0% found this document useful (0 votes)
56 views1 page

From: Jan 2008 To Dec 2008 BA/BSD/Project: Checked By: Approved By: Prepared by

Audit Plan

Uploaded by

Shakir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views1 page

From: Jan 2008 To Dec 2008 BA/BSD/Project: Checked By: Approved By: Prepared by

Audit Plan

Uploaded by

Shakir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Doc NO: QA&QC/FRM-06

Rev: 03
MASTER SCHEDULE FOR INTERNAL AUDITS Date: Jul 06, 2005
Page: 1 of 1

From: Jan 2008 To Dec 2008 Nov 07, 2008

S.No. BA/BSD/Project Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
1 Business Development (BD)
2 Human Resource Development (HRD)
3 Project Personnel & Administration (PP&A)
4 Administration P

5 Project Management Systems (PMS)


6 Quality, Health, Safety, Environment (QHSE)
7 Proposals
8 EPC-BA
9 Infrastructure Projects - BA P

Projects
i 5005-Mangla Dam Project PS2

ii 5008-Rainee Canal PS2

iii 5009-Kachi Canal


10 Plant Construction & Services (PC&S) - BA
Projects
i 1121-Engro Chemicals Pakistan Ltd PS2

ii 1123-Fauji Cement Plant


iii 1124-Bosicar Refinary
PS2
iv 1126 MOL Manzalai-CPF PS2

v 1127 Trans Asia


vi 1130 Bhikki Power Plant PS1

vii 2210-Oxychem
11 Lahore Manufacturing - BA P

12 Karachi Manufacturing - BA
13 Qatar -BA
Projects
i 8002- Olefin Project
ii 8005-Pearl GTL Project
iii Dukhan Cement Plant
14 UAE-BA
i Manufacturing Shop, Hamriyah
ii Borouge -2 Fabrication of Ethylene Furnaces
iii EPC For upgrade of Wellhead control & Safety
iv 1311-AGD-II
v Offshore Associated Gases
vi Fertil Urea-Debottlenecking Project
15 KSA-BA
i Manufacturing Shop, Jubail
ii Manufacturing ShopYanbu
iii Petro Rabigh
iv Sahara Project
P PS1 PS2 NC
PS3
Planned audit Stage 1 Stage 2 Stage 3 Connector Not Conducted Audit carried out and no Non-Conformities reported Audit carried out and Non-Conformities reported CAR(s)/PAR(s) Closed through follow ups
Audit Audit Audit
Prepared by: Checked by: Approved by:

Khalid Aziz ( Asstt Officer QA) QMF (I/C QA) ASB (Head QA&QC)

This document is the intellectual property of Descon Engineering Limited. Any unathorized use, including modification and reproduction of the content is strictly prohibited.© Copyrights Ordinance 2002, All rights reserved.