01.coring Wall of Lift B-SL1, B-SL2

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PROJECT NORTH TRUE NORTH

EXTENSION BUILDING - B

RENOVATION BUILDING - A

THIS AREA

REMARKS:
Upright sprinkler head

Pendant sprinkler exposed head


200
All elevation shall be determined from

400
elevation of finished floor

CONCRETE BEAMS 200(W)x400(H)


(BY CUSTOMER)
F

P.B
REV DATE AMENDMENT CHECK

CLIENT

L'HOPITAL FRANCAIS DE HANOI


No 1 Phuong Mai, Dong Da,
Ha Noi, Vietnam, 100000
Tel:+84 4 3577 1100,
Fax:+84 4 3576 4443
[email protected]
www.hfh.com.vn

GENERAL DIRECTOR

PROJECT MANAGER, CONSTRUCTION MANAGER, ARCHITECTURAL, CIVIL &


STRUCTURAL, MECHANICAL & ELECTRICAL ENGINEERING DESIGN SERVICES

HBP Project Management Ltd.


LEVEL 6 - DINH LE BUILDING
01 - DINH LE ST., DISTRICT 4,
HO CHI MINH CITY, VIETNAM
TEL: +84 8 3826 9775
FAX: +84 8 3826 9776

GENERAL DIRECTOR SAM STEVENSON

The Spirit Of Possibilities

SIGMA ENGINEERING., JSC

Head Office:
Tel: (84-4) 3 9288 683 Fax: (84-4) 3 9288 667
Website: www.sigma.net.vn

Ho Chi Minh City Representative Office:


Unit 1001, 10th Floor, Beautiful Saigon Office Building
02 Nguyen Khac Vien, District 7, Ho Chi Minh, Vietnam
B1 Tel: (84-8) 5 4178 558 Fax: (84-8) 5 4128 558

PROJECT NAME

ADDRESS: NO. 1, PHUONG MAI, DONG DA DISTRICT, HANOI

DISCIPLINE

DRAWING TITLE

CORING LOCATION FOR FIRE PIPE


SPRINKLER AT TOP OF LIFT SHAFT
B-SL1, B-SL2

PROJECT No. DRAWING No. REVISION No.

116

DRAWN BY CHECKED BY APPROVED BY

DATE SIZE A3 SCALE