Commissioning
Commissioning
College of Engineering
Lucban, Quezon
ME Laboratory 3
MCE23
VIDEO OUTLINE
9 KEY ELEMENTS OF COMMISSIONING
Submitted by:
BSME V-GO
Submitted to:
ME Department Faculty
1. Planning
Without proper planning, you will not be commissioned a plant safely and
in time.
2. Mechanical Completion
This is the time when the commissioning team takes over the system from
3. P&ID Checking
Commissioning Engineers were verify that everything in the field was built
according to specifications.
4. Pre commissioning
5. Commissioning
This step includes for example introduction to utilities, dry running trials,
safe fluid dynamic testing, solvent dynamic testing and process fluid test.
6. Start-Up
This means the entire plant will be taken slowly to full operation.
7. Initial Operation
This phase is necessary to prepare the performance test. During the initial
8. Performance Testing
Now, we have to prove that the plant meets all specifications under
9. Post Commissioning
A reduced commissioning staff will take care and solved open punch
activities.
PLANNING
The first priority during commissioning is safety. To ensure the safe work
you have to think carefully about the complete commissioning process. A good tool for
risk assessment is HAZOP (Hazard Operability Analysis). The pre commissioning and
commissioning of safe plans will be carried out using system by system and unit and unit
basis. Therefore each unit is divided into process and or piping and equipment systems
or subs systems. These systems are generally defined by process boundaries and
incorporate all equipment we carried for particular service or operation part. On a Master
Completion, prioritization means you have to think about the right order for
commissioning systems. Which unit or system do I need when? For example, usually we
need all utility system like plant air, instrument air, steam, etc. at first in the long time of
After you wrote down the completion and prioritization, you have to
communicate it to the construction team to let them know which system to finish and
when. You have to consider which software tool you will used to re caught your
commissioning progress and to capture your test results. It can be one using extra sheets
with some kind of databases like excels or a very specialized software tools like ICAPS
Different documents that needs to prepare before the commissioning team will be
on site.
Time Schedule
Organizational Chart
Checklists
Operating Manual
Pre-Commissioning Procedures
Commissioning Procedures
Safety Procedures
Security Procedures
Test Records
Punchlist Template
Pre-Commissioning Team
Commissioning Team
Operating Team
Maintenance Team
Client’s Team
Contractors
Vendors
Licensor
It is important to plan the material which will be needed during pre-commissioning and
Blinds
Spool Pieces
Hoses
Additional Gaskets
Sample Bottles
It depends on the type of the plant you want to commission, which additional equipment
will be needed. Also, you should plan as well simple tools necessary.
MECHANICAL COMPLETION
installation is in accordance with drawings and specifications and ready for pre-
requirements.
Mechanical
other machines.
Piping
pressure testing
Blowing
Flushing
Chemical cleaning
Drying
Preservation
Reinstatement
Bolt tensioning
Insulation*
Flow coding*
Structural
Electrical
Inspection
Cable trays
Cables
Bend radius
Wiring
Termination
Grounding
Megger Testing
Instrumentation
Inspection
Cable trays
Cables
Bend radius
Wiring
Termination
Grounding
Validation of instruments
Validation of valves
Loop checks
Flushing of tubing
Piping
Equipment
Instrumentation
Point of View
Safety Operations
Construction Maintenance
We can also perform additional tasks to assist subsequent commissioning & start-up
Plans Standards
Specifications
When you performed the P&ID Check, you will for sure find one or more deviations from
the P&ID or other specifications. In such case, you have to put this deviations into a punch
list. If you are unsure of the validity of any item, just contact the lead unit process engineer.
Any punch items which changes any feature of the P&ID must be screened by the
lead unit process engineer from a design and safety point of view before implementation.
Construction
Engineering
QA/QC
such as cleaning, catalyst loading, dry-runs and checks within the systems in order
completion.
Since July 2013, Pre-Commissioning had been using API Recommended Practice
1FSC.
Chemical cleaning
Lubricants application
Installation of filters
6. Oily sewer/clean sewer systems and chemical sewers & neutralization pits
20. Sour water treatment section and chemical handling treatment section
Air blowing
Steam blowing
Water flushing
Chemical cleaning
Tightness test
Is used to record the inspection and status of equipment items within the plant
Cleaning
Chemical cleaning
Drying
Loading of catalysts
Blinds list
Performance Indicators
Tightness tests
Package units
API Recommended Practice 1FSC – is the minor milestone in project when pre-
COMMISSIONING
design process fluids are introduced to the systems and sub-systems. Sometimes
Commissioning moves the project from the “end of construction” closed to the
Group of energized and dynamic tests that constitute verification that each
accordance with design and the systems are ready for start-up.
Grey Area
Cold Commissioning
Hot Commissioning
Cold Commissioning
Dry Commissioning
are the tests and procedures that are conducted without solvents or process
Example activities
Wet Commissioning
We can play here operating scenarios and we see how system behave
Example activities
Hot Commissioning
synonym to “Live Commissioning”
commence commissioning
API Recommended Practice 1FSC – is the minor milestone in project when pre-
trained in their role in such procedures and practical drills held to confirm
effectiveness.
Commissioning of the facilities will be carried out on a system-by system and unit-
by-unit basis.
Interfaces Examples:
Production Planning
production plan for the commissioning and operation of the new facilities
phase.
This commence with first requirements for fuel gas, etc. from the existing
plant for boilers tart-up and heater’s dry through initial feedstock transfer
and start-up. Security of the new facilities requires coordination with the
existing.
Operations safety procedures and permit system for the new facilities must
start-up.
Maintenance Support
Company will perform “hands-on” duties and give technical support during
Vendors
Licensor
Licensor
are complete and the required safety verification is ready to commence start-up.
The phase in a project where the entire plant (all systems and sub-systems) are
taken into operation. Process fluids are introduced and process conditions are
are complete and the required safety verification is ready to commence start-up.
Shift Works:
Client Vendors
Contractor Licensor
Shift log book
Who
How
What
Paper or electronically
Licensor
Pre-Start-Up Checks (What is required to be in place before start-up
Utilities
Feed
Product Storage
Start-Up Procedures Examples:
Pipe & equipment purging
Start-up sequence
Holding steps
Detailed procedures how the systems and the whole plant is brought into
operation
Shut down
Interfaces Examples:
Operations and Maintenance (by company)
Hands-on activities
Licensor
Where necessary, the process licensor may supervise the start-up of relevant
The entire plant is running in continuous operation, fine-tuned and prepared for the
performance test.
Shift Works
Client Vendors
Contractor Licensor
What
Activities
Tuning of process
Data collection
Equipment data
Process data
Performance data
Interfaces Examples:
Hands-on activities
Where necessary, the process licensor may supervise the start-up of relevant
PERFORMANCE TESTING
Performance testing involves operating the facility and carrying out a series of
defined tasks, demonstrations and tests to measure the new plant and equipment
Examples:
Sulphuric Acid Plant 3x4500 tons per day (4x5 consecutive days)
Client Vendors
Contractor Licensor
What
Mutual Agreement
sequences, schedules and other conditions for carrying out the performance
testing.
Interfaces Examples:
Operations and Maintenance (by company)
Hands-on activities
Licensor
Where necessary, the process licensor may supervise the start-up of relevant
Don’t Forget
Does everybody knows what can be touched and what should not be touched
Handover
POST COMMISSIONING
The phase starting after handing over the plant to the client (FAC) – until operations
assistance is not needed anymore and the outstanding punch points are solved.
Activities:
The first routine maintenance checks are performed, findings evaluated and
reported
Process equipment and items covered by warranty are observed for possible
problems
are maintained
Interfaces Examples:
Contractor
He or she is the first contact person for the client in the daily routine
Company
Production Planning
Operations
Maintenance
Licensor
Duration