Cs Pipe Fab Amp Erect Costs
Cs Pipe Fab Amp Erect Costs
Cs Pipe Fab Amp Erect Costs
Stainless 304L & 316 15 Units Total 20 Units Total 25 Units Total 40 Units Total 50 Units Total 80 Units Total 100 Units Total
Pipe size 150 Units Total 200 Units Total 250 Units Total 300 Units Total 350 Units Total 400 Units Total 450 Units Total
Wall thickness 2m/m 2m/m 2m/m 2m/m 2.5m/m 3m/m 3m/m
Handling & erect straight run pipe. 0.89 400 356 1.05 200 210 1.31 30 39.3 1.57 100 157 1.8 30 54 2.13 80 170 2.46 0
Handle & erect fab spool pieces. 1.31 307 402 1.64 109 179 2.03 16 32.5 2.36 36 85 2.69 9 24.2 2.95 34 100 3.61 0
Pipe cutting 0.92 70 64.4 1.08 30 32.4 1.2 4 4.8 1.76 13 22.9 2 3 6 3.1 11 34.1 4 0
Pipe bevelling 0.68 30 20.4 0.88 15 13.2 1.04 2 2.08 1.4 6 8.4 1.7 1 1.7 2.4 5 12 3.2 0
Tack & buttweld 3.1 70 217 3.75 30 113 4.56 4 18.2 5 13 65 5.86 3 17.6 6.8 11 74.8 8.7 0
Slip on flanges & weld 3.65 0 5.17 0 6.45 0 7.56 0 8.85 0 9.36 0 10.02 0
O'lets 12.72 0 13.56 0 0 0 0 0 0
Hydrotesting 1 100 100 50 0 1 10 10 1 36 36 1 10 10 1 40 40 0
Supports 0 0 0 0 0 0 0
0 0 0 0 0 0 0
Total manhours. 1160 546.86 106.9 374.2 113.49 431.6 0
2733.06
Pipe size 500 Units Total 600 Units Total 700 Units Total 900 Units Total 1200 Units Total 1500 Units Total 1700 Units Total
Carbon Steel 15 Units Total 20 Units Total 25 Units Total 40 Units Total 50 Units Total 80 Units Total 100 Units Total
Field Erection
Handling & erect straight run 0.52 0 0.55 0 0.59 0 0.62 0 0.65 20 13 0.75 70 52.5 0.82 60 49.2
Handling & erect fab spools sch 10-60. 0.6 0 0.7 0 0.73 0 0.81 0 0.88 11 9.68 1.02 41 41.8 1.05 39 40.95
Handling & erect fab spools sch 80-100. 0.75 0 0.8 0 0.85 0 0.93 0 1.02 0 1.26 0 1.33 0
Handling & erect fab spools sch 120-160. 0.85 0 0.9 0 1 0 1.12 0 1.26 0 1.56 0 1.6 0
Make on screw fittings & valves. 0.1 0 0.1 0 0.2 0 0.3 0 0.3 0 0.4 0 0.5 0
Field handling valves & install. < 600# 0.2 0 0.2 0 0.3 0 0.4 0 0.5 0 1.2 0 1.75 0
Field erection bolt ups < 600# 0.7 0 0.7 0 0.7 0 0.7 0 0.7 0 0.8 0 1.2 0
Attaching flanges screw type. 1.2 0 1.2 0 1.2 0 1.2 0 1.2 0 1.4 0 1.7 0
Attaching flanges slip on type. 0.9 0 0.9 0 0.9 0 1 0 1.3 0 1.8 0 2.4 0
Attaching flanges weld neck. 1.5 0 1.5 0 1.5 0 1.5 0 1.5 0 2.5 0 3.2 0
Man B/W Tig root run sched 40 pipe. 0.7 0 0.98 0 1.09 0 1.36 0 1.47 4 5.88 2.25 16 36 2.86 13 37.18
Man B/W Tig root run sched 80 pipe. 0.9 0 1.1 0 1.33 0 1.71 0 1.87 0 2.83 0 3.66 0
Man B/W Tig root run sched 160 pipe. 1.2 0 1.6 0 1.83 0 2.37 0 2.76 0 4.04 0 4.88 0
Man B/W Tig root run sched 160 pipe. 0 0 0 0 0 0 5.3 0
Man B/W Tig root run sched 160 pipe. 0 0 0 0 0 0 10 0
Olet type welds. 1.5 0 1.8 0 2.1 0 2.9 0 3.9 0 5.3 0 7 0
Mark cut & bevel < 80. 0.1 0 0.1 0 0.17 0 0.17 0 0.21 4 0.84 0.27 12 3.24 0.4 8 3.2
Threading pipe including cut. 0.23 0 0.23 0 0.23 0 0.26 0 0.3 0 0.39 0 0.42 0
Bending 1.4 0 1.5 0 1.6 0 2 0 2.3 0 3.1 0 4.4 0
Pressure test 10% of piping manhours. 1 0 1 0 1 0 1 0 1 4 4 1 12 12 1 12 12
0 0 0 0 0 0
Total manhours. 0 0 0 0 33.4 146 142.5
321.5
Pipe size 150 Units Total 200 Units Total 250 Units Total 300 Units Total 350 Units Total 400 Units Total 450 Units Total
Handling & erect straight run pipe. 0.91 100 91 1.11 40 44.4 1.41 0 1.7 20 34 2.09 30 62.7 2.46 12 29.5 2.88 0
Handling & erect fab spools sch 10-60. 1.16 58 67.3 1.33 37 49.2 1.7 0 1.74 12 20.9 1.93 18 34.7 2.61 3 7.83 3.05 0
Handling & erect fab spools sch 80-100. 1.58 0 1.79 0 2.21 0 2.28 0 2.78 0 3.18 0 3.75 0
Handling & erect fab spools sch 120-160. 1.96 0 2.16 0 3 0 3.15 0 3.56 0 4.15 0 4.76 0
Field handling valves & install. < 600# 2.31 0 2.94 0 3.1 0 3.6 0 3.85 0 4.55 0 5.2 0
Bolt ups < 300# 1.5 0 2.1 0 2.7 0 3.4 0 3.8 0 4.4 0 4.8 0
Attaching flanges slip on type. 3.6 0 5.1 0 7.56 0 9.24 0 10.8 0 12.6 0 14.64 0
Attaching flanges weld neck. 4.2 0 5.4 0 6.7 0 7.3 0 8.8 0 9.6 0 12 0
Man B/W Tig root run sched 40 pipe. 3.6 22 79.2 4.59 11 50.5 5.45 0 6.62 5 33.1 7.56 7 52.9 8.6 2 17.2 10.05 0
Man B/W Tig root run sched 80 pipe. 4.8 0 6.15 0 7.48 0 9.24 0 10.6 0 11.97 0 13.94 0
Man B/W Tig root run >> sched 160 pipe. 11 0 0 0 45.5 0 0 52 0 0
Mark cut & bevel < 80. 0.55 12 6.6 0.82 6 4.92 1.1 0 1.4 2 2.8 1.6 3 4.8 2 1 2 2.5 0
Pressure test 10% of piping manhours. 1 24 24 1 14 14 1 0 1 9 9 1 15 15 1 6 6 1 0
Install supports at approx 4mtr centres. 4 0 4.5 0 5.3 0 6 0 6.5 0 7 0 7.5 0
0 0 0 0 0 0 0
Total manhours. 268 163 0 99.8 170 62.6 0
763.6
Pipe size 500 Units Total 600 Units Total 750 Units Total 800 Units Total 950 Units Total 1400 Units Total 1500 Units Total
Handling & erect straight run pipe. 3.37 0 3.77 40 151 0 0 0 0 0
Handling & erect fab spools sch 10-60. 3.68 0 4.76 13 61.9 0 0 0 0 0
Handling & erect fab spools sch 80-100.4.42 0 5.16 0 0 0 0 0 0
Handling & erect fab spools sch 120-160.5.23 0 6 0 0 7.2 0 7.6 0 0 0
Handling & erect fab spools sch >160. 0 0 0 0 0 0 0
Field handling valves & install. < 600# 5.67 0 6.3 0 0 7.5 0 0 15.7 0 0
Bolt ups < 300# 5.5 0 6.6 0 0 0 0 0 0
Attaching flanges slip on type. 14.6 0 18.3 0 0 0 0 0 0
Attaching flanges weld neck. 13.3 0 17.6 0 0 0 0 0 0
Man B/W Tig root run sched 40 pipe. 11 0 12.5 6 74.9 0 0 0 0 0
Man B/W Tig root run sched 80 pipe. 15.5 0 17.9 0 0 0 0 0 0
Mark cut & bevel < 80. 2.9 0 3.3 4 13.2 0 3.7 0 4 0 0 0
Pressure test 10% of piping manhours. 1 0 1 21 21 0 0 0 0 0
Install supports at approx 4mtr centres. 9 0 10 0 0 16 0 16 0 0 0
Total manhours. 0 322 0 0 0 0 0
321.8
1407
Carbon steel sch-40 15 Units Total 20 Units Total 25 Units Total 40 Units Total 50 Units Total 80 Units Total 100 Units Total
Workshop Spooling
Wall thickness 2.77 2.87 3.38 3.68 3.91 5.49 6.02
Shop handling pipe for fabrication. 0.1 0 0.1 0 0.1 0 0.012 0 0.13 0 0.26 0 0.35 0
Mark & Cut 0 0 0 0.065 0 0.1 0 0.13 0 0.175 0
Pipe bevelling 0 0 0 0.04 0 0.046 0 0.053 0 0.0693 0
Tack & buttweld 0.85 0 0.85 0 0.85 0 0.9 0 1.1 6 6.6 1.44 16 23 1.78 16 28.48
Slip on flanges & weld 0.6 0 0.6 0 0.75 0 0.8 0 1.12 0 1.48 0 1.87 0
90 deg nozzle ( un reinforced ) 0 0 0 0 0 0 0 0 2.48 0 3.26 0 3.77 0
90 deg nozzle ( reinforced ) 0 0 0 0 0 0 0 0 6.41 0 7.36 0 8.15 0
45 deg nozzle ( un reinforced ) 0 0 0 0 0 0 0 0 3.38 0 4.2 0 4.95 0
45 deg nozzle ( reinforced ) 0 0 0 0 6.6 0 8.36 0 10.2 0
Socket weld 0.56 0 0.56 0 0.6 0 0.7 0 0.75 0 1.48 0 0
O'lets 1.45 0 1.79 0 2.02 0 2.79 0 3.81 0 5.73 0 7.27 0
Install vents or drains 3.5 0 3.6 0 3.73 0 0 0 0 0
Bending 1 x 90deg 1.9 0 1.9 0 1.9 0 2.38 0 2.73 0 3.84 0 5.65 0
Thread pipe including cut. 0.23 0 0.23 0 0.23 0 0.23 0 0.23 0 0.35 0 0.52 0
Total manhours. 0 0 0 0 6.6 23.04 28.48
58.12
Carbon steel sch-40 150 Units Total 200 Units Total 250 Units Total 300 Units Total 350 Units Total 400 Units Total 450 Units Total
Wall thickness 7.11 8.18 9.27 Std-Wt 9.53 9.53 9.53 9.5
Shop handling pipe for fabrication. 0.4 100 40 0.46 0 0.67 0 0.83 0 0.88 0 1.01 0 1.13 0
Mark & Cut 0.312 15 4.68 0.416 0 0.52 0 0.624 0 0.728 0 0.832 0 0.936 0
Pipe bevelling 0.15 12 1.8 0.185 0 0.277 0 0.323 0 0.37 0 0.41 0 0.461 1
Tack & buttweld 2.55 26 66.3 3.09 12 37.08 3.23 0 4.64 5 23.2 4.68 8 37.44 5.2 3 15.6 6.1 0
Slip on flanges & weld 2.68 5 13.4 3.24 0 3.81 0 5.08 0 5.2 0 5.9 0 6.88 0
90 deg nozzle ( un reinforced ) 4.86 2 9.72 5.99 0 7.4 0 8.8 0 9.79 0 11.36 0 14.59 0
90 deg nozzle ( reinforced ) 9.48 0 11.85 0 14.5 0 16.25 0 18.7 0 22.96 0 0
45 deg nozzle ( un reinforced ) 6.05 0 7.59 0 8.91 0 10.25 0 12.66 0 15.68 0 0
45 deg nozzle ( reinforced ) 11.74 0 14.35 0 15.79 0 19.37 0 0 0 0
O'lets 8.82 1 8.82 9.78 0 13.8 0 21.08 0 0 0 0
Total manhours. 144.7 37.08 0 23.2 37.44 15.6 1
259.04
Carbon steel sch-40 500 Units Total 600 Units Total 700 Units Total 750 Units Total 900 Units Total 1050 Units Total 1700 Units Total
Wall thickness 9.53 9.5 9.5 9.5 9.5
Shop handling pipe for fabrication. 1.2 0 1.35 0 1.58 0 1.67 0 2 0 2.4 0 0
Mark & Cut 1.04 0 1.248 0 1.5 0 1.547 0 1.85 0 2.16 0 0
Pipe bevelling 0.512 0 0.615 0 0.72 0 0.769 0 0.922 0 1.077 0 0
Tack & buttweld 6.8 0 8 8 64 9.2 0 10 0 12 14
Slip on flanges & weld 7.87 0 8.84 0 10.2 0 11 0 13 15
90 deg nozzle ( un reinforced ) 16.35 0 20.84 0 29 0 30.5 0 37.5 44
90 deg nozzle ( reinforced ) 0 0 0 0
45 deg nozzle ( un reinforced ) 0 0 0 0
45 deg nozzle ( reinforced ) 0 0 0 0
Total manhours. 0 64 0 0 0 0 0
64
302
Carbon steel sch-80 15 Units Total 20 Units Total 25 Units Total 40 Units Total 50 Units Total 80 Units Total 100 Units Total
Workshop Spooling
Wall thickness 3.73 3.91 4.55 5.08 5.54 7.62 8.56
Shop handling pipe for fabrication. 0.1 0 0.1 0 0.14 0 0.16 0 0.18 0 0.34 0 0.35 0
Mark & Cut 0 0 0.075 0 0.095 0 0.105 0 0.1365 0 0.1838 0
Pipe bevelling 0 0 0.033 0 0.042 0 0.048 0 0.0556 0 0.0728 0
Tack & buttweld 0.7 0 0.75 0 0.8 0 0.95 0 1 0 1.59 0 1.99 0
Slip on flanges & weld 0.75 0 0.8 0 0.85 0 1 0 1.1 0 1.62 0 2.05 0
90 deg nozzle ( un reinforced ) 0 0 0 0 0 0 0 0 3.92 0 4.95 0 5.61 0
90 deg nozzle ( reinforced ) 0 0 0 0 0 0 0 0 7.45 0 9.81 0 10.75 0
45 deg nozzle ( un reinforced ) 0 0 0 0 0 0 0 0 4.29 0 5.45 0 6.49 0
45 deg nozzle ( reinforced ) 0 0 0 0 9.32 0 11.69 0 13.79 0
Socket weld 0.56 0 0.56 0 0.6 0 0.7 0 0.75 0 1.48 0 0
O'lets 2.18 0 2.68 0 3.02 0 4.19 0 5.71 0 8.59 0 10.9 0
Install vents or drains 3.5 0 3.6 0 3.73 0 0 0 0 0
Bending 1 x 90deg 1.9 0 1.9 0 1.9 0 2.38 0 2.73 0 3.84 0 5.65 0
Thread pipe including cut. 0.23 0 0.23 0 0.23 0 0.23 0 0.23 0 0.35 0 0.52 0
Total manhours. 0 0 0 0 0 0 0
Carbon steel sch-80 150 Units Total 200 Units Total 250 Units Total 300 Units Total 350 Units Total 400 Units Total 450 Units Total
Wall thickness 10.97 12.7 15.09 17.48 19.05 21.44 23.83
Shop handling pipe for fabrication. 0.55 0 0.61 0 0.94 0 1.02 0 1.13 0 1.35 0 1.52 0
Mark & Cut 0.328 0 0.4368 0 0.546 0 0.6552 0 0.764 0 0.8736 0 0.9828 0
Pipe bevelling 0.158 0 0.1943 0 0.291 0 0.3392 0 0.389 0 0.431 0 0.4841 0
Tack & buttweld 2.85 0 3.52 0 4.75 0 6.27 0 7.62 0 8.96 0 10.94 0
Slip on flanges & weld 3.14 0 3.8 0 4.9 0 6.1 0 7.4 0 9.05 0 10.5 0
90 deg nozzle ( un reinforced ) 7.54 0 8.64 0 9.37 0 10.92 0 13.49 0 15.68 0 18.2 0
90 deg nozzle ( reinforced ) 12.75 0 17.15 0 19.25 0 21.9 0 25.5 0 29.5 0 0
45 deg nozzle ( un reinforced ) 7.26 0 10.4 0 12.65 0 14.55 0 16.96 0 19.77 0 0
45 deg nozzle ( reinforced ) 14.89 0 21.86 0 25.9 0 29.87 0 34.8 0 40.24 0 0
O'lets 13.22 0 14.67 0 23.46 0 35.84 0 0 0 0
Total manhours. 0 0 0 0 0 0 0
Carbon steel sch-80 500 Units Total 600 Units Total 700 Units Total 750 Units Total 900 Units Total 1050 Units Total 1700 Units Total
Wall thickness 26.19 30.96 S 30 15.88 15.88 16 12.7
Shop handling pipe for fabrication. 1.65 0 1.84 0 0 0 0 0 0
Mark & Cut 1.092 0 1.31 0 0 0 0 0 0
Pipe bevelling 0.538 0 0.646 0 0 0 0 0 0
Tack & buttweld 12.3 0 17.73 0 0 0
Slip on flanges & weld 11.9 0 15 0 0 0
90 deg nozzle ( un reinforced ) 21.81 0 27.8 0 0 0
90 deg nozzle ( reinforced ) 0 0 0 0
45 deg nozzle ( un reinforced ) 0 0 0 0
45 deg nozzle ( reinforced ) 0 0 0 0
Total manhours. 0 0 0 0 0 0 0