0% found this document useful (0 votes)
53 views9 pages

Time Sheet

This document is a time sheet for personnel working on a tender document project for an integrated engineering, procurement, construction and commissioning project to modernize two power plants from August 29th to September 15th. It lists 7 experts and 7 support personnel along with their positions and schedules. The total budget needed for the project is IDR7,500,000 with IDR1,500,000 to be spent in August and IDR2,500,000 in September.

Uploaded by

andrieysyah2525
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views9 pages

Time Sheet

This document is a time sheet for personnel working on a tender document project for an integrated engineering, procurement, construction and commissioning project to modernize two power plants from August 29th to September 15th. It lists 7 experts and 7 support personnel along with their positions and schedules. The total budget needed for the project is IDR7,500,000 with IDR1,500,000 to be spent in August and IDR2,500,000 in September.

Uploaded by

andrieysyah2525
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 9

TIME SHEET

Pekerjaan : Pembuatan Dokumen Tender Pekerjaan Konstruksi Terintegrasi Engineering, Procurement Construction and Commisioning (EP
Pengembangan dan Moderinisasi PG. DJATIROTO dan PG. ASEMBAGUS

AGUSTUS SEPTEMBER
NO PERSONIL POSISI
29 30 31 1 2 3 4 5 6 7 8 9 10
A TENAGA AHLI

1 Agung Setiawan, ST Team Leader

2 Ir. Sunarto, MT Mechanical Engineer 1

3 Edy Suroso, ST Mechanical Engineer2

4 M. Aminuddin, ST Elektrical Engineer 1

5 Ir. Eko Asianto Elektrical Engineer 2

6 Ardian, ST Piping Engineer

B TENAGA PENDUKUNG

1 Juned Cahyano, ST Drafter Leader

2 Iqbal Fanani Drafter 1

3 Alif Hadani Darojat Drafter 2

4 Murdi Drafter 3

5 Indra Herwandoko Drafter 4

6 Ahmad Masud, AMd Administrasi Dok. Tender

7 Aris Nurrochim Administrasi Dok. Tender


Mengetahui,
Tim PT. ADHI KARYA (Persero) Tbk

MUHARTANTO
ioning (EPCC)

11 12 13 14 15
Surabaya, 16 September 2016

AGUNG SETIAWAN, ST
Team Leader
TIME SHEET
Pekerjaan : Pembuatan Dokumen Tender Pekerjaan Konstruksi Terintegrasi Engineering, Procurement Construction and Commisioning (EP
Pengembangan dan Moderinisasi PG. DJATIROTO

AGUSTUS SEPTEMBER
NO PERSONIL POSISI
29 30 31 1 2 3 4 5 6 7 8 9 10
A TENAGA AHLI

1 Agung Setiawan, ST Team Leader

2 Ir. Sunarto, MT Mechanical Engineer 1

3 Edy Suroso, ST Mechanical Engineer2

4 M. Aminuddin, ST Elektrical Engineer 1

5 Ir. Eko Asianto Elektrical Engineer 2

6 Ardian, ST Piping Engineer

B TENAGA PENDUKUNG

1 Juned Cahyano, ST Drafter Leader

2 Iqbal Fanani Drafter 1

3 Alif Hadani Darojat Drafter 2

4 Murdi Drafter 3

5 Indra Herwandoko Drafter 4

6 Ahmad Masud, AMd Administrasi Dok. Tender

7 Aris Nurrochim Administrasi Dok. Tender


Mengetahui,
Tim PT. ADHI KARYA (Persero) Tbk

1. Muhartanto ..............................

2. Guntur Muda Ali Akbar ..............................


ioning (EPCC)

11 12 13 14 15
Surabaya, 16 September 2016

AGUNG SETIAWAN, ST
Team Leader
listrik 1,000,000
drafter 1,500,000
atk 500,000
ass 2,000,000
bp 500,000
bj 500,000
printer 1,500,000

7,500,000
1,500,000 2,500,000