Golden Success College Renovation and Expansion With ADDITIONAL FLOORS (Foundation To 3 Floor Column Dowels ONLY)

This document provides information about a construction project for the renovation and expansion of Golden Success College in Cebu City, Philippines. It details the project scope, which includes demolishing walls, setting up scaffolding, and hauling excavated soil. Photos show workers demolishing walls and setting up scaffolding. The document notes that the building permit has not yet been released, which is required for the hauling, fencing, and demolition permits. It requests rerouting high tension wires and notes ventilation has not been removed. Hauling can only occur at night to avoid impoundment without the necessary building permit. The project-in-charge and manpower details are provided.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
102 views2 pages

Golden Success College Renovation and Expansion With ADDITIONAL FLOORS (Foundation To 3 Floor Column Dowels ONLY)

This document provides information about a construction project for the renovation and expansion of Golden Success College in Cebu City, Philippines. It details the project scope, which includes demolishing walls, setting up scaffolding, and hauling excavated soil. Photos show workers demolishing walls and setting up scaffolding. The document notes that the building permit has not yet been released, which is required for the hauling, fencing, and demolition permits. It requests rerouting high tension wires and notes ventilation has not been removed. Hauling can only occur at night to avoid impoundment without the necessary building permit. The project-in-charge and manpower details are provided.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

RSG Construction & Development

Address: Sitio Tambisan, Brgy. Tisa, Cebu City


Cellphone No.: 09206221433/09420075631

GOLDEN SUCCESS COLLEGE RENOVATION AND EXPANSION WITH


ADDITIONAL FLOORS (Foundation to 3rd floor Column Dowels ONLY)

Golden Success College


1297 V. Rama Ave., Cor. Singson St., Guadalupe
Cebu City 6000, Philippines

Date: May 23, 2017


Weather: 8:00 am – Fair; 3:40 pm – Cloudy ; 5:30 pm to 7:00 pm - Rainy
Project-in-charge:
 Arielle Nicole Tambanillo
 Sarah Emily Gudia
 Andrew Baydid

Manpower:

 Foreman – 1
 Electrician – 1
 Skilled Workers – 6
 Operator – 1

Scope of Works:

1. Demolition of Walls

Fig 15: Worker demolishing the remaining wall Fig 16: Worker with chipping hammer demolishing
the wall
RSG Construction & Development
Address: Sitio Tambisan, Brgy. Tisa, Cebu City
Cellphone No.: 09206221433/09420075631

2. Scaffoldings

Fig. 17: Workers setting up scaffoldings before demolition Fig. 18: Workers setting up scaffoldings

3. Hauling

Fig 19: Backhoe fills dump truck with excavated soil

REMARKS:

 Building permit not yet released.


 Building permit is a requirement to get hauling permit.
 Building permit is a requirement to get fencing permit.
 Building permit is a requirement to get demolition permit.
 Request VECO to reroute high tension wires for safety. (Building permit is a requirement.)
 Ventilation not yet removed.
 Hauling can only be possible at night time with caution to avoid impoundment. Cannot get
hauling permit without building permit.