Breakdown of Works Total (Area/Unit) Labor Cost (PHP) Unit Multiplier Man Hour (MH) Days
This document provides a breakdown of labor costs for various construction works. It lists 33 separate works items like site clearing, excavation, concrete pouring, wall construction, roofing works, and door installation. For each item it provides the labor requirements in man power, man hours and estimated costs in a range from low to high. The total estimated cost for all the works ranges from 14,000 to 41,000 Philippine pesos depending on the estimates used.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
253 views2 pages
Breakdown of Works Total (Area/Unit) Labor Cost (PHP) Unit Multiplier Man Hour (MH) Days
This document provides a breakdown of labor costs for various construction works. It lists 33 separate works items like site clearing, excavation, concrete pouring, wall construction, roofing works, and door installation. For each item it provides the labor requirements in man power, man hours and estimated costs in a range from low to high. The total estimated cost for all the works ranges from 14,000 to 41,000 Philippine pesos depending on the estimates used.