Precision Drilling International Task Risk Assessment Worksheet
Precision Drilling International Task Risk Assessment Worksheet
Precision Drilling International Task Risk Assessment Worksheet
SEVERITY
CATEGORY DEFINITION CATEGORY DEFINITIONS L 1 2 3 Acceptable
LOW (1) Remote LOW (1) Minor Injury No Damage No Pollution M 2 4 6 Tolerable
MEDIUM (2) Possible MEDIUM (2) Serious Injury Minor Damage Minor Pollution H 3 6 9 Unacceptable
HIGH (3) Probable HIGH (3) Major Injury Major Damage Major Pollution L M H TRA Policy Reference
IS THERE A SAFER WAY TO COMPLETE THE JOB? ARE THERE ALTERNATIVES WITH LESS RISK? LIKELIHOOD 03-31-PRO
Residual Acceptable?
Risk Reduction
Step Task Hazard Risk Tolerable ?
Measure
L S R L S R Unacceptable?
OPERATE THE
HOIST SLOWLY TO
TACK THE STRAIN,
MAKE SURE THE
LOAD IS UNDER
FAST HOISTING RESULT AN CONTROL AND NOT
3 PERFORM HOISTING INJURY 3 3 9 SWINGING 1 1 1
Residual Acceptable?
Risk Reduction
Step Task Hazard Risk Tolerable ?
Measure
L S R L S R Unacceptable?
LINE IS NOT SPOOLING TO BE SYRE THE
PROPERLY RESULT LINE IS SPOOLING
4 DURING PERFORMING HOISTING JERKING THE LOAD 3 3 9 PROPERLY 1 1 1