Database of Success Indicators (Dilg Central Office) : Major Final Output/Ppas Success Indicators Standard Rating Due Date

1) The document provides performance standards and success indicators for various outputs and activities of the Capacity Development core function of the DILG Central Office, including activity designs, attendance sheets, requests for endorsement, invitation letters, liquidation reports, and memorandums. 2) It establishes due dates and measures quality, efficiency, and timeliness in meeting deadlines or completing revisions for each output or activity. Ratings of 5 to 1 are used to evaluate performance. 3) Specific metrics are defined for items like the number of days before or after an event that documents should be submitted and approved, percentages for attendance or funds liquidated, and timeframes for revisions.

Uploaded by

Fender Boyang
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views

Database of Success Indicators (Dilg Central Office) : Major Final Output/Ppas Success Indicators Standard Rating Due Date

1) The document provides performance standards and success indicators for various outputs and activities of the Capacity Development core function of the DILG Central Office, including activity designs, attendance sheets, requests for endorsement, invitation letters, liquidation reports, and memorandums. 2) It establishes due dates and measures quality, efficiency, and timeliness in meeting deadlines or completing revisions for each output or activity. Ratings of 5 to 1 are used to evaluate performance. 3) Specific metrics are defined for items like the number of days before or after an event that documents should be submitted and approved, percentages for attendance or funds liquidated, and timeframes for revisions.

Uploaded by

Fender Boyang
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

DATABASE OF SUCCESS INDICATORS (DILG CENTRAL OFFICE)

PERFORMANCE STANDARD RATING


MAJOR FINAL DUE DATE MEASURES (Quality,
SUCCESS INDICATORS Efficiency,
OUTPUT/PPAS (Timeliness) 5 4 3 2 1
Timeliness) (Outstanding)
(Very
(Satisfactory) (Unsatisfactory) (Poor)
Satisfactory)

CORE FUNCTION: CAPACITY DEVELOPMENT

Q no rev. 1 minor rev. 1 major rev. 2 minor revs. 2 or more major revs.

___ (No.) Activity designs prepared and


Activity Design submitted 30 days before the activity/event 30 days E 130% 115-129% 100-114% 51-99% 50% & below
and approved after 2 revisions
39 days and
T 34-38 days 30-33 days 16-29 days less than 15 days
above

E
Attendance sheets prepared 2 days before the
Attendance sheets 2 days
activity/training/seminar
2days & 6 h 2 days & 3h TO 2 days TO 1 day and 1 h TO
T less than 1 day
and above 2 days & 5 h 2 days & 2h 1day & 7h

Q no rev. 1 minor rev. 1 major rev 2 minor revs 2 or more major revs.

Request for BAC endorsement prepared and E


BAC endorsement submitted 30 days before the activity and 30 days
approved after 2 revisions
39 days and
T 34-38 days 30-33 days 16-29 days less than 15 days
above

Q no rev. 1 minor rev. 1 major rev 2 minor revs 2 or more major revs.

Invitation letter for target participants


E
Invites prepared and submitted 10 days before the 10 days
activity and approved after 2 revisions
13 days and 11 days & 5 h 10 days TO 5 days & 1h to 9
T less than 5 days
above TO 12 days 11 days & 4 h days

Legend: rev - revision wd - working day h - hour m - minute


AS:HRMD:JJ:HFG::jnuyda_spms standard success indicators for CO 1
PERFORMANCE STANDARD RATING
MAJOR FINAL DUE DATE MEASURES (Quality,
SUCCESS INDICATORS Efficiency,
OUTPUT/PPAS (Timeliness) 5 4 3 2 1
Timeliness) (Outstanding)
(Very
(Satisfactory) (Unsatisfactory) (Poor)
Satisfactory)

Q complete incomplete
__ (No.) Liquidation Reports with complete
attachments prepared and submitted 30 days E 130% 115-129% 100-114% 51-99% 50% & below
30 days
after the conduct of activity (for travel 2
weeks)
T 21 days 22-26 days 27-30 days 31-44 days 45 days & beyond
Liquidation Report
Q complete incomplete
__ (No.) Liquidation Reports for cash advance
with complete attachments prepared and 10 days E 130% 115-129% 100-114% 51-99% 50% & below
submitted 10 days after the travel
T 7 days 8 days 9-10 days 11-14 days 15 days & beyond

Q no rev. 1 minor rev. 1 major rev. 2 minor revs. 2 or more major revs.

__ (No.) Memo prepared and submitted 3 days


upon receipt of instruction and approved after 2 3 days E 130% 115-129% 100-114% 51-99% 50% & below
revisions
2 days & 1h TO 2 days & 6h 3 days & 1h TO 4 days & 5 h and
T 2 days
2 days & 5 h TO 3 days 4 days & 4h beyond
Memorandum
Q no rev. 1 minor rev. 1 major rev 2 minor revs 2 or more major revs.
__ (No.) Memo on staff assistance provided to the
head of office prepared and submitted 5 working 5 days E 130% 115-129% 100-114% 51-99% 50% & below
days after the activity and noted after 2 revisions
3 days & 6 h 4 days & 3 h 5 days & 1h TO 7 days & 5h and
T 3 days & 5h
TO 4 days & 2h TO 5 days 7 days & 4h beyond

Q 1 minor rev. 2 minor revs. 1-2 major revs. 3-4 minor revs. 3 or more major revs.
Presentation Materials prepared and submitted 3
Presentation Materials days before the activity and accepted approved 3 days E
after 3 revisions 3 days & 7 3 days & 4 h
3 days TO 1 day 6h TO 2 days
T hours and TO 3 days & 6 less than 1 day & 5 hours
3 days & 3 h &7h
above h

Legend: rev - revision wd - working day h - hour m - minute


AS:HRMD:JJ:HFG::jnuyda_spms standard success indicators for CO 2
PERFORMANCE STANDARD RATING
MAJOR FINAL DUE DATE MEASURES (Quality,
SUCCESS INDICATORS Efficiency,
OUTPUT/PPAS (Timeliness) 5 4 3 2 1
Timeliness) (Outstanding)
(Very
(Satisfactory) (Unsatisfactory) (Poor)
Satisfactory)

Q no rev. 1 minor rev. 1 major rev 2 minor revs 2 or more major revs.

PPMP prepared and submitted 30 days before E


PPMP 30 days
the activity and approved after 2 revisions
39 days and
T 34-38 days 30-33 days 16-29 days less than 15 days
above

Q no rev. 1 minor rev. 1 major rev. 2 minor revs. 2 or more major revs.
Purchase Request prepared and submitted 10
Purchase Request days upon receipt of instruction and approved 10 days E 130% 115-129% 100-114% 51-99% 50% & below
after 2 revisions
T 7 days 8 days 9-10 days 11-14 days 15 days & beyond

Q no rev. 1 minor rev. 1 major rev. 2 minor revs. 2 or more major revs.
___ (No.) Request for Downloading of Funds
Request for Downloading prepared and submitted for approval after 2 E 130% 115-129% 100-114% 51-99% 50% & below
30 days
of Funds revisions and released to FMS 30 days before
the actual activity
39 days and
T 34-38 days 30-33 days 16-29 days less than 15 days
above

Q no rev. 1 minor rev. 1 major rev. 2 minor revs. 2 or more major revs.
Training/Activity Design prepared and
E 130% 115-129% 100-114% 51-99% 50% & below
Training Design submitted 45 days before the actual activity 45 days
and approved after 2 revisions
58 days & 5 h 51 days 7 h TO 45 days to 51
T 23 to 44 days & 7h less than 22 days & 7h
and above 58 days & 4 h days & 6 h

Q no rev. 1 minor rev. 1 major rev 2 minor revs 2 or more major revs.
___ (No.) Terminal Report prepared and
Terminal Report submitted 15 working days after the activity 15 wd E 130% 115-129% 100-114% 51-99% 50% & below
and approved/noted after 2 revisions
10days & 6h
13 TO 15 23 days
T 10 days & 5h TO 16 TO 22 days
days and beyond
12 days & 8 h

Legend: rev - revision wd - working day h - hour m - minute


AS:HRMD:JJ:HFG::jnuyda_spms standard success indicators for CO 3
PERFORMANCE STANDARD RATING
MAJOR FINAL DUE DATE MEASURES (Quality,
SUCCESS INDICATORS Efficiency,
OUTPUT/PPAS (Timeliness) 5 4 3 2 1
Timeliness) (Outstanding)
(Very
(Satisfactory) (Unsatisfactory) (Poor)
Satisfactory)

SUPPORT FUNCTIONS

Q no rev. 1 minor rev. 1 major rev. 2 minor revs. 2 or more major revs.

Accomplishment Report per OPB prepared and


Accomplishment Report submitted 3 days before the deadline and approved 3 days E 130% 115-129% 100-114% 51-99% 50% & below
after 2 revisions
3 days & 7 3 days & 4 h
3 days TO 1 day 6h TO
T hours and TO less than 1 day & 5 hours
3 days & 3 h 2 days & 7 h
above 3 days & 6 h

Q no rev. 1 minor rev. 1 major rev. 2 minor revs. 2 or more major revs.

___ (No.) Activity designs prepared and


Activity Design submitted 30 days before the activity/event 30 days E 130% 115-129% 100-114% 51-99% 50% & below
and approved after 2 revisions

39 days and
T 34-38 days 30-33 days 16-29 days less than 15 days
above

Q no rev. 1 minor rev. 1 major rev. 2 minor revs. 2 or more major revs.

Advisory _______ advisory prepared and submitted 4 E 130% 115-129% 100-114% 51-99% 50% & below
4 hrs
hours upon instruction after 2 revisions
2 h & 9m TO 3h & 5m TO 6h & 1m
T 2h & 8m 4h & 1m TO 6h
3h & 4m 4h and beyond

Q 1 minor rev. 2 minor revs. 1-2 major revs. 3-4 minor revs. 3 or more major revs.

BP Forms prepared and submitted 3 days before E 130% 115-129% 100-114% 51-99% 50% & below
BP Forms 3 days
the deadline and approved after 3 revisions

3 days & 7 3 days & 4 h


3 days TO 1 day 6h TO 2 days
T hours and TO 3 days & 6 less than 1 day & 5 hours
3 days & 3 h &7h
above h

Legend: rev - revision wd - working day h - hour m - minute


AS:HRMD:JJ:HFG::jnuyda_spms standard success indicators for CO 4
PERFORMANCE STANDARD RATING
MAJOR FINAL DUE DATE MEASURES (Quality,
SUCCESS INDICATORS Efficiency,
OUTPUT/PPAS (Timeliness) 5 4 3 2 1
Timeliness) (Outstanding)
(Very
(Satisfactory) (Unsatisfactory) (Poor)
Satisfactory)

Q no rev. 1 minor rev. 1 major rev. 2 minor revs. 2 or more major revs.

__ (No.) Memo prepared and submitted 3 days


upon receipt of instruction and approved after 2 3 days E 130% 115-129% 100-114% 51-99% 50% & below
revisions
2 days & 1h TO 2 days & 6h 3 days & 1h TO 4 days & 5 h and
T 2 days
2 days & 5 h TO 3 days 4 days & 4h beyond

Q no rev. 1 minor rev. 1 major rev 2 minor revs 2 or more major revs.
__ (No.) Memo on staff assistance provided to the
Memorandum head of office prepared and submitted 5 working 5 days E 130% 115-129% 100-114% 51-99% 50% & below
days after the activity and noted after 2 revisions
3 days & 6 h
4 days & 3 h 5 days & 1h TO 7 days & 5h and
T 3 days & 5h TO 4 days &
TO 5 days 7 days & 4h beyond
2h

Q no rev. 1 minor rev. 1 major rev. 2 minor revs. 2 or more major revs.
___ (No.) Request for Downloading of Funds
prepared and submitted for approval after 2
30 days E 130% 115-129% 100-114% 51-99% 50% & below
revisions and released to FMS 30 days before
the actual activity
39 days and
T 34-38 days 30-33 days 16-29 days less than 15 days
above

Q complete incomplete
__ (No.) Liquidation Reports with complete
attachments prepared and submitted 30 days E 130% 115-129% 100-114% 51-99% 50% & below
30 days
after the conduct of activity (for travel 2
weeks)
T 21 days 22-26 days 27-30 days 31-44 days 45 days & beyond
Liquidation Report

Q complete incomplete
__ (No.) Liquidation Reports for cash advance
with complete attachments prepared and 10 days E 130% 115-129% 100-114% 51-99% 50% & below
submitted 10 days after the travel
T 7 days 8 days 9-10 days 11-14 days 15 days & beyond

Legend: rev - revision wd - working day h - hour m - minute


AS:HRMD:JJ:HFG::jnuyda_spms standard success indicators for CO 5
PERFORMANCE STANDARD RATING
MAJOR FINAL DUE DATE MEASURES (Quality,
SUCCESS INDICATORS Efficiency,
OUTPUT/PPAS (Timeliness) 5 4 3 2 1
Timeliness) (Outstanding)
(Very
(Satisfactory) (Unsatisfactory) (Poor)
Satisfactory)

Q no rev. 1 minor rev. 1 major rev. 2 minor revs. 2 or more major revs.
6 Monthly Disbursement Program (BED 3)
Monthly Disbursement prepared and submitted on the 3rd week of 3rd week of E 130% 115-129% 100-114% 51-99% 50% & below
Program May and approved by the head of office after May
2 revisions
1st week of 2nd week of 3rd week of
T 4th week of May June & beyond
May May May

1-2 major
Q 1 minor rev. 2 minor revs. 3-4 minor revs. 3 or more major revs.
revs.

OPB prepared and submitted 3 days before E


OPB 3 days
the deadline and approved after 3 revisions
3 days & 7 3 days & 4 h
3 days TO 1 day 6h TO 2 days
T hours and TO 3 days & 6 less than 1 day & 5 hours
3 days & 3 h &7h
above h

1-2 major
Q 1 minor rev. 2 minor revs. 3-4 minor revs. 3 or more major revs.
revs.
Presentation Materials prepared and
Presentation Materials submitted 3 days before the activity and 3 days E
accepted approved after 3 revisions
3 days & 7 3 days & 4 h
3 days TO 1 day 6h TO 2 days
T hours and TO 3 days & 6 less than 1 day & 5 hours
3 days & 3 h &7h
above h

Q no rev. 1 minor rev. 1 major rev. 2 minor revs. 2 or more major revs.

Post-Activity Report/Back to office Report prepared


Post Activity Report/Back to E 130% 115-129% 100-114% 51-99% 50% & below
and submitted 7 days after the activity and noted 7 days
Office Report
after 2 revisions

7 days & 1 h to 10 days & 5 h &


T 4 days & 8 h 5 to 6 days 6 to 7 days
10 days & 4h beyond

Legend: rev - revision wd - working day h - hour m - minute


AS:HRMD:JJ:HFG::jnuyda_spms standard success indicators for CO 6
PERFORMANCE STANDARD RATING
MAJOR FINAL DUE DATE MEASURES (Quality,
SUCCESS INDICATORS Efficiency,
OUTPUT/PPAS (Timeliness) 5 4 3 2 1
Timeliness) (Outstanding)
(Very
(Satisfactory) (Unsatisfactory) (Poor)
Satisfactory)

Q no rev. 1 minor rev. 1 major rev. 2 minor revs. 2 or more major revs.

Post-Activity Report for trainings conducted


Post Activity Report/Back to
prepared and submitted 10 days after the 10 days E 130% 115-129% 100-114% 51-99% 50% & below
Office Report
training/activity and noted after 2 revisions

T 7 days 8 days 9-10 days 11-14 days 15 days & beyond

LEGAL

100% of documents received/ released to E 130% 115-129% 100-114% 51-99% 50% & below
Documents
concerned offices 8 hours from date of 8 hours
recceived/released
receipt
5h & 7m TO 6h & 9m TO 8h & 1m TO 12h
T 5h & 6m
6h & 8m 8h 11h & 59m and beyond

Q no rev. 1 minor rev. 1 major rev. 2 minor revs. 2 or more major revs.
75% of assigned legislative bills reviewed 30
Review/comment on days from date of assignment with Position
30 days E 130% 115-129% 100-114% 51-99% 50% & below
legislative bills Paper prepared and approved without
exceeding 2 revisions
T 21 days 22-26 days 27-30 days 31-44 days 45 days & beyond

Q no rev. 1 minor rev. 1 major rev. 2 minor revs. 2 or more major revs.

100% of assigned contracts prepared with


Review/Comment on
Legal Review 3 days from date of assignment 3 days E 130% 115-129% 100-114% 51-99% 50% & below
draft Contracts
without exceeding 2 revisions
2 days & 1h TO 2 days & 6h 3 days & 1h TO 4 days & 5 h and
T 2 days
2 days & 5 h TO 3 days 4 days & 4h beyond

Legend: rev - revision wd - working day h - hour m - minute


AS:HRMD:JJ:HFG::jnuyda_spms standard success indicators for CO 7
PERFORMANCE STANDARD RATING
MAJOR FINAL DUE DATE MEASURES (Quality,
SUCCESS INDICATORS Efficiency,
OUTPUT/PPAS (Timeliness) 5 4 3 2 1
Timeliness) (Outstanding)
(Very
(Satisfactory) (Unsatisfactory) (Poor)
Satisfactory)

Q no rev. 1 minor rev. 1 major rev. 2 minor revs. 2 or more major revs.

100% of letters /communications received E 130% 115-129% 100-114% 51-99% 50% & below
prepared with reply/acknowledgement 3 days 3 days
upon receipt and approved after 2 revisions
2 days & 1h TO 2 days & 6h 3 days & 1h TO 4 days & 5 h and
T 2 days
2 days & 5 h TO 3 days 4 days & 4h beyond

Q no rev. 1 minor rev. 1 major rev. 2 minor revs. 2 or more major revs.

5% of letters /records acted upon within 10


days (simple) from date of assignment and 10 days E 130% 115-129% 100-114% 51-99% 50% & below
approved after 2 revisions

T 7 days 8 days 9-10 days 11-14 days 15 days & beyond


Replies to
communications/queries/ 1-2 minor 2-4 minor
referrals Q 5 minor revs. 1-3 major revs. 4 or more major revs.
revs. revs.

5% of letters /records acted upon within 25


days (complex) from date of assignment and 25 days E 130% 115-129% 100-114% 51-99% 50% & below
approved after 5 revisions
17 days & 6h
21 days & 4h 25 days & 1h TO 37 days & 5h and
T 17 days & 5h TO 21 days &
TO 25 days 37 days & 4h beyond
3h

Q no rev. 1 minor rev. 1 major rev. 2 minor revs. 2 or more major revs.
100% of documents received/indorsed/
referred to other offices (DILG /other E 130% 115-129% 100-114% 51-99% 50% & below
2 days
agencies) 2 days upon receipt of action
officer and approved after 2 revisions
1 day & 5h TO 2 days & 1h TO
T 1day & 4h 2 days 3 days & beyond
1 day & 7h 2 days 7 hours

Legend: rev - revision wd - working day h - hour m - minute


AS:HRMD:JJ:HFG::jnuyda_spms standard success indicators for CO 8
PERFORMANCE STANDARD RATING
MAJOR FINAL DUE DATE MEASURES (Quality,
SUCCESS INDICATORS Efficiency,
OUTPUT/PPAS (Timeliness) 5 4 3 2 1
Timeliness) (Outstanding)
(Very
(Satisfactory) (Unsatisfactory) (Poor)
Satisfactory)

Q no rev. 1 minor rev. 1 major rev. 2 minor revs. 2 or more major revs.

Replies to simple communications prepared E 130% 115-129% 100-114% 51-99% 50% & below
Replies to communication and submitted 3 days upon receipt and 3 days
approved after 2 revisions
2 days & 1h TO 2 days & 6h 3 days & 1h TO 4 days & 5 h and
T 2 days
2 days & 5 h TO 3 days 4 days & 4h beyond

ADMIN REQUIREMENTS

Q no rev. 1 minor rev. 1 major rev 2 minor revs 2 or more major revs.

SPMS form 3 (IPCR) Commitments prepared E


and submitted on the deadline and approved on the deadline
after 2 revisions
2 wd before 1 wd before on the 1-2 wd after
T 3 wd & beyond
deadline deadline deadline deadline

Q complete incomplete
SPMS Form 3 (IPCR) Ratings with complete
attachments (SPMS Form 4 - Monthly DPCR E
Accomplished SPMS
Monitoring Form) prepared and submitted on the deadline
forms
on the deadline and approved after 2
2 wd before 1 wd before on the 1-2 wd after
revisions T 3 wd & beyond
deadline deadline deadline deadline

Q no rev. 1 minor rev. 1 major rev 2 minor revs 2 or more major revs.

SPMS Form 2 (DPCR) Commitments prepared


and submitted on the deadline and approved on the deadline E
after 2 revisions
2 wd before 1 wd before on the 1-2 wd after
T 3 wd & beyond
deadline deadline deadline deadline

Legend: rev - revision wd - working day h - hour m - minute


AS:HRMD:JJ:HFG::jnuyda_spms standard success indicators for CO 9
PERFORMANCE STANDARD RATING
MAJOR FINAL DUE DATE MEASURES (Quality,
SUCCESS INDICATORS Efficiency,
OUTPUT/PPAS (Timeliness) 5 4 3 2 1
Timeliness) (Outstanding)
(Very
(Satisfactory) (Unsatisfactory) (Poor)
Satisfactory)

Q complete incomplete
SPMS Form 2 (DPCR) Ratings with complete
E
attachments (SPMS Form 5, 6, 7, 9 & 10) on the deadline
prepared and submitted on the deadline
2 wd before 1 wd before on the 1-2 wd after
T 3 wd & beyond
deadline deadline deadline deadline

SPMS Form 1 (OPCR) Commitments prepared E


on the deadline
and submitted on the deadline
2 wd before 1 wd before on the 1-2 wd after
T 3 wd & beyond
deadline deadline deadline deadline
Accomplished SPMS
Q
forms

SPMS Form 1 (OPCR) prepared and submitted E


on the deadline
on the deadline
2 wd before 1 wd before on the 1-2 wd after
T 3 wd & beyond
deadline deadline deadline deadline

Q no rev. 1 minor rev. 1 major rev 2 minor revs 2 or more major revs.
SPMS Form 8 for individual employees or
Form 14 for DCs (IDP) prepared and submitted E
on the deadline
on the deadline and approved after 2
revisions
2 wd before 1 wd before on the 1-2 wd after
T 3 wd & beyond
deadline deadline deadline deadline

Q no rev. 1 minor rev. 1 major rev. 2 minor revs. 2 or more major revs.

Response to AOM prepared and submitted 2 days


COA Audit Observation E
upon receipt and approved by the head of office 2 days
Memo
after 2 revisions
1 day & 5h TO 2 days & 1h TO
T 1day & 4h 2 days 3 days & beyond
1 day & 7h 2 days 7 hours

Legend: rev - revision wd - working day h - hour m - minute


AS:HRMD:JJ:HFG::jnuyda_spms standard success indicators for CO 10
PERFORMANCE STANDARD RATING
MAJOR FINAL DUE DATE MEASURES (Quality,
SUCCESS INDICATORS Efficiency,
OUTPUT/PPAS (Timeliness) 5 4 3 2 1
Timeliness) (Outstanding)
(Very
(Satisfactory) (Unsatisfactory) (Poor)
Satisfactory)

Q no rev. 1 minor rev. 1 major rev. 2 minor revs. 2 or more major revs.
CRA prepared and submitted 10 days after
Consolidated Report of
receipt of printed DTR and approved after 2 10 days E 130% 115-129% 100-114% 51-99% 50% & below
Attendance (CRA)
revisions
T 7 days 8 days 9-10 days 11-14 days 15 days & beyond

Q complete incomplete

Completely filled-out DTRwith attachments E 130% 115-129% 100-114% 51-99% 50% & below
Daily Time Record (DTR) 8 hrs
submitted 8 hours upon receipt
5h & 7m TO 6h & 9m TO 8h & 1m TO 12h
T 5h & 6m
6h & 8m 8h 11h & 59m and beyond

Q no rev. 1 minor rev. 1 major rev. 2 minor revs. 2 or more major revs.

Department Order Department Order prepared and submitted 5 E 130% 115-129% 100-114% 51-99% 50% & below
(Trainings) working days before the conduct of activity 5 days
and approved after 2 revisions
5 days TO
6 days & 4 h 5 days & 6h TO 2 days & 5h TO less than 2 days & 5
T 5 days & 7
and above 6 days and 3h 4 days & 7 h hours
hrs

DTR - Review Accomplished DTRs reviewed 4 hours upon E 130% 115-129% 100-114% 51-99% 50% & below
4 hrs
receipt
2 h & 9m TO 3h & 5m TO 6h & 1m
T 2h & 8m 4h & 1m TO 6h
3h & 4m 4h and beyond

Q no rev. 1 minor rev. 1 major rev. 2 minor revs. 2 or more major revs.
ISO Form (Potential;
Interview Form, ISO Forms submitted 50 days upon receipt of E 130% 115-129% 100-114% 51-99% 50% & below
50 days
Comparative Assessment PQE Results and approved after 2 revisions
35 days & 1h
Form, etc.) 42 days & 6h 50 days & 1h TO 74 days & 6h
T 35 days TO 42 days &
TO 50 days 74 days &5h and beyond
5h
Legend: rev - revision wd - working day h - hour m - minute
AS:HRMD:JJ:HFG::jnuyda_spms standard success indicators for CO 11
PERFORMANCE STANDARD RATING
MAJOR FINAL DUE DATE MEASURES (Quality,
SUCCESS INDICATORS Efficiency,
OUTPUT/PPAS (Timeliness) 5 4 3 2 1
Timeliness) (Outstanding)
(Very
(Satisfactory) (Unsatisfactory) (Poor)
Satisfactory)

Notice of Meeting for sub selection E 130% 115-129% 100-114% 51-99% 50% & below
Notice of Meeting deliberation prepared 5 days upon receipt of 5 days
approved PRF
3 days & 6 h 4 days & 3 h 5 days & 1h TO 7 days & 5h and
T 3 days & 5h
TO 4 days & 2h TO 5 days 7 days & 4h beyond

1-2 major
Q 1 minor rev. 2 minor revs. 3-4 minor revs. 3 or more major revs.
revs.
Minutes of the Meeting prepared and
submitted 7 days after the conduct of sub E 130% 115-129% 100-114% 51-99% 50% & below
Minutes of the Meeting 7 days
selection deliberation and approved after 3
revisions
7 days & 1 h to 10 days & 5 h &
T 4 days & 8 h 5 to 6 days 6 to 7 days
10 days & 4h beyond

Updated PDS submitted on the last working last working day 2 wd before 1 wd before
PDS on the last 1-2 wd after the
day of January of January the last the last
T working day last working day 3 wd & beyond
working day working day
of January of January
of January of January

1-2 major
Q 1 minor rev. 2 minor revs. 3-4 minor revs. 3 or more major revs.
revs.

Personnel Requisition PRF submitted 5 days upon receipt of E 130% 115-129% 100-114% 51-99% 50% & below
5 days
Form (PRF) instruction and approved after 3 revisions
3 days & 6 h 4 days & 3 h 5 days & 1h TO 7 days & 5h and
T 3 days & 5h
TO 4 days & 2h TO 5 days 7 days & 4h beyond

Position Description and PDQ submitted 15 days upon receipt of E 130% 115-129% 100-114% 51-99% 50% & below
15 days
Qualification (PDQ) appointment
10days & 6h TO 13 TO 15 23 days
T 10 days & 5h 16 TO 22 days
12 days & 8 h days and beyond

Legend: rev - revision wd - working day h - hour m - minute


AS:HRMD:JJ:HFG::jnuyda_spms standard success indicators for CO 12
PERFORMANCE STANDARD RATING
MAJOR FINAL DUE DATE MEASURES (Quality,
SUCCESS INDICATORS Efficiency,
OUTPUT/PPAS (Timeliness) 5 4 3 2 1
Timeliness) (Outstanding)
(Very
(Satisfactory) (Unsatisfactory) (Poor)
Satisfactory)

Q no rev. 1 minor rev. 1 major rev. 2 minor revs. 2 or more major revs.

Request for BAC resolution prepared and


Request BAC Resolution E 130% 115-129% 100-114% 51-99% 50% & below
submitted 30 days prior to the activity, and 30 days
approved after 2 revisions
39 days and
T 34-38 days 30-33 days 16-29 days less than 15 days
above

Q no rev. 1 minor rev. 1 major rev. 2 minor revs. 2 or more major revs.

Request for posting of Request for posting of draft MC prepared and


Draft MC submitted 8 hours upon receipt of request 8 hrs E 130% 115-129% 100-114% 51-99% 50% & below
and approved after 2 revisions
5h & 7m TO 6h & 9m TO 8h & 1m TO 12h
T 5h & 6m
6h & 8m 8h 11h & 59m and beyond

E 130% 115-129% 100-114% 51-99% 50% & below


SALN with complete information submitted last working day
SALN
on the last working day of March of March 2 wd before 1 wd before
on the last 1-2 wd after the
the last the last
T working day last working day 3 wd & beyond
working day working day
of March of March
of March of March

Legend: rev - revision wd - working day h - hour m - minute