This document outlines the project plan for Max Specialty Films Limited from August 20, 2018 to October 8, 2018. The project involves studying existing film packaging processes, identifying gaps, and improving processes. Key tasks include inducting team members, process mapping, rating current processes, and identifying and addressing gaps over 3 weeks. The project is then scheduled to implement improvements and new processes over the remaining 3 weeks.

Uploaded by

ajit singh bisht
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views6 pages

New Microsoft Office Excel Worksheet

This document outlines the project plan for Max Specialty Films Limited from August 20, 2018 to October 8, 2018. The project involves studying existing film packaging processes, identifying gaps, and improving processes. Key tasks include inducting team members, process mapping, rating current processes, and identifying and addressing gaps over 3 weeks. The project is then scheduled to implement improvements and new processes over the remaining 3 weeks.

Uploaded by

ajit singh bisht
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Max specality films limited

Project Start Date 8/23/2018 (Thursday) Display Week 1 Week 1


Project Lead 20 Aug 2018
20

WBS TASK LEAD START END DAYS % DONE WORK M


DAYS
1 Induction and process study - -

0.1 Induction 23-Aug-18 28-Aug-18 6 50% 4

0.1 Map broad level-Factory layout 28-Aug-18 30-Aug-18 3 50% 3

0.1 Primary slitting process study 31-Aug-18 1-Sep-18 2 100% 1

0.1 Secondary slitting process study 1-Sep-18 1-Sep-18 1 100% 0

0.1 A type packing process study 4-Sep-18 5-Sep-18 2 100% 2

0.1 B type packing process study 5-Sep-18 6-Sep-18 2 100% 2

0.1 Modified packing process study 6-Sep-18 7-Sep-18 2 100% 2

0.1 ITC packing process study 7-Sep-18 7-Sep-18 1 100% 1

0.1 Loading process study 7-Sep-18 7-Sep-18 1 50% 1

0.1 Dispatch process study 10-Sep-18 10-Sep-18 1 75% 1

2 Rating and Process mapping - -

2.1 Rating for primary and secondary slitting 11 Sep 2018 12 Sep 2018 2 0% 2

2.2 Rating for Packing process 12 Sep 2018 13 Sep 2018 2 0% 2

2.3 Broad level process mapping 13 Sep 2018 14 Sep 2018 2 0% 2

2.4 Detailed level process mapping 17 Sep 2018 18 Sep 2018 2 0% 2

3 - -

3.1 Identify gap as a process 31 Aug 2018 19 Sep 2018 20 10% 14

3.2 Bridge the gap 24 Sep 2018 26 Sep 2018 3 0% 3

3.3 [Task]

3.4 [Task]

3.5 [Task]

4 [Task Category]
4.1 [Task]

4.2 [Task]

4.3 [Task]

4.4 [Task]

4.5 [Task]
Week 1 Week 2 Week 3 Week 4 Week 5 Week 6
20 Aug 2018 27 Aug 2018 3 Sep 2018 10 Sep 2018 17 Sep 2018 24 Sep 2018
21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29

T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S
Week 6 Week 7 Week 8
4 Sep 2018 1 Oct 2018 8 Oct 2018
30 1 2 3 4 5 6 7 8 9 10 11 12 13 14

S M T W T F S S M T W T F S S