Ghana Institute of Management and Public Administration
Ghana Institute of Management and Public Administration
Ghana Institute of Management and Public Administration
April 26th,2018
MONTHLY PROGRESS REPORT AS AT 26H APRIL,2018
ACTUAL FORCAST
PLANNED
ITEM ACTIVITY PLANNED PLANNED REMARKS
PROGRESS(%)
PROGRESS(%) PROGRESS(%)
(LOT 1)
SUBSTRUCTURE
1 WORKS
i.) Earthworks,Foundation
works,Sleeper wall,ground
beams and slabs,Isolated 100 100 COMPLETED
columns columns
construction.
SUPERSTRUCTURE
WORKS
2.0 Ground floor works
2/8
3.0 First Floor works
v) Blockworks 70 70
Planned Progress for Lot
1:35 %
Actual Progress for Lot 1:
35 %
Forcast Progress for Lot 1
: 40 %
ACTUAL FORECAST
PLANNED
ITEM ACTIVITY PLANNED PLANNED REMARKS
PROGRESS(100%)
PROGRESS(%) PROGRESS(%)
(LOT 2)
SUBSTRUCTURE
WORKS
1 Preliminaries works:
i) Site setup
ii)Disposal of debris
and spoil material
iii)Leveling 100 100 COMPLETED
1.2 Earthwork
3/8
1.3 Column base construction 95 95 100
Planned
Progress for Lot
1:20 %
Actual Progress
for Lot 1: 20 %
Forecast
Progress for Lot
1 35 %
4/8
3. Site Labour Force
4. Materials on Site
5/8
6. Progress Photos
LOT 1 Photos
6/8
LOT 2 Photos.
7/8
Endorsed by: George Dabi
………………………………………
Clerk of works
………………………………………......
Site Manager (China State)
………………………………………......
Works Engineer (China State
8/8