287.50

22). 1 m3 Pasang konstruksi kuda - kuda/ Gording Kayu Borneo

a Bahan
Kayu Borneo, balok 1.1000 M3 x Rp. 2,500,000.00 = Rp. 2,750,000.00
Besi strip 15.0000 Kg x Rp. 11,100.00 = Rp. 166,500.00
Paku biasa 2" - 5" 0.8000 Kg x Rp. 16,900.00 = Rp. 13,520.00
Sub Jumlah (1) = Rp. 2,930,020.00

b Tenaga
Pekerja 4.000 Oh x Rp. 30,000.00 = Rp. 120,000.00
Tukang kayu 12.000 Oh x Rp. 40,000.00 = Rp. 480,000.00
Kepala tukang 1.200 Oh x Rp. 50,000.00 = Rp. 60,000.00
Mandor 0.200 Oh x Rp. 50,000.00 = Rp. 10,000.00
Sub Jumlah (2) = Rp. 670,000.00
Jumlah (1) + (2) = Rp. 3,600,020.00

ED_K@K@#1
RAB 2007
23). 1 m1 Listplank ukuran 2 x (2 x 20) cm, kayu kamper

a Bahan
Kayu kamper, papan 0.0086 M3 x Rp. 3,200,000.00 = Rp. 27,520.00
Paku biasa 2" - 5" 0.0600 Kg x Rp. 16,900.00 = Rp. 1,014.00
Sub Jumlah (1) = Rp. 28,534.00

b Tenaga
Pekerja 0.100 Oh x Rp. 30,000.00 = Rp. 3,000.00
Tukang kayu 0.100 Oh x Rp. 40,000.00 = Rp. 4,000.00
Kepala tukang 0.010 Oh x Rp. 50,000.00 = Rp. 500.00
Mandor 0.050 Oh x Rp. 50,000.00 = Rp. 2,500.00
Sub Jumlah (2) = Rp. 10,000.00
Jumlah (1) + (2) = Rp. 38,534.00

24). 1 m2 Pasang Atap Seng Gelombang BJLS 0.30 mm

a Bahan
Seng gelombang 3" x 6" bjls 28 0.700 Lbr x Rp. 41,600.00 = Rp. 29,120.00
Paku biasa 1/2" - 1" 0.020 Kg x Rp. 23,600.00 = Rp. 472.00
Sub Jumlah (1) = Rp. 29,592.00

b Tenaga
Pekerja 0.120 Oh x Rp. 30,000.00 = Rp. 3,600.00
Tukang kayu 0.060 Oh x Rp. 40,000.00 = Rp. 2,400.00
Kepala tukang 0.006 Oh x Rp. 50,000.00 = Rp. 300.00
Mandor 0.006 Oh x Rp. 50,000.00 = Rp. 300.00
Sub Jumlah (2) = Rp. 6,600.00
Jumlah (1) + (2) = Rp. 36,192.00

25). 1 m2 Pasang Atap Nok Seng

a Bahan
Seng plat 3" x 6" bjls 28 0.300 Lbr x Rp. 41,600.00 = Rp. 12,480.00
Paku biasa 1/2" - 1" 0.040 Kg x Rp. 22,400.00 = Rp. 896.00
Sub Jumlah (1) = Rp. 13,376.00

b Tenaga
Pekerja 0.150 Oh x Rp. 30,000.00 = Rp. 4,500.00
Tukang kayu 0.070 Oh x Rp. 40,000.00 = Rp. 2,800.00
Kepala tukang 0.008 Oh x Rp. 50,000.00 = Rp. 400.00
Mandor 0.008 Oh x Rp. 50,000.00 = Rp. 400.00
Sub Jumlah (2) = Rp. 8,100.00
Jumlah (1) + (2) = Rp. 21,476.00

26). 1 m2 Pasang Plafond Tripleks (60 x 120) cm, tebal 4 mm, Rangkap kayu borneo

1). 1m2 Pasang rangka langit - langit (30 x 60) cm, kayu borneo

a Bahan
Kayu borneo, balok 0.0230 M3 x Rp. 1,650,000.00 = Rp. 37,950.00
Paku biasa 2" - 5" 0.1500 Kg x Rp. 16,900.00 = Rp. 2,535.00
Sub Jumlah (1a) = Rp. 40,485.00

b Tenaga
Pekerja 0.150 Oh x Rp. 30,000.00 = Rp. 4,500.00
Tukang kayu 0.070 Oh x Rp. 40,000.00 = Rp. 2,800.00
Kepala tukang 0.008 Oh x Rp. 50,000.00 = Rp. 400.00
Mandor 0.008 Oh x Rp. 50,000.00 = Rp. 400.00
Sub Jumlah (1b) = Rp. 8,100.00
Jumlah (1) = Rp. 48,585.00

ED_K@K@#1
RAB 2007
2). 1m2 Pasang langit - langit tripleks (30 x 60) cm, tebal 3 mm

a Bahan
Tripleks 4 mm 0.3600 Lbr x Rp. 65,000.00 = Rp. 23,400.00
Paku 0.0300 Kg x Rp. 16,900.00 = Rp. 507.00
Sub Jumlah (2a) = Rp. 23,907.00

b Tenaga
Pekerja 0.0700 Oh x Rp. 30,000.00 = Rp. 2,100.00
Tukang kayu 0.1000 Oh x Rp. 40,000.00 = Rp. 4,000.00
Kepala tukang 0.0100 Oh x Rp. 50,000.00 = Rp. 500.00
Mandor 0.0035 Oh x Rp. 50,000.00 = Rp. 175.00
Sub Jumlah (2b) = Rp. 6,775.00
Jumlah (2) = Rp. 30,682.00
Jumlah (1) + (2) = Rp. 79,267.00

27). 1 m1 List plafond profil

a Bahan
List Plafond Multipleks 6 mm 1.050 M x Rp. 3,000.00 = Rp. 3,150.00
Sub Jumlah (1) = Rp. 3,150.00

b Tenaga
Pekerja 0.021 Oh x Rp. 30,000.00 = Rp. 630.00
Tukang kayu 0.021 Oh x Rp. 40,000.00 = Rp. 840.00
Kepala tukang 0.002 Oh x Rp. 50,000.00 = Rp. 100.00
Mandor 0.001 Oh x Rp. 50,000.00 = Rp. 50.00
Sub Jumlah (2) = Rp. 1,620.00
Jumlah (1) + (2) = Rp. 4,770.00

28). 1 m2 Pasang lantai keramik 30 x 30 cm

a Bahan
Ubin keramik 30x30 cm 11.870 Bh x Rp. 6,000.00 = Rp. 71,220.00
Semen portland 8.360 Kg x Rp. 1,100.00 = Rp. 9,196.00
Pasir pasang 0.023 M3 x Rp. 117,700.00 = Rp. 2,707.10
Semen warna 0.900 Kg x Rp. 4,800.00 = Rp. 4,320.00
Sub Jumlah (1) = Rp. 87,443.10

b Tenaga
Pekerja 0.2500 Oh x Rp. 30,000.00 = Rp. 7,500.00
Tukang batu 0.1200 Oh x Rp. 40,000.00 = Rp. 4,800.00
Kepala tukang 0.0120 Oh x Rp. 50,000.00 = Rp. 600.00
Mandor 0.0125 Oh x Rp. 50,000.00 = Rp. 625.00
Sub Jumlah (2) = Rp. 13,525.00
Jumlah (1) + (2) = Rp. 100,968.10

29). 1 m2 Pasang Tegel Keramik 30 x 30 cm

a Bahan
Tegel 30x30 cm 11.870 Bh x Rp. 6,000.00 = Rp. 71,220.00
Semen portland 14.150 Kg x Rp. 1,100.00 = Rp. 15,565.00
Pasir pasang 0.039 M3 x Rp. 117,700.00 = Rp. 4,590.30
Semen warna 2.000 Kg x Rp. 4,800.00 = Rp. 9,600.00
Sub Jumlah (1) = Rp. 100,975.30

b Tenaga
Pekerja 0.2500 Oh x Rp. 30,000.00 = Rp. 7,500.00
Tukang batu 0.1200 Oh x Rp. 40,000.00 = Rp. 4,800.00
Kepala tukang 0.0120 Oh x Rp. 50,000.00 = Rp. 600.00
Mandor 0.0125 Oh x Rp. 50,000.00 = Rp. 625.00
Sub Jumlah (2) = Rp. 13,525.00
Jumlah (1) + (2) = Rp. 114,500.30

ED_K@K@#1
RAB 2007
31). 1 m2 Memasang Tegel Porselin 20 x 20 cm, warna

a Bahan
Porselin 20x20 cm warna 25.000 Bh x Rp. 1,800.00 = Rp. 45,000.00
Semen abu-abu 9.300 Kg x Rp. 1,100.00 = Rp. 10,230.00
Pasir pasang 0.018 M3 x Rp. 117,700.00 = Rp. 2,118.60
Semen warna 1.500 Kg x Rp. 4,800.00 = Rp. 7,200.00
Sub Jumlah (1) = Rp. 64,548.60

b Tenaga
Pekerja 0.6000 Oh x Rp. 30,000.00 = Rp. 18,000.00
Tukang batu 0.4500 Oh x Rp. 40,000.00 = Rp. 18,000.00
Kepala tukang 0.0450 Oh x Rp. 50,000.00 = Rp. 2,250.00
Mandor 0.0300 Oh x Rp. 50,000.00 = Rp. 1,500.00
Sub Jumlah (2) = Rp. 39,750.00
Jumlah (1) + (2) = Rp. 104,298.60

32). Memasang 1 buah wastafel

a Bahan
Wastafel 1.000 Bh x Rp. 300,000.00 = Rp. 300,000.00
Perlengkapan 12% x Rp. 36,000.00 = Rp. 4,320.00
Semen abu-abu 6.000 Kg x Rp. 1,100.00 = Rp. 6,600.000
Pasir pasang 0.010 M3 x Rp. 117,700.00 = Rp. 1,177.000
Sub Jumlah (1) = Rp. 312,097.00
b Tenaga
Pekerja 1.2000 Oh x Rp. 30,000.00 = Rp. 36,000.00
Tukang batu 1.4500 Oh x Rp. 40,000.00 = Rp. 58,000.00
Kepala tukang 0.1500 Oh x Rp. 50,000.00 = Rp. 7,500.00
Mandor 0.1000 Oh x Rp. 50,000.00 = Rp. 5,000.00
Sub Jumlah (2) = Rp. 106,500.00
Jumlah (1) + (2) = Rp. 418,597.00

33). Memasang 1 buah bak mandi batu bata volume 0.30 m3

a Bahan
Batu Bata 330.579 bh x Rp. 1,300.00 = Rp. 429,752.07
Semen Portland 120.000 Kg x Rp. 1,100.00 = Rp. 132,000.00
Pasir pasang 0.300 M3 x Rp. 117,700.00 = Rp. 35,310.00
Porselen 11 x 11 cm 360.000 Bh x Rp. 548.78 = Rp. 197,560.98
Semen Warna 6.000 Kg x Rp. 4,800.00 = Rp. 28,800.000
Sub Jumlah (1) = Rp. 823,423.042
b Tenaga
Pekerja 6.000 Oh x Rp. 30,000.00 = Rp. 180,000.00
Tukang batu 3.000 Oh x Rp. 40,000.00 = Rp. 120,000.00
Kepala tukang 0.300 Oh x Rp. 50,000.00 = Rp. 15,000.00
Mandor 0.300 Oh x Rp. 50,000.00 = Rp. 15,000.00
Sub Jumlah (2) = Rp. 330,000.00
Jumlah (1) + (2) = Rp. 1,153,423.042

ED_K@K@#1
RAB 2007
34). Memasang 1 buah kloset jongkok porselen

a Bahan
Kloset Jongkok Porselen 1.000 Bh x Rp. 450,000.00 = Rp. 450,000.00
Semen Portland 6.000 Kg x Rp. 1,100.00 = Rp. 6,600.00
Pasir pasang 0.010 M3 x Rp. 117,700.00 = Rp. 1,177.00
Sub Jumlah (1) = Rp. 457,777.000
b Tenaga
Pekerja 1.000 Oh x Rp. 30,000.00 = Rp. 30,000.00
Tukang batu 1.500 Oh x Rp. 40,000.00 = Rp. 60,000.00
Kepala tukang 1.500 Oh x Rp. 50,000.00 = Rp. 75,000.00
Mandor 0.160 Oh x Rp. 50,000.00 = Rp. 8,000.00
Sub Jumlah (2) = Rp. 173,000.00
Jumlah (1) + (2) = Rp. 630,777.000

35). Memasang 1 buah Floor Drain

a Bahan
Floor Drain 1.000 Bh x Rp. 16,700.00 = Rp. 16,700.00
Sub Jumlah (1) = Rp. 16,700.000
b Tenaga
Pekerja 0.010 Oh x Rp. 30,000.00 = Rp. 300.00
Tukang batu 0.100 Oh x Rp. 40,000.00 = Rp. 4,000.00
Kepala tukang 0.010 Oh x Rp. 50,000.00 = Rp. 500.00
Mandor 0.005 Oh x Rp. 50,000.00 = Rp. 250.00
Sub Jumlah (2) = Rp. 5,050.00
Jumlah (1) + (2) = Rp. 21,750.000

36). Memasang 1 buah kran diameter 3/4" atau 1/2"

a Bahan
Kran Air 1.000 Bh x Rp. 25,000.00 = Rp. 25,000.00
Seal Tape 0.025 Bh x Rp. 8,000.00 200.00
Sub Jumlah (1) = Rp. 25,200.000
b Tenaga
Pekerja 0.0100 Oh x Rp. 30,000.00 = Rp. 300.00
Tukang batu 0.1000 Oh x Rp. 40,000.00 = Rp. 4,000.00
Kepala tukang 0.0100 Oh x Rp. 50,000.00 = Rp. 500.00
Mandor 0.0050 Oh x Rp. 50,000.00 = Rp. 250.00
Sub Jumlah (2) = Rp. 5,050.00
Jumlah (1) + (2) = Rp. 30,250.000

37). 1 m2 Pengecatan tembok baru ( 1 plamir, 1 lapis cat dasar, 2 lapis cat penutup)

a Bahan
Plamir 0.100 Kg x Rp. 9,100.00 = Rp. 910.00
Cat dasar 0.100 Kg x Rp. 22,500.00 = Rp. 2,250.00
Cat penutup 2 x 0.26 Kg x Rp. 12,500.00 = Rp. 3,250.00
Sub Jumlah (1) = Rp. 6,410.00

b Tenaga
Pekerja 0.0200 Oh x Rp. 30,000.00 = Rp. 600.00
Tukang cat 0.0630 Oh x Rp. 40,000.00 = Rp. 2,520.00
Kepala tukang 0.0063 Oh x Rp. 50,000.00 = Rp. 315.00
Mandor 0.0025 Oh x Rp. 50,000.00 = Rp. 125.00
Sub Jumlah (2) = Rp. 3,560.00
Jumlah (1) + (2) = Rp. 9,970.00

ED_K@K@#1
RAB 2007
38). 1 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup

a Bahan
Cat meni 0.200 Kg x Rp. 22,400.00 = Rp. 4,480.00
Plamir 0.150 Kg x Rp. 22,400.00 = Rp. 3,360.00
Cat dasar 0.170 Kg x Rp. 22,500.00 = Rp. 3,825.00
Cat penutup 2 x 0.260 Kg x Rp. 37,500.00 = Rp. 9,750.00
Sub Jumlah (1) = Rp. 21,415.00

b Tenaga
Pekerja 0.0700 Oh x Rp. 30,000.00 = Rp. 2,100.00
Tukang cat 0.0090 Oh x Rp. 40,000.00 = Rp. 360.00
Kepala tukang 0.0060 Oh x Rp. 50,000.00 = Rp. 300.00
Mandor 0.0025 Oh x Rp. 50,000.00 = Rp. 125.00
Sub Jumlah (2) = Rp. 2,885.00
Jumlah (1) + (2) = Rp. 24,300.00

39). 1 m2 Pengecatan permukaan baja lapis seng (galbani) secara manual sistem 1 lapis cat muktahir
dengan tebal 200um

a Bahan
Cat 0.300 Kg x Rp. 22,500.00 = Rp. 6,750.00
Sub Jumlah (1) = Rp. 6,750.00

b Tenaga
Pekerja 0.0060 Oh x Rp. 30,000.00 = Rp. 180.00
Tukang cat 0.0600 Oh x Rp. 40,000.00 = Rp. 2,400.00
Kepala tukang 0.0120 Oh x Rp. 50,000.00 = Rp. 600.00
Mandor 0.0060 Oh x Rp. 50,000.00 = Rp. 300.00
Sub Jumlah (2) = Rp. 3,480.00
Jumlah (1) + (2) = Rp. 10,230.00

40). 1 m2 Pelaburan bidang kayu dengan teak oil

a Bahan
Teak oil 0.360 Ltr x Rp. 21,000.00 = Rp. 7,560.00
Sub Jumlah (1) = Rp. 7,560.00

b Tenaga
Pekerja 0.0400 Oh x Rp. 30,000.00 = Rp. 1,200.00
Tukang cat 0.0630 Oh x Rp. 40,000.00 = Rp. 2,520.00
Kepala tukang 0.0630 Oh x Rp. 50,000.00 = Rp. 3,150.00
Mandor 0.0025 Oh x Rp. 50,000.00 = Rp. 125.00
Sub Jumlah (2) = Rp. 6,995.00
Jumlah (1) + (2) = Rp. 14,555.00

41).1 buah pasang kunci Dua Kali Putar

a Bahan
kunci tanam biasa 1.000 Bh x Rp. 150,000.00 = Rp. 150,000.00
Sub Jumlah (1) = Rp. Rp 150,000.00

b Tenaga
Pekerja 0.0100 Oh x Rp. 30,000.00 = Rp. 300.00
Tukang kayu 0.5000 Oh x Rp. 40,000.00 = Rp. 20,000.00
Kepala tukang 0.0100 Oh x Rp. 50,000.00 = Rp. 500.00
Mandor 0.0050 Oh x Rp. 50,000.00 = Rp. 250.00
Sub Jumlah (2) = Rp. 21,050.00
Jumlah (1) + (2) = Rp. 171,050.00

ED_K@K@#1
RAB 2007
42).1 buah pasang kunci Dua Kali Putar Untuk Kamar Mandi

a Bahan
kunci tanam kamar mandi 1.000 Bh x Rp. 150,000.00 = Rp. 150,000.00
Sub Jumlah (1) = Rp. 150,000.00

b Tenaga
Pekerja 0.0050 Oh x Rp. 30,000.00 = Rp. 150.00
Tukang kayu 0.5000 Oh x Rp. 40,000.00 = Rp. 20,000.00
Kepala tukang 0.0050 Oh x Rp. 50,000.00 = Rp. 250.00
Mandor 0.0025 Oh x Rp. 50,000.00 = Rp. 125.00
Sub Jumlah (2) = Rp. 20,525.00
Jumlah (1) + (2) = Rp. 170,525.00

43).1 buah pasang Grendel

a Bahan
Grendel Ekspagnolet 1.000 Bh x Rp. 25,000.00 = Rp. 25,000.00
Sub Jumlah (1) = Rp. 25,000.00

b Tenaga
Pekerja 0.0050 Oh x Rp. 30,000.00 = Rp. 150.00
Tukang kayu 0.5000 Oh x Rp. 40,000.00 = Rp. 20,000.00
Kepala tukang 0.0050 Oh x Rp. 50,000.00 = Rp. 250.00
Mandor 0.0025 Oh x Rp. 50,000.00 = Rp. 125.00
Sub Jumlah (2) = Rp. 20,525.00
Jumlah (1) + (2) = Rp. 45,525.00

44).1 buah pasang engsel

a Bahan
Engsel 1.0000 Bh x Rp. 11,100.00 = Rp. 11,100.00
Sub Jumlah (1) = Rp. 11,100.00

b Tenaga
Pekerja 0.0150 Oh x Rp. 30,000.00 = Rp. 450.00
Tukang kayu 0.1500 Oh x Rp. 40,000.00 = Rp. 6,000.00
Kepala tukang 0.0150 Oh x Rp. 50,000.00 = Rp. 750.00
Mandor 0.00075 Oh x Rp. 50,000.00 = Rp. 37.50
Sub Jumlah (2) = Rp. 7,237.50
Jumlah (1) + (2) = Rp. 18,337.50

45).1 buah pasang kait angin

a Bahan
Kait angin 1.000 Bh x Rp. 2,700.00 = Rp. 2,700.00
Sub Jumlah (1) = Rp. 2,700.00

b Tenaga
Pekerja 0.015 Oh x Rp. 30,000.00 = Rp. 450.00
Tukang kayu 0.150 Oh x Rp. 40,000.00 = Rp. 6,000.00
Kepala tukang 0.015 Oh x Rp. 50,000.00 = Rp. 750.00
Mandor 0.00075 Oh x Rp. 50,000.00 = Rp. 37.50
Sub Jumlah (2) = Rp. 7,237.50
Jumlah (1) + (2) = Rp. 9,937.50

46). 1 m1 Memasang Pipa Beton, diameter 30 cm - 100 cm

a Bahan
Pipa beton 1.100 Bh x Rp. 133,333.33 = Rp. 146,666.67
Batu bata 454.545 Bh x Rp. 1,300.00 = Rp. 590,909.09
Sement portland 10.300 Bh x Rp. 1,100.00 = Rp. 11,330.00
Pasir pasang 0.061 Bh x Rp. 117,700.00 = Rp. 7,179.70
Pasir urug 0.069 Bh x Rp. 83,300.00 = Rp. 5,747.70
Sub Jumlah (1) = Rp. 761,833.16
b Tenaga
Pekerja 0.380 Oh x Rp. 30,000.00 = Rp. 11,400.00
Tukang batu 0.190 Oh x Rp. 40,000.00 = Rp. 7,600.00
Kepala tukang 0.019 Oh x Rp. 50,000.00 = Rp. 950.00
Mandor 0.019 Oh x Rp. 50,000.00 = Rp. 950.00
Sub Jumlah (2) = Rp. 20,900.00
Jumlah (1) + (2) = Rp. 782,733.16

ED_K@K@#1
RAB 2007
HARGA SATUAN BAHAN DAN UPAH
HARGA
NO NAMA BAHAN SAT SATUAN
(Rp)
1 2 3 4
A. BAHAN LOKAL
1 Tanah urug M³ 65,600.00
2 Pasir Urug M³ 83,300.00
3 Pasir Pasang M³ 117,700.00
4 Pasir Beton M³ 117,700.00
5 Koral beton M³ 211,100.00
6 Batu Kali/belah M³ 117,200.00
7 Batu Bata Merah Bh 1,300.00
8 Balok kelapa M³ 2,500,000.00
9 Balok Kayu Jati,nara,wala,mundi M³ 4,000,000.00
10 Papan Kayu kls II M³ 3,200,000.00
11 Balok kayu kls II M³ 3,000,000.00
12 Papan Bekesting M³ 1,000,000.00
13 Papan Kayu Jati,nara,wala,mundi M³ 4,500,000.00
14 List kaca M' 2,000.00
15 Lis plafond papan kayu kls II uk. 1/6 cm M' 3,000.00
16 Usuk 5/7 Kayu Kls II M³ 1,650,000.00
17 Bambu Btg 10,000.00
18 Ijuk (1 x 1 m) Lbr 10,000.00

ED_K@K@#1
RAB 2007
1 2 3 4
B. BAHAN NON LOKAL
1 Pc @ 40 kg Zak 44,000.00
2 Pc @ 40 kg Kg 1,100.00
3 Semen Warna Kg 4,800.00
4 Paku uk 3 - 5 cm, 5 - 12 Kg 16,900.00
5 Paku uk 2 - 3 cm Kg 22,400.00
6 Paku seng Kg 23,600.00
7 Besi beton Kg 8,800.00
8 Kawat Beton Kg 22,400.00
9 Kaca bening 5 mm M2 140,500.00
10 Teakwood 3 mm Lbr 66,900.00
11 Tripleks lapis aluminium perak uk pintu Lbr 100,300.00
12 Tripleks 9 mm Lbr 130,600.00
13 Tripleks 4 mm Lbr 65,000.00
14 Keramik 30 x 30 cm Bh 6,000.00
15 Kuas Bh 3,300.00
16 Politur Kg 9,100.00
17 Lem kayu Kg 33,400.00
18 Plamur tembok Kg 9,100.00
19 Plamur kayu / dempul jadi Kg 22,400.00
20 Cat tembok Kg 12,500.00
21 Cat mengkilap Kg 37,500.00
22 Cat dasar Kg 22,500.00
23 Minyak cat Ltr 21,000.00
24 Minyak bekisting Ltr 6,800.00
25 Menie seng Kg 22,400.00
26 Seng plat Bjls. 0,20/40 cm utk bubungan M' 21,000.00
27 Seng gelombang Bjls. 0,20 Lbr 41,600.00
28 Amplas Lbr 3,300.00
29 Engsel Pintu Bh 6,900.00
30 Engsel jendela Bh 5,000.00
31 Kapur Padam M³ 200,000.00

ED_K@K@#1
RAB 2007
HARGA
NO NAMA BAHAN SAT SATUAN
(Rp)
1 2 3 4
31 Grendel pintu Panjang Bh 11,100.00
32 Grendel jendela Bh 5,500.00
33 Kunci Tanam Pintu Uk. Besar 2 x Putar Psg 150,000.00
34 Besi Angker/Neut dook Bh 8,300.00
35 Beugel U Bulat Bh 19,500.00
36 Beugel U Plat Bh 19,500.00
37 Besi Strip Kg 11,100.00
38 Baut di 12" Panjang 40 cm Bh 13,900.00
39 Baut di 12" Panjang 25 cm Bh 10,000.00
40 Baut di 12" Panjang 10 cm Bh 5,500.00
41 Angker Baut di 12" Panjang 25 cm Bh 13,900.00
42 Kait angin Bh 2,700.00
43 Closed jongkok Bh 450,000.00
44 Floordrain Bh 16,700.00
45 Pipa PVC dia 4" M' 44,600.00
46 Pipa PVC dia 2" M' 16,700.00
47 Elbow PVC dia 4" Bh 22,300.00
48 Elbow PVC dia 2" Bh 11,100.00
49 Pipa Hawa 2" Bh 167,200.00
50 Wastafel Bh 300,000.00
51 Porselin 20 / 20 cm Bh 1,800.00
52 Porselin 11 / 11 cm Bh 548.78
53 Kran air 1/2" Bh 25,000.00
54 Slep Tip Bh 8,000.00
55 Pipa Gip Dia 4 " Medium B M' 133,333.33

C. UPAH KERJA
1 Tukang batu/kayu/cat o/h 40,000.00
2 Kepala Tukang o/h 50,000.00
3 Pekerja o/h 30,000.00
4 Mandor o/h 50,000.00

ED_K@K@#1
RAB 2007
AN DAN UPAH

KETERANGAN

Harga di Lokasi pekerjaan


sudah termasuk
semua jenis pajak

ED_K@K@#1
RAB 2007
5

ED_K@K@#1
RAB 2007
KETERANGAN

Harga di Lokasi pekerjaan


sudah termasuk
semua jenis pajak

8 (Delapan)
Jam kerja

ED_K@K@#1
RAB 2007
RENCANA ANGGARAN BIAYA
(R A B)
Volume Satuan Bahan Satuan Pekerja Harga Satuan Total Harga Bahan Total Upah Pekerja Total Harga
No. Jenis Pekerjaan Sat. Bobot
(I) ( II ) ( III ) ( II + III ) ( I x II ) ( I x III ) ( I x ( II + II ))
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lahan m2 216.000 Rp - Rp 1,000.00 Rp 1,000.00 Rp - Rp 216,000.00 Rp 216,000.00 0.076
2 Pemasangan Bowplank + Vitset m1 51.000 Rp 27,138.00 Rp 7,500.00 Rp 34,638.00 Rp 1,384,038.00 Rp 382,500.00 Rp 1,766,538.00 0.625
3 Penyediaan Air Kerja LS 1.000 Rp 300,000.00 Rp - Rp 300,000.00 Rp 300,000.00 Rp - Rp 300,000.00 0.106
TOTAL = Rp 1,684,038.00 Rp 598,500.00 Rp 2,282,538.00 0.807
II. PEKERJAAN TANAH DAN URUGAN
1 Galian Tanah Pondasi m3 66.960 Rp - Rp 40,600.00 Rp 40,600.00 Rp - Rp 2,718,576.00 Rp 2,718,576.00 0.961
2 Urugan Tanah Kembali m3 16.740 Rp - Rp 4,810.00 Rp 4,810.00 Rp - Rp 80,519.40 Rp 80,519.40 0.028
3 Urugan Pasir di Bawah Pondasi m3 7.685 Rp 99,960.00 Rp 80,000.31 Rp 179,960.31 Rp 768,192.60 Rp 614,802.38 Rp 1,382,994.98 0.489
4 Urugan Pasir Peninggi Lantai m3 15.700 Rp 99,960.00 Rp 80,000.31 Rp 179,960.31 Rp 1,569,372.00 Rp 1,256,004.87 Rp 2,825,376.87 0.999
TOTAL = Rp 2,337,564.60 Rp 4,669,902.65 Rp 7,007,467.25 2.478
III. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pekerjaan Pasangan batu kosong m3 15.370 Rp 165,630.00 Rp 42,900.00 Rp 208,530.00 Rp 2,545,733.10 Rp 659,373.00 Rp 3,205,106.10 1.133
2 Pasangan Pondasi Batu Kali (1 pc : 5 psr) m3 39.487 Rp 342,548.80 Rp 75,750.00 Rp 418,298.80 Rp 13,526,224.47 Rp 2,991,140.25 Rp 16,517,364.72 5.840
3 Pasangan Tembok Trasraam (1 pc : 3 psr) m2 36.475 Rp 111,515.00 Rp 14,850.00 Rp 126,365.00 Rp 4,067,509.63 Rp 541,653.75 Rp 4,609,163.38 1.630
4 Pasangan Tembok Biasa (1 pc : 5 psr) m2 337.843 Rp 106,944.50 Rp 14,850.00 Rp 121,794.50 Rp 36,130,450.71 Rp 5,016,968.55 Rp 41,147,419.26 14.548
5 Plesteran Tembok Trasraam (1 pc : 3 psr) m2 31.250 Rp 9,364.30 Rp 13,250.00 Rp 22,614.30 Rp 292,634.38 Rp 414,062.50 Rp 706,696.88 0.250
6 Plesteran Tembok Biasa (1 pc : 5 psr) m2 361.250 Rp 7,341.40 Rp 13,250.00 Rp 20,591.40 Rp 2,652,080.75 Rp 4,786,562.50 Rp 7,438,643.25 2.630
7 Plesteran Pondasi Tepi Luar (1 pc : 4 psr) m2 13.050 Rp 8,074.00 Rp 13,250.00 Rp 21,324.00 Rp 105,365.70 Rp 172,912.50 Rp 278,278.20 0.098
8 Acian Tembok m2 374.300 Rp 2,902.50 Rp 13,250.00 Rp 16,152.50 Rp 1,086,405.75 Rp 4,959,475.00 Rp 6,045,880.75 2.138
TOTAL = Rp 60,406,404.48 Rp 19,542,148.05 Rp 79,948,552.53 28.267
IV. PEKERJAAN BETON
1 Cor Beton Sloof (1pc : 2psr : 3krl) m3 2.295 Rp 2,482,902.16 Rp 328,686.80 Rp 2,811,588.96 Rp 5,698,260.46 Rp 754,336.21 Rp 6,452,596.66 2.281
2 Cor Beton Kolom Praktis (1pc : 2psr : 3krl) m3 2.310 Rp 3,229,031.20 Rp 421,256.00 Rp 3,650,287.20 Rp 7,459,062.07 Rp 973,101.36 Rp 8,432,163.43 2.981
3 Cor Beton Kolom Teras (1pc : 2psr : 3krl) m3 0.280 Rp 3,443,722.16 Rp 433,436.80 Rp 3,877,158.96 Rp 964,242.20 Rp 121,362.30 Rp 1,085,604.51 0.384
4 Cor Beton Ringbalk (1pc : 2psr : 3krl) m3 2.900 Rp 2,482,902.16 Rp 328,686.80 Rp 2,811,588.96 Rp 7,200,416.26 Rp 953,191.72 Rp 8,153,607.98 2.883
6 Cor Meja Beton (1pc : 2psr : 3krl) m3 0.105 Rp 484,661.00 Rp 64,750.00 Rp 549,411.00 Rp 50,889.41 Rp 6,798.75 Rp 57,688.16 0.020
TOTAL = Rp 21,372,870.40 Rp 2,808,790.34 Rp 24,181,660.74 8.550
V. PEKERJAAN KAYU DAN KACA
1 Pasangan Kayu Kusen Klas I m3 0.659 Rp 4,400,000.00 Rp 1,095,000.00 Rp 5,495,000.00 Rp 2,899,600.00 Rp 721,605.00 Rp 3,621,205.00 1.280
2 Pasangan Daun Pintu Panil Kayu m2 9.600 Rp 180,000.00 Rp 145,000.00 Rp 325,000.00 Rp 1,728,000.00 Rp 1,392,000.00 Rp 3,120,000.00 1.103
4 Pas. Daun Pintu Double Teacwood lapis Alluminium m2 2.800 Rp 166,797.68 Rp 109,500.00 Rp 276,297.68 Rp 467,033.50 Rp 306,600.00 Rp 773,633.50 0.274
5 Pas. Daun Jendela Kaca dan Ventilasi 3 mm m2 29.940 Rp 312,050.00 Rp 123,237.50 Rp 435,287.50 Rp 9,342,777.00 Rp 3,689,730.75 Rp 13,032,507.75 4.608
6 Pas. Kaca Polos (Kaca Silang) m2 3.240 Rp 154,550.00 Rp 7,237.50 Rp 161,787.50 Rp 500,742.00 Rp 23,449.50 Rp 524,191.50 0.185
7 Pas. Kayu Kap dan Gording m3 3.310 Rp 2,930,020.00 Rp 670,000.00 Rp 3,600,020.00 Rp 9,698,366.20 Rp 2,217,700.00 Rp 11,916,066.20 4.213
8 Pasangan Lisplank Papan m1 106.600 Rp 28,534.00 Rp 10,000.00 Rp 38,534.00 Rp 3,041,724.40 Rp 1,066,000.00 Rp 4,107,724.40 1.452
TOTAL = Rp 27,678,243.10 Rp 9,417,085.25 Rp 37,095,328.35 13.115
VI. PEKERJAAN ATAP DAN PLAFOND
1 Pas. Atap Seng BJLS 0.30 mm m2 323.400 Rp 29,592.00 Rp 6,600.00 Rp 36,192.00 Rp 9,570,052.80 Rp 2,134,440.00 Rp 11,704,492.80 4.138
2 Pas. Atap Bubungan Seng Licin 0.30 mm m1 37.200 Rp 13,376.00 Rp 8,100.00 Rp 21,476.00 Rp 497,587.20 Rp 301,320.00 Rp 798,907.20 0.282
3 Pas. Plafond Tripleks 3 mm & Rangka m2 78.500 Rp 64,392.00 Rp 14,875.00 Rp 79,267.00 Rp 5,054,772.00 Rp 1,167,687.50 Rp 6,222,459.50 2.200

ED_K@K@#1
RAB 2007
4 Pas. List Penutup Plafond (Berprofil) m1 153.000 Rp 3,150.00 Rp 1,620.00 Rp 4,770.00 Rp 481,950.00 Rp 247,860.00 Rp 729,810.00 0.258
TOTAL = Rp 15,604,362.00 Rp 3,851,307.50 Rp 19,455,669.50 6.879

ED_K@K@#1
RAB 2007
VII. PEKERJAAN LANTAI
1 Pasangan Tegel Keramik 30/30 m2 72.500 Rp 87,443.10 Rp 13,525.00 Rp 100,968.10 Rp 6,339,624.75 Rp 980,562.50 Rp 7,320,187.25 2.588
2 Pasangan Lantai Keramik wc / km 20 / 20 m2 6.000 Rp 100,975.30 Rp 13,525.00 Rp 114,500.30 Rp 605,851.80 Rp 81,150.00 Rp 687,001.80 0.243
4 Pasangan Dinding Keramik 20 / 25 m2 16.350 Rp 64,548.60 Rp 39,750.00 Rp 104,298.60 Rp 1,055,369.61 Rp 649,912.50 Rp 1,705,282.11 0.603
TOTAL = Rp 8,000,846.16 Rp 1,711,625.00 Rp 9,712,471.16 3.434
VIII PEKERJAAN INSTALASI LISTRIK DAN AIR
1 Pasangan Titik Lampu Buah 11 Rp - Rp 17,500.00 Rp 17,500.00 Rp - Rp 192,500.00 Rp 192,500.00 0.068
2 Pasangan Lampu TL 40 Watt Buah 2 Rp 64,000.00 Rp - Rp 64,000.00 Rp 128,000.00 Rp - Rp 128,000.00 0.045
3 Pasangan Lampu Pijar 24 Watt Buah 6 Rp 64,000.00 Rp - Rp 3,900.00 Rp 384,000.00 Rp - Rp 23,400.00 0.008
4 Pasangan Lampu Pijar 25 Watt Buah 4 Rp 3,250.00 Rp - Rp 3,250.00 Rp 13,000.00 Rp - Rp 13,000.00 0.005
5 Pasangan Saklar Tunggal Buah 2 Rp 10,750.00 Rp - Rp 10,750.00 Rp 21,500.00 Rp - Rp 21,500.00 0.008
6 Pasangan SaklarGanda Buah 5 Rp 14,250.00 Rp - Rp 14,250.00 Rp 71,250.00 Rp - Rp 71,250.00 0.025
7 Pasangan Stop Kontak Buah 6 Rp 12,750.00 Rp - Rp 12,750.00 Rp 76,500.00 Rp - Rp 76,500.00 0.027
8 Pasangan Sekring Cast Buah 1 Rp 14,000.00 Rp - Rp 14,000.00 Rp 14,000.00 Rp - Rp 14,000.00 0.005
9 Pasangan Arde Pembumian Buah 1 Rp 100,000.00 Rp - Rp 100,000.00 Rp 100,000.00 Rp - Rp 100,000.00 0.035
10 Pasangan Wastafel Buah 1 Rp 312,097.00 Rp 106,500.00 Rp 418,597.00 Rp 312,097.00 Rp 106,500.00 Rp 418,597.00 0.148
11 Pasangan Bak Air Porselin Buah 2 Rp 823,423.04 Rp 330,000.00 Rp 1,153,423.04 Rp 1,646,846.08 Rp 660,000.00 Rp 2,306,846.08 0.816
12 Pasangan Closed Jongkok Porselin Buah 2 Rp 457,777.00 Rp 173,000.00 Rp 630,777.00 Rp 915,554.00 Rp 346,000.00 Rp 1,261,554.00 0.446
13 Pasangan Septic Tank dan Peresapan Buah 2 Rp 7,500,000.00 Rp - Rp 7,500,000.00 Rp 15,000,000.00 Rp - Rp 15,000,000.00 5.303
14 Pasangan Instalasi Air Bersih LS 1 Rp - Rp 600,000.00 Rp 600,000.00 Rp - Rp 600,000.00 Rp 600,000.00 0.212
15 Pasangan Instalasi Air Kotor LS 1 Rp - Rp 600,000.00 Rp 600,000.00 Rp - Rp 600,000.00 Rp 600,000.00 0.212
16 Pasangan Floor Drain Buah 2 Rp 16,700.00 Rp 5,050.00 Rp 21,750.00 Rp 33,400.00 Rp 10,100.00 Rp 43,500.00 0.015
17 Pasangan Kran Air Buah 3 Rp 25,200.00 Rp 5,050.00 Rp 30,250.00 Rp 75,600.00 Rp 15,150.00 Rp 90,750.00 0.032
TOTAL = Rp 18,791,747.08 Rp 2,530,250.00 Rp 20,961,397.08 7.411
IX. PEKERJAAN FINISHING
1 Cat Tembok m2 374.300 Rp 6,410.00 Rp 3,560.00 Rp 9,970.00 Rp 2,399,263.00 Rp 1,332,508.00 Rp 3,731,771.00 1.319
2 Cat Plafond m2 78.500 Rp 21,415.00 Rp 2,885.00 Rp 24,300.00 Rp 1,681,077.50 Rp 226,472.50 Rp 1,907,550.00 0.674
3 Cat Kayu m2 36.858 Rp 21,415.00 Rp 2,885.00 Rp 24,300.00 Rp 789,314.07 Rp 106,335.33 Rp 895,649.40 0.317
4 Cat Seng m2 323.400 Rp 6,750.00 Rp 3,480.00 Rp 10,230.00 Rp 2,182,950.00 Rp 1,125,432.00 Rp 3,308,382.00 1.170
5 Teak Oil m2 19.200 Rp 7,560.00 Rp 6,995.00 Rp 14,555.00 Rp 145,152.00 Rp 134,304.00 Rp 279,456.00 0.099
TOTAL = Rp 7,197,756.57 Rp 2,925,051.83 Rp 10,122,808.40 3.579
X. PEKRJAAN PENGGANTUNG DAN PENGUNCI
1 Pasangan Kunci Tanam 2 kali putar Buah 6 Rp 150,000.00 Rp 21,050.00 Rp 171,050.00 Rp 900,000.00 Rp 126,300.00 Rp 1,026,300.00 0.363
2 Pasangan Grendel pintu Buah 2 Rp 11,100.00 Rp - Rp 11,100.00 Rp 22,200.00 Rp - Rp 22,200.00 0.008
3 Pasangan Grendel jendela Buah 8 Rp 5,500.00 Rp - Rp 5,500.00 Rp 44,000.00 Rp - Rp 44,000.00 0.016
4 Pasangan Engsel pintu Zet 9 Rp 11,100.00 Rp 7,237.50 Rp 18,337.50 Rp 99,900.00 Rp 65,137.50 Rp 165,037.50 0.058
5 Pasangan Engsel Zet 30 Rp 11,100.00 Rp 7,237.50 Rp 18,337.50 Rp 333,000.00 Rp 217,125.00 Rp 550,125.00 0.195
6 Pasangan Kait Angin Zet 60 Rp 2,700.00 Rp 2,700.00 Rp 9,937.50 Rp 162,000.00 Rp 162,000.00 Rp 596,250.00 0.211
7 Pasangan Anker Doc Buah 60 Rp 8,300.00 Rp - Rp 8,300.00 Rp 498,000.00 Rp - Rp 498,000.00 0.176
8 Pasangan Mur, Baut LS 117 Rp 5,500.00 Rp - Rp 5,500.00 Rp 643,500.00 Rp - Rp 643,500.00 0.228
9 Pasangan Beughel U Buah 3 Rp 19,500.00 Rp - Rp 19,500.00 Rp 58,500.00 Rp - Rp 58,500.00 0.021
10 Pasangan Beugel U Bulat Buah 6 Rp 19,500.00 Rp - Rp 19,500.00 Rp 117,000.00 Rp - Rp 117,000.00 0.041

TOTAL = Rp 2,878,100.00 Rp 570,562.50 Rp 3,720,912.50 1.316


XI. PEKERJAAN LAIN - LAIN 2.631
1 Pasangan Saluran Keliling Bangunan ( Buis Beton U 30 cm) m1 87.000 Rp 761,833.16 Rp 20,900.00 Rp 782,733.16 Rp 66,279,484.71 Rp 1,818,300.00 Rp 68,097,784.71 24.077
2 Pembersihan kembali LS 1.000 Rp - Rp 250,000.00 Rp 250,000.00 Rp - Rp 250,000.00 Rp 250,000.00 0.088
TOTAL = Rp 66,279,484.71 Rp 2,068,300.00 Rp 68,347,784.71 24.165

ED_K@K@#1
RAB 2007
REKAPITULASI
HARGA BAHAN HARGA UPAH TOTAL HARGA BOBOT
NO URAIAN PEKERJAAN
I II I + II (%)
I. Pekerjaan Persiapan Rp 1,684,038.00 Rp 598,500.00 Rp 2,282,538.00 0.807

II. Pekerjaan Tanah dan Urugan Rp 2,337,564.60 Rp 4,669,902.65 Rp 7,007,467.25 2.478

III. Pekerjaan Pasangan dan Plesteran Rp 60,406,404.48 Rp 19,542,148.05 Rp 79,948,552.53 28.267


IV. Pekerjaan Beton Rp 21,372,870.40 Rp 2,808,790.34 Rp 24,181,660.74 8.550

V. Pekerjaan Kayu dan Kaca Rp 27,678,243.10 Rp 9,417,085.25 Rp 37,095,328.35 13.115

VI. Pekerjaan Atap dan Plafond Rp 15,604,362.00 Rp 3,851,307.50 Rp 19,455,669.50 6.879

VII. Pekerjaan Lantai Rp 8,000,846.16 Rp 1,711,625.00 Rp 9,712,471.16 3.434

VIII. Pekerjaan Instalasi Listrik dan Air Rp 18,791,747.08 Rp 2,530,250.00 Rp 20,961,397.08 7.411

IX. Pekerjaan Finishing Rp 7,197,756.57 Rp 2,925,051.83 Rp 10,122,808.40 3.579

X. Pekerjaan Penggantung dan Pengunci Rp 2,878,100.00 Rp 570,562.50 Rp 3,720,912.50 1.316

XI. Pekerjaan Lain - Lain Rp 66,279,484.71 Rp 2,068,300.00 Rp 68,347,784.71 24.165


Total Rp 232,231,417.11 Rp 50,693,523.12 Rp 282,836,590.23
100.000
PPN 10 % Rp 23,223,141.71 Rp 5,069,352.31 Rp 28,283,659.02
Jumlah Rp 255,454,558.82 Rp 55,762,875.43 Rp 311,120,249.25
Dibulatkan Rp 312,000,000.00
TERBILANG = # TIGA RATUS DUA BELAS JUTA RUPIAH #

Kupang ...................................................
MENGETAHUI
Dosen Pembinbing Mata Kulia Dibuat Oleh
RAB

ADHE DHEKU,Spd SON T. DAKAPULING


Nim. 080 111 0589

ED_K@K@#1
RAB 2007
TIME SCHEDULLE & KURVA S

Bobot MINGGU KE
No. Jenis Pekerjaan
% 1 2 3 4 5 6 7 8 9 10 11 12 13 100
#REF!

I PEKERJAAN PERSIAPAN
1 Pembersihan Lahan 0.076 0.076
2 Pemasangan Bowplank + Vitset 0.625 0.625
3 Penyediaan Air Kerja 0.106 0.027 0.045 0.055
II PEKERJAAN TANAH DAN URUGAN
1 Galian Tanah Pondasi 0.961 0.961
2 Urugan Tanah Kembali 0.028 0.013 0.016
3 Urugan Pasir di Bawah Pondasi 0.489 0.489 90
4 Urugan Pasir Peninggi Lantai 0.999 0.382 0.617
III PEKERJAAN PASANGAN DAN PLESTERAN
1 Pekerjaan Pasangan batu kosong 1.133 1.133
2 Pasangan Pondasi Batu Kali (1 pc : 5 psr) 5.840 1.939 3.901
3 Pasangan Tembok Trasraam (1 pc : 3 psr) 1.630 1.061 0.569
4 Pasangan Tembok Biasa (1 pc : 5 psr) 14.548 3.146 2.154 0.477
5 Plesteran Tembok Trasraam (1 pc : 3 psr) 0.250 0.114 0.496
6 Plesteran Tembok Biasa (1 pc : 5 psr) 2.630 0.671 1.959 80
7 Plesteran Pondasi Tepi Luar (1 pc : 4 psr) 0.098 0.098
8 Acian Tembok 2.138 0.410 1.600 1.329 0.150
IV PEKERJAAN BETON
1 Cor Beton Sloof (1pc : 2psr : 3krl) 2.281 0.705 0.737 0.840
2 Cor Beton Kolom Praktis (1pc : 2psr : 3krl) 2.981 0.559 1.154 0.572
3 Cor Beton Kolom Teras (1pc : 2psr : 3krl) 0.384 0.384
4 Cor Beton Ringbalk (1pc : 2psr : 3krl) 2.883 0.115 1.067 1.931
0.000
70
6 Cor Beton Neut (1pc : 3psr : 5krl) 0.020 0.020
V PEKERJAAN KAYU DAN KACA
1 Pasangan Kayu Kusen Klas I 1.280 0.465 0.102 0.713
2 Pasangan Daun Pintu Panil Kayu 1.103 1.103
3 Pas. Daun Pintu Double Teacwood 3 mm #REF! #REF!
4 Pas. Daun Pintu Double Teacwood 3 mm lapis Seng 0.274 0.274
5 Pas. Daun Jendela Kaca dan Ventilasi 3 mm 4.608 3.219 1.183
6 Pas. Kaca Polos (Kaca Silang) 0.185 0.185
60
7 Pas. Kayu Kap dan Gording 4.213 2.134 2.327 2.271
8 Pasangan Lisplank Papan 1.452 1.060 0.431

50
60

VI PEKERJAAN ATAP DAN PLAFOND


1 Pas. Atap Seng BJLS 0.30 mm 4.138 0.881 1.800 1.882
2 Pas. Atap Bubungan Seng Licin 0.30 mm 0.282 0.282
3 Pas. Plafond Tripleks 3 mm & Rangka 2.200 1.054 0.416 0.730
4 Pas. List Penutup Plafond (Berprofil) 0.258 0.824 0.065
VII PEKERJAAN LANTAI
50
1 Pasangan Ubin Keramik 30/30 2.588 1.664 1.374 0.078
2 Pasangan Ubin Mozaik 30/30 0.243 0.243
3 Pasangan Tegel Porselen 20/20 #REF! #REF! #REF!
4 Pasangan Plint Keramik 10/20 0.603 0.320 0.283
VIII PEKERJAAN INSTALASI LISTRIK & AIR
1 Pasangan Titik Lampu 0.068 0.089 0.035
2 Pasangan Lampu TL 40 Watt 0.045 0.045
3 Pasangan Lampu Pijar 40 Watt 0.008 0.008
4 Pasangan Lampu Pijar 25 Watt 0.005 0.005 40

5 Pasangan Saklar Tunggal 0.008 0.008


6 Pasangan Saklar Ganda 0.025 0.025
7 Pasangan Stop Kontak 0.027 0.027
8 Pasangan Sekring Cast 0.005 0.005
9 Pasangan Arde Pembumian 0.035 0.035
10 Pasangan Wastafel 0.148 0.148
11 Pasangan Bak Mandi Batu Bata 0.816 0.792 0.024
12 Pasangan Closed Jongkok Porselin 0.446 0.446 30

13 Pasangan Septic Tank dan Peresapan 5.303 1.419 1.925 0.748 1.856 0.143
14 Pasangan Instalasi Air Bersih 0.212 0.053 0.084 0.075
15 Pasangan Instalasi Air Kotor 0.212 0.212
16 Pasangan Floor Drain 0.015 0.015
17 Pasangan Kran Air 0.032 0.032
IX PEKERJAAN FINISHING
1 Cat Tembok 1.319 0.454 1.845 0.296
2 Cat Plafond 0.674 0.674 20
3 Cat Kayu 0.317 0.063 0.190 0.063
4 Cat Seng 1.170 0.819 0.351
5 Teak Oil 0.099 0.099
X PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pasangan Kunci Tanam Biasa 0.363 0.363
2 Pasangan Kunci KM/ WC 0.008 0.008
3 Pasangan Grendel 0.016 0.016
4 Pasangan Engsel 0.195 0.775 0.039 10
5 Pasangan Kait Angin 0.211 0.211
6 Pasangan Anker Doc 0.176 0.024 0.023 0.341
7 Pasangan Mur, Baut 0.228 0.080 0.148
8 PasanganBeughel U 0.021 0.010 0.010
XI PEKERJAAN LAIN - LAIN
1 Pasangan Saluran Keliling Bangunan (Buis Beton U 30 cm) 24.077 24.077
2 Pembersihan Kembali 0.088 0.088
Parsil #REF! 1.742 5.725 7.429 6.464 7.539 10.347 11.954 10.826 9.156 8.428 #REF! #REF! 3.305 0
RENCANA Kumulatif 0.000 1.742 7.467 14.896 21.360 28.898 39.245 51.199 62.025 71.181 79.609 #REF! #REF! #REF!
0
ANALISA TENAGA KERJA

I. PEKERJAAN PERSIAPAN
1 m1 Pemasangan Bowplank
Pekerja = 0.100 x 51.000 / 6 = 0.850 orang
Tukang kayu = 0.100 x 51.000 / 6 = 0.850 orang
Kepala tukang = 0.01 x 51.000 / 6 = 0.085 orang
Mandor = 0.0050 x 51.000 / 6 = 0.043 orang
TOTAL :
pekerja = 0.8500 orang
tukang kayu = 0.8500 orang
kepala tukang = 0.0850 orang
mandor = 0.0425 orang
II. PEKERJAAN TANAH DAN URUGAN
1 Galian Tanah pondasi
pekerja = 1.2500 x 66.960 / 6 = 13.950 orang
mandor = 0.0620 x 66.960 / 6 = 0.692 orang
2 Urugan Tanah Kembali
pekerja = 0.1920 x 16.740 / 6 x 2 = 1.071 orang
mandor = 0.0190 x 16.740 / 6 x 2 = 0.106 orang
3 Urugan Pasir Di Bawah Pondasi
pekerja = 0.300 x 7.685 / 6 = 0.384 orang
mandor = 0.010 x 7.685 / 6 = 0.013 orang
4 Urugan Pasir Peninggi Lantai
pekerja = 0.3000 x 15.700 / 6 x 2 = 1.570 orang
mandor = 0.0100 x 15.700 / 6 x 2 = 0.052 orang
TOTAL :
pekerja = 17.826 orang
mandor = 0.906 orang

III. PEKERJAAN PASANGAN DAN PLESTERAN


1 1 m3 Pasangan Aanstamping
pekerja = 0.7800 x 15.370 / 6 = 1.998 orang
Tukang batu = 0.3900 x 15.370 / 6 = 0.999 orang
Kepala tukang = 0.0390 x 15.370 / 6 = 0.100 orang
mandor = 0.0390 x 15.370 / 6 = 0.100 orang
2 1 m3 Pasangan Pondasi Batu Karang (1pc : 5psr)
pekerja = 1.5000 x 39.487 / 6 x 2 = 19.744 orang
tukang batu = 0.6000 x 39.487 / 6 x 2 = 7.897 orang
kepala tukang = 0.0600 x 39.487 / 6 x 2 = 0.790 orang
mandor = 0.0750 x 39.487 / 6 x 2 = 0.987 orang
3 1 m3 Pasangan Tembok Trasraam (1pc : 3psr)
pekerja = 0.3200 x 38.544 / 6 x 2 = 4.111 orang
tukang batu = 0.1000 x 38.544 / 6 x 2 = 1.285 orang
kepala tukang = 0.0100 x 38.544 / 6 x 2 = 0.128 orang
mandor = 0.0150 x 38.544 / 6 x 2 = 0.193 orang
4 1 m3 Pasangan Tembok Biasa (1pc : 5psr)
pekerja = 0.3200 x 337.843 / 6 x 3 = 54.055 orang
tukang batu = 0.1000 x 337.843 / 6 x 3 = 16.892 orang
kepala tukang = 0.0100 x 337.843 / 6 x 3 = 1.689 orang
mandor = 0.0150 x 337.843 / 6 x 3 = 2.534 orang
5 1 m2 Plesteran Tembok Trasraam (1pc : 3psr)
pekerja = 0.2000 x 31.250 / 6 x 2 = 2.083 orang
tukang batu = 0.1500 x 31.250 / 6 x 2 = 1.563 orang
kepala tukang = 0.0150 x 31.250 / 6 x 2 = 0.156 orang
mandor = 0.0100 x 31.250 / 6 x 2 = 0.104 orang
6 1 m2 Plesteran Tembok Biasa (1pc : 5psr)
pekerja = 0.2000 x 361.250 / 6 x 2 = 24.083 orang
tukang batu = 0.1500 x 361.250 / 6 x 2 = 18.063 orang
kepala tukang = 0.0150 x 361.250 / 6 x 2 = 1.806 orang
mandor = 0.0100 x 361.250 / 6 x 2 = 1.204 orang
7 1 m2 Plesteran Pondasi Tepi Luar (1pc : 4psr)
pekerja = 0.2000 x 13.050 / 6 = 0.435 orang
tukang batu = 0.1500 x 13.050 / 6 = 0.326 orang
kepala tukang = 0.0150 x 13.050 / 6 = 0.033 orang
mandor = 0.0100 x 13.050 / 6 = 0.022 orang
8 1 m2 Acian Tembok
pekerja = 0.2000 x 374.300 / 6 x 4 = 49.907 orang
tukang batu = 0.1500 x 374.300 / 6 x 4 = 37.430 orang
kepala tukang = 0.0150 x 374.300 / 6 x 4 = 3.743 orang
mandor = 0.0100 x 374.300 / 6 x 4 = 2.495 orang

TOTAL :
pekerja = 154.4370 orang
tukang batu = 83.5555 orang
kepala tukang = 8.3456 orang
mandor = 7.6173 orang

IV. PEKERJAAN BETON :


1 1 m3 Pasangan Beton Sloof (1pc : 2psr : 3krl)
pekerja = 4.8500 x 2.295 / 6 x 3 = 5.565 orang
tukang batu = 0.3500 x 2.295 / 6 x 3 = 0.402 orang
tukang kayu = 1.5600 x 2.295 / 6 x 3 = 1.790 orang
tukang besi = 1.4000 x 2.295 / 6 x 3 = 1.607 orang
kepala tukang = 0.3310 x 2.295 / 6 x 3 = 0.380 orang
mandor = 0.1700 x 2.295 / 6 x 3 = 0.195 orang
2 1 m3 Pasangan Beton Kolom Praktis (1pc : 2psr : 3krl)
pekerja = 0.4000 x 2.310 / 6 x 3 = 0.462 orang
tukang batu = 0.3500 x 2.310 / 6 x 3 = 0.404 orang
tukang kayu = 3.3000 x 2.310 / 6 x 3 = 3.812 orang
tukang besi = 2.1000 x 2.310 / 6 x 3 = 2.426 orang
kepala tukang = 0.5700 x 2.310 / 6 x 3 = 0.658 orang
mandor = 0.2500 x 2.310 / 6 x 3 = 0.289 orang
3 1 m3 Pasangan Beton Kolom Teras (1pc : 2psr : 3krl)
pekerja = 0.4000 x 0.280 / 6 = 0.019 orang
tukang batu = 0.3500 x 0.280 / 6 = 0.016 orang
tukang kayu = 3.3000 x 0.280 / 6 = 0.154 orang
tukang besi = 2.1000 x 0.280 / 6 = 0.098 orang
kepala tukang = 0.5700 x 0.280 / 6 = 0.027 orang
mandor = 0.2500 x 0.280 / 6 = 0.012 orang
4 1 m3 Pasangan Beton Ringbalk (1pc : 2psr : 3krl)
pekerja = 4.8500 x 2.900 / 6 x 3 = 7.033 orang
tukang batu = 0.3500 x 2.900 / 6 x 3 = 0.508 orang
tukang kayu = 1.5600 x 2.900 / 6 x 3 = 2.262 orang
tukang besi = 1.4000 x 2.900 / 6 x 3 = 2.030 orang
kepala tukang = 0.3310 x 2.900 / 6 x 3 = 0.480 orang
mandor = 0.1700 x 2.900 / 6 x 3 = 0.247 orang
5 1 m3 Pasangan Beton Meja Dapur (1pc : 2psr : 3krl)
pekerja = 5.6000 x 0.00 / 6 = 0.000 orang
tukang batu = 0.3500 x 0.000 / 6 = 0.000 orang
tukang kayu = 2.3000 x 0.000 / 6 = 0.000 orang
tukang besi = 1.4000 x 0.000 / 6 = 0.000 orang
kepala tukang = 0.4050 x 0.000 / 6 = 0.000 orang
mandor = 0.2020 x 0.000 / 6 = 0.000 orang
6 1 m3 Pasangan Beton Neut (1pc : 2psr : 3krl)
pekerja = 1.6500 x 0.105 / 6 = 0.029 orang
tukang batu = 0.2500 x 0.105 / 6 = 0.00438 orang
kepala tukang = 0.0250 x 0.105 / 6 = 0.00044 orang
mandor = 0.0800 x 0.105 / 6 = 0.00140 orang

TOTAL :
pekerja = 13.1074 orang
tukang batu = 1.3341 orang
tukang kayu = 8.0176 orang
tukang besi = 6.1600 orang
kepala tukang = 1.5447 orang
mandor = 0.7420 orang

V. PEKERJAAN KAYU DAN KACA :


1 1 m3 Pasangan Kayu Kusen Klas I (Bayam)
pekerja = 6.0000 x 0.659 / 6 x 3 = 1.977 orang
tukang kayu = 20.0000 x 0.659 / 6 x 3 = 6.590 orang
kepala tukang = 2.0000 x 0.659 / 6 x 3 = 0.659 orang
mandor = 0.3000 x 0.659 / 6 x 3 = 0.099 orang
2 1 m2 Pasangan Daun Pintu Panil Kayu
pekerja = 1.0000 x 9.600 / 6 = 1.600 orang
tukang kayu = 2.5000 x 9.600 / 6 = 4.000 orang
kepala tukang = 0.2500 x 9.600 / 6 = 0.400 orang
mandor = 0.0500 x 9.600 / 6 = 0.080 orang
3 1 m2 Pasangan Daun Pintu Double Teacwood
pekerja = 0.6000 x #REF! / 6 = #REF! orang
tukang kayu = 2.0000 x #REF! / 6 = #REF! orang
kepala tukang = 0.2000 x #REF! / 6 = #REF! orang
mandor = 0.0300 x #REF! / 6 = #REF! orang
4 1 m2 Pasangan Daun Pintu Double Teacwood lapis seng
pekerja = 0.0600 x 2.800 / 6 = 0.028 orang
tukang kayu = 2.0000 x 2.800 / 6 = 0.933 orang
kepala tukang = 0.2000 x 2.800 / 6 = 0.093 orang
mandor = 0.0300 x 2.800 / 6 = 0.014 orang
5 1 m2 Pasangan Daun Jendela Kaca & Ventilasi 3mm
pekerja = 0.8150 x 29.940 / 6 x 2 = 8.134 orang
tukang kayu = 2.1500 x 29.940 / 6 x 2 = 21.457 orang
kepala tukang = 0.2150 x 29.940 / 6 x 2 = 2.146 orang
mandor = 0.0408 x 29.940 / 6 x 2 = 0.407 orang
6 1 m2 Pasang Daun Jendela Kaca Polos
pekerja = 0.0150 x 3.240 / 6 = 0.008 orang
tukang kayu = 0.1500 x 3.240 / 6 = 0.081 orang
kepala tukang kayu = 0.0150 x 3.240 / 6 = 0.008 orang
mandor = 0.0008 x 3.240 / 6 = 0.0004 orang
7 1 m3 Pasangan Konstruksi kuda-kuda/ Gording Kayu Borneo
pekerja = 4.0000 x 3.310 / 6 x 3 = 6.620 orang
tukang kayu = 12.0000 x 3.310 / 6 x 3 = 19.860 orang
kepala tukang = 1.2000 x 3.310 / 6 x 3 = 1.986 orang
mandor = 0.2000 x 3.310 / 6 x 3 = 0.331 orang
8 1 m1 Listplank Ukuran 2 x (2x20) cm, Kayu Kamper
pekerja = 0.1000 x 106.600 / 6 x 2 = 3.553 orang
tukang kayu = 0.1000 x 106.600 / 6 x 2 = 3.553 orang
kepala tukang = 0.0100 x 106.600 / 6 x 2 = 0.355 orang
mandor = 0.0500 x 106.600 / 6 x 2 = 1.777 orang

TOTAL :
pekerja = #REF! orang
mandor = #REF! orang
tukang kayu = #REF! orang
kepala tukang = #REF! orang

VI. PEKERJAAN ATAP DAN PLAFOND :


1 1 m2 Pasangan Atap Seng Gelombang BJLS 0.30 mm
pekerja = 0.1200 x 323.400 / 6 x 3 = 19.404 orang
tukang kayu = 0.0060 x 323.400 / 6 x 3 = 0.970 orang
kepala tukang = 0.0600 x 323.400 / 6 x 3 = 9.702 orang
mandor = 0.0060 x 323.400 / 6 x 3 = 0.970 orang
2 1 m2Pasangan Atap Nok Seng
pekerja = 0.1500 x 37.200 / 6 = 0.930 orang
tukang kayu = 0.0080 x 37.200 / 6 = 0.050 orang
kepala tukang = 0.0700 x 37.200 / 6 = 0.434 orang
mandor = 0.0080 x 37.200 / 6 = 0.050 orang
3 1 m2 Pasangan Plafond Tripleks ( 60 x 120 ) cm, tebal 4 mm, Rangkap Kayu Borneo
pekerja = 0.2200 x 78.500 / 6 x 3 = 8.635 orang
mandor = 0.0115 x 78.500 / 6 x 3 = 0.451 orang
tukang kayu = 0.1700 x 78.500 / 6 x 3 = 6.673 orang
kepala tukang = 0.0180 x 78.500 / 6 x 3 = 0.707 orang
4 1 m1 List Plafond Profil
pekerja = 0.0210 x 153.000 / 6 x 2 = 1.071 orang
mandor = 0.0010 x 153.000 / 6 x 2 = 0.051 orang
tukang kayu = 0.0210 x 153.000 / 6 x 2 = 1.071 orang
kepala tukang = 0.0020 x 153.000 / 6 x 2 = 0.102 orang

TOTAL :
pekerja = 30.0400 orang
mandor = 1.5222 orang
tukang kayu = 8.7633 orang
kepala tukang = 10.5601 orang
VII. PEKERJAAN LANTAI
1 1 m2 Pasang Lantai Keramik 30 x 30 cm
pekerja = 0.2500 x 72.500 / 6 x 3 = 9.063 orang
tukang batu = 0.1200 x 72.500 / 6 x 3 = 4.350 orang
kepala tukang = 0.0120 x 72.500 / 6 x 3 = 0.435 orang
mandor = 0.0125 x 72.500 / 6 x 3 = 0.453 orang
2 1 m2 Pasang Lantai Mozaik 30 x30 cm
pekerja = 0.2500 x 6.000 / 6 = 0.250 orang
tukang batu = 0.1200 x 6.000 / 6 = 0.120 orang
kepala tukang = 0.0120 x 6.000 / 6 = 0.012 orang
mandor = 0.1250 x 6.000 / 6 = 0.125 orang
3 1 m2 Pasang Keramik porselin 20 x 20 cm
pekerja = 0.0900 x 16.350 / 6 x 2 = 0.491 orang
tukang batu = 0.0900 x 16.350 / 6 x 2 = 0.491 orang
kepala tukang = 0.0090 x 16.350 / 6 x 2 = 0.049 orang
mandor = 0.0045 x 16.350 / 6 x 2 = 0.025 orang
4 1 m2 Pasang Plint Keramik Artistik 10 x 20 cm
pekerja = 0.6000 x #REF! / 6 x 2 = #REF! orang
tukang batu = 0.4500 x #REF! / 6 x 2 = #REF! orang
kepala tukang = 0.0450 x #REF! / 6 x 2 = #REF! orang
mandor = 0.0300 x #REF! / 6 x 2 = #REF! orang

TOTAL :
pekerja = #REF! orang
mandor = #REF! orang
tukang batu = #REF! orang
kepala tukang = #REF! orang

VIII. PEKERJAAN INSTALASI LISTRIK DAN AIR


1 Memasang 1 buah Wastavel
pekerja = 1.2000 x 1 / 6 = 0.200 orang
tukang batu = 1.4500 x 1 / 6 = 0.242 orang
kepala tukang = 0.1500 x 1 / 6 = 0.025 orang
mandor = 0.1000 x 1 / 6 = 0.017 orang
2 Memasang 1 Buah Bak Mandi Batu Bata volume 0.30 m3
pekerja = 6.0000 x 2 / 6 x 2 = 4.000 orang
tukang batu = 3.0000 x 2 / 6 x 2 = 2.000 orang
kepala tukang = 0.3000 x 2 / 6 x 2 = 0.200 orang
mandor = 0.3000 x 2 / 6 x 2 = 0.200 orang
3 Memasang 1 Buah Kloset Jongkok Porselin
pekerja = 1.0000 x 2 / 6 = 0.333 orang
tukang batu = 1.5000 x 2 / 6 = 0.500 orang
kepala tukang = 1.5000 x 2 / 6 = 0.500 orang
mandor = 0.1600 x 2 / 6 = 0.053 orang
4 Memasang 1 Buah Floor Drain
pekerja = 0.0100 x 2 / 6 = 0.003 orang
tukang batu = 0.1000 x 2 / 6 = 0.033 orang
kepala tukang = 0.0100 x 2 / 6 = 0.003 orang
mandor = 0.0050 x 2 / 6 = 0.002 orang
5 Memasang 1 Kran Diameter 3/4 " atau 1/2 "
pekerja = 0.0100 x 3 / 6 = 0.005 orang
tukang batu = 0.1000 x 3 / 6 = 0.050 orang
kepala tukang = 0.0100 x 3 / 6 = 0.005 orang
mandor = 0.0050 x 3 / 6 = 0.003 orang

TOTAL :
pekerja = 4.5367 orang
mandor = 0.2717 orang
tukang batu = 2.7750 orang
kepala tukang = 0.7283 orang

IX PEKERJAAN FINISHING
1 1 m2 Pengecatan Tembok Baru (1 plamir, a lapis cat dasar, 2 lapis cat penutup)
pekerja = 0.0200 x 374.300 / 6 x 3 = 3.743 orang
tukang cat = 0.0630 x 374.300 / 6 x 3 = 11.790 orang
kepala tukang = 0.0063 x 374.300 / 6 x 3 = 1.179 orang
mandor = 0.0020 x 374.300 / 6 x 3 = 0.374 orang
2 1 m2 Pengecatan Plafond ( 1 plamir, 1 lapis cat dasar, 2 lapis cat penutup )
pekerja = 0.0200 x 78.500 / 6 = 0.262 orang
tukang cat = 0.0630 x 78.500 / 6 = 0.824 orang
kepala tukang = 0.0063 x 78.500 / 6 = 0.082 orang
mandor = 0.0025 x 78.500 / 6 = 0.033 orang
3 1m2 Pengecatan Bidang Kayu Baru ( 1 plamir, 1 lapis cat dasar, 2 lapis cat penutup )
pekerja = 0.0700 x 36.858 / 6 x 3 = 1.290 orang
tukang cat = 0.0090 x 36.858 / 6 x 3 = 0.166 orang
kepala tukang = 0.0060 x 36.858 / 6 x 3 = 0.111 orang
mandor = 0.0025 x 36.858 / 6 x 3 = 0.046 orang
4 1 m2 Pengecatan Permukaan Baja Lapis Seng secara manual sistem
1 lapis cat mutakhir dengan tebal 200 mm
pekerja = 0.0060 x 323.400 / 6 x 2 = 0.647 orang
tukang cat = 0.0600 x 323.400 / 6 x 2 = 6.468 orang
kepala tukang = 0.0120 x 323.400 / 6 x 2 = 1.294 orang
mandor = 0.0060 x 323.400 / 6 x 2 = 0.647 orang
5 1 m2 Peleburan Bidang Kayu dengan Teac Oil
pekerja = 0.0400 x 19.200 / 6 = 0.128 orang
tukang cat = 0.0630 x 19.200 / 6 = 0.202 orang
kepala tukang = 0.0630 x 19.200 / 6 = 0.202 orang
mandor = 0.0025 x 19.200 / 6 = 0.008 orang

TOTAL :
pekerja = 6.0695 orang
mandor = 1.1079 orang
tukang cat = 19.4502 orang
kepala tukang = 2.8672 orang

X PEKERJAAN PENGGANTUNG DAN PENGUNCI


1 1 Buah Pasang Kunci Tanam Biasa
pekerja = 0.0100 x 6 / 6 = 0.010 orang
tukang kayu = 0.5000 x 6 / 6 = 0.500 orang
kepala tukang = 0.0100 x 6 / 6 = 0.010 orang
mandor = 0.0050 x 6 / 6 = 0.005 orang
2 1 Buah Pasang Kunci Tanam KM
pekerja = 0.0050 x 2 / 6 = 0.002 orang
tukang kayu = 0.5000 x 2 / 6 = 0.167 orang
kepala tukang = 0.0050 x 2 / 6 = 0.002 orang
mandor = 0.0025 x 2 / 6 = 0.001 orang
3 1 Buah Pasang Grendel
pekerja = 0.0050 x 8 / 6 = 0.007 orang
tukang kayu = 0.5000 x 8 / 6 = 0.667 orang
kepala tukang = 0.0050 x 8 / 6 = 0.007 orang
mandor = 0.0025 x 8 / 6 = 0.003 orang
4 1 Buah Pasang Engsel
pekerja = 0.0150 x 9 / 6 x 2 = 0.045 orang
tukang kayu = 0.1500 x 9 / 6 x 2 = 0.450 orang
kepala tukang = 0.0150 x 9 / 6 x 2 = 0.045 orang
mandor = 0.0008 x 9 / 6 x 2 = 0.002 orang
5 1 Buah Pasang Kait Angin
pekerja = 0.0150 x 28 / 6 = 0.070 orang
tukang kayu = 0.1500 x 28 / 6 = 0.700 orang
kepala tukang = 0.0150 x 28 / 6 = 0.070 orang
mandor = 0.0008 x 28 / 6 = 0.004 orang

TOTAL :
pekerja = 0.1333 orang
mandor = 0.0153 orang
tukang cat = 2.4833 orang
kepala tukang = 0.1333 orang

XI PEKERJAAN LAIN - LAIN


1 1 m Pasang buis beton U 30
pekerja = 0.3800 x 87.000 / 6 = 5.510 orang
tukang batu = 0.1900 x 87.000 / 6 = 2.755 orang
kepala tukang = 0.0190 x 87.000 / 6 = 0.276 orang
mandor = 0.0190 x 87.000 / 6 = 0.276 orang

TOTAL :
pekerja = 5.5100 orang
mandor = 0.2755 orang
tukang batu = 2.7550 orang
kepala tukang = 0.2755 orang
TABEL KEBUTUHAN TENAGA KERJA

MINGGU KE
NO TENAGA KERJA
1 2 3 4 5 6 7 8 9 10 11 12 13
I PEKERJAAN PERSIAPAN
1 Pemasangan Bowplank dan Vitset
Pekerja 0.850 0.850
Tukang kayu 0.850 0.850
Kepala tukang 0.085 0.085
Mandor 0.043 0.043
TOTAL Pekerja 0.850
Tukang kayu 0.850
Kepala tukang 0.085
Mandor 0.043
II PEKERJAAN TANAH DAN URUGAN
1 Galian Tanah Pondasi
pekerja 13.950 13.950
mandor 0.692 0.692
2 Urugan Tanah di tepi Pondasi
pekerja 1.071 1.071 1.071
mandor 0.106 0.106 0.106
3 Urugan Pasir di bawah Pondasi
pekerja 0.384 0.384
mandor 0.013 0.013
4 Urugan Pasir Peninggi Lantai
pekerja 1.570 1.570 1.570
mandor 0.052 0.052 0.052
TOTAL Pekerja 13.950 1.071 1.570 1.570
Mandor 0.692 0.106 0.106 0.052
III PEKERJAAN PASANGAN DAN PLESTERAN
1 1 m3 Pasangan Aanstamping
pekerja 1.998 1.998
Tukang batu 0.999 0.999
Kepala tukang 0.100 0.100
mandor 0.100 0.100
2 1 m3 Pasangan Pondasi Batu Karang ( 1 pc : 5 psr )
pekerja 19.744 19.744 19.744
Tukang batu 7.897 7.897 7.897
Kepala tukang 0.790 0.790 0.790
mandor 0.987 0.987 0.987
3 1 m3 Pasangan Tembok Trasram ( 1 pc : 3 psr )
pekerja 4.111 4.111 4.111
Tukang batu 1.285 1.285 1.285
Kepala tukang 0.128 0.128 0.128
mandor 0.193 0.193 0.193
4 1 m3 Pasangan Tembok Biasa ( 1 pc : 5 psr )
pekerja 54.055 54.055 54.055 54.055
Tukang batu 16.892 16.892 16.892 16.892
Kepala tukang 1.689 1.689 1.689 1.689
mandor 2.534 2.534 2.534 2.534
5 1 m2 Plesteran Tembok Trasraam ( 1 pc : 3 psr )
pekerja 2.083 2.083 2.083
Tukang batu 1.563 1.563 1.563
Kepala tukang 0.156 0.156 0.156
mandor 0.104 0.104 0.104
6 1 m2 Plesteran Tembok Biasa ( 1 pc : 5 psr )
pekerja 24.083 24.083 24.083
Tukang batu 18.063 18.063 18.063
Kepala tukang 1.806 1.806 1.806
mandor 1.204 1.204 1.204
7 1 m2 Plesteran Pondasi Tepi Luar ( 1 pc : 4 psr )
pekerja 0.435 0.435
Tukang batu 0.326 0.326
Kepala tukang 0.033 0.033
mandor 0.022 0.022
8 1 m2 Acian Tembok
pekerja 49.907 49.907 49.907 49.907 49.907
Tukang batu 37.430 37.430 37.430 37.430 37.430
Kepala tukang 3.743 3.743 3.743 3.743 3.743
mandor 2.495 2.495 2.495 2.495 2.495
TOTAL Pekerja 19.744 19.744 54.055 54.055 54.055 49.907 49.907
Tukang batu 7.897 7.897 16.892 37.430 37.430 37.430 37.430
Kepala tukang 0.790 0.790 1.689 3.743 3.743 3.743 3.743
Mandor 0.987 0.987 2.534 2.534 2.534 2.495 2.495
IV PEKERJAAN BETON
1 1 m3 Pasangan Beton Sloof (1pc : 2psr : 3krl)
pekerja 5.565 5.565 5.565 5.565
tukang batu 0.402 0.402 0.402 0.402
tukang kayu 1.790 1.790 1.790 1.790
tukang besi 1.607 1.607 1.607 1.607
kepala tukang 0.380 0.380 0.380 0.380
mandor 0.195 0.195 0.195 0.195
2 1 m3 Pasangan Beton Kolom Praktis (1pc : 2psr : 3krl)
pekerja 0.462 0.462 0.462 0.462
tukang batu 0.404 0.404 0.404 0.404
tukang kayu 3.812 3.812 3.812 3.812
tukang besi 2.426 2.426 2.426 2.426
kepala tukang 0.658 0.658 0.658 0.658
mandor 0.289 0.289 0.289 0.289
3 1 m3 Pasangan Beton Kolom Teras (1pc : 2psr : 3krl)
pekerja 0.019 0.019
tukang batu 0.016 0.016
tukang kayu 0.154 0.154
tukang besi 0.098 0.098
kepala tukang 0.027 0.027
mandor 0.012 0.012
4 1 m3 Pasangan Beton Ringbalk (1pc : 2psr : 3krl)
pekerja 7.033 7.033 7.033 7.033
tukang batu 0.508 0.508 0.508 0.508
tukang kayu 2.262 2.262 2.262 2.262
tukang besi 2.030 2.030 2.030 2.030
kepala tukang 0.480 0.480 0.480 0.480
mandor 0.247 0.247 0.247 0.247
5 1 m3 Pasangan Beton Meja Dapur (1pc : 2psr : 3krl)
pekerja 0.000 0.000
tukang batu 0.000 0.000
tukang kayu 0.000 0.000
tukang besi 0.000 0.000
kepala tukang 0.000 0.000
mandor 0.000 0.000
6 1 m3 Pasangan Beton Neut (1pc : 2psr : 3krl)
pekerja 0.029 0.029
tukang batu 0.0044 0.0044
kepala tukang 0.00044 0.00044
mandor 0.0014 0.0014
TOTAL pekerja 5.565 5.565 7.033 0.462 7.033 7.033
tukang batu 0.402 0.402 0.508 0.404 0.508 0.508
tukang kayu 1.790 1.790 3.812 3.812 3.812 2.262
tukang besi 1.607 1.607 2.426 2.426 2.426 2.030
kepala tukang 0.380 0.380 0.658 0.658 7.033 0.480
mandor 0.195 0.195 0.289 0.289 0.508 0.247
V PEKERJAAN KAYU DAN KACA
1 1 m3 Pasangan Kayu Kusen Klas I
pekerja 1.977 1.977 1.977 1.977
tukang kayu 6.590 6.590 6.590 6.590
kepala tukang 0.659 0.659 0.659 0.659
mandor 0.099 0.099 0.099 0.099
2 1 m2 Pasangan Daun Pintu Panil Kayu
pekerja 1.600 1.600
tukang kayu 4.000 4.000
kepala tukang 0.400 0.400
mandor 0.080 0.080
3 1 m2 Pasangan Daun Pintu Double Teacwood
pekerja #REF! #REF!
tukang kayu #REF! #REF!
kepala tukang #REF! #REF!
mandor #REF! #REF!
4 1 m2 Pasangan Daun Pintu double Teacwood Lapis seng
pekerja 0.028 0.028
tukang kayu 0.933 0.933
kepala tukang 0.093 0.093
mandor 0.014 0.014
5 1 m2 Pasangan Daun Jendela Kaca dan Ventilasi
pekerja 8.134 8.134 8.134
tukang kayu 21.457 21.457 21.457
kepala tukang 2.146 2.146 2.146
mandor 0.407 0.407 0.407
6 1 m2 Pasang Daun Jendela Kaca Polos ( Silang )
pekerja 0.008 0.008
tukang kayu 0.081 0.081
kepala tukang 0.008 0.008
mandor 0.0004 0.0004
7 1 m3 Pasangan Kayu Kap dan Gording
pekerja 6.620 6.620 6.620 6.620
tukang kayu 19.860 19.860 19.860 19.860
kepala tukang 1.986 1.986 1.986 1.986
mandor 0.331 0.331 0.331 0.331
8 1 m1 Pasangan Papan Lisplank
pekerja 3.553 3.553 3.553
tukang kayu 3.553 3.553 3.553
kepala tukang 0.355 0.355 0.355
mandor 1.777 1.777 1.777
TOTAL pekerja 1.977 1.977 1.977 6.620 6.620 6.620 #REF! 8.134 8.134
tukang kayu 6.590 6.590 6.590 19.860 19.860 19.860 #REF! 21.457 21.457
kepala tukang 0.659 0.659 0.659 1.986 1.986 1.986 #REF! 2.146 2.146
mandor 0.099 0.099 0.099 0.331 0.331 0.331 #REF! 1.777 0.407
VI PEKERJAAN ATAP DAN PLAFOND
1 1 m2 Pasangan Atap Seng BJLS 0.30 mm
pekerja 19.404 19.404 19.404 19.404
tukang kayu 0.970 0.970 0.970 0.970
kepala tukang 9.702 9.702 9.702 9.702
mandor 0.970 0.970 0.970 0.970
2 1 m2 Pasang Atap Nok Seng
pekerja 0.930 0.930
tukang kayu 0.050 0.050
kepala tukang 0.434 0.434
mandor 0.050 0.050
3 1 m2 Pasangan Plafond Tripleks dan Rangka
pekerja 8.635 8.635 8.635 8.635
tukang kayu 0.451 0.451 0.451 0.451
kepala tukang 6.673 6.673 6.673 6.673
mandor 0.707 0.707 0.707 0.707
4 1 m1 List Plafond Profil
pekerja 1.071 1.071 1.071
tukang kayu 0.051 0.051 0.051
kepala tukang 1.071 1.071 1.071
mandor 0.102 0.102 0.102
TOTAL pekerja 19.404 19.404 19.404 8.635
tukang kayu 0.970 0.970 0.970 0.451
kepala tukang 9.702 9.702 9.702 6.673
mandor 0.970 0.970 0.970 0.707
VII PEKERJAAN LANTAI
1 1 m2 Pasangan Tegel Keramik 30 x 30 cm
pekerja 9.063 9.063 9.063 9.063
tukang batu 4.350 4.350 4.350 4.350
kepala tukang 0.435 0.435 0.435 0.435
mandor 0.453 0.453 0.453 0.453
2 1 m2 Pasangan Tegel Mozaik30 x 30 cm
pekerja 0.250 0.250
tukang batu 0.120 0.120
kepala tukang 0.012 0.012
mandor 0.125 0.125
3 1 m2 Pasangan Tegel Plint 10 x 20 cm
pekerja #REF! #REF! #REF!
tukang batu #REF! #REF! #REF!
kepala tukang #REF! #REF! #REF!
mandor #REF! #REF! #REF!
4 1 m2 Pasangan Tegel Porselin 20 x 20 cm
pekerja 0.491 0.491 0.491
tukang batu 0.491 0.491 0.491
kepala tukang 0.049 0.049 0.049
mandor 0.025 0.025 0.025
TOTAL pekerja 9.063 9.063 9.063 #REF! #REF!
tukang batu 4.350 4.350 4.350 #REF! #REF!
kepala tukang 0.435 0.435 0.435 #REF! #REF!
mandor 0.453 0.453 0.453 #REF! #REF!
VIII PEKERJAAN INSTALASI LISTRIK DAN AIR
1 Memasang 1 buah Wastavel
pekerja 0.200 0.200
tukang batu 0.242 0.242
kepala tukang 0.025 0.025
mandor 0.017 0.017
2 Memasang 1 buah bak mandi batu bata volume 0.30 m3
pekerja 4.000 4.000 4.000
tukang batu 2.000 2.000 2.000
kepala tukang 0.200 0.200 0.200
mandor 0.200 0.200 0.200
3 Memasang 1 buah kloset jongkok porselin
pekerja 0.333 0.333
tukang batu 0.500 0.500
kepala tukang 0.500 0.500
mandor 0.053 0.053
4 Memasang 1 buah floor drain
pekerja 0.003 0.003
tukang batu 0.033 0.033
kepala tukang 0.003 0.003
mandor 0.002 0.002
5 Memasang 1 buah kran diameter 3/4" atau 1/2"
pekerja 0.005 0.005
tukang batu 0.050 0.050
kepala tukang 0.005 0.005
mandor 0.003 0.003
TOTAL pekerja 0.003 4.000 4.000
tukang batu 0.033 2.000 2.000
kepala tukang 0.003 0.500 0.200
mandor 0.002 0.200 0.200
IX PEKERJAAN FINISHING
1 1m2 pengecatan tembok baru
pekerja 3.743 3.743 3.743 3.743
tukang cat 11.790 11.790 11.790 11.790
kepala tukang 1.179 1.179 1.179 1.179
mandor 0.374 0.374 0.374 0.374
2 1m2 pengecatan plafon
pekerja 0.262 0.262
tukang cat 0.824 0.824
kepala tukang 0.082 0.082
mandor 0.033 0.033
3 1m2 pengecatan bidang kayu baru
pekerja 1.290 1.290 1.290 1.290
tukang cat 0.166 0.166 0.166 0.166
kepala tukang 0.111 0.111 0.111 0.111
mandor 0.046 0.046 0.046 0.046
4 1m2 pengecatan permukaan baja lapis seng
pekerja 0.647 0.647 0.647
tukang cat 6.468 6.468 6.468
kepala tukang 1.294 1.294 1.294
mandor 0.647 0.647 0.647
5 1m2 pelaburaqn bidang kayu dengan taek oil
pekerja 0.128 0.128
tukang cat 0.202 0.202
kepala tukang 0.202 0.202
mandor 0.008 0.008
TOTAL pekerja 1.290 3.743 3.743 3.743 1.290 0.647
tukang cat 0.166 11.790 11.790 11.790 6.468 6.468
kepala tukang 0.111 1.179 1.179 1.179 1.294 1.294
mandor 0.046 0.374 0.374 0.374 0.647 0.647
X PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 1 buah pasang kunci tanam biasa
pekerja 0.010 0.010
tukang kayu 0.500 0.500
kepala tukang 0.010 0.010
mandor 0.005 0.005
2 1 buah pasang kunci tanam KM
pekerja 0.002 0.002
tukang kayu 0.167 0.167
kepala tukang 0.002 0.002
mandor 0.001 0.001
3 1 buah pasang grendel
pekerja 0.007 0.007
tukang kayu 0.667 0.667
kepala tukang 0.007 0.007
mandor 0.003 0.003
4 1 buah pasang engsel
pekerja 0.045 0.045 0.045
tukang kayu 0.450 0.450 0.450
kepala tukang 0.045 0.045 0.045
mandor 0.002 0.002 0.002
5 1 buah kait angin
pekerja 0.070 0.070
tukang kayu 0.700 0.700
kepala tukang 0.070 0.070
mandor 0.004 0.004
TOTAL pekerja 0.045 0.070
tukang cat 0.450 0.700
kepala tukang 0.045 0.070
mandor 0.002 0.005
XI PEKERJAAN LAIN - LAIN
1 1 m pasangan buis beton U 30
pekerja 5.510 5.510
tukang batu 2.755 2.755
kepala tukang 0.276 0.276
mandor 0.276 0.276
TOTAL pekerja 5.510
tukang batu 2.755
kepala tukang 0.276
mandor 0.276

PERHITUNGAN DAN KONTROL TENAGA KERJA

MINGGU KE
NO TENAGA KERJA JUMLAH
1 2 3 4 5 6 7 8 9 10 11 12 13
1 PEKERJA 13.950 19.744 19.744 54.055 54.055 54.055 49.907 49.907 #REF! 19.404 9.063 #REF! #REF! #REF!
2 TUKANG BATU 7.897 7.897 16.892 37.430 37.430 37.430 37.430 4.350 4.350 4.350 #REF! #REF! #REF!
3 TUKANG BESI 1.607 1.607 2.426 2.426 2.426 2.030 12.520
4 TUKANG KAYU 0.850 1.790 1.790 6.590 6.590 19.860 19.860 19.860 #REF! 21.457 21.457 #REF!
5 TUKANG CAT 0.166 11.790 11.790 11.790 6.468 6.468 48.473
6 KEPALA TUKANG 0.085 0.790 0.790 1.689 3.743 7.033 3.743 9.702 #REF! 9.702 6.673 #REF! #REF! #REF!
7 MANDOR 0.692 0.987 0.987 2.534 2.534 2.534 2.495 0.970 #REF! 1.777 0.707 #REF! #REF! #REF!
DAFTAR HARGA SATUAN UPAH DAN BAHAN 2010

Kualitas / merk
No Jenis Barang / Upah SATUAN HARGA 2008
/ Spesifikasi
A UPAH
1 Pekerja / buruh 5 Jam / Hari Org / Hari 26,000.00
2 Tukang Batu 5 Jam / Hari Org / Hari 42,000.00
3 Tukang Kayu 5 Jam / Hari Org / Hari 42,000.00
4 Tukang Besi 5 Jam / Hari Org / Hari 42,000.00
5 Tukang Cat 5 Jam / Hari Org / Hari 42,000.00
6 Tukang Listrik 5 Jam / Hari Org / Hari 42,000.00
7 Tukang Pipa 5 Jam / Hari Org / Hari 42,000.00
8 Tukang Las 5 Jam / Hari Org / Hari 42,000.00
9 Mandor 5 Jam / Hari Org / Hari 45,000.00
10 Mekanik 5 Jam / Hari Org / Hari 57,500.00
11 Pembantu Mekanik 5 Jam / Hari Org / Hari 35,000.00
12 Operator 5 Jam / Hari Org / Hari 52,500.00
13 Pembantu Operator 5 Jam / Hari Org / Hari 40,000.00
14 Supir 5 Jam / Hari Org / Hari 45,000.00
15 Pembantu Supir 5 Jam / Hari Org / Hari 42,500.00
16 Kepala Tukang 5 Jam / Hari Org / Hari 45,000.00

B BAHAN BANGUNAN
1 Agregat Kasar Bulat 2/3 Ret m3 187,500.00
2 Air bersih 5000 L Tangki liter 65,000.00
3 Amplas Pabrikan Lbr 3,000.00
4 Angker Dok - - 10,000.00
5 Arde Pembumian - - 100,000.00
6 Bak cuci piring Stainless Steel Pabrikan Set 184,500.00
7 Bata Merah Pabrikan Bh 600.00
8 Batako Pabrikan Bh 2,200.00
9 Batu Karang 5 / 7 - m3 71,667.00
10 Batu Karang - m3 71,667.00
11 Baut + Moer Kuda - kuda 0.12 mm Pabrikan Kg 10,000.00
12 Baut + Moer Angker f 12 mm Pabrikan Kg 10,000.00
13 Baut Sudut 0.16 f 16 mm Pabrikan Kg 10,000.00
14 Besi Beton Polos Ø 6 mm - Kg 6,695.00
15 Besi Beton Polos Ø 8 mm - Kg 6,130.00

ED_K@K@#1
RAB 2007
Kualitas / merek
No Jenis Barang / Upah SATUAN HARGA 2008
/ Spesifikasi
15 Besi Beton Polos Ø 12 mm - Kg 5,919.00
16 Beugel U - Bh 15,000.00
17 Box sekring f 4" Pabrikan Bh 15,000.00
18 BRC T (90, 120, 150) 3m lbr 227,500.00
19 Bubungan Multiroof Sakura lbr 27,000.00
20 Bubungan Genteng Beton Pabrikan Bh 7,500.00
21 Cat Kayu Dasar Altex Kg 15,500.00
22 Cat Kayu Mengkilap Altex Kg 25,750.00
24 Cat Tembok merk Bell Mas Bell Mas Kg 26,000.00
Cat meni 25,000.00
Cat seng Kg 20,000.00
25 Dolken Ø 8 mm/4 m - Btg 2,000.00
26 Dumpul Altex Kg 46,500.00
27 Embol Box Pabrikan Bh 625.00
28 Engsel Pintu Merk Everbst Pabrikan Bh 11,875.00
29 Expagnolet/grendel pintu tanam Pabrikan Bh 25,000.00
30 Filer abu batu Pabrikan m3 475,000.00
31 Fitting tempel biasa Pabrikan Bh 2,250.00
32 Floor Drain Stainles Steel Pabrikan Set 18,750.00
33 Grendel pintu Pabrikan Bh 17,500.00
34 Grendel Jendela Pabrikan psg 12,250.00
35 Instalasi Air Bersih - Paket 600,000.00
36 Instalasi Air Kotor - Paket 600,000.00
37 Isolasi Listrik Pabrikan roll 3,000.00
38 Kabel NYY 1.5 mm Pabrikan m1 3,375.00
39 Kaca Bening 3 mm Pabrikan m2 47,500.00
40 Kaca Bening 5 mm Pabrikan m2 61,250.00
41 Kaca Bening 8 mm Pabrikan m2 165,000.00
42 Kaca Es 3 mm Pabrikan m2 40,250.00
43 Kaca Rayband 3 mm 60% m2 55,000.00
44 Kaca Rayband 5 mm 60% m2 68,750.00
45 Kait angin jendela Pabrikan Bh 8,250.00
46 Kait angin pintu Pabrikan Bh 22,500.00
47 Kapur padam - m3 200,000.00
48 Kawat Anyaman 5 cm Pabrikan Kg 10,000.00
49 Kawat Beton Pabrikan Kg 11,250.00
50 Kayu kls I Balok (Bayam) f 2" Bayam m3 4,625,000.00
51 Kayu kls I Usuk (Bayam) f3" Bayam m3 5,500,000.00
52 Kayu kls I Reng (Bayam) f 4" Bayam m3 5,500,000.00
53 Kayu kls I Papan Tipis (Bayam) f6" Bayam m3 5,750,000.00
54 Kayu kls I Papan Tebal (Bayam) Bayam m3 6,000,000.00
55 Kayu kls II Balok f4" - m3 1,825,000.00
56 Kayu kls II Usuk f6" - m3 1,825,000.00
57 Kayu kls II Reng - m3 1,900,000.00

ED_K@K@#1
RAB 2007
Kualitas / merek
No Jenis Barang / Upah SATUAN HARGA 2008
/ Spesifikasi
58 Kayu kls II papan tipis - m3 1,775,000.00
59 Kayu kls II papan tebal - m3 2,350,000.00
Keramik Porselen 11 x 11 cm - Bh 950.00
60 Keramik putih 40 x 40 cm Pabrikan Bh 6,700.00
61 Keramik putih 30 x 30 cm Pabrikan Bh 2,835.00
62 Keramik putih 20 x 20 cm Pabrikan Bh 1,580.00
63 Kertas Pasir Besi Pabrikan lbr 2,750.00
64 Kertas Pasir Kayu Pabrikan lbr 2,250.00
65 Klem Kabel Pabrikan Bh 8,000.00
66 Kloset Jongkok Merk INA f 20 mm Pabrikan Bh 97,500.00
67 Kran air Stainlesstel f 25 mm Pabrikan Unit 42,500.00
68 Kunci Pintu Merk Top Pabrikan Bh 35,000.00
69 Kunci Pintu Merk Valencia 2x putar Pabrikan Bh 92,500.00
70 Kunci Pintu Merk Yuri 2x putar Pabrikan Bh 137,500.00
71 Kunci lemari dinding Pabrikan Bh 5,000.00
72 Kunci Alfa Pabrikan Bh 67,500.00
73 Kwas Pabrikan Bh 4,500.00
74 Lampu TL 40 watt merk Philips Philips Bh 14,000.00
75 Lampu TL 40 watt merk Philips Lengka Philips Bh 64,000.00
76 Lampu TL 20 watt merk Philips Lengka Philips Bh 56,500.00
77 Lampu TL Bundar 20 watt Pabrikan Bh 28,000.00
78 Lampu Pijar 40/60 watt merk Philips Philips Bh 3,900.00
79 Lampu Pijar 25 watt Pabrikan Bh 3,250.00
80 Lem Weber putih Kg 20,000.00
81 Lem Weber kuning Kg 30,000.00
82 List profil kayu Pabrikan m1 17,500.00
83 List Kaca Pabrikan m1 2,000.00
84 List Plafond Multipleks 6 mm Pabrikan m1 6,250.00
85 List Profil Gypsum Pabrikan m1 23,000.00
86 L Joint PVC Ǿ 2 " Pabrikan Bh 9,000.00
87 L Joint PVC Ǿ 3 " Pabrikan Bh 25,000.00
88 L Joint PVC Ǿ 4 " Pabrikan Bh 30,000.00
89 MCB Pabrikan Bh 27,500.00
90 Minyak Cat Super liter 6,750.00
91 Minyak Tanah - liter 2,500.00
92 Nako Lengkap ( 7 ssr ) Pabrikan set 92,750.00
93 Oli - liter 13,000.00
94 Paku halus (2-5 cm) Pabrikan Kg 12,500.00
95 Paku 5s /d 12 cm Pabrikan Kg 8,500.00
96 Paku Beton Halus (2 - 5 cm) Pabrikan Kg 16,250.00
97 Paku Seng Pabrikan Kg 28,250.00
98 Paku Beton 5 s / d 12 cm Pabrikan Kg 14,450.00
99 Paku Tripleks Pabrikan Kg 14,750.00
100 Paku Alumanium Pabrikan Kg 14,550.00

ED_K@K@#1
RAB 2007
Kualitas / merek
No Jenis Barang / Upah SATUAN HARGA 2008
/ Spesifikasi
101 Paku Skrup Halus Pabrikan Kg 3,000.00
102 Paku Skrup Kasar Pabrikan Kg 10,000.00
103 Papan Gypsum Pabrikan lbr 49,000.00
104 Pasir Pasang - m3 95,833.00
105 Pasir Beton - m3 125,333.00
106 Pasir Urugan - m3 75,000.00
107 Paving Stone warna Pabrikan Bh 1,050.00
108 Pegangan Pintu Pabrikan Bh 75,000.00
122 Pipa beton Pabrikan m 30,000.00
123 Pegangan Jendela Pabrikan Bh 10,000.00
124 Pipa GIP MEDIUM B Ø 1/2 " 6m m 66,550.00
125 Pipa GIP MEDIUM B Ø 3/4 " 6m m 81,300.00
126 Pipa GIP MEDIUM B Ø 1" 6m m 116,450.00
127 Pipa GIP MEDIUM B Ø 1 1/2 " 6m m 365,300.00
128 Pipa GIP MEDIUM B Ø 2" 6m m 237,850.00
129 Pipa GIP MEDIUM B Ø 3 " 6m m 369,800.00
130 Pipa GIP MEDIUM B Ø 4 " 6m m 730,250.00
131 Pipa PVC Ǿ 2 " Pabrikan Btg 27,500.00
132 Pipa PVC Ǿ 3 " Pabrikan Btg 42,500.00
133 Pipa PVC Ǿ 4 " Pabrikan Btg 75,000.00
134 Pipa PVC 0.5" untuk listrik Pabrikan m1 4,500.00
135 Pipa Penguras Bak Mandi f 40 mm Pabrikan Unit 17,500.00
136 Plamuur Tembok Pedang Pabrikan Kg 25,000.00
137 Plat Jepit 2 x 50.5 Pabrikan Kg 11,250.00
138 Plat inventarisasi jembatan (Marmer) - Bh 775,000.00
139 Plint Keramik 10 x 30 cm - Bh 1,350.00
140 Politur Pabrikan liter 32,500.00
141 Rangka Nako Pabrikan m2 7,750.00
142 Reducer Ǿ 4"3" Pabrikan Bh 7,500.00
143 Residu/Teer Pabrikan liter 75,000.00
144 Rool cat Pabrikan Bh 13,750.00
145 Saklar Tunggal merk Broco f 20 mm Broco Bh 10,750.00
146 Saklar Ganda merk Broco f 40 mm Broco Bh 14,250.00
147 Saklar Triple merk KJ Pabrikan Bh 13,250.00
148 Seal Tape Pabrikan Bh 6,000.00
149 Sekring cast 3 grup f 15 mm Pabrikan Bh 14,000.00
150 Semen Kupang (portland) - Kg 650.00
151 Semen Tonasa - Kg 706.00
152 Semen Bosowa - Kg 706.00
153 Semen Warna - Kg 2,050.00
154 Seng Gelombang BJLS 0.30 mm Gajahcalisco lbr 54,000.00
155 Seng Bubungan BJLS 0.30 mm Gajahcalisco lbr 33,750.00
156 Seng Plat BJLS 0.30 mm (60 cm) 60 cm lbr 21,500.00
157 Seng Plat BJLS 0.30 mm (90 cm) 90 cm lbr 30,000.00
158 Seng Gelombang BJLS 0.20 mm Gajahcalisco lbr 33,750.00

ED_K@K@#1
RAB 2007
Kualitas / merek
No Jenis Barang / Upah SATUAN HARGA 2008
/ Spesifikasi
160 Seng Bubungan BJLS 0.20 mm Gajahcalisco lbr 28,250.00
161 Seng Plat BJLS 0.20 mm (60 cm) 60 cm lbr 11,675.00
162 Seng Plat BJLS 0.20 mm (90 cm) 90 cm lbr 13,650.00
163 Septictank + Peresapan - Unit 7,500,000.00
164 Sirtu - m3 79,167.00
165 Socket Ǿ 3" Pabrikan Bh 6,750.00
166 Socket Ǿ 4" Pabrikan Bh 8,000.00
167 Stop Kontak merk Broco Broco Bh 12,750.00
168 Tanah Urug - m3 65,000.00
169 Tangki Fibre Glass 2.2 m3 Pabrikan Bh 1,150,000.00
170 Teakwood 3.8 mm Pabrikan lbr 82,250.00
171 Teakwood 2.8 mm Pabrikan lbr 70,000.00
172 Tegel Mozaik - Buah 3,750.00
170 Titik Lampu kontak - - 17,500.00
171 T Joint PVC Ǿ 2 " Pabrikan Bh 5,500.00
172 T Joint PVC Ǿ 3" Pabrikan Bh 8,750.00
173 T Joint PVC Ǿ 4 " Pabrikan Bh 12,500.00
174 Tripleks 9 mm Pabrikan lbr 108,750.00
175 Tripleks 2.8 mm Pabrikan lbr 44,500.00
176 Tripleks 3.8 mm Pabrikan lbr 56,250.00
177 Tripleks 6.0 mm Pabrikan lbr 77,500.00
178 Tripleks lapis aluminium foil Pabrikan lbr 70,000.00
179 Tripleks lapis melamine Pabrikan lbr 70,000.00
180 Wastafel f 75 mm Pabrikan Unit 162,500.00

ED_K@K@#1
RAB 2007
KEBUTUHAN MATERIAL

NO. URAIAN PEKERJAAN VOLUME


I PEKERJAAN PERSIAPAN
1 Pemasangan Bowplank + Vitset 51.000
Kayu 5/7
Paku biasa
Kayu papan 3/20
2 Penyediaan Air Kerja 1

II PEKERJAAN TANAH DAN URUGAN


1 Urugan Pasir di Bawah Pondasi 7.685
Pasir urug
2 Urugan Pasir Peninggi Lantai 15.700
Pasir urug

III PEKERJAAN PASANGAN DAN PLESTERAN


1 Pekerjaan Pasangan batu kosong 15.370
Batu Karang
Pasir urug
2 Pasangan Pondasi Batu Kali (1 pc : 5 psr) 39.487
Batu Karang
Semen portland
Pasir pasang
3 Pasangan Tembok Trasraam (1 pc : 3 psr) 36.475
Bata merah 5 x 11 x 22 cm
Semen portland
Pasir pasang
4 Pasangan Tembok Biasa (1 pc : 5 psr) 337.843
Bata merah 5 x 11 x 22 cm
Semen portland
Pasir pasang
5 Plesteran Tembok Trasraam (1 pc : 3 psr) 31.250
Semen portland
Pasir pasang
6 Plesteran Tembok Biasa (1 pc : 5 psr) 361.250
Semen portland
Pasir pasang
7 Plesteran Pondasi Tepi Luar (1 pc : 4 psr) 13.050
Semen portland
Pasir pasang
8 Acian Tembok 374.300
Semen merah
Kapur padam
Pasir pasang

IV PEKERJAAN BETON
1 Cor Beton Sloof 15/20 (1pc : 2psr : 3krl) 2.295
Kayu terentang
Paku biasa 2"-5"
Minyak bekesting
Besi beton polos (Ø 12)
Besi beton polos (Ø 6)
Kawat beton
Semen portland
Pasir beton
Koral beton
2 Cor Beton Kolom Praktis 15/15 (1pc : 2psr : 3krl) 2.310
Kayu terentang
Paku biasa 2"-5"
Minyak bekesting
Besi beton polos (Ø 8)
Besi beton polos (Ø 6)
Kawat beton
Semen portland
Pasir beton
Koral beton
Kayu borneo balok
Tripleks 2,8 mm
Dolken Ø 8cm/4m
3 Cor Beton Kolom Teras 15/20 (1pc : 2psr : 3krl) 0.280
Kayu terentang
Paku biasa 2"-5"
Minyak bekesting
Besi beton polos (Ø 12)
Besi beton polos (Ø 6)
Kawat beton
Semen portland
Pasir beton
Koral beton
Kayu borneo balok
Tripleks 2,8 mm
Dolken Ø 8cm/4m
4 Cor Beton Ringbalk 15/20 (1pc : 2psr : 3krl) 2.900
Kayu terentang
Paku biasa 2"-5"
Minyak bekesting
Besi beton polos (Ø 12)
Besi beton polos (Ø 6)
Kawat beton
Semen portland
Pasir beton
Koral beton
6 Cor Beton Neut (1pc : 3psr : 5krl) 0.105
Semen portland
Pasir beton
Koral beton

V PEKERJAAN KAYU DAN KACA


1 Pasangan Kayu Kusen Klas I 0.659
Kayu jati, balok
2 Pasangan Daun Pintu Panil Kayu 9.600
Kayu jati, papan
3 Pas. Daun Pintu Double Teacwood 3 mm #REF!
Kayu kamper, papan
Paku biasa 1/2" - 1"
Lem kayu
Teakwood 4" x 8" x 4 mm
4 Pas. Daun Pintu Double Teacwood 3 mm lapis Seng 2.800
Kayu kamper, papan
Paku biasa 1/2" - 1"
Lem kayu
Teakwood 4" x 8" x 4 mm
Seng plat BJLS 0.20 mm
5 Pas. Daun Jendela Kaca dan Ventilasi 3 mm 29.940
a.) 1m2 Pasang jendela kaca kayu jat
Kayu jati, papan
b.) 1m2 Pasang kaca, tebal 3 mm
Kaca
6 Pas. Kaca Polos (Kaca Silang) 3.240
Kaca
7 Pas. Kayu Kap dan Gording 3.310
a.) Kayu 8/12 #VALUE!
Kayu Borneo, balok
Besi strip
Paku biasa 2" - 5"
b.) Kayu 6/12 #VALUE!
Kayu Borneo, balok
Besi strip
Paku biasa 2" - 5"
c.) Kayu 4/12 #VALUE!
Kayu Borneo
Besi strip
Paku biasa 2" - 5"
8 Pasangan Lisplank Papan 106.600
Kayu kamper, papan
Paku biasa 2" - 5"

VI PASANGAN ATAP DAN PLAFOND


1 Pas. Atap Seng BJLS 0.30 mm 323.400
Seng gelombang 3" x 6" bjls 28
Paku biasa 1/2" - 1"
2 Pas. Atap Bubungan Seng Licin 0.30 mm 37.200
Seng plat 3" x 6" bjls 28
Paku biasa 1/2" - 1"
3 Pas. Plafond Tripleks 3 mm & Rangka 78.500
a.) 1m rangka langit (30 x 60) cm, kayu borneo
2 2

Kayu borneo, balok


Paku biasa 2" - 5"
b.) 1m2 langit2 tripleks (30 x 60) cm, tebal 3 mm
Tripleks 2,8 mm
Paku
4 Pas. List Penutup Plafond (Berprofil) 153.000
List Plafond Multipleks 6mm

VII PEKERJAAN LANTAI


1 Pasangan Ubin Keramik 30/30 72.500
Ubin keramik 30x30 cm 11.870
Semen portland 8.360
Pasir pasang 0.023
Semen warna 0.900
2 Pasangan Ubin Mozaik 30/30 6.000
Mozaik 30x30 cm
Semen portland
Pasir pasang
Semen warna
3 Pasangan Tegel Porselen 20/20 16.350
Porselin 20x20 cm warna
Semen abu-abu
Pasir pasang
Semen warna
4 Pasangan Plint Keramik 10/20 #REF!
Plint keramik artistik 10x20 cm
Semen portland
Pasir pasang
Semen warna

VIII PEKERJAAN INSTALASI LISTRIK DAN AIR


1 Pasangan Titik Lampu 11
2 Pasangan Lampu TL 40 Watt 2
3 Pasangan Lampu Pijar 40 Watt 6
4 Pasangan Lampu Pijar 25 Watt 4
5 Pasangan Saklar Tunggal 2
6 Pasangan Saklar Ganda 5
7 Pasangan Stop Kontak 6
8 Pasangan Sekring Cast 1
9 Pasangan Arde Pembumian 1
10 Pasangan Wastafel 1
Wastafel
Perlengkapan
Semen abu-abu
Pasir pasang
11 Pasangan Bak Mandi Batu Bata 2
Batu Bata
Semen Portland
Pasir pasang
Porselen 11 x 11 cm
Semen Warna
12 Pasangan Closed Jongkok Porselin 2
Kloset Jongkok Porselen
Semen Portland
Pasir pasang
13 Pasangan Septic Tank dan Peresapan 2
14 Pasangan Instalasi Air Bersih 1
15 Pasangan Instalasi Air Kotor 1
16 Pasangan Floor Drain 2
Floor Drain
17 Pasangan Kran Air 3
Kran Air
Seal Tape

IX PEKERJAAN FINISHING
1 Cat Tembok 374.300
Plamir
Cat dasar
Cat penutup 2 x
2 Cat Plafond 78.500
Cat meni
Plamir
Cat dasar
Cat penutup 2 x
3 Cat Kayu 36.858
Cat meni
Plamir
Cat dasar
Cat penutup 2 x
4 Cat Seng 323.400
Cat
5 Teak Oil 19.200
Teak oil

X PEKERJAAN PENGGANTUNG DAN PENGUNCI


1 Pasangan Kunci Tanam Biasa 6
kunci tanam biasa
2 Pasangan Kunci KM/ WC 2
kunci tanam kamar mandi
3 Pasangan Grendel 8
Grendel Ekspagnolet
4 Pasangan Engsel 9
Engsel
5 Pasangan Kait Angin 28
Kait angin
6 Pasangan Anker Doc 60
7 Pasangan Mur, Baut 117
8 Pasangan Beughel U 3

XI PEKERJAAN LAIN - LAIN


1 Pasangan Saluran Keliling Bangunan (Buis Beton U 30 cm) 87.000
Pipa beton
Batu bata
Sement portland
Pasir pasang
Pasir urug

TOTAL KEBUTUHAN MATERIAL

NO. Jenis Barang Total Satuan


1 Agregat Kasar Bulat 2/3 6.164 m3
2 Air bersih 5000 L 1.000 LS
3 Angker Dok 60.000 Buah
4 Arde Pembumian 1.000 Buah
5 Bak cuci piring Stainless Steel 1.000 Buah
6 Bata merah 66408.872 Buah
7 Batu Karang 5 / 7 18.444 m3
8 Batu Karang 43.436 m3
9 Baut + Moer Kuda - kuda 0.12 mm 12.000 Buah
10 Baut + Moer Angker f 12 mm 22.000 Buah
11 Besi Beton Polos Ø 6 mm 313.585 staf
12 Besi Beton Polos Ø 8 mm 51.354 staf
13 Besi Beton Polos Ø 12 mm 91.861 staf
14 Beugel U 3.000 Buah
15 Cat Kayu Dasar 57.041 Kg
16 Cat Kayu Mengkilap 29.993 Kg
17 Cat meni 23.072 Kg
18 Cat seng 97.020 Kg
19 Cat Tembok merk Bell Mas 97.318 Kg
20 Dolken Ø 8 mm/4 m 51.800 btng
21 Dumpul 10.000 Kg
22 Engsel Pintu Merk Everbst 9.000 Buah
23 Expagnolet/grendel pintu tanam 8.000 Buah
24 Floor Drain Stainles Steel 2.000 Buah
25 Instalasi Air Bersih 1.000 Buah
26 Instalasi Air Kotor 1.000 Buah
27 Isolasi Listrik 10.000 Buah
28 Kabel NYY 1.5 mm 132.000 m1
29 Kaca Bening 3 mm 36.498 m2
30 Kait angin 28.000 Buah
31 Kawat Beton 20.691 Kg
32 Kayu kls I Balok (Jati) f 2" 0.725 m3
33 Kayu kls I Papan Tipis (Jati) f6" 1.432 m3
34 Kayu kls II balok 5/7 2.418 m3
35 Kayu kls II balok 4/12 #VALUE! m3
36 Kayu kls II balok 8/12 #VALUE! m3
37 Kayu kls II balok 6/12 #VALUE! m3
38 Kayu kls II papan tipis #REF! m3
39 Keramik putih 30 x 30 cm 860.575 Buah
40 Keramik putih 20 x 20 cm 408.750 Buah
41 Kertas Pasir Besi 10.000 lbr
42 Kertas Pasir Kayu 15.000 lbr
43 Klem Kabel 10.000 dos
44 Kloset Jongkok Merk INA f 20 mm 2.000 Buah
45 Kran air Stainlesstel f 25 mm 3.000 Buah
46 Kunci Pintu Merk Top 2.000 Buah
47 Kunci Pintu Merk Valencia 2x putar 6.000 Buah
48 Kwas 20.000 Buah
49 Lampu TL 40 watt merk Philips Lengkap 2.000 Buah
50 Lampu Pijar 40/60 watt merk Philips 6.000 Buah
51 Lampu Pijar 25 watt 4.000 Buah
52 Lem #REF! Kg
53 List Kaca 304.150 m
54 List Plafond Multipleks 6 mm 160.650 m
55 L Joint PVC Ǿ 2 " 11.000 Buah
56 MCB 1.000 Buah
57 Minyak Cat 55.053 Kg
58 Minyak Tanah LS 1
59 Oli 15.209 ltr
60 Paku halus (2-5 cm) #REF! Kg
61 Paku 5s /d 12 cm #VALUE! Kg
62 Paku Seng 7.956 Kg
63 Paku Skrup 100.000 Buah
64 Pasir Pasang #REF! m3
65 Pasir Beton 4.103 m3
66 Pasir Urugan 38.676 m3
67 Pegangan Pintu 8.000 Buah
68 Pipa beton 95.700 Buah
69 Pegangan Jendela 28.000 Buah
70 Pipa PVC 0.5" untuk listrik 44.000 btng
71 Pipa Penguras Bak Mandi f 40 mm 2.000 Buah
72 Plamuur Tembok Pedang 37.430 Kg
73 Plat Jepit 2 x 50.5 3.000 Buah
74 Plint Keramik 10 x 30 cm #REF! Buah
75 Politur 17.304 Kg
76 Saklar Tunggal merk Broco f 20 mm 2.000 Buah
77 Saklar Ganda merk Broco f 40 mm 5.000 Buah
78 Sekring cast 3 grup f 15 mm 1.000 Buah
79 Seal Tape 0.075 Buah
80 Semen Kupang (portland) 20 kg #REF! Zag
81 Semen Warna #REF! Kg
82 Seng Gelombang BJLS 0.30 mm 226.380 lbr
83 Seng Bubungan BJLS 0.20 mm 11.160 lbr
84 Septictank + Peresapan 1.000 LS
85 Stop Kontak merk Broco 6.000 Buah
86 Tanah Urug 18.840 m3
87 Tangki Fibre Glass 2.2 m3 1.000 Buah
88 Teakwood 3.8 mm #REF! lbr
89 Tegel Mozaik 71.220 Buah
90 Titik Lampu kontak 11.000 ttk
91 T Joint PVC Ǿ 2 " 27.000 Buah
92 Tripleks 2.8 mm 28.260 lbr
93 Wastafel f 75 mm 1.000 Buah
RIAL

KOEFISIEN TOTAL SATUAN

m1
0.012 0.612 m3
0.020 1.020 Kg
0.007 0.357 m3
1.000 LS

m3
1.200 9.222 m3
m3
1.200 18.840 m3

m3
1.200 18.444 m3
0.300 4.611 m3
m3
1.100 43.436 m3
136.000 5370.232 Kg
0.544 21.481 m3
m2
70.000 2553.250 bh
14.370 524.146 Kg
0.040 1.459 m3
m2
70.000 23649.010 bh
9.680 3270.320 Kg
0.045 15.203 m3
m2
6.480 202.500 Kg
0.019 0.594 m3
m2
4.320 1560.600 Kg
0.022 7.948 m3
m2
5.200 67.860 Kg
0.020 0.261 m3
m2
0.009 3.369 Kg
0.009 3.369 m3
0.009 3.369 m3

m3
0.270 0.620 m3
2.000 4.590 Kg
0.600 1.377 ltr
118.118 271.082 Kg
66.442 152.483 Kg
2.768 6.353 Kg
323.000 741.285 Kg
0.520 1.193 m3
0.780 1.790 m3
m3
0.400 0.924 m3
4.000 9.240 Kg
2.000 4.620 ltr
78.253 180.764 Kg
81.447 188.143 Kg
2.396 5.534 Kg
323.000 746.130 Kg
0.520 1.201 m3
0.780 1.802 m3
0.150 0.347 m3
3.500 8.085 lbr
20.000 46.200 btng
m3
0.400 0.112 m3
4.000 1.120 Kg
2.000 0.560 ltr
118.118 33.073 Kg
66.442 18.604 Kg
2.768 0.775 Kg
323.000 90.440 Kg
0.520 0.146 m3
0.780 0.218 m3
0.150 0.042 m3
3.500 0.980 lbr
20.000 5.600 btng
m3
0.400 1.160 m3
2.000 5.800 Kg
0.600 1.740 ltr
118.118 342.543 Kg
66.442 192.681 Kg
2.768 8.028 Kg
323.000 936.700 Kg
0.520 1.508 m3
0.780 2.262 m3
m3
218.000 22.890 Kg
0.520 0.055 m3
0.870 0.091 m3

m2
1.100 0.725 m3
m2
0.040 0.384 m3
m2
#REF! #REF! m3
#REF! #REF! Kg
#REF! #REF! ltr
#REF! #REF! lbr
m2
0.020 0.055 m3
0.300 0.840 Kg
0.300 0.840 ltr
0.347 0.972 lbr
1.000 2.800 lbr
m2

0.035 1.048 m3

1.100 32.934 m2
m2
1.100 3.564 m2
m3
m3
1.100 #VALUE! m3
15.000 #VALUE! Kg
0.800 #VALUE! Kg
m3
1.100 #VALUE! m3
15.000 #VALUE! Kg
0.800 #VALUE! Kg
m3
1.100 #VALUE! m3
15.000 #VALUE! Kg
0.800 #VALUE! Kg

0.009 0.917 m3
0.060 6.396 Kg

m2
0.700 226.380 lbr
0.020 6.468 Kg
m2
0.300 11.160 lbr
0.040 1.488 Kg
m2

0.023 1.806 m3
0.150 11.775 Kg

0.360 28.260 lbr


0.030 2.355 Kg
m1
1.050 160.650 m1

m2
11.870 860.575 bh
8.360 606.100 Kg
0.023 1.668 m3
0.900 65.250 Kg
m2
11.870 71.220 bh
14.150 84.900 Kg
0.039 0.234 m3
2.000 12.000 Kg
m2
25.000 408.750 bh
9.300 152.055 Kg
0.018 0.294 m3
1.500 24.525 Kg
m2
#REF! #REF! bh
#REF! #REF! Kg
#REF! #REF! m3
#REF! #REF! Kg

1 11.000 Titik
1 2.000 Buah
1 6.000 Buah
1 4.000 Buah
1 2.000 Buah
1 5.000 Buah
1 6.000 Buah
1 1.000 Buah
1 1.000 Buah
Buah
1.000 1.000 Buah
0.120 0.120
6.000 6.000 Kg
0.010 0.010 m3
Buah
330.579 661.157 Buah
120.000 240.000 Kg
0.300 0.600 m3
360.000 720.000 Buah
6.000 12.000 Kg
Buah
1.000 2.000 Buah
6.000 12.000 Kg
0.010 0.020 m3
1.000 2.000 unit
1.000 1.000 LS
1.000 1.000 LS
Buah
1.000 2.000 Buah
Buah
1.000 3.000 Buah
0.025 0.075 Buah

m2
0.100 37.430 Kg
0.100 37.430 Kg
0.260 97.318 Kg
m2
0.200 15.700 Kg
0.150 11.775 Kg
0.170 13.345 Kg
0.260 20.410 Kg
m2
0.200 7.372 Kg
0.150 5.529 Kg
0.170 6.266 Kg
0.260 9.583 Kg
m2
0.300 97.020 Kg
m2
0.360 6.912 Kg

Buah
1.000 6.000 Buah
Buah
1.000 2.000 Buah
Buah
1.000 8.000 Buah
Buah
1.000 9.000 Buah
Buah
1.000 28.000 Buah
1.000 60.000 Buah
1.000 117.000 LS
1.000 3.000 Buah

m1
1.100 95.700 Buah
454.545 39545.455 Buah
10.300 896.100 Kg
0.061 5.307 m3
0.069 6.003 m3
KONTROL TENAGA KERJA

PEKERJA = #REF! x Rp 25,000.00 = #REF!


TUKANG BATU = #REF! x Rp 40,000.00 = #REF!
TUKANG BESI = 13 x Rp 40,000.00 = Rp 520,000.00
TUKANG KAYU = #REF! x Rp 40,000.00 = #REF!
TUKANG CAT = 49 x Rp 35,000.00 = Rp 1,715,000.00
KEPALA TUKANG = #REF! x Rp 45,000.00 = #REF!
MANDOR = #REF! x Rp 45,000.00 = #REF!
JUMLAH = #REF!

#REF!
PERCENTASE =
Rp 282,836,590.23

= #REF! %