0% found this document useful (0 votes)
246 views49 pages

Cube Strength - Concrete Trend Analysis - SCM2-Not Update

The document is a report from Lim Hoo Seng Construction Sdn Bhd about concrete mixes used for Setia City Mall 2. It includes details of 11 trial concrete mixes conducted between February and April, including the mix reference, grade, slump/flow, date cast, and compressive strength test results at 3 days, 7 days, 14 days, and 28 days. The concrete was supplied by Lafarge and compressive strength results met specifications.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
246 views49 pages

Cube Strength - Concrete Trend Analysis - SCM2-Not Update

The document is a report from Lim Hoo Seng Construction Sdn Bhd about concrete mixes used for Setia City Mall 2. It includes details of 11 trial concrete mixes conducted between February and April, including the mix reference, grade, slump/flow, date cast, and compressive strength test results at 3 days, 7 days, 14 days, and 28 days. The concrete was supplied by Lafarge and compressive strength results met specifications.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 49

LIM HOO SENG CONSTRUCTION SDN BHD

SETIA CITY MALL 2


CONCRETE GRADE : VARIOUS
MIX REFERENCE : TRIAL MIX
SUPPLIER : LAFARGE

3
SLUMP
Batch No. Location Floor GRID Structure Grade (mm)/ Date Cast DO No
FLOW
Cube Ref.

-1
FRESH
1 - - TRIAL MIX 30N 75+/-25 5-Feb-18 -2
CONCRETE
-3
-1
FRESH
2 - - TRIAL MIX 30P 100+/-25 5-Feb-18 -2
CONCRETE
-3
-1
FRESH
3 - - TRIAL MIX 35N 75+/-25 5-Feb-18 -2
CONCRETE
-3
-1
FRESH
4 - - TRIAL MIX 35P 100+/-25 5-Feb-18 -2
CONCRETE
-3
-1
FRESH
5 - - TRIAL MIX 30N 75+/-25 28-Mar-18 -2
CONCRETE
-3
-1
FRESH
6 - - TRIAL MIX 30P 100+/-25 28-Mar-18 -2
CONCRETE
-3
-1
FRESH
7 - - TRIAL MIX 35N 75+/-25 28-Mar-18 -2
CONCRETE
-3
-1
FRESH
8 - - TRIAL MIX 35P 100+/-25 28-Mar-18 -2
CONCRETE
-3
-1
FRESH
9 - - TRIAL MIX 25N 75+/-25 29-Mar-18 -2
CONCRETE
-3
-1
FRESH
10 - - TRIAL MIX 25P 100+/-25 29-Mar-18 -2
CONCRETE
-3
-1
FRESH
11 - - TRIAL MIX 35N (WP) 75+/-25 9-Apr-18 -2
CONCRETE
-3
-1
FRESH
12 - - TRIAL MIX 35P (WP) 100+/-25 9-Apr-18 -2
CONCRETE
-3
-1
FRESH 35P (Early
13 - - TRIAL MIX 100+/-25 18-Apr-18 -2
CONCRETE Strength)
-3
Age of Test

3 Day 7 Day

Date Test Test Age N/mm2 Ave. Cube Ref. Date Test Test Age N/mm2 Ave.

-4
-5
-6
-4
-5
-6
33.3 -4 40.6
8-Feb-18 3 Days 31.7 32.5 -5 12-Feb-18 7 Days 39.9
32.6 -6 41.0
36.8 -4 42.4
8-Feb-18 3 Days 36.7 36.8 -5 12-Feb-18 7 Days 41.7
36.9 -6 40.8
-4 23.0
-5 4-Apr-18 7 Days 21.6 22.4
-6 22.6
-4 26.1
-5 4-Apr-18 7 Days 26.1 25.9
-6 25.6
-4 26.7
-5 4-Apr-18 7 Days 27.3 27.5
-6 28.4
-4 22.2
-5 4-Apr-18 7 Days 22.1 22.5
-6 23.3
-4 18.2
-5 5-Apr-18 7 Days 17.8 17.8
-6 17.3
-4 19.8
-5 5-Apr-18 7 Days 19.9 19.8
-6 19.7
32.2 -4 42.0
13-Apr-18 4 Days 33.0 32.5 -5 17-Apr-18 8 41.6 41.4
32.3 -6 40.5
32.2 -4 41.0
13-Apr-18 4 Days 31.1 32.8 -5 17-Apr-18 8 39.3 40.1
35.1 -6 40.0
31.2 -4 39.9
21-Apr-18 3 Days 28.3 30.0 -5 25-Apr-18 7 42.5 41.4
30.5 -6 41.7
Age of Test

14 Day 28 Day

Cube Ref. Date Test Test Age N/mm2 Test result Cube Ref. Date Test Test Age N/mm2 Test result

-7 -10
-8 -11
-9 -12
-7 -10
-8 -11
-9 -12
-7 -10 43.8
-8 -11 5-Mar-18 28 Days 46.0 44.6
-9 -12 43.9
-7 -10 53.4
-8 -11 5-Mar-18 28 Days 47.8 49.1
-9 -12 46.2
-7 28.4 -10 32.8
-8 13-Apr-18 16 25.4 26.8 -11 25-Apr-18 28 Days 33.3 32.7
-9 26.5 -12 31.9
-7 30.7 -10 36.6
-8 13-Apr-18 16 31.9 30.5 -11 25-Apr-18 28 Days 36.1 35.7
-9 28.9 -12 34.5
-7 32.1 -10 38.1
-8 13-Apr-18 16 32.2 31.9 -11 25-Apr-18 28 Days 39.6 38.5
-9 31.4 -12 37.8
-7 29.2 -10 32.8
-8 13-Apr-18 16 26.7 27.8 -11 25-Apr-18 28 Days 30.0 31.5
-9 27.5 -12 31.8
-7 21.4 -10 29.6
-8 13-Apr-18 15 22.6 21.9 -11 26-Apr-18 28 Days 30.9 31.4
-9 21.7 -12 33.6
-7 21.2 -10 32.6
-8 13-Apr-18 15 22.2 21.4 -11 26-Apr-18 28 Days 28.6 29.6
-9 20.9 -12 27.6
-7 51.7
-8 9-May-18 30 Days 52.9 52.4
-9 52.6
-7 50.1
-8 9-May-18 30 Days 56.0 52.8
-9 52.2
-7 45.0
-8 16-May-18 28 Days 50.3 48.6
-9 50.6
Criteria 1 Criteria 2
(Average of Consecutive 4 Test (Each Test result ≥ 0.85
Standard Current Results ≥ fck + 0.5 CM) fck)
Deviation, Margin,
σ 1.64 x σ35 Average of
fck + 0.5
Remark
4 Test 0.85 fck
CM Status Status
Results
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
LIM HOO SENG CONSTRUCTION SDN BHD
SETIA CITY MALL 2
CONCRETE GRADE : VARIOUS
MIX REFERENCE : TRIAL MIX
SUPPLIER : VIMIX

SLUMP
Batch No. Location Floor GRID Structure Grade (mm)/ Date Cast DO No
FLOW
Cube Ref.

1
FRESH
1 - - TRIAL MIX 30N 75+/-25 2-Feb-18 2
CONCRETE
3
1
FRESH
2 - - TRIAL MIX 30P 100+/-25 2-Feb-18 2
CONCRETE
3
1
FRESH
3 - - TRIAL MIX 35N 75+/-25 2-Feb-18 2
CONCRETE
3
1
FRESH
4 - - TRIAL MIX 35P 100+/-25 2-Feb-18 2
CONCRETE
3
1
FRESH
5 - - TRIAL MIX 20P 100+/-25 22-Mar-18 2
CONCRETE
3
1
FRESH
6 - - TRIAL MIX 25P 100+/-25 22-Mar-18 2
CONCRETE
3
1
FRESH
7 - - TRIAL MIX 30P 100+/-25 22-Mar-18 2
CONCRETE
3
1
FRESH
8 - - TRIAL MIX 35P 100+/-25 22-Mar-18 2
CONCRETE
3

10

11
12
Age of Test

3 Day 7 Day

Date Test Test Age N/mm2 Ave. Cube Ref. Date Test Test Age N/mm2 Test result Cube Ref.

4 7
5 8
6 9
4 7
5 8
6 9
4 31.0 7
5 9-Feb-18 7 Days 30.6 31.2 8
6 31.9 9
4 26.2 7
5 9-Feb-18 7 Days 26.2 26.5 8
6 27.2 9
14.2 4 18.7 7
26-Mar-18 4 Days 14.0 14.2 5 29-Mar-18 7 Days 18.3 18.5 8
14.3 6 18.4 9
20.7 4 27.4 7
26-Mar-18 4 Days 19.5 20.2 5 29-Mar-18 7 Days 25.5 26.6 8
20.5 6 26.8 9
24.6 4 29.6 7
26-Mar-18 4 Days 22.1 23.1 5 29-Mar-18 7 Days 29.2 29.4 8
22.7 6 29.4 9
25.3 4 30.7 7
26-Mar-18 4 Days 25.3 25.5 5 29-Mar-18 7 Days 32.3 31.3 8
25.8 6 30.9 9
Criteria 1 Criteria 2
(Average of Consecutive 4 Test (Each Test result ≥ 0.85
28 Day Standard Current Results ≥ fck + 0.5 CM) fck)
Deviation, Margin,
σ 1.64 x σ35 Average of
fck + 0.5
4 Test 0.85 fck
Date Test Test Age N/mm 2
Test result CM Status
Results
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2

38.8
2-Mar-18 28 Days 37.7 38.7
39.5
37.8
2-Mar-18 28 Days 35.5 35.4
32.9
27.6
19-Apr-18 28 Days 26.2 26.7
26.4
38.3
19-Apr-18 28 Days 39.1 37.3
34.5
42.0
19-Apr-18 28 Days 44.3 43.0
42.6
45.3
19-Apr-18 28 Days 44.7 44.5
43.6
Criteria 2
(Each Test result ≥ 0.85
fck)
Remark

Status
LIM HOO SENG CONSTRUCTION SDN BHD
SETIA CITY MALL 2
CONCRETE GRADE : VARIOUS
MIX REFERENCE : TRIAL MIX
SUPPLIER : GREAT CONCRETE

3
SLUMP
Batch No. Location Floor GRID Structure Grade (mm)/ Date Cast DO No
FLOW
Cube Ref.

FRESH
1 - - TRIAL MIX 20N 75+/-25 24-Jan-18 20275
CONCRETE

FRESH
2 - - TRIAL MIX 35N 75+/-25 24-Jan-18 20276
CONCRETE

FRESH
3 - - TRIAL MIX 35P 100+/-25 24-Jan-18 20277
CONCRETE

21458 -1
FRESH
4 - - TRIAL MIX 30N 75+/-25 16-Apr-18 21458 21458 -2
CONCRETE
21458 -3
21460-1
FRESH
5 - - TRIAL MIX 30P 100+/-25 16-Apr-18 21460 21460-2
CONCRETE
21460-3
21457-1
FRESH
6 - - TRIAL MIX 35N 75+/-25 16-Apr-18 21457 21457-2
CONCRETE
21457-3
21455-1
FRESH
7 - - TRIAL MIX 35P 100+/-25 16-Apr-18 21455 21455-2
CONCRETE
21455-3
21457-1
FRESH
8 - - TRIAL MIX 35N (WP) 75+/-25 16-Apr-18 21457 21457-2
CONCRETE
21457-3
21455-1
FRESH
9 - - TRIAL MIX 35P (WP) 100+/-25 16-Apr-18 21455 21455-2
CONCRETE
21455-3
Age of Test

3 Day 7 Day

Date Test Test Age N/mm2 Ave. Cube Ref. Date Test Test Age N/mm2 Ave.

20275 -1 20.3
20275 -2 1-Feb-18 8 20.0 19.9
20275 -3 19.5
20276 -1 29.2
20276 -2 1-Feb-18 8 27.8 29.0
20276 -3 30.0
20277 -1 35.7

20277 -2 1-Feb-18 8 35.8 37.5

20277 -3 41.1
26.3 21458 -4 29.9
19-Apr-18 3 Days 25.3 25.3 21458 -5 23-Apr-18 7 29.7 29.7
24.2 21458 -6 29.6
24.4 21460-4 28.3
19-Apr-18 3 Days 23.3 24.0 21460-5 23-Apr-18 7 29.3 29.1
24.3 21460-6 29.8
32.8 21457-4 36.9
19-Apr-18 3 Days 31.0 31.8 21457-5 23-Apr-18 7 37.1 36.9
31.6 21457-6 36.7
27.5 21455-4 32.4
19-Apr-18 3 Days 26.1 27.1 21455-5 23-Apr-18 7 32.5 32.6
27.6 21455-6 32.9
30.5 21457-4 36.3
19-Apr-18 3 Days 30.4 30.7 21457-5 23-Apr-18 7 35.5 35.9
31.3 21457-6 36.0
27.6 21455-4 32.8
19-Apr-18 3 Days 26.0 27.3 21455-5 23-Apr-18 7 33.7 33.9
28.4 21455-6 35.3
Age of Test

14 Day 28 Day

Cube Ref. Date Test Test Age N/mm2 Test result Cube Ref. Date Test Test Age N/mm2 Test result

20275 -4 25.1
20275 -5 21-Feb-18 28 23.4 24.0
20275 -6 23.4
20276 -4 37.6
20276 -5 21-Feb-18 28 35.1 36.1
20276 -6 35.5
20277 -4 45.4

20277 -5 21-Feb-18 28 47.2 46.6

20277 -6 47.3
21458-7 40.4
21458-8 15-May-18 29 Days 42.4 41.5
21458-9 41.6
21460-7 42.3
21460-8 15-May-18 29 Days 41.5 42.2
21460-9 42.8
21457-7 50.2
21457-8 15-May-18 29 Days 48.0 48.0
21457-9 45.8
21455-7 43.0
21455-8 15-May-18 29 Days 43.4 42.9
21455-9 42.3
21457-7 51.8
21457-8 15-May-18 29 Days 45.3 48.0
21457-9 46.8
21455-7 45.2
21455-8 15-May-18 29 Days 44.8 44.5
21455-9 43.6
Criteria 1 Criteria 2
(Average of Consecutive 4 Test (Each Test result ≥ 0.85
Standard Current Results ≥ fck + 0.5 CM) fck)
Deviation, Margin,
σ 1.64 x σ35 Average of
fck + 0.5
Remark
4 Test 0.85 fck
CM Status Status
Results
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
LIM HOO SENG CONSTRUCTION SDN BHD
SETIA CITY MALL 2
CONCRETE GRADE : VARIOUS
MIX REFERENCE : TRIAL MIX
SUPPLIER : SETIA READYMIX

SLUMP
Batch No. Location Floor GRID Structure Grade (mm)/ Date Cast DO No
FLOW

FRESH
1 - - TRIAL MIX 35N (GBI) 75+/-25 15-Aug-18
CONCRETE

FRESH 35N (GBI)


2 - - TRIAL MIX 75+/-25 15-Aug-18
CONCRETE xypex

FRESH
3 - - TRIAL MIX 35P (GBI) 100+/-25 15-Aug-18
CONCRETE

FRESH 35P (GBI)


4 - - TRIAL MIX 100+/-25 15-Aug-18
CONCRETE xypex

FRESH G35T2
5 - - TRIAL MIX 175+/-25 18-Sep-18
CONCRETE (GBI)
UCTION SDN BHD

Age of Test

3 Day 7 Day

Cube Ref. Date Test Test Age N/mm2 Ave. Cube Ref. Date Test Test Age N/mm2

1 27.8 4 34.4
2 19-Aug-18 4 Days 26.7 27.0 5 23-Aug-18 8 35.0
3 26.7 6 32.2
1 26.2 4 39.7
2 19-Aug-18 4 Days 27.3 27.0 5 23-Aug-18 8 40.3
3 27.3 6 40.0
1 26.7 4 40.2
2 19-Aug-18 4 Days 27.3 26.9 5 23-Aug-18 8 39.0
3 26.7 6 38.1
1 27.1 4 42.1
2 19-Aug-18 4 Days 27.6 27.1 5 23-Aug-18 8 43.3
3 26.7 6 43.7
1 24.0 4 38.0
2 21-Sep-18 3 Days 23.6 23.7 5 25-Sep-18 7 35.0
3 23.6 6 39.6
Age of Test

14 Day 28 Day

Ave. Cube Ref. Date Test Test Age N/mm2 Test result Cube Ref. Date Test Test Age

7
33.9 8 12-Sep-18 28
9
7
40.0 8 12-Sep-18 28
9
7
39.1 8 12-Sep-18 28
9
7
43.0 8 12-Sep-18 28
9
7
37.5 8 16-Oct-18 28 Days
9
Criteria 1 Criteria 2
(Average of Consecutive 4 Test (Each Test result ≥ 0.85
28 Day Standard Current Results ≥ fck + 0.5 CM) fck)
Deviation, Margin,
σ 1.64 x σ35 Average of
fck + 0.5
4 Test 0.85 fck
N/mm 2
Test result CM Status Status
Results
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
47.4
45.2 46.3
46.2
54.3
51.5 55.3
60.0
50.7
51.5 51.9
53.6
48.4
49.1 49.4
50.6
Remark
LIM HOO SENG CONSTRUCTION SDN BHD
SETIA CITY MALL 2
CONCRETE GRADE : VARIES
MIX REFERENCE : F4-60LHS Production Mix
SUPPLIER : LAFARGE

Age of Test Criteria 1 Criteria 2


(Average of Consecutive 4 Test (Each Test result ≥ 0.85
3 Day 7 Day 28 Day Standard Current Results ≥ fck + 0.5 CM) fck)
SLUMP Deviation, Margin,
Batch No. Location Floor GRID Structure Grade (mm)/ Date Cast DO No σ 1.64 x σ35 Average of
fck + 0.5
Remark
FLOW 4 Test 0.85 fck
Cube Ref. Date Test Test Age N/mm2 Average Cube Ref. Date Test Test Age N/mm2 Average Cube Ref. Date Test Test Age N/mm2 Average CM Status Status
Results
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
461904-1 37.1 461904-4 39.1 461904-7 51.0
TC3 - - Pile Cap G35P 100+/-25 26-May-18 11206840 461904-2 29-May-18 3 Days 34.2 35.5 461904-5 4-Jun-18 9 Days 42.5 40.0 461904-8 28-Jun-18 33 Days 46.8 49.8
461094-3 35.1 461904-6 38.5 461904-9 51.7
461905-1 33.8 461905-4 41.4 461905-7 48.8
TC3 - - Pile Cap G35P 100+/-25 26-May-18 11206842 461905-2 29-May-18 3 Days 35.1 34.4 461905-5 4-Jun-18 9 Days 40.9 41.6 461905-8 28-Jun-18 33 Days 44.9 47.6
461905-3 34.4 461905-6 42.6 461905-9 49.1
461906-1 40.9 461906-4 47.6 461906-7 57.1
TC3 - - Pile Cap G35P 100+/-25 26-May-18 11206844 461906-2 29-May-18 3 Days 35.1 37.6 461906-5 4-Jun-18 9 Days 40.5 44.4 461906-8 28-Jun-18 33 Days 52.0 53.9
461906-3 36.9 461906-6 45.1 461906-9 52.6
461907-1 32.2 461907-4 40.9 461907-7 45.3
TC3 - - Pile Cap G35P 100+/-25 26-May-18 11206846 461907-2 29-May-18 3 Days 32.9 32.3 461907-5 4-Jun-18 9 Days 41.4 41.7 461907-8 28-Jun-18 33 Days 51.2 47.2
461907-3 31.8 461907-6 42.8 461907-9 45.2
461908-1 29.6 461908-4 39.7 461908-7 47.5
TC3 - - Pile Cap G35P 100+/-25 26-May-18 11206848 461908-2 29-May-18 3 Days 31.6 30.5 461908-5 4-Jun-18 9 Days 40.1 39.0 461908-8 28-Jun-18 33 Days 46.8 47.0
461908-3 30.2 461908-6 37.2 461908-9 46.6
461949-1 37.3 461949-4 41.1 461949-7 44.6
TC2 - - Pile Cap G35P 100+/-25 4-Jun-18 11207135 461949-2 7-Jun-18 3 Days 36.2 36.5 461949-5 12-Jun-18 8 Days 42.4 41.0 461949-8 2-Jul-18 28 Days 44.2 44.1
461949-3 36.0 461949-6 39.4 461949-9 43.4
461950-1 32.7 461950-4 35.9 461950-7 42.5
TC2 - - Pile Cap G35P 100+/-25 4-Jun-18 11207137 461950-2 7-Jun-18 3 Days 32.2 32.2 461950-5 12-Jun-18 8 Days 35.4 34.9 461950-8 2-Jul-18 28 Days 41.1 41.2
461950-3 31.6 461950-6 33.5 461950-9 40.0
461951-1 30.7 461951-4 39.9 461951-7 40.3
TC2 - - Pile Cap G35P 100+/-25 4-Jun-18 11207142 461951-2 7-Jun-18 3 Days 32.4 32.2 461951-5 12-Jun-18 8 Days 40.7 39.2 461951-8 2-Jul-18 28 Days 41.1 42.0
461951-3 33.6 461951-6 37.1 461951-9 44.5
461952-1 31.6 461952-4 34.2 461952-7 41.5
TC2 - - Pile Cap G35P 100+/-25 4-Jun-18 11207145 461952-2 7-Jun-18 3 Days 32.4 31.9 461952-5 12-Jun-18 8 Days 37.5 36.6 461952-8 2-Jul-18 28 Days 40.1 41.4
461952-3 31.8 461952-6 38.1 461952-9 42.5
461953-1 27.6 461953-4 30.9 461953-7 42.0
TC2 - - Pile Cap G35P 100+/-25 4-Jun-18 11207149 461953-2 7-Jun-18 3 Days 28.6 28.1 461953-5 12-Jun-18 8 Days 32.2 31.0 461953-8 2-Jul-18 28 Days 46.1 43.5
461953-3 28.2 461953-6 29.9 461953-9 42.4
460079-1 28.0 460079-4 35.7 460079-7 56.0
B1 - - Pile Cap G35N 75+/-25 9-Jun-18 11207348 460079-2 12-Jun-18 3 Days 29.1 28.7 460079-5 22-Jun-18 13 Days 36.0 35.6 460079-8 9-Jul-18 30 Days 56.9 56.7
460079-3 28.9 460079-6 35.0 460079-9 57.1
460126-1 38.8 460126-4 42.0
B1 - - Pile Cap G35N 75+/-25 28-Jun-18 11207641 460126-2 6-Jul-18 8 Days 41.0 39.6 460126-5 27-Jul-18 29 Days 40.1 42.3
460126-3 39.0 460126-6 44.9
460127-1 47.1 460127-4 50.8
B1 - - Pile Cap G35N 75+/-25 28-Jun-18 11207644 460127-2 6-Jul-18 8 Days 42.1 44.5 460127-5 27-Jul-18 29 Days 50.4 50.5
460127-3 44.4 460127-6 50.4
460131-1 47.0 460131-4 58.4
B1 - - Pile Cap G35N 75+/-25 30-Jun-18 11207729 460131-2 9-Jul-18 9 Days 46.6 46.4 460131-5 28-Jul-18 28 Days 55.9 58.2
460131-3 45.6 460131-6 60.2
460167-1 34.1 460167-4 40.5
B1 - - Pile Cap G35N 75+/-25 2-Jul-18 460167-2 11-Jul-18 9 Days 35.6 34.6 460167-5 30-Jul-18 28 Days 47.9 44.3
460167-3 34.1 460167-6 44.5
460132-1 41.9 460132-4 41.7
B1 - - Pile Cap G35N 75+/-25 3-Jul-18 460132-2 11-Jul-18 8 Days 42.9 41.9 460132-5 31-Jul-18 28 Days 48.0 45.5
460132-3 41.0 460132-6 46.7
461868-1 38.9 461868-4 41.9
B1 - - Pile Cap G35N 75+/-25 5-Jul-18 11207971 461868-2 13-Jul-18 8 Days 38.9 38.4 461868-5 2-Aug-18 28 Days 36.0 40.4
461868-3 37.5 461868-6 43.2
461839-1 48.5 461839-4 54.9
B1 - - Pile Cap G35N 75+/-25 7-Jul-18 11208037 461839-2 17-Jul-18 10 Days 47.2 47.4 461839-5 9-Aug-18 33 Days 58.2 56.8
461839-3 46.6 461839-6 57.2
461882-1 53.0 461882-4 54.9
B1 - - Pile Cap G35N 75+/-25 7-Jul-18 461882-2 17-Jul-18 10 Days 49.9 51.5 461882-5 9-Aug-18 33 Days 50.2 52.4
461882-3 51.5 461882-6 52.0
460161-1 37.7 460161-4 44.9
B1 - - Pile Cap G35N 75+/-25 9-Jul-18 460161-2 18-Jul-18 9 Days 34.5 34.6 460161-5 6-Aug-18 28 Days 42.8 44.6
460161-3 31.5 460161-6 46.1
460208-1 30.2 460208-4 40.2
B1 - - Pile Cap G35N 75+/-25 11-Jul-18 460208-2 18-Jul-18 7 Days 32.2 31.1 460208-5 8-Aug-18 28 Days 37.2 39.3
460208-3 30.9 460208-6 40.5
460212-1 44.1 460212-4 47.9
B1 - - W2 G35P 100+/-25 12-Jul-18 460212-2 19-Jul-18 7 Days 43.4 41.8 460212-5 9-Aug-18 28 Days 44.5 45.9
460212-3 38.0 460212-6 45.3
460213-1 41.5 460213-4 46.7
B1 - - W2 G35P 100+/-25 12-Jul-18 19-Jul-18 7 Days 38.5 9-Aug-18 28 Days 41.5
Age of Test Criteria 1 Criteria 2
(Average of Consecutive 4 Test (Each Test result ≥ 0.85
3 Day 7 Day 28 Day Standard Current Results ≥ fck + 0.5 CM) fck)
SLUMP Deviation, Margin,
Batch No. Location Floor GRID Structure Grade (mm)/ Date Cast DO No σ 1.64 x σ35 Average of
fck + 0.5
Remark
FLOW 4 Test 0.85 fck
Cube Ref. Date Test Test Age N/mm2 Average Cube Ref. Date Test Test Age N/mm2 Average Cube Ref. Date Test Test Age N/mm2 Average CM Status Status
Results
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
B1 - - W2 G35P 100+/-25 12-Jul-18 460213-2 19-Jul-18 7 Days 38.2 38.5 460213-5 9-Aug-18 28 Days 41.9 41.5
460213-3 35.7 460213-6 36.0
460214-1 36.8 460214-4 34.3
B1 - - W2 G35P 100+/-25 12-Jul-18 460214-2 19-Jul-18 7 Days 39.3 36.8 460214-5 9-Aug-18 28 Days 35.6 37.2
460214-3 34.3 460214-6 41.7
460215-1 36.6 460215-4 48.0
B1 - - W2 G35P 100+/-25 12-Jul-18 460215-2 19-Jul-18 7 Days 41.9 40.2 460215-5 9-Aug-18 28 Days 46.7 48.0
460215-3 42.2 460215-6 49.2
460300-1 37.8 460300-4 42.6
B1 - - W2 G35P 100+/-25 12-Jul-18 460300-2 19-Jul-18 7 Days 37.4 37.0 460300-5 9-Aug-18 28 Days 43.9 42.8
460300-3 35.8 460300-6 41.9
460301-1 41.2 460301-4 36.0
B1 - - W2 G35P 100+/-25 12-Jul-18 460301-2 19-Jul-18 7 Days 35.8 37.9 460301-5 9-Aug-18 28 Days 43.2 40.8
460301-3 36.8 460301-6 43.3
460227-1 35.5 460227-4 40.6
B1 - - Pile Cap 184, 188 G35N 75+/-25 13-Jul-18 460227-2 23-Jul-18 10 Days 35.0 34.2 460227-5 10-Aug-18 28 Days 47.1 44.7
460227-3 32.0 460227-6 46.3
460224-1 43.0 460224-4 47.6
B1 - - Pile Cap G35N 75+/-25 14-Jul-18 460224-2 23-Jul-18 9 Days 42.3 42.5 460224-5 11-Aug-18 28 Days 41.4 44.3
460224-3 42.1 460224-6 43.8
460241-1 34.5 460241-4 47.4
B1 - - Pile Cap G35N 75+/-25 16-Jul-18 460241-2 23-Jul-18 7 Days 35.5 34.9 460241-5 18-Aug-18 33 Days 43.6 46.9
460241-3 34.7 460241-6 49.7
460254-1 34.4 460254-4 47.9
B1 - - Pile Cap 222, 242, 241 G35N 75+/-25 17-Jul-18 11208476 460254-2 27-Jul-18 10 Days 34.2 34.9 460254-5 18-Aug-18 32 Days 50.8 49.6
460254-3 36.1 460254-6 50.0
460258-1 36.1 460258-4 50.9
B1 - - Pile Cap G35N 75+/-25 18-Jul-18 460258-2 27-Jul-18 9 Days 34.5 36.1 460258-5 15-Aug-18 28 Days 54.1 51.1
460258-3 37.8 460258-6 48.3
460249-1 30.3 460249-4 57.0
B1 - - Pile Cap 183, 240 G35N 75+/-25 19-Jul-18 460249-2 27-Jul-18 8 Days 31.7 32.3 460249-5 18-Aug-18 30 Days 55.3 57.4
460249-3 34.9 460249-6 59.9
461601 30.3 461601 44.2
B1 - - Pile Cap 236 & Stump G35N 75+/-25 21-Jul-18 11208671 461601 28-Jul-18 7 Days 31.7 32.3 461601 18-Aug-18 28 Days 43.4 43.4
461601 34.9 461601 42.5
461501 40.5 461501 37.6
B1 - - Pile Cap B2/B1 G35N 75+/-25 23-Jul-18 461501 1-Aug-18 9 Days 44.5 41.9 461501 20-Aug-18 28 Days 39.7 37.8
461501 40.8 461501 36.0
461586 43.9 461586 37.8
A1 - - Slab Zone A1 G35N xypex 75+/-25 25-Jul-18 461586 1-Aug-18 7 Days 39.3 40.1 461586 22-Aug-18 28 Days 41.2 39.6
461586 37.1 461586 39.9
461588 34.5 461588 38.4
A1 - - Slab Zone A1 G35N xypex 75+/-25 25-Jul-18 461588 1-Aug-18 7 Days 37.8 34.2 461588 22-Aug-18 28 Days 39.9 38.7
461588 30.3 461588 37.8
461590 36.8 461590 42.2
A1 - - Slab Zone A1 G35N xypex 75+/-25 25-Jul-18 461590 1-Aug-18 7 Days 35.5 35.8 461590 22-Aug-18 28 Days 41.8 43.3
461590 35.0 461590 46.0
461592 42.2 461592 44.9
A1 - - Slab Zone A1 G35N xypex 75+/-25 25-Jul-18 461592 1-Aug-18 7 Days 37.8 39.1 461592 22-Aug-18 28 Days 45.3 44.2
461592 37.4 461592 42.3
461594 34.3 461594 46.0
A1 - - Slab Zone A1 G35N xypex 75+/-25 25-Jul-18 461594 1-Aug-18 7 Days 36.6 37.6 461594 22-Aug-18 28 Days 41.7 44.2
461594 41.9 461594 45.0
461596 35.7 461596 37.9
A1 - - Slab Zone A1 G35N xypex 75+/-25 25-Jul-18 461596 1-Aug-18 7 Days 36.8 37.3 461596 22-Aug-18 28 Days 34.0 35.5
461596 39.3 461596 34.6
461598 38.0 461598 41.8
A1 - - Slab Zone A1 G35N xypex 75+/-25 25-Jul-18 461598 1-Aug-18 7 Days 41.5 39.2 461598 22-Aug-18 28 Days 34.4 38.7
461598 38.2 461598 39.9
461600 37.7 461600 44.4
A1 - - Slab Zone A1 G35N xypex 75+/-25 25-Jul-18 461600 1-Aug-18 7 Days 34.5 34.6 461600 22-Aug-18 28 Days 46.1 44.7
461600 31.5 461600 43.6
461692 31.2 461692 37.9
- - Pile Cap 223 & 224 G35N 75+/-25 26-Jul-18 11208906 461692 2-Aug-18 7 Days 32.2 30.2 461692 23-Aug-18 28 Days 40.5 38.5
461692 27.3 461692 37.2
461771 27.4 461771 37.0
- - Pile Cap 158, 167 G35N 75+/-25 28-Jul-18 11209006 461771 6-Aug-18 9 Days 29.8 28.6 461771 25-Aug-18 28 Days 34.9 35.9
461771 28.6 461771 35.7
461528 30.3 461528 38.4
- - Pile Cap 157 G35N 75+/-25 30-Jul-18 11209063 461528 6-Aug-18 7 Days 30.6 30.6 461528 27-Aug-18 28 Days 40.6 39.5
461528 30.9 461528 39.4
461544 27.3 461544 30.7 461544 43.4
- - Pile Cap TC1 G35N 75+/-25 2-Aug-18 11209180 461544 6-Aug-18 4 Days 27.1 26.9 461544 9-Aug-18 7 Days 30.9 31.1 461544 30-Aug-18 28 Days 45.1 43.5 7d at Lafarge
Age of Test Criteria 1 Criteria 2
(Average of Consecutive 4 Test (Each Test result ≥ 0.85
3 Day 7 Day 28 Day Standard Current Results ≥ fck + 0.5 CM) fck)
SLUMP Deviation, Margin,
Batch No. Location Floor GRID Structure Grade (mm)/ Date Cast DO No σ 1.64 x σ35 Average of
fck + 0.5
Remark
FLOW 4 Test 0.85 fck
Cube Ref. Date Test Test Age N/mm2 Average Cube Ref. Date Test Test Age N/mm2 Average Cube Ref. Date Test Test Age N/mm2 Average CM Status Status
Results
- - Pile Cap TC1 G35N 75+/-25 2-Aug-18 11209180 6-Aug-18 4 Days 26.9 9-Aug-18 7 Days 31.1 30-Aug-18 28 Days 43.5 N/mm2 N/mm2 N/mm2 N/mm2 N/mm2 7d at Lafarge
461544 26.4 461544 31.6 461544 41.9
461545 24.4 461545 30.9 461545 40.3
- - Pile Cap TC1 G35N 75+/-25 2-Aug-18 11209185 461545 6-Aug-18 4 Days 24.3 24.6 461545 9-Aug-18 7 Days 31.1 31.3 461545 30-Aug-18 28 Days 41.8 40.5 7d at Lafarge
461545 25.2 461545 32.0 461545 39.5
461546 20.3 461546 31.1 461546 35.1
- - Pile Cap TC1 G35N 75+/-25 2-Aug-18 11209192 461546 6-Aug-18 4 Days 20.3 20.7 461546 9-Aug-18 7 Days 29.8 29.9 461546 30-Aug-18 28 Days 34.7 35.1 7d at Lafarge
461546 21.5 461546 28.9 461546 35.4
461560 30.0 461560 37.0
Zone B - - Pile Cap G35N 75+/-25 3-Aug-18 461560 11-Aug-18 8 Days 30.7 29.7 461560 31-Aug-18 28 Days 39.9 40.3
461560 28.3 461560 43.9
461208 43.5 461208 49.3
- - Slab Zone A G35P xypex 100+/-25 4-Aug-18 11209275 461208 11-Aug-18 7 Days 42.7 43.2 461208 1-Sep-18 28 Days 49.6 48.7
461208 43.3 461208 47.1
461210 41.7 461210 48.7
- - Slab Zone A G35P xypex 100+/-25 4-Aug-18 11209278 461210 11-Aug-18 7 Days 43.1 42.9 461210 1-Sep-18 28 Days 49.8 48.3
461210 44.0 461210 46.4
461212 42.3 461212 47.7
- - Slab Zone A G35P xypex 100+/-25 4-Aug-18 11209283 461212 11-Aug-18 7 Days 45.9 43.1 461212 1-Sep-18 28 Days 48.6 48.5
461212 41.2 461212 49.2
461214 40.0 461214 48.4
- - Slab Zone A G35P xypex 100+/-25 4-Aug-18 11209289 461214 11-Aug-18 7 Days 44.6 42.6 461214 1-Sep-18 28 Days 49.1 48.7
461214 43.2 461214 48.6
461216 43.6 461216 49.2
- - Slab Zone A G35P xypex 100+/-25 4-Aug-18 11209293 461216 11-Aug-18 7 Days 41.0 41.5 461216 1-Sep-18 28 Days 48.1 48.7
461216 39.8 461216 48.9
461218 36.0 461218 49.2
- - Slab Zone A G35P xypex 100+/-25 4-Aug-18 11209297 461218 11-Aug-18 7 Days 40.5 39.6 461218 1-Sep-18 28 Days 49.0 50.2
461218 42.4 461218 52.4
461220 39.9 461220 50.4
- - Slab Zone A G35P xypex 100+/-25 4-Aug-18 11209302 461220 11-Aug-18 7 Days 42.0 41.5 461220 1-Sep-18 28 Days 50.9 51.2
461220 42.7 461220 52.4
461222 35.7 461222 47.0
- - Slab Zone A G35P xypex 100+/-25 4-Aug-18 11209306 461222 11-Aug-18 7 Days 38.4 38.0 461222 1-Sep-18 28 Days 46.9 47.5
461222 39.8 461222 48.5
461224 43.8 461224 48.8
- - Slab Zone A G35P xypex 100+/-25 4-Aug-18 11209310 461224 11-Aug-18 7 Days 45.8 45.4 461224 1-Sep-18 28 Days 48.1 49.2
461224 46.5 461224 50.6
461226 43.3 461226 49.0
- - Slab Zone A G35P xypex 100+/-25 4-Aug-18 11209314 461226 11-Aug-18 7 Days 40.2 42.5 461226 1-Sep-18 28 Days 46.4 49.3
461226 43.9 461226 52.4
461306 39.3 461306 50.6
- - W2 G35N xypex 75+/-25 7-Aug-18 11209426 461306 14-Aug-18 7 Days 37.1 39.3 461306 4-Sep-18 28 Days 52.4 51.7
461306 41.5 461306 52.1
461236 32.3 461236 38.3
- - PC G35N 75+/-25 8-Aug-18 11209465 461236 15-Aug-18 7 Days 29.5 30.4 461236 5-Sep-18 28 Days 39.5 39.6
461236 29.5 461236 40.9
461331 31.4 461331 40.6
- - Lift Pit L5 G35P 100+/-25 10-Aug-18 11209534 461331 17-Aug-18 7 Days 32.3 31.8 461331 7-Sep-18 28 Days 39.2 40.4
461331 31.8 461331 41.4
461238 43.2 461238 37.1
- - PC145 & PC155 G35N 75+/-25 13-Aug-18 11209631 461238 20-Aug-18 7 Days 43.6 42.6 461238 10-Sep-18 28 Days 31.2 34.5
461238 41.0 461238 35.3
461341 30.0 461341 38.7
- - Slab Zone A7 G35P xypex 100+/-25 14-Aug-18 461341 21-Aug-18 7 Days 29.1 28.8 461341 11-Sep-18 28 Days 38.3 35.9
461341 27.2 461341 30.6
461343 30.4 461343 40.0
- - Slab Zone A7 G35P xypex 100+/-25 14-Aug-18 461343 21-Aug-18 7 Days 32.8 31.6 461343 11-Sep-18 28 Days 40.3 40.5
461343 31.6 461343 41.2
461345 33.6 461345 42.9
- - Slab Zone A7 G35P xypex 100+/-25 14-Aug-18 461345 21-Aug-18 7 Days 34.8 34.0 461345 11-Sep-18 28 Days 45.5 43.8
461345 33.5 461345 43.1
461347 29.2 461347 44.5
- - Slab Zone A7 G35P xypex 100+/-25 14-Aug-18 461347 21-Aug-18 7 Days 30.7 30.2 461347 11-Sep-18 28 Days 40.0 41.5
461347 30.8 461347 39.9
461349 27.7 461349 39.5
- - Slab Zone A7 G35P xypex 100+/-25 14-Aug-18 461349 21-Aug-18 7 Days 29.5 27.4 461349 11-Sep-18 28 Days 38.5 38.7
461349 25.1 461349 38.2
461351 26.4 461351 35.5
- - Slab Zone A7 G35P xypex 100+/-25 14-Aug-18 461351 21-Aug-18 7 Days 24.6 25.8 461351 11-Sep-18 28 Days 33.1 34.9
461351 26.4 461351 36.1
461353 26.4 461353 35.5
- - Slab Zone A7 G35P xypex 100+/-25 14-Aug-18 461353 21-Aug-18 7 Days 24.6 25.8 461353 11-Sep-18 28 Days 33.1 34.9
461353 26.4 461353 36.1
Age of Test Criteria 1 Criteria 2
(Average of Consecutive 4 Test (Each Test result ≥ 0.85
3 Day 7 Day 28 Day Standard Current Results ≥ fck + 0.5 CM) fck)
SLUMP Deviation, Margin,
Batch No. Location Floor GRID Structure Grade (mm)/ Date Cast DO No σ 1.64 x σ35 Average of
fck + 0.5
Remark
FLOW 4 Test 0.85 fck
Cube Ref. Date Test Test Age N/mm2 Average Cube Ref. Date Test Test Age N/mm2 Average Cube Ref. Date Test Test Age N/mm2 Average CM Status Status
Results
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
461376 32.2 461376 37.2
- - Column GL L2-L1/23 G35N 75+/-25 15-Aug-18 11209772 461376 22-Aug-18 7 Days 34.9 33.5 461376 12-Sep-18 28 Days 39.3 37.5
461376 33.4 461376 35.9
461375 36.0 461375 43.4
- - Pile Cap G35N 75+/-25 15-Aug-18 11209758 461375 22-Aug-18 7 Days 35.3 35.6 461375 12-Sep-18 28 Days 39.7 42.1
461375 35.4 461375 43.1
461368 30.8 461368 40.0
- - Pile Cap B/14 & B2/19 G35N 75+/-25 16-Aug-18 11209817 461368 23-Aug-18 7 Days 32.1 31.5 461368 13-Sep-18 28 Days 37.2 37.7
461368 31.7 461368 36.0
461369 30.0 461369 35.0
- - Pile Cap B/14 & B2/19 G35N 75+/-25 16-Aug-18 461369 23-Aug-18 7 Days 31.6 30.9 461369 13-Sep-18 28 Days 33.1 34.1
461369 31.1 461369 34.3
461399 32.1 461399 35.7
- - Lift 5 G35N xypex 75+/-25 17-Aug-18 11209822 461399 24-Aug-18 7 Days 31.6 32.4 461399 14-Sep-18 28 Days 36.6 36.6
461399 33.4 461399 37.6
461386 31.6 461386 54.4
A2 - - Slab Zone A2 G35P xypex 100+/-25 18-Aug-18 11209882 461386 25-Aug-18 7 Days 30.5 30.6 461386 15-Sep-18 28 Days 47.6 50.6
461386 29.6 461386 49.7
461388 31.4 461388 44.8
A2 - - Slab Zone A2 G35P xypex 100+/-25 18-Aug-18 11209892 461388 25-Aug-18 7 Days 30.1 31.3 461388 15-Sep-18 28 Days 41.2 44.7
461388 32.3 461388 48.2
461390 31.8 461390 45.4
A2 - - Slab Zone A2 G35P xypex 100+/-25 18-Aug-18 11209904 461390 25-Aug-18 7 Days 29.9 30.3 461390 15-Sep-18 28 Days 46.4 44.4
461390 29.1 461390 41.3
461101 32.5 461101 48.5
A2 - - Slab Zone A2 G35P xypex 100+/-25 18-Aug-18 11209914 461101 25-Aug-18 7 Days 30.6 31.5 461101 15-Sep-18 28 Days 43.1 45.9
461101 31.3 461101 46.1
461103 30.4 461103 45.7
A2 - - Slab Zone A2 G35P xypex 100+/-25 18-Aug-18 11209922 461103 25-Aug-18 7 Days 31.5 31.3 461103 15-Sep-18 28 Days 40.4 44.5
461103 32.1 461103 47.4
461267 29.4 461267 44.2
B - - Pile Cap 149, 151, 147 G35N 75+/-25 21-Aug-18 11200020 461267 28-Aug-18 7 Days 31.2 29.8 461267 18-Sep-18 28 Days 43.1 43.6
461267 28.9 461267 43.6
461268 27.4 461268 42.5
B - - L5 Wall G35N 75+/-25 21-Aug-18 11200039 461268 28-Aug-18 7 Days 26.5 26.5 461268 18-Sep-18 28 Days 44.5 43.5
461268 25.5 461268 43.4
461273 27.5 461273 34.3
B - - Pile Cap 170 G35N 75+/-25 24-Aug-18 11200138 461273 31-Aug-18 7 Days 26.4 27.9 461273 21-Sep-18 28 Days 34.2 34.8
461273 29.9 461273 35.9
461484 41.3 461484 38.8
A - - Slab Zone A5 & A8 G35P xypex 100+/-25 25-Aug-18 11210161 461484 1-Sep-18 7 Days 40.1 39.8 461484 22-Sep-18 28 Days 40.0 41.4
461484 38.0 461484 45.3
461486 43.1 461486 44.5
A - - Slab Zone A5 & A8 G35P xypex 100+/-25 25-Aug-18 11210165 461486 1-Sep-18 7 Days 42.6 42.2 461486 22-Sep-18 28 Days 46.4 46.5
461486 40.8 461486 48.6
461488 39.9 461488 48.0
A - - Slab Zone A5 & A8 G35P xypex 100+/-25 25-Aug-18 11210171 461488 1-Sep-18 7 Days 39.6 39.7 461488 22-Sep-18 28 Days 49.0 47.3
461488 39.7 461488 45.0
461490 36.8 461490 46.4
A - - Slab Zone A5 & A8 G35P xypex 100+/-25 25-Aug-18 11210176 461490 1-Sep-18 7 Days 38.9 38.0 461490 22-Sep-18 28 Days 47.9 47.1
461490 38.4 461490 46.9
461492 40.8 461492 45.3
A - - Slab Zone A5 & A8 G35P xypex 100+/-25 25-Aug-18 11210181 461492 1-Sep-18 7 Days 37.1 37.8 461492 22-Sep-18 28 Days 43.1 45.4
461492 35.6 461492 47.9
461494 36.1 461494 46.0
A - - Slab Zone A5 & A8 G35P xypex 100+/-25 25-Aug-18 11210186 461494 1-Sep-18 7 Days 38.4 36.6 461494 22-Sep-18 28 Days 42.6 43.5
461494 35.3 461494 41.9
461496 35.7 461496 45.4
A - - Slab Zone A5 & A8 G35P xypex 100+/-25 25-Aug-18 11210191 461496 1-Sep-18 7 Days 44.0 39.1 461496 22-Sep-18 28 Days 42.1 42.3
461496 37.7 461496 39.4
LIM HOO SENG CONSTRUCTION SDN BHD
SETIA CITY MALL 2
CONCRETE GRADE : VARIOUS
MIX REFERENCE : PRODUCTION MIX
SUPPLIER : GREAT CONCRETE

Age of Test Criteria 1 Criteria 2


(Average of Consecutive 4 Test (Each Test result ≥ 0.85
3 Day 7 Day 14 Day 28 Day Standard Current Results ≥ fck + 0.5 CM) fck)
SLUMP Deviation, Margin,
Batch No. Location Floor GRID Structure Grade (mm)/ Date Cast DO No σ 1.64 x σ35 Average of
fck + 0.5
Remark
FLOW 4 Test 0.85 fck
Cube Ref. Date Test Test Age N/mm2 Ave. Cube Ref. Date Test Test Age N/mm2 Ave. Cube Ref. Date Test Test Age N/mm2 Test result Cube Ref. Date Test Test Age N/mm2 Test result CM Status Status
Results
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
460079-1 35.7 460079-4 40.3
1 B1 - - Pile Cap G35N 75+/-25 9-Jun-18 460079 460079-2 22-Jun-18 13 36.0 35.6 460079-5 7-Jul-18 28 41.0 40.9
460079-3 35.0 460079-6 41.3
159454-1 36.8 159454-4 44.7
2 B1 - - Pile Cap G35N 75+/-25 12-Jun-18 159454 159454-2 22-Jun-18 10 37.2 37.3 159454-5 11-Jul-18 29 40.5 42.1
159454-3 37.8 159454-6 41.1
22356-1 35.2 22356-4 40.4 22356-7 48.0
3 B1 - - Pile Cap G35N 75+/-25 21-Jun-18 22356 22356-2 28-Jun-18 7 36.2 36.0 22356-5 9-Jul-18 18 Days 39.8 40.9 22356-8 19-Jul-18 28 45.9 47.9
22356-3 36.5 22356-6 42.5 22356-9 49.7
22411-1 36.4 22411-4 32.8 22411-7 41.8
4 B1 - - Pile Cap G35N 75+/-25 25-Jun-18 22411 22411-2 6-Jul-18 11 34.2 35.6 22411-5 11-Jul-18 16 Days 34.5 33.2 22411-8 27-Jul-18 32 41.3 42.5
22411-3 36.1 22411-6 32.3 22411-9 44.3

9
LIM HOO SENG CONSTRUCTION SDN BHD
SETIA CITY MALL 2
CONCRETE GRADE : VARIOUS
MIX REFERENCE : PRODUCTION MIX
SUPPLIER : VIMIX

SLUMP
Batch No. Location Floor GRID Structure Grade (mm)/ Date Cast DO No
FLOW
Cube Ref.

10

11
12
Age of Test

3 Day 7 Day

Date Test Test Age N/mm2 Ave. Cube Ref. Date Test Test Age N/mm2 Test result Cube Ref.
Criteria 1 Criteria 2
(Average of Consecutive 4 Test (Each Test result ≥ 0.85
28 Day Standard Current Results ≥ fck + 0.5 CM) fck)
Deviation, Margin,
σ 1.64 x σ35 Average of
fck + 0.5
4 Test 0.85 fck
Date Test Test Age N/mm
2
Test result CM Status
Results
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
Criteria 2
(Each Test result ≥ 0.85
fck)
Remark

Status
LIM HOO SENG CONSTRUCTION SDN BHD
SETIA CITY MALL 2
CONCRETE GRADE : VARIES
MIX REFERENCE : F4-60LHS Production Mix
SUPPLIER : SETIA

Age of Test Criteria 1 Criteria 2


(Average of Consecutive 4 Test (Each Test result ≥ 0.85
3 Day 7 Day 28 Day Standard Current Results ≥ fck + 0.5 CM) fck)
SLUMP Deviation, Margin,
Batch No. Location Floor GRID Structure Grade (mm)/ Date Cast DO No σ 1.64 x σ35 Average of
fck + 0.5
Remark
FLOW 4 Test 0.85 fck
Cube Ref. Date Test Test Age N/mm2 Average Cube Ref. Date Test Test Age N/mm2 Average Cube Ref. Date Test Test Age N/mm2 Average CM Status Status
Results

N/mm2 N/mm2 N/mm2 N/mm2 N/mm2


32.9 38.4
1 Zone B LG - Pile Cap 153, 152 G35N 75+/-25 25-Aug-18 10129116 1-Sep-18 7 Days 33.8 33.7 22-Sep-18 28 Days 37.1 39.1
34.4 41.8
32.4 42.0
Zone A LG Column P2 J1/P2 26 G35P 100+/-25 27-Aug-18 10129224 3-Sep-18 7 Days 33.8 33.6 24-Sep-18 28 Days 42.2 42.3
34.7 42.7
33.3 41.8
Zone A LG Column P2 L1/P2 25 G35P 100+/-25 28-Aug-18 110112072 4-Sep-18 7 Days 34.0 33.9 25-Sep-18 28 Days 42.7 42.5
34.4 43.1
31.1 41.7
Zone B LG Pile Cap 172 G35N 75+/-25 28-Aug-18 110112073 4-Sep-18 7 Days 32.0 32.1 25-Sep-18 28 Days 47.7 44.0
33.1 42.6
32.0 38.0
Zone A LG Slab Zone A5 G35P xypex 100+/-25 29-Aug-18 110112115 5-Sep-18 7 Days 32.7 32.7 26-Sep-18 28 Days 46.5 43.0
33.3 44.4
31.6 45.3
Zone A LG Slab Zone A5 G35P xypex 100+/-25 29-Aug-18 110112124 5-Sep-18 7 Days 32.4 32.3 26-Sep-18 28 Days 42.5 42.6
32.9 40.0
31.1 44.4
Zone A LG Slab Zone A5 G35P xypex 100+/-25 29-Aug-18 110112136 5-Sep-18 7 Days 32.9 32.4 26-Sep-18 28 Days 52.0 45.7
33.3 40.8
32.0 36.5
Zone A LG Slab Zone A5 G35P xypex 100+/-25 29-Aug-18 110112144 5-Sep-18 7 Days 32.2 32.4 26-Sep-18 28 Days 38.3 38.3
32.9 40.0
31.1 45.4
Zone B LG Staircase 9A G35N 75+/-25 29-Aug-18 110112137 5-Sep-18 7 Days 33.3 32.7 26-Sep-18 28 Days 43.8 46.5
33.6 50.4
32.0 41.4
Zone B LG Staircase 9A G35N 75+/-25 29-Aug-18 110112156 5-Sep-18 7 Days 32.7 32.7 26-Sep-18 28 Days 45.4 40.9
33.6 35.8
1 32.0 4 48.7
Zone A LG Column P2-J1/P2-24 G35N 75+/-25 30-Aug-18 110112200 2 6-Sep-18 7 Days 33.3 33.0 5 27-Sep-18 28 Days 48.0 46.4
3 33.6 6 42.5
308 A 31.8 308 A 41.4
Zone B LG Slab Zone B1a G35P xypex 100+/-25 30-Aug-18 210128750 308 A 6-Sep-18 7 Days 32.9 32.7 308 A 27-Sep-18 28 Days 40.1 40.4
308 A 33.3 308 A 39.6
308 B 31.6 308 B 44.2
Zone B LG Slab Zone B1a G35P xypex 100+/-25 30-Aug-18 110112171 308 B 6-Sep-18 7 Days 31.8 32.1 308 B 27-Sep-18 28 Days 43.5 42.9
308 B 32.9 308 B 41.1
308 C 32.0 308 C 31.6
Zone B LG Slab Zone B1a G35P xypex 100+/-25 30-Aug-18 210128764 308 C 6-Sep-18 7 Days 33.1 32.9 308 C 27-Sep-18 28 Days 43.0 38.5
308 C 33.6 308 C 40.9
308 D 32.9 308 D 44.6
Zone B LG Slab Zone B1a G35P xypex 100+/-25 30-Aug-18 110112186 308 D 6-Sep-18 7 Days 33.6 33.4 308 D 27-Sep-18 28 Days 49.2 47.6
308 D 33.8 308 D 48.9
308 E 32.4 308 E 38.9
Zone B LG Slab Zone B1a G35P xypex 100+/-25 30-Aug-18 110112194 308 E 6-Sep-18 7 Days 33.8 33.4 308 E 27-Sep-18 28 Days 36.0 38.9
308 E 34.0 308 E 41.8
308 F 31.6 308 F 39.9
Zone B LG Slab Zone B1a G35P xypex 100+/-25 30-Aug-18 21018779 308 F 6-Sep-18 7 Days 32.7 32.5 308 F 27-Sep-18 28 Days 45.0 42.1
308 F 33.3 308 F 41.5
1 32.0 4 40.5
Zone B LG Pile Cap 128, 239, 238 G35N 75+/-25 2-Sep-18 110112275 2 9-Sep-18 7 Days 33.1 32.8 5 30-Sep-18 28 Days 47.6
3 33.3 6 48.8
1 32.2 4 49.7
Column K1/20, K1/19,
Zone A LG G35P 100+/-25 3-Sep-18 110112329 2 10-Sep-18 7 Days 33.6 33.3 5 1-Oct-18 28 Days 48.1
J1/20
3 34.0 6 45.5
1 32.0 4
Pile Cap 226, 179, 225,
Zone B LG G35N 75+/-25 4-Sep-18 110112412 2 11-Sep-18 7 Days 32.4 32.6 5 2-Oct-18 28 Days
171
3 33.3 6
A 27.6 A 32.2 A
Zone B LG TC4 Pile Cap G35P 100+/-25 5-Sep-18 110112436 A 10-Sep-18 5 Days 27.8 27.9 A 12-Sep-18 7 Days 32.4 32.7 A 3-Oct-18 28 Days
A 28.2 A 33.3 A
B B 32.4 B
Zone B LG TC4 Pile Cap G35P 100+/-25 5-Sep-18 110112440 10-Sep-18 5 Days 12-Sep-18 7 Days 32.6 3-Oct-18 28 Days
Age of Test Criteria 1 Criteria 2
(Average of Consecutive 4 Test (Each Test result ≥ 0.85
3 Day 7 Day 28 Day Standard Current Results ≥ fck + 0.5 CM) fck)
SLUMP Deviation, Margin,
Batch No. Location Floor GRID Structure Grade (mm)/ Date Cast DO No σ 1.64 x σ35 Average of
fck + 0.5
Remark
FLOW 4 Test 0.85 fck
Cube Ref. Date Test Test Age N/mm2 Average Cube Ref. Date Test Test Age N/mm2 Average Cube Ref. Date Test Test Age N/mm2 Average CM Status Status
Results
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
Zone B LG TC4 Pile Cap G35P 100+/-25 5-Sep-18 110112440 B 10-Sep-18 5 Days B 12-Sep-18 7 Days 32.0 32.6 B 3-Oct-18 28 Days
B B 33.3 B
C C 31.6 C
Zone B LG TC4 Pile Cap G35P 100+/-25 5-Sep-18 110112448 C 10-Sep-18 5 Days C 12-Sep-18 7 Days 32.4 32.3 C 3-Oct-18 28 Days
C C 32.9 C
D D 32.0 D
Zone B LG TC4 Pile Cap G35P 100+/-25 5-Sep-18 110112455 D 10-Sep-18 5 Days D 12-Sep-18 7 Days 32.9 32.7 D 3-Oct-18 28 Days
D D 33.1 D
E E 32.2 E
Zone B LG TC4 Pile Cap G35P 100+/-25 5-Sep-18 110112457 E 10-Sep-18 5 Days E 12-Sep-18 7 Days 32.9 32.8 E 3-Oct-18 28 Days
E E 33.3 E
F F 32.0 F
Zone B LG TC4 Pile Cap G35P 100+/-25 5-Sep-18 110112463 F 10-Sep-18 5 Days F 12-Sep-18 7 Days 32.4 32.7 F 3-Oct-18 28 Days
F F 33.6 F
31.1
Zone B LG PC 227 & 228 G35N 75+/-25 6-Sep-18 210128925 13-Sep-18 7 Days 32.4 32.3 4-Oct-18 28 Days
33.3
210128930 31.6 210128930
Zone A LG Slab Zone A G35P xypex 100+/-25 6-Sep-18 210128930 13-Sep-18 7 Days 32.4 32.5 210128930 4-Oct-18 28 Days
210128930 33.6 210128930
210128935 32.0 210128935
Zone A LG Slab Zone A G35P xypex 100+/-25 6-Sep-18 210128935 13-Sep-18 7 Days 32.9 32.8 210128935 4-Oct-18 28 Days
210128935 33.6 210128935
210128949 33.1 210128949
Zone A LG Slab Zone A G35P xypex 100+/-25 6-Sep-18 210128949 13-Sep-18 7 Days 33.8 33.9 210128949 4-Oct-18 28 Days
210128949 34.7 210128949
210128959 31.6 210128959
Zone A LG Slab Zone A G35P xypex 100+/-25 6-Sep-18 210128959 13-Sep-18 7 Days 32.7 32.4 210128959 4-Oct-18 28 Days
210128959 32.9 210128959
A 32.9 A
Zone B LG Slab Zone B1b G35P xypex 100+/-25 7-Sep-18 210128983 A 14-Sep-18 7 Days 33.6 33.4 A 5-Oct-18 28 Days
A 33.8 A
B 31.1 B
Zone B LG Slab Zone B1b G35P xypex 100+/-25 7-Sep-18 210128986 B 14-Sep-18 7 Days 32.4 32.2 B 5-Oct-18 28 Days
B 33.1 B
C 32.9 C
Zone B LG Slab Zone B1b G35P xypex 100+/-25 7-Sep-18 210129001 C 14-Sep-18 7 Days 33.3 33.3 C 5-Oct-18 28 Days
C 33.8 C
D 32.0 D
Zone B LG Slab Zone B1b G35P xypex 100+/-25 7-Sep-18 210129009 D 14-Sep-18 7 Days 33.3 33.2 D 5-Oct-18 28 Days
D 34.2 D
A 32.0 A
Slab Zone A2 & Trench
Zone A LG G35P xypex 100+/-25 7-Sep-18 210129009 A 14-Sep-18 7 Days 32.9 32.9 A 5-Oct-18 28 Days
Zone 9A
A 33.8 A
B 32.9 B
Slab Zone A2 & Trench
Zone A LG G35P xypex 100+/-25 7-Sep-18 210129002 B 14-Sep-18 7 Days 33.1 33.3 B 5-Oct-18 28 Days
Zone 9A
B 33.8 B
C 32.4 C
Slab Zone A2 & Trench
Zone A LG G35P xypex 100+/-25 7-Sep-18 110112502 C 14-Sep-18 7 Days 33.3 33.1 C 5-Oct-18 28 Days
Zone 9A
C 33.6 C
32.0
Zone A LG Zone A column G35P 100+/-25 8-Sep-18 110112539 15-Sep-18 7 Days 32.2 32.4 6-Oct-18 28 Days
32.9
31.6
Zone B LG PC 207 & 206 Zone B6 G35N 75+/-25 11-Sep-18 18-Sep-18 7 Days 32.2 32.3 9-Oct-18 28 Days
33.1
31.8
Zone A LG Zone A Column G35P 100+/-25 11-Sep-18 210129144 15-Sep-18 4 Days 32.0 32.2 6-Oct-18 25 Days
32.9
31.3
Zone B LG Escalator Pit Zone B1 G35N 75+/-25 12-Sep-18 210129193 19-Sep-18 7 Days 32.9 32.5 10-Oct-18 28 Days
33.3
10129839 32.0 10129839
Zone B LG Slab Zone B3-1 G35P xypex 100+/-25 14-Sep-18 A 10129839 21-Sep-18 7 Days 33.3 33.2 10129839 12-Oct-18 28 Days
10129839 34.2 10129839
10129844 32.0 10129844
Zone B LG Slab Zone B3-1 G35P xypex 100+/-25 14-Sep-18 B 10129844 21-Sep-18 7 Days 32.9 33.0 10129844 12-Oct-18 28 Days
10129844 34.2 10129844
00112617 32.9 00112617
Zone B LG Slab Zone B3-1 G35P xypex 100+/-25 14-Sep-18 C 00112617 21-Sep-18 7 Days 32.4 33.0 00112617 12-Oct-18 28 Days
Age of Test Criteria 1 Criteria 2
(Average of Consecutive 4 Test (Each Test result ≥ 0.85
3 Day 7 Day 28 Day Standard Current Results ≥ fck + 0.5 CM) fck)
SLUMP Deviation, Margin,
Batch No. Location Floor GRID Structure Grade (mm)/ Date Cast DO No σ 1.64 x σ35 Average of
fck + 0.5
Remark
FLOW 4 Test 0.85 fck
Cube Ref. Date Test Test Age N/mm2 Average Cube Ref. Date Test Test Age N/mm2 Average Cube Ref. Date Test Test Age N/mm2 Average CM Status Status
Results
Zone B LG Slab Zone B3-1 G35P xypex 100+/-25 14-Sep-18 C 21-Sep-18 7 Days 33.0 12-Oct-18 28 Days N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
00112617 33.6 00112617
00112625 32.7 00112625
Zone B LG Slab Zone B3-1 G35P xypex 100+/-25 14-Sep-18 D 00112625 21-Sep-18 7 Days 34.0 33.6 00112625 12-Oct-18 28 Days
00112625 34.2 00112625
10129872 31.6 10129872
Zone B LG Slab Zone B3-1 G35P xypex 100+/-25 14-Sep-18 E 10129872 21-Sep-18 7 Days 32.4 32.3 10129872 12-Oct-18 28 Days
10129872 32.9 10129872
1 32.4 4
Zone B LG Zone B Column G35P 100+/-25 14-Sep-18 2 21-Sep-18 7 Days 33.6 33.3 5 12-Oct-18 28 Days
3 34.0 6
112644 32.4 112644
Zone A LG Slab Zone A6 & A9 G35P xypex 100+/-25 15-Sep-18 A 112644 22-Sep-18 7 Days 32.7 33.0 112644 13-Oct-18 28 Days
112644 34.0 112644
112650 32.2 112650
Zone A LG Slab Zone A6 & A9 G35P xypex 100+/-25 15-Sep-18 B 112650 22-Sep-18 7 Days 33.3 33.3 112650 13-Oct-18 28 Days
112650 34.2 112650
10129899 32.2 10129899
Zone A LG Slab Zone A6 & A9 G35P xypex 100+/-25 15-Sep-18 C 10129899 22-Sep-18 7 Days 33.6 33.2 10129899 13-Oct-18 28 Days
10129899 33.8 10129899
112661 32.0 112661
Zone A LG Slab Zone A6 & A9 G35P xypex 100+/-25 15-Sep-18 D 112661 22-Sep-18 7 Days 32.9 33.0 112661 13-Oct-18 28 Days
112661 34.2 112661
10129913 32.9 10129913
Zone A LG Slab Zone A6 & A9 G35P xypex 100+/-25 15-Sep-18 E 10129913 22-Sep-18 7 Days 33.1 33.3 10129913 13-Oct-18 28 Days
10129913 33.8 10129913
112671 32.4 112671
Zone A LG Slab Zone A6 & A9 G35P xypex 100+/-25 15-Sep-18 F 112671 22-Sep-18 7 Days 33.8 33.4 112671 13-Oct-18 28 Days
112671 34.0 112671
10130070 32.0 10130070
Zone B LG PC 174 G35N 75+/-25 18-Sep-18 10130070 25-Sep-18 7 Days 32.4 32.4 10130070 16-Oct-18 28 Days
10130070 32.9 10130070
10130079 31.6 10130079
Zone A LG 1A Staircase Wall G35P 100+/-25 19-Sep-18 10130079 26-Sep-18 7 Days 32.0 32.2 10130079 17-Oct-18 28 Days
10130079 32.9 10130079
112745 31.8 112745
Zone A LG 1A Staircase Wall G35P 100+/-25 19-Sep-18 112745 26-Sep-18 7 Days 32.0 32.2 112745 17-Oct-18 28 Days
112745 32.7 112745
112761 31.3 112761
Zone A LG 1A Staircase Wall G35P 100+/-25 19-Sep-18 112761 26-Sep-18 7 Days 32.9 32.4 112761 17-Oct-18 28 Days
112761 33.1 112761
10130087 32.9 10130087
Zone B LG Slab Zone B1 G35P xypex 100+/-25 19-Sep-18 A 10130087 26-Sep-18 7 Days 33.8 33.6 10130087 17-Oct-18 28 Days
10130087 34.0 10130087
112740 32.7 112740
Zone B LG Slab Zone B1 G35P xypex 100+/-25 19-Sep-18 B 112740 26-Sep-18 7 Days 34.0 33.6 112740 17-Oct-18 28 Days
112740 34.2 112740
112750 32.9 112750
Zone B LG Slab Zone B1 G35P xypex 100+/-25 19-Sep-18 C 112750 26-Sep-18 7 Days 33.8 33.7 112750 17-Oct-18 28 Days
112750 34.4 112750
112757 32.9 112757
Zone B LG Slab Zone B1 G35P xypex 100+/-25 19-Sep-18 D 112757 26-Sep-18 7 Days 33.8 33.6 112757 17-Oct-18 28 Days
112757 34.2 112757
112760 31.1 112760
Zone A LG Column A G35P 100+/-25 19-Sep-18 112760 26-Sep-18 7 Days 32.0 32.0 112760 17-Oct-18 28 Days
112760 32.9 112760
112773 33.3 112773
Zone A LG Slab Zone A3 & A6 G35P xypex 100+/-25 20-Sep-18 112773 27-Sep-18 7 Days 32.9 33.3 112773 18-Oct-18 28 Days
112773 33.8 112773
112782 32.4 112782
Zone A LG Slab Zone A3 & A6 G35P xypex 100+/-25 20-Sep-18 112782 27-Sep-18 7 Days 32.9 33.0 112782 18-Oct-18 28 Days
112782 33.8 112782
112790 32.4 112790
Zone A LG Slab Zone A3 & A6 G35P xypex 100+/-25 20-Sep-18 112790 27-Sep-18 7 Days 34.2 33.4 112790 18-Oct-18 28 Days
112790 33.6 112790
112794 32.0 112794
Zone A LG Slab Zone A3 & A6 G35P xypex 100+/-25 20-Sep-18 112794 27-Sep-18 7 Days 33.1 33.0 112794 18-Oct-18 28 Days
112794 33.8 112794
10130178 32.2 10130178
Zone A LG Slab Zone A3 & A6 G35P xypex 100+/-25 20-Sep-18 10130178 27-Sep-18 7 Days 32.7 33.0 10130178 18-Oct-18 28 Days
10130178 34.0 10130178
Age of Test Criteria 1 Criteria 2
(Average of Consecutive 4 Test (Each Test result ≥ 0.85
3 Day 7 Day 28 Day Standard Current Results ≥ fck + 0.5 CM) fck)
SLUMP Deviation, Margin,
Batch No. Location Floor GRID Structure Grade (mm)/ Date Cast DO No σ 1.64 x σ35 Average of
fck + 0.5
Remark
FLOW 4 Test 0.85 fck
Cube Ref. Date Test Test Age N/mm2 Average Cube Ref. Date Test Test Age N/mm2 Average Cube Ref. Date Test Test Age N/mm2 Average CM Status Status
Results
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
10130187 32.9 10130187
Zone A LG Slab Zone A3 & A6 G35P xypex 100+/-25 20-Sep-18 10130187 27-Sep-18 7 Days 33.8 33.6 10130187 18-Oct-18 28 Days
10130187 34.2 10130187
A 32.4 A
Zone B LG Slab Zone B2 G35P xypex 100+/-25 22-Sep-18 A 29-Sep-18 7 Days 33.6 33.3 A 20-Oct-18 28 Days
A 34.0 A
B 32.0 B
Zone B LG Slab Zone B2 G35P xypex 100+/-25 22-Sep-18 B 29-Sep-18 7 Days 32.9 32.9 B 20-Oct-18 28 Days
B 33.8 B
C 32.9 C
Zone B LG Slab Zone B2 G35P xypex 100+/-25 22-Sep-18 C 29-Sep-18 7 Days 33.3 33.3 C 20-Oct-18 28 Days
C 33.8 C
D 32.4 D
Zone B LG Slab Zone B2 G35P xypex 100+/-25 22-Sep-18 D 29-Sep-18 7 Days 33.1 33.3 D 20-Oct-18 28 Days
D 34.2 D
E 32.0 E
Zone B LG Slab Zone B2 G35P xypex 100+/-25 22-Sep-18 E 29-Sep-18 7 Days 33.6 33.3 E 20-Oct-18 28 Days
E 34.2 E
F 32.9 F
Zone B LG Slab Zone B2 G35P xypex 100+/-25 22-Sep-18 F 29-Sep-18 7 Days 33.6 33.5 F 20-Oct-18 28 Days
F 34.0 F
G 31.6 G
Zone B LG Slab Zone B2 G35P xypex 100+/-25 22-Sep-18 G 29-Sep-18 7 Days 33.1 32.8 G 20-Oct-18 28 Days
G 33.8 G
H 32.0 H
Zone B LG Slab Zone B2 G35P xypex 100+/-25 22-Sep-18 H 29-Sep-18 7 Days 32.9 33.1 H 20-Oct-18 28 Days
H 34.4 H
110113167 31.6 110113167
Zone B LG PC 247, 219 G35N 75+/-25 25-Sep-18 110113167 2-Oct-18 7 Days 31.8 32.2 110113167 23-Oct-18 28 Days
110113167 33.1 110113167
A 32.9 A
Zone A LG Lift Wall Zone A G35T2 175+/-25 27-Sep-18 A 4-Oct-18 7 Days 32.4 33.0 A 25-Oct-18 28 Days
A 33.6 A
B 32.2 B
Zone A LG Lift Wall Zone A G35T2 175+/-25 27-Sep-18 B 4-Oct-18 7 Days 33.3 33.1 B 25-Oct-18 28 Days
B 33.8 B
A 32.9 A
Zone B LG Slab Zone B2 G35P xypex 100+/-25 27-Sep-18 A 4-Oct-18 7 Days 32.7 33.0 A 25-Oct-18 28 Days
A 33.3 A
B 32.9 B
Zone B LG Slab Zone B2 G35P xypex 100+/-25 27-Sep-18 B 4-Oct-18 7 Days 33.1 33.3 B 25-Oct-18 28 Days
B 34.0 B
C 32.0 C
Zone B LG Slab Zone B2 G35P xypex 100+/-25 27-Sep-18 C 4-Oct-18 7 Days 33.8 33.3 C 25-Oct-18 28 Days
C 34.2 C
D 32.2 D
Zone B LG Slab Zone B2 G35P xypex 100+/-25 27-Sep-18 D 4-Oct-18 7 Days 33.1 33.3 D 25-Oct-18 28 Days
D 34.4 D
E 32.0 E
Zone B LG Slab Zone B2 G35P xypex 100+/-25 27-Sep-18 E 4-Oct-18 7 Days 32.9 33.0 E 25-Oct-18 28 Days
E 34.0 E
A 32.7 A
Zone A LG Slab Zone A2 & A3 G35P xypex 100+/-25 29-Sep-18 A 6-Oct-18 7 Days 33.8 33.6 A 27-Oct-18 28 Days
A 34.2 A
B 32.2 B
Zone A LG Slab Zone A2 & A3 G35P xypex 100+/-25 29-Sep-18 B 6-Oct-18 7 Days 33.3 33.2 B 27-Oct-18 28 Days
B 34.0 B
C 32.4 C
Zone A LG Slab Zone A2 & A3 G35P xypex 100+/-25 29-Sep-18 C 6-Oct-18 7 Days 33.1 33.1 C 27-Oct-18 28 Days
C 33.8 C
D 32.7 D
Zone A LG Slab Zone A2 & A3 G35P xypex 100+/-25 29-Sep-18 D 6-Oct-18 7 Days 33.6 33.6 D 27-Oct-18 28 Days
D 34.4 D
E 32.2 E
Zone A LG Slab Zone A2 & A3 G35P xypex 100+/-25 29-Sep-18 E 6-Oct-18 7 Days 32.9 33.1 E 27-Oct-18 28 Days
E 34.2 E
F 32.4 F
Zone A LG Slab Zone A2 & A3 G35P xypex 100+/-25 29-Sep-18 F 6-Oct-18 7 Days 33.3 33.2 F 27-Oct-18 28 Days
F 33.8 F
210130085 31.6 210130085
Zone B LG PC 211, 212 G35N 75+/-25 30-Sep-18 7-Oct-18 7 Days 32.5 28-Oct-18 28 Days
Age of Test Criteria 1 Criteria 2
(Average of Consecutive 4 Test (Each Test result ≥ 0.85
3 Day 7 Day 28 Day Standard Current Results ≥ fck + 0.5 CM) fck)
SLUMP Deviation, Margin,
Batch No. Location Floor GRID Structure Grade (mm)/ Date Cast DO No σ 1.64 x σ35 Average of
fck + 0.5
Remark
FLOW 4 Test 0.85 fck
Cube Ref. Date Test Test Age N/mm2 Average Cube Ref. Date Test Test Age N/mm2 Average Cube Ref. Date Test Test Age N/mm2 Average CM Status Status
Results
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
Zone B LG PC 211, 212 G35N 75+/-25 30-Sep-18 210130085 7-Oct-18 7 Days 32.9 32.5 210130085 28-Oct-18 28 Days
210130085 33.1 210130085
A 32.4 113396
LG Slab Zone A9 & B3 G35P xypex 100+/-25 3-Oct-18 A 10-Oct-18 7 Days 33.8 33.5 113396 31-Oct-18 28 Days
A 34.2 113396
B 32.9 10130800
LG Slab Zone A9 & B3 G35P xypex 100+/-25 3-Oct-18 B 10-Oct-18 7 Days 33.3 33.4 10130800 31-Oct-18 28 Days
B 34.0 10130800
A 33.1 A
Zone B LG Slab Zone B3 G35P xypex 100+/-25 5-Oct-18 A 12-Oct-18 7 Days 33.3 33.3 A 2-Nov-18 28 Days
A 33.6 A
B 33.3 B
Zone B LG Slab Zone B3 G35P xypex 100+/-25 5-Oct-18 B 12-Oct-18 7 Days 33.8 33.9 B 2-Nov-18 28 Days
B 34.4 B
C 32.4 C
Zone B LG Slab Zone B3 G35P xypex 100+/-25 5-Oct-18 C 12-Oct-18 7 Days 32.7 33.0 C 2-Nov-18 28 Days
C 34.0 C
D 33.3 D
Zone B LG Slab Zone B3 G35P xypex 100+/-25 5-Oct-18 D 12-Oct-18 7 Days 33.6 33.7 D 2-Nov-18 28 Days
D 34.2 D
A 31.6 A
Zone B LG Slab Zone B2-3 G35P xypex 100+/-25 8-Oct-18 A 15-Oct-18 7 Days 33.3 32.6 A 5-Nov-18 28 Days
A 32.9 A
B 32.0 B
Zone B LG Slab Zone B2-3 G35P xypex 100+/-25 8-Oct-18 B 15-Oct-18 7 Days 32.7 32.6 B 5-Nov-18 28 Days
B 33.1 B
C 32.4 C
Zone B LG Slab Zone B2-3 G35P xypex 100+/-25 8-Oct-18 C 15-Oct-18 7 Days 33.1 33.0 C 5-Nov-18 28 Days
C 33.6 C
D 31.6 D
Zone B LG Slab Zone B2-3 G35P xypex 100+/-25 8-Oct-18 D 15-Oct-18 7 Days 32.9 32.7 D 5-Nov-18 28 Days
D 33.8 D
A 32.4 A
LG Slab B3 / ST9A G35P xypex 100+/-25 10-Oct-18 A 17-Oct-18 7 Days 32.7 33.0 A 7-Nov-18 28 Days
A 33.8 A
B 32.2 B
LG Slab B3 / ST9A G35P xypex 100+/-25 10-Oct-18 B 17-Oct-18 7 Days 32.7 32.7 B 7-Nov-18 28 Days
B 33.3 B
C 32.4 C
LG Slab B3 / ST9A G35P xypex 100+/-25 10-Oct-18 C 17-Oct-18 7 Days 32.7 32.9 C 7-Nov-18 28 Days
C 33.6 C
31.1
LG Column J6/J17 Zone B G35P 100+/-25 10-Oct-18 17-Oct-18 7 Days 32.2 32.1 7-Nov-18 28 Days
33.1
110113972 32.7 110113972
Zone A LG Staircase Wall 10A G35T2 175+/-25 13-Oct-18 110113972 20-Oct-18 7 Days 33.6 33.4 110113972 10-Nov-18 28 Days
110113972 34.0 110113972
A 26.7 A 32.0 A
Zone A UG UG Slab Zone A1 G35P 100+/-25 17-Oct-18 A 21-Oct-18 4 Days 27.1 27.2 A 24-Oct-18 7 Days 32.7 32.6 A 14-Nov-18 28 Days
A 27.8 A 33.1 A
B B 31.6 B
Zone A UG UG Slab Zone A1 G35P 100+/-25 17-Oct-18 B 21-Oct-18 4 Days B 24-Oct-18 7 Days 32.2 32.2 B 14-Nov-18 28 Days
B B 32.9 B
C C 32.2 C
Zone A UG UG Slab Zone A1 G35P 100+/-25 17-Oct-18 C 21-Oct-18 4 Days C 24-Oct-18 7 Days 32.4 32.6 C 14-Nov-18 28 Days
C C 33.1 C
D D 32.0 D
Zone A UG UG Slab Zone A1 G35P 100+/-25 17-Oct-18 D 21-Oct-18 4 Days D 24-Oct-18 7 Days 32.9 32.7 D 14-Nov-18 28 Days
D D 33.3 D
E E 31.6 E
Zone A UG UG Slab Zone A1 G35P 100+/-25 17-Oct-18 E 21-Oct-18 4 Days E 24-Oct-18 7 Days 33.1 32.7 E 14-Nov-18 28 Days
E E 33.6 E
A A
Zone B LG Slab LG Zone B1 & B2 G35P xypex 100+/-25 18-Oct-18 A 25-Oct-18 7 Days A 15-Nov-18 28 Days
A A
B B
Zone B LG Slab LG Zone B1 & B2 G35P xypex 100+/-25 18-Oct-18 B 25-Oct-18 7 Days B 15-Nov-18 28 Days
B B
C C
Zone B LG Slab LG Zone B1 & B2 G35P xypex 100+/-25 18-Oct-18 C 25-Oct-18 7 Days C 15-Nov-18 28 Days
Age of Test Criteria 1 Criteria 2
(Average of Consecutive 4 Test (Each Test result ≥ 0.85
3 Day 7 Day 28 Day Standard Current Results ≥ fck + 0.5 CM) fck)
SLUMP Deviation, Margin,
Batch No. Location Floor GRID Structure Grade (mm)/ Date Cast DO No σ 1.64 x σ35 Average of
fck + 0.5
Remark
FLOW 4 Test 0.85 fck
Cube Ref. Date Test Test Age N/mm2 Average Cube Ref. Date Test Test Age N/mm2 Average Cube Ref. Date Test Test Age N/mm2 Average CM Status Status
Results
Zone B LG Slab LG Zone B1 & B2 G35P xypex 100+/-25 18-Oct-18 25-Oct-18 7 Days 15-Nov-18 28 Days N/mm2 N/mm2 N/mm2 N/mm2 N/mm2
C C
D D
Zone B LG Slab LG Zone B1 & B2 G35P xypex 100+/-25 18-Oct-18 D 25-Oct-18 7 Days D 15-Nov-18 28 Days
D D
A A A
Zone A UG UG Slab Zone A2 G35P 100+/-25 22-Oct-18 A 26-Oct-18 4 Days A 29-Oct-18 7 Days A 19-Nov-18 28 Days
A A A
B B B
Zone A UG UG Slab Zone A2 G35P 100+/-25 22-Oct-18 B 26-Oct-18 4 Days B 29-Oct-18 7 Days B 19-Nov-18 28 Days
B B B
C C C
Zone A UG UG Slab Zone A2 G35P 100+/-25 22-Oct-18 C 26-Oct-18 4 Days C 29-Oct-18 7 Days C 19-Nov-18 28 Days
C C C
D D D
Zone A UG UG Slab Zone A2 G35P 100+/-25 22-Oct-18 D 26-Oct-18 4 Days D 29-Oct-18 7 Days D 19-Nov-18 28 Days
D D D
1013522 1013522
Zone B LG Column P2 D1/P2 17 G35P 100+/-25 23-Oct-18 1013522 30-Oct-18 7 Days 1013522 20-Nov-18 28 Days
1013522 1013522
A A
Zone B LG Slab Zone B2 G35P xypex 100+/-25 23-Oct-18 A 30-Oct-18 7 Days A 20-Nov-18 28 Days
A A
B B
Zone B LG Slab Zone B2 G35P xypex 100+/-25 23-Oct-18 B 30-Oct-18 7 Days B 20-Nov-18 28 Days
B B
C C
Zone B LG Slab Zone B2 G35P xypex 100+/-25 23-Oct-18 C 30-Oct-18 7 Days C 20-Nov-18 28 Days
C C
Age of Test Criteria 1 Criteria 2
(Average of Consecutive 4 Test (Each Test result ≥ 0.85
3 Day 7 Day 28 Day Standard Current Results ≥ fck + 0.5 CM) fck)
SLUMP Deviation, Margin,
Batch No. Location Floor GRID Structure Grade (mm)/ Date Cast DO No σ 1.64 x σ35 Average of
fck + 0.5
Remark
FLOW 4 Test 0.85 fck
Cube Ref. Date Test Test Age N/mm2 Average Cube Ref. Date Test Test Age N/mm2 Average Cube Ref. Date Test Test Age N/mm2 Average CM Status Status
Results
N/mm2 N/mm2 N/mm2 N/mm2 N/mm2