Jackup Introduction - Structure
Jackup Introduction - Structure
Drill pipes
1. Raising and lowering the drill bit and drill pipe in the well using a
winch and blocks located in the derrick (a highly visible feature of the
rig). The derrick is a lattice of steel mounted over the drill floor where
most of the drilling activity takes place.
3. Circulating drilling fluid down to the drill bit and back to the rig.
Drilling fluid cools the bit, lubricates the hole to prevent sticking, and
carries rock cuttings to the surface. The circulation equipment
consists of high pressure pumps, separation equipment (to separate
rock cuttings from fluid) and storage tanks for the drilling fluid
ADVANTAGES OF JACK UP IN
COMPARISON TO SEMISUBMERSIBLES
• The daily rate is generally lower due to fact that construction cost
is less and it takes less people to operate a jack up.
• It can work over a platform even though some semis are claimed
to be able to workover a platform by sitting on bottom.
• It is cheaper for the operators to use a jack up.
• It needs less powerful boats and less time for relocation
• It does not need to run anchors
• Maintenance costs are less, there is no subsea system, the well
head assembly is much simpler.
• The down time is less on a jack up
-Once on location there is limited motion
-The drilling operation, handling operation are faster
DISADVANTAGES OF JACK UP IN
COMPARISON TO SEMISUBMERSIBLES
• The bottom condition may pose dangers of deep penetration
or punch through.
• The rig can not be move off location in case of a blow out or
other mishap
• The water depth is limited.
Cylindrical legs:
They are hollow steel tubes. They may or may
not have internal stiffening, and may have rack
teeth or holes in the shell to permit jacking of the
hull up and down the legs.
•Currently found on Units operating in water
depths less than 300 feet.
• Not recommended for higher depth design as
these legs require more steel to provide the
same resistance to environmental loads and
provide the same elevated response as truss
legged Units.
•Cylindrical legs take up less deck area and are
generally less complicated requiring less
experience to construct than trussed legs.
Trussed legs:
• Widely used with rack and pinion
system
• Attract lesser loads due to
hydrodynamic “transparency”
• Can be 4 chord or 3 chord
• Can be double pinion or single pinion
• Main components are:
- Chord (rack and split tube)
- Diagonal braces
- Horizontal braces
Chor
Chord
Horizontal Braces
Diagonal Braces
Span Breaker
Rack
Split tube
Chord
3-LEGGED VS. 4-LEGGED JACK-UPS
The great majority of Jack Up Units in the world have no more than
four legs, with three being the minimum required for stability. There
are some Units built with more than four legs.
3 Legged:
•The main advantage of three-legged Units is that they completely
eliminate the need to build extra leg.
•Furthermore, for a given hull size, they can carry more deck load in
the afloat mode; and usually have a reduced number of elevating
units (pinions, cylinders, etc) resulting in reduced power/
maintenance requirements and less weight ,resulting in reduced
power/maintenance requirements, and less weight.
•Disadvantages of three-legged units include the fact that they
require preload tanks and they have no leg redundancy.
3-LEGGED VS. 4-LEGGED JACK-UPS (CONTD…)
4 Legged:
•Units with 4-legs usually have the legs arranged in some
rectangular form.
•Four-legged Units require little or no preload tanks on board. This
is because four legged Units can preload two legs at a time using
the elevated weight as preload weight. This results in a savings of
piping and equipment weights, and more usable space within the
hull.
•Because of the fourth leg, these Units are stiffer in the elevated
mode than a three-legged Unit.
•This apparent advantage may be offset by the fact that the
additional leg adds wind, wave and current loads.
• In the afloat transit mode, the fourth leg is a disadvantage as its
weight causes a direct reduction in the afloat deck load when
compared to an equivalent three legged unit
3-LEGGED VS 4-LEGGED JACK-UPS (CONTD..)
3-CHORDED LEGS VS 4-CHORDED JACK-UPS
All jacking systems exert vertical and horizontal forces on the leg
at the pinion/rack interface (as the contact area is not horizontal).
•Opposed pinion systems balance these loads across the chord
introducing zero net additional horizontal load applied to the leg
bracing.
•Radial pinions exert a horizontal load on the leg bracing due to the
pinion arrangement
OPPOSED PINION CHORDS VS.
RADIAL PINION CHORDS ( CONT…)
LEG AND SPUD CAN SYSTEM
- Spud cans are generally modified circular in general, some times other
geometric configurations are also used
- Spud cans are “footings” that will spread the load on the soil there by
preventing deep penetrations
- Leg to spud can joint to with stand moments due to uneven sea bed
- Generally sized as per the bearing area requirement
- Shape is basically decided based on leg arrangement and to maximize
bearing area and strength of spud can
- Eductors are used for emptying the spud can
- Free flooding is the usual mode of spud can filling
- There are cases where spud cans are designed buoyant
- The so-called rock crusher at tip of can is used when landing on very
hard soil / rock formations
FOOTING
(INDEPENDENT LEG VS MAT TYPE)
• INDEPENDENT LEG
• Spud can of independent type legs are
generally circular or polygonal shape
structure designed with heavy point to
provide penetration in the hardest sea
floor as well as to ease retrieval from deep
penetration soft bottom.
• This type of rig are designed for a wider
range of bottom conditions including
uneven or slanting excessive.
• Latest Jack ups have conical shape
with diameter varying from 10m to20m.
• MAT TYPE
• Mat type of jack up is designed specifically for very soft bottom
such as west coast of India or in Gulf of Mexico.
• During float transit mode, mats provide considerable buoyancy,
which may translate to increased variable load
carrying capability.
• However the bottom must be rather flat and free of outcrop to
limit damage to the mat.
LEG AND SPUD CAN SYSTEM CONTD.
Elevating System
All Jack Ups have mechanisms for lifting and lowering the hull.
Main Types:
• Rack and pinion
Uses racks on legs and pinions mounted on hull/jack frame
• Hydraulic pin type
Uses holes on legs and pins fixed to hull / hydraulic jack frame
Majority of Jack Ups in use today are equipped with a
Rack and Pinion system for continuous jacking
operations.
Rotary Table
Drill floor equipment contd
Drill floor equipment contd
Drill floor equipment contd
Drill floor equipment contd
Drill floor equipment contd
Sand line drum
the same components as Low
main drum
Make up High Gear Gear
cathead Brake Bands Brake-out
High clutch Brake Flange Cathead
Main Drum
Brake handle
Drillers
controls Low clutch
• Generally 25 years
• This is generally standard life for marine structures / vessels
• Will decide the fatigue life parameter during design
ENVIRONMENTAL FORCES ON JACK UP
ENVIRONMENTAL LIMITING CONDITIONS
Survival Environment
• Generally based on metocean data study.
• Minimum storm condition to be considered in the calculations for a
new location are the one with 50 year return period.
• Few class requires 100 year return period environment.
Operating Environment
• Generally derived based on the chosen leg design from the survival
• Operating environment data is from nomograms
• Operating environment will be sometimes critical because of DAF as
operating wave period can be closer to natural period.
• In real operations at site, site specific data is also checked against
Class requirement
AMBIENT TEMPERATURES
• Drill floor area within the derrick shall also comply with dropped
object criteria (for eg, 9 MT from 1 m or 3 MT from 3 m)
CANTILEVER & DRILLING CAPACITY
• Jacking / Afloat VL
- Jacking VL is determined by capacity of jacking system
- Generally jacking VL and afloat VL is same
- Loading condition change may be required between jacking
VL and afloat VL changeover because of spud can buoyancy
loss and to alter LCG and TCG.
OTHER DESIGN BASIS PARTS
-Naval Architectural
- Hull Shape & Size
- Stability and Free Board
- Towing Resistance
-Structural
- Hull
- Cantilever & Drill Floor Structure
- Legs
- Spudcans
- Jackcase Structure
- Crane Foundation & Boom Support Structures
- Deck House
OTHER DESIGN BASIS PARTS
L
PRELOADING
Preloading is process of simulating maximum storm reaction
before jacking up the hull to reach required air gap at a location.
WHY?
Jack-up in addition to gravity load also exposed to environmental
loads which tends to overturn the rig and gives additional vertical
force on leeward side Spudcan. Should the rig have not been
preloaded to simulate leg load , the additional vertical force on the
leeway Spudcan during storm would cause an additional
penetration and resulting tilling of the rig.
FOUNDATION STABILITY
JACK UP FOUNDATION ACCIDENTS
JACK UP FOUNDATION ACCIDENTS
• I
• Generally the rapid penetration of one or more spudcans into the weaker layer will continue
until adequate resistance is encountered at a deeper penetration.
• This resistance is comprised of soil bearing capacity as it increase with depth in the weaker
layer and if the drop is large, to the increasing buoyancy of hull as it enters the water.
SCOUR
• Scour may partially remove the soil from below the spudcan,
resulting in a reduction of the ultimate bearing capacity of the
foundation and any seabed fixity.
• Removal of seabed soils by currents and waves chiefly incurred in
sandy seafloors.
• Scouring often develops in a very short period of time, a few hours
to a few days, when the right current and wave conditions are
satisfied.
• Regular inspection of the state of scouring around the jack up spud
cans is therefore necessary in sandy seafloors.
Thank You
Questions