Precision Drilling International Task Risk Assessment Worksheet

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

Precision Drilling International

TASK RISK ASSESSMENT WORKSHEET


Facility: Rig 174 Original Issue Date: JUNE-28-06 Date: Page 1 of TRA # : 41 1 Rev:0
Supervisor:
Work Group Preparing TRA:
(Name & Position) Rig Manager
Description of work activities: AIR HOISTING OPERATION SOP Ref # (If Applicable):
List unusual physical or operational factors, existing or expected during this tour, which will cause a departure from or changes to the content below within this TRA:

List the measures to be taken in recognition of the points mentioned above:

L - LIKELIHOOD S - SEVERITY R - RATING RESULT

SEVERITY
CATEGORY DEFINITION CATEGORY DEFINITIONS L 1 2 3 Acceptable
LOW (1) Remote LOW (1) Minor Injury No Damage No Pollution M 2 4 6 Tolerable
MEDIUM (2) Possible MEDIUM (2) Serious Injury Minor Damage Minor Pollution H 3 6 9 Unacceptable
HIGH (3) Probable HIGH (3) Major Injury Major Damage Major Pollution L M H TRA Policy Reference
IS THERE A SAFER WAY TO COMPLETE THE JOB? ARE THERE ALTERNATIVES WITH LESS RISK? LIKELIHOOD 03-31-PRO
Residual Acceptable?
Risk Reduction
Step Task Hazard Risk Tolerable ?
Measure
L S R L S R Unacceptable?

CHECK THE LINE,


AIR HOSE,LINE
SPOOLING
CONDITION,
DEFECT ON THE HOIST AND LIFTING SHACKLE,
THE LINE RESULTS AN THE BREAK,
1 USING THE AIR HOIST INJURY 3 3 9 SWIVEL, CHAIN. 1 1 1 Acceptable
USE THE
UNEXPERIENCED MAN COMPTENT AIR
2 SELECT THE OPERATOR RESULTS AN INJURY 3 3 9 HOIST OPERATOR 2 2 4

OPERATE THE
HOIST SLOWLY TO
TACK THE STRAIN,
MAKE SURE THE
LOAD IS UNDER
FAST HOISTING RESULT AN CONTROL AND NOT
3 PERFORM HOISTING INJURY 3 3 9 SWINGING 1 1 1
Residual Acceptable?
Risk Reduction
Step Task Hazard Risk Tolerable ?
Measure
L S R L S R Unacceptable?
LINE IS NOT SPOOLING TO BE SYRE THE
PROPERLY RESULT LINE IS SPOOLING
4 DURING PERFORMING HOISTING JERKING THE LOAD 3 3 9 PROPERLY 1 1 1